125-10001-015 Issue 1.5 Date 20/04/2011 2 x 20W Phase 2 RRH Installation Instructions AXIS COMPANY PROPRIETARY 1/5 2 x 20W Phase 2 RRH Installation Instructions Ownership: Ownership: Ownership: Ownership: Name Name Name Name Position Position Position Position Author Craig Duncan Mechanical Designer Approver Chris Simmonds Product Manager Revision History: Revision History: Revision History: Revision History: Issue Issue Issue Issue Date Date Date Date Author Author Author Author Description Description Description Description 0.1 21/12/11 C.Simmonds First Draft. 1.0 12/01/11 C.Simmonds First Release. 1.1 12/01/11 C.Simmonds C.Cornish Update after review. 1.2 12/01/11 C.Simmonds Release to customer. 1.4 06/04/11 A.Osman Update following usability investigation. 1.5 20/04/11 C.Duncan Update after review. This document and the information contain herein is supplied in commercial confidence and upon the condition that the individual and corporate rights originating in the information, whether patented or not, will be respected. All information contained in this manual is considered confidential and proprietary to AceAxis Ltd. AceAxis, Ltd assume copyright for all material contained within this document. © 2011, AceAxis Ltd

Upload: abd961

Post on 27-Dec-2015

41 views

Category:

Documents


0 download

DESCRIPTION

huawei

TRANSCRIPT

125-10001-015 Issue 1.5 Date 20/04/2011

2 x 20W Phase 2 RRH Installation Instructions

AXIS COMPANY PROPRIETARY 1/5

2 x 20W Phase 2 RRH Installation Instructions

Ownership:Ownership:Ownership:Ownership: NameNameNameName PositionPositionPositionPosition Author Craig Duncan Mechanical Designer Approver Chris Simmonds Product Manager

Revision History:Revision History:Revision History:Revision History:

IssueIssueIssueIssue DateDateDateDate AuthorAuthorAuthorAuthor DescriptionDescriptionDescriptionDescription 0.1 21/12/11 C.Simmonds First Draft. 1.0 12/01/11 C.Simmonds First Release. 1.1 12/01/11 C.Simmonds

C.Cornish Update after review.

1.2 12/01/11 C.Simmonds Release to customer. 1.4 06/04/11 A.Osman Update following usability investigation. 1.5 20/04/11 C.Duncan Update after review.

This document and the information contain herein is supplied in commercial confidence and upon the condition that the individual and corporate rights originating in the information, whether patented or not, will be respected.

All information contained in this manual is considered confidential and proprietary to AceAxis Ltd.

AceAxis, Ltd assume copyright for all material contained within this document. © 2011, AceAxis Ltd

125-10001-015 Issue 1.5 Date 20/04/2011

2 x 20W Phase 2 RRH Installation Instructions

AXIS COMPANY PROPRIETARY 2/5

Related Documents

Axis Document Number Description

120-00158-002 125-10001-018

Installing or Replacing Phase 2 RRH SFP Modules. RRH Aluminium Solar Shield Installation Instructions.

125-10008-002 Axis 20W LTE Remote Radio Head Product Description. 125-10009-002 2 x 20W LTE Remote Radio Head User Guide.

Contents

1. Abstract ....................................................................................................................................... 3

2. Box Contents .............................................................................................................................. 3

3. Tools Required ........................................................................................................................... 3

4. Health and Safety ........................................................................................................................ 4

5. Choosing a Site for the Radiohead ............................................................................................. 5

6. Wall Mounting the RRH............................................................................................................. 6

6.1.RRH Wall-Mounting Brackets .................................................................................... 6

6.2.Bracket Hole Positions ................................................................................................ 8

7. Pole Mounting ............................................................................................................................ 9

7.1.Mounting the RRH to a Pole ....................................................................................... 9

8. Cable Attachment to the RRH .................................................................................................. 13

Appendix A. DC Supply Connection .......................................................................................... 16

A.1DC Supply Connector ............................................................................................... 16

A.2Recommended Maximum Power Supply Cable Length. .......................................... 17

A.3 Harting Connector Assembly. .................................................................................. 18

125-10001-015 Issue 1.5 Date 20/04/2011

2 x 20W Phase 2 RRH Installation Instructions

AXIS COMPANY PROPRIETARY 3/5

1. Abstract

The solar shield installation guide provides the operator/engineer the basic instructions needed to

install the aluminum solar shield on a 2-channel G3G remote radio head for using wall-mounting or

pole-mounting deployments.

2. Box Contents

1 off Remote Radio Head.

