Kthe B-J ames
29 September 2010
Condition Monitoring - Class Requirements
IMarEST - CBM Conference, London
-
7/29/2019 12 - Kathe Bo-James
2/6
Det Norske Veritas AS. All rights reserved.
Condition Monitoring - Class Requirements
29 September 2010
2
Optimised for your operation
DNVs Machinery Survey Arrangements
Machinery
Renewal
Machinery
Continuous
(CMS)
Machinery PMS(Planned
Maintenance
System)
Machinery CM(Condition
Monitoring)
In
creasedfle
xibility
Increa
sedfle
xibilit
y
Increa
sedflexibility
Increase
df
lexibility
-
7/29/2019 12 - Kathe Bo-James
3/6
Det Norske Veritas AS. All rights reserved.
Condition Monitoring - Class Requirements
29 September 2010
3
DNVs CM Arrangements
Machinery CMApplicable for all components on DNVs Machinery list, exceptdiesel engines
Turbine CM (Now included in Machinery CM)Applicable for steam propulsion systems;
- Main and auxiliary turbines
- Reduction gears
- Turbo generators
- Steam driven pumps
Thruster CM / Water J et CMApplicable for thrusters for propulsion and DP
and water jets
-
7/29/2019 12 - Kathe Bo-James
4/6Det Norske Veritas AS. All rights reserved.
Condition Monitoring - Class Requirements
29 September 2010
4
Approval process
Approval of the CM programme shall cover the following:
Maintenance strategy, including business goals
Training programme/plan
Monitoring methods for components, including baseline
Condition monitoring equipment
Implementation of condition monitoring in the planned maintenance system
Programme for lubricating oil analysis
A company approval will be granted if the above documentation is accepted
Company and
vessel approval
Initial survey
onboard
Survey Arrangement CM
is granted the vessel
Annual surveys
-
7/29/2019 12 - Kathe Bo-James
5/6Det Norske Veritas AS. All rights reserved.
Condition Monitoring - Class Requirements
29 September 2010
5
Possible future for follow-up CM in DNV
Approved Service Suppliers for CM
New Rules under development:Condition monitoring as part of the periodical surveys of machinery and equipment
can be carried out by a qualified company approved by the Society. This minimizes
the requirement to oversee the condition monitoring onboard each individual vessel.
- Guidance note:
- For more information, see Standard for Certification No. . / Approval Programme No..:"Service Suppliers Engaged in condition monitoring of machinery. See also DNV Rules.
-
7/29/2019 12 - Kathe Bo-James
6/6Det Norske Veritas AS. All rights reserved.
Condition Monitoring - Class Requirements
29 September 2010
6
Safeguarding life, property
and the environment
www.dnv.com