    Kthe B-J ames

    29 September 2010

    Condition Monitoring - Class Requirements

    IMarEST - CBM Conference, London

  • 7/29/2019 12 - Kathe Bo-James

    2/6

    Det Norske Veritas AS. All rights reserved.

    Condition Monitoring - Class Requirements

    29 September 2010

    2

    Optimised for your operation

    DNVs Machinery Survey Arrangements

    Machinery

    Renewal

    Machinery

    Continuous

    (CMS)

    Machinery PMS(Planned

    Maintenance

    System)

    Machinery CM(Condition

    Monitoring)

    In

    creasedfle

    xibility

    Increa

    sedfle

    xibilit

    y

    Increa

    sedflexibility

    Increase

    df

    lexibility

  • 7/29/2019 12 - Kathe Bo-James

    3/6

    Det Norske Veritas AS. All rights reserved.

    Condition Monitoring - Class Requirements

    29 September 2010

    3

    DNVs CM Arrangements

    Machinery CMApplicable for all components on DNVs Machinery list, exceptdiesel engines

    Turbine CM (Now included in Machinery CM)Applicable for steam propulsion systems;

    - Main and auxiliary turbines

    - Reduction gears

    - Turbo generators

    - Steam driven pumps

    Thruster CM / Water J et CMApplicable for thrusters for propulsion and DP

    and water jets

  • 7/29/2019 12 - Kathe Bo-James

    4/6Det Norske Veritas AS. All rights reserved.

    Condition Monitoring - Class Requirements

    29 September 2010

    4

    Approval process

    Approval of the CM programme shall cover the following:

    Maintenance strategy, including business goals

    Training programme/plan

    Monitoring methods for components, including baseline

    Condition monitoring equipment

    Implementation of condition monitoring in the planned maintenance system

    Programme for lubricating oil analysis

    A company approval will be granted if the above documentation is accepted

    Company and

    vessel approval

    Initial survey

    onboard

    Survey Arrangement CM

    is granted the vessel

    Annual surveys

  • 7/29/2019 12 - Kathe Bo-James

    5/6Det Norske Veritas AS. All rights reserved.

    Condition Monitoring - Class Requirements

    29 September 2010

    5

    Possible future for follow-up CM in DNV

    Approved Service Suppliers for CM

    New Rules under development:Condition monitoring as part of the periodical surveys of machinery and equipment

    can be carried out by a qualified company approved by the Society. This minimizes

    the requirement to oversee the condition monitoring onboard each individual vessel.

    - Guidance note:

    - For more information, see Standard for Certification No. . / Approval Programme No..:"Service Suppliers Engaged in condition monitoring of machinery. See also DNV Rules.

  • 7/29/2019 12 - Kathe Bo-James

    6/6Det Norske Veritas AS. All rights reserved.

    Condition Monitoring - Class Requirements

    29 September 2010

    6

    Safeguarding life, property

    and the environment

    www.dnv.com