1 off Wall Mounting Kit. [340-00025-001]

340-00025-001 contains: 2 off Wall Mounting Brackets. [610-00057-001]

4 off M8 x 12 Hex Head Screw. [810-00003-007]

4 off M8 Plain Washer. [810-00003-005]

4 off M8 Spring Washer. [810-00003-006]

3. Tools Required

The minimum tools required to install an RRH are:

• Torque Driver (Capable of measuring 5Nm) and No.2 Pozi-Drive bit.

• 13mm Spanner.

• Torque Wrench (Capable of measuring 1, 1.5 and 5Nm) with 13 and 19mm Hexagonal

Sockets.

125-10001-015 Issue 1.5 Date 20/04/2011

2 x 20W Phase 2 RRH Installation Instructions

AXIS COMPANY PROPRIETARY 4/5

4. Health and Safety

The unit weighs approximately 13Kg (29lbs); so care should be exercised when lifting and moving

the product.

Appropriate safety equipment should be used at all times.

If using a hoist to lift the unit up a mast, attach the rope to the carrying handle at the top of the unit,

see Figure 4.1 for details.

4.1 Carrying Handle Location.

125-10001-015 Issue 1.5 Date 20/04/2011

2 x 20W Phase 2 RRH Installation Instructions

AXIS COMPANY PROPRIETARY 5/5

5. Choosing a Site for the Radiohead

The remote radio head is a heat dissipating unit and so it will run at a temperature notably above the

local ambient. If the temperatures of the unit become excessive the unit will run less efficiently,

therefore the unit must always be mounted vertically as detailed in these instructions, in an area

with unrestricted airflow/ventilation.

Solar radiation can also significantly increase the temperature of the unit and so should be taken

into consideration when choosing a location for the unit. In particular it is recommended that the

finned surfaces should be shaded from the sun. Ideally in the Northern Hemisphere the unit should

be located on a North facing wall where it is shaded from the sun; or in a location where an adjacent

object or building will offer similar shade. In the Southern hemisphere the unit is should ideally be

located on a South facing wall.

In areas where the temperature can be considered to be moderately warm, or the ambient

temperature could reach temperatures of approaching 30°C or above and shade is not given to the

unit by any of the adjacent walls or buildings then a solar shield should be fitted to the unit.

125-10001-015 Issue 1.5 Date 20/04/2011

2 x 20W Phase 2 RRH Installation Instructions

AXIS COMPANY PROPRIETARY 6/5

6. Wall Mounting the RRH

6.1. RRH Wall-Mounting Brackets

6.1.1 Position a mounting bracket [610-00057-001] as shown in Figure 6.1

Figure 6.1: Positioning and Mounting the Lower Bracket

6.1.2 Using plain washers, spring washers and M8 x 12 screws attach the bracket to the

body of the unit (Good assembly practice dictates that a spring washer should be

placed on the screw first followed by the plain washer); Tighten screws to 5Nm.

6.1.3 Repeat with the second bracket as shown in Figure 6.2.

125-10001-015 Issue 1.5 Date 20/04/2011

2 x 20W Phase 2 RRH Installation Instructions

AXIS COMPANY PROPRIETARY 7/5

Figure 6.2: Positioning and Mounting the Upper Bracket.

125-10001-015 Issue 1.5 Date 20/04/2011

2 x 20W Phase 2 RRH Installation Instructions

AXIS COMPANY PROPRIETARY 8/5

6.2. Bracket Hole Positions

6.1.4 Mark out hole positions on the wall as shown in 6.3

6.1.5 Drill holes suitable for the fixings to be used, i.e. M8 Rawlbolts (Not Supplied).

6.1.6 Insert fixings into the drilled holes.

6.1.7 Position RRH so that the mounting brackets locate over the fixing holes and

secure into place (To the appropriate tightening torque for the fixings being used).

Note: Spring and Plain washers (or a suitable alternative) must be used under the

head of any fixing screws.

Figure 6.3 Fixing Location Dimensions for Wall Mounting

168 mm

470.5 mm

125-10001-015 Issue 1.5 Date 20/04/2011

2 x 20W Phase 2 RRH Installation Instructions

AXIS COMPANY PROPRIETARY 9/5

7. Pole Mounting

Pole mounting of the unit requires the use of the G3G RRH Pole Mounting Kit [340-00023-001].

340-00023-001 contains: 4 off Pole Mount Grip Brackets. [610-00070-001]

4 off M8 Stud (230mm long) . [610-00071-001]

20 off M8 Nuts. [810-00003-004]

24 off M8 Plain Washer. [810-00003-005]

4 off M8 Spring Washer. [810-00003-006]

4 off M8 x 12 Hex Head Screw. [810-00003-007]

7.1. Mounting the RRH to a Pole

7.1.1 Attach the wall mounting brackets to the RRH as described in Section 1.

7.1.2 Attach studs supplied to the outer pair of holes on a pole mounting bracket as

shown in Figure 7.1. The nuts on the outer faces of the brackets must be

assembled with Spring and Plain Washers, and the nuts on the inside faces

assembled with Plain Washers only.

Figure 7.1 Assembling Stud and Fixings to Mounting

Bracket

125-10001-015 Issue 1.5 Date 20/04/2011

2 x 20W Phase 2 RRH Installation Instructions

AXIS COMPANY PROPRIETARY 10/5

7.1.3 Tighten the pair of nuts against the brackets to a torque of 5Nm.

7.1.4 Thread a nut and washer onto the free end of each stud as shown in Figure 7.1,

ensuring that these nuts will not foul the second bracket before it has been

tightened against the pole.

7.1.5 Position the bracket at the required height and orientation, and slide the second

bracket into position over the free end of the stud.

Note: You should always install the upper brackets first – and the hooks on this set should be

directed upwards.

7.1.6 Secure the brackets in position using a washer and nut on the outside face of to a

torque of 5Nm, as shown in Figure 7.2.

7.1.7 The inner nuts installed in step 7.1.4 should now be wound out to secure the

second bracket into place (so that the assembly looks symmetrical) and tightened

to 5Nm.

Figure 7.2 Top Bracket Assembly in Position

125-10001-015 Issue 1.5 Date 20/04/2011

2 x 20W Phase 2 RRH Installation Instructions

AXIS COMPANY PROPRIETARY 11/5

7.1.8 Repeat steps 7.1.2 to 7.1.7 for the lower bracket assembly, positioning the pair of

brackets approximately 350mm beneath upper set of brackets, with the hooks

facing downwards and the nuts only finger tight (so that the brackets don’t fall

down the pole but can be easily moved).

7.1.9 Position RRH so the slots in the top wall mounting bracket locate over the hooks

on the upper pole mount bracket assembly (See Fig 7.3).

7.1.10 Slide the lower pair of pole mounting brackets down the pole until the hooks

locate into the slots on the lower unit mounting bracket.

7.1.11 Secure the lower pair of pole mounting brackets firmly in position as per the 7.1.6

and 7.1.7.

7.1.12 Secure the unit to the pole mounting brackets using the M8 screws, washers,

spring washers and nuts provided, to 5Nm, as shown in Figure 7.4.

Figure 7.3 Hooking the RRH onto the Pole Mounting Brackets

125-10001-015 Issue 1.5 Date 20/04/2011

2 x 20W Phase 2 RRH Installation Instructions

AXIS COMPANY PROPRIETARY 12/5

Figure 7.4 Securing the RRH to the Pole Mounting Kit.

125-10001-015 Issue 1.5 Date 20/04/2011

2 x 20W Phase 2 RRH Installation Instructions

AXIS COMPANY PROPRIETARY 13/5

8. Cable Attachment to the RRH

All caps or bungs should be removed just prior to connection, after mounting of the unit to the wall

or pole. Optical [refer to AceAxis document 125-10001-018] and DC connections should not be

made if the environment or weather is likely to allow water or dust ingress to the unit as these

connection points are only IP rated once the seal is made. The connection procedure of the cables

could be as follows (see Fig 8.1 for RRH connector identifications):

8.1.1 Earth Cable.

Attach an approved, correctly terminated Earth Cable (AWG10 minimum diameter), using the

2 x M6 earth screws and washers provided. Tighten to 5Nm.

Note: It is critical that this is the first cable connected to the RRH. Under no

circumstances should a unit be commissioned without adequate grounding.

8.1.2 Antenna Port Cables (1-2).

Attach the two antenna cables, in order, with N type connectors and tighten the coupling nut

to 1Nm.

Note: It is not recommended that any ports remain unterminated, as this could lead to

degradation of the connector material if left exposed to the environment and prevent

easy installation of a cable at a later date.

8.1.3 Optical Fiber Port (1-2).

Clip the LC connector into the relevant SFP, and slide the rubber sealing boot up the cable

and into the sealing port [refer to AceAxis document 125-10001-018].;

125-10001-015 Issue 1.5 Date 20/04/2011

2 x 20W Phase 2 RRH Installation Instructions

AXIS COMPANY PROPRIETARY 14/5

Note: The correct SFPs should have already been installed into the RRH (in a suitable

anti-static environment prior to mounting). If a port is not to be used for any reason, the

weather resistant bung should remain in place and be kept, sealed to prevent any ingress

of dust or moisture.

8.1.4 Remote Electrical Tilt (RET): Optional Connection.

Line up the relevant cable so that the electrical connections and guide pin in the connector are

all aligned with those in the receptacle. Insert the connector into the receptacle on the RRH

and tighten the screw thread until the cable is secured in place and the relevant seal has been

made.

Note: If the RET connection is not used, then the shipping cap must be left securely in

place to prevent the ingress of water or dust.

8.1.5 External Alarms: Optional Connection.

Line up the relevant cable so that the electrical connections and guide pin in the connector are

all aligned with those in the receptacle. Insert the connector into the receptacle on the RRH

and tighten the screw thread until the cable is secured in place and the relevant seal has been

made.

Note: If the RET connection is not used, then the shipping cap must be left securely in

place to prevent the ingress of water or dust.

8.1.6 DC Power Connection.

Attach the DC power connector (-48Vdc) using an appropriately assembled Harting cable

assembly. The connector has a pivoting latch that should be pulled across and locked into

position onto the two locating dowels (See Appendix A for more details).

125-10001-015 Issue 1.5 Date 20/04/2011

2 x 20W Phase 2 RRH Installation Instructions

AXIS COMPANY PROPRIETARY 15/5

8.1.7 Sealing All Used Connectors

Whilst these units have been designed and qualified to an appropriate standard to ensure it is

suitably protected against ingress during its operational life, AceAxis Ltd are unable to

control the standard and consistency of installations. Subsequently it is strongly recommended

that appropriate environmental sealing tape is applied to all antenna connections, the fiber

optic connections, DC power connection and all other optional fitted cables / connectors to

prevent water ingress or corrosion of the connector joints/threads.

Figure 8.1 Electrical, RF and Optical Interfaces.

Fiber Optic 1 connection (dust cap not shown).

Earth - 2 x M6 screw 6mm deep thread

DC Power -48Vdc

RX / TX1 RX / TX2

RET Connector External Equipment

Fiber Optic 2 connection (dust cap not shown).

125-10001-015 Issue 1.5 Date 20/04/2011

2 x 20W Phase 2 RRH Installation Instructions

AXIS COMPANY PROPRIETARY 16/5

Appendix A. DC Supply Connection

The minimum tools required to assemble a Harting DC Connector are:

• 2mm Hexagonal Allen key.

• Wire strippers.

A.1 DC Supply Connector

The standard power connector is a Harting Han Q, the connectors are both wired as follows (Table

A1). Care should be taken to observe the correct pin location on the connector in the case of

reverse-sex contacts.

Pin Attribute 1 Positive Return (Red) 2 Negative Supply (Black) 3 On the mating (RRH) connector this pin is connected to the Chassis Earth (Green/yellow)

Table A1: DC Supply Pinout Conventions

The cable housing can accept cable gauge AWG 8-12. A cable sheath should be used for outdoor

deployments that will provide an environmental seal between the connector and the cable. Either

can be fitted although the cable gauge determines the maximum length of power cable that can be

supported (See A2 for more details).

For convenience the manufacturer’s part numbers (for a recommended Cable Connector assembly)

are listed below (Table A2). The correct connector must be used to give the IP65 or higher

protection.

Part Description Harting Part Number

Female insert 0912 002 2751 Connector Hood Black Plastic 1920 003 0427

Cable Gland 20 mm 1900 000 5084

Table A2: Harting Connector Part Numbers

125-10001-015 Issue 1.5 Date 20/04/2011

2 x 20W Phase 2 RRH Installation Instructions

AXIS COMPANY PROPRIETARY 17/5

A.2 Recommended Maximum Power Supply Cable Length.

The power cable should be AWG 8-12 minimum gauge, specified to NEC/CEC.ANSI/NFPA70.

The cable length should be sufficient to make sure that the cable voltage drop under highest current

load does not increase the input voltage at the RRH above -36V.

The maximum allowable cable length can be calculated using the following equation;

Maximum cable length (m) = 1000 × (VPSU - 36) / (IMAX × 2 × CableRES)

Where:

IMAX is the maximum current

VPSU is the source voltage (in this case 48V)

CableRES is the cable resistance* (expressed as Ω/Km).

* This value will depend upon the manufacturer and gauge of cable.

The following table (Table A3) shows the range for each AWG cable size.

AWG Diameter Turns of Wire

mm inch per cm per inch 8 3.264 0.1285 3.06 7.78 9 2.906 0.1144 3.44 8.74 10 2.588 0.1019 3.86 9.81 11 2.305 0.0907 4.34 11 12 2.053 0.0808 4.87 12.4

Table A3 American Wire Gauge Details

125-10001-015 Issue 1.5 Date 20/04/2011

2 x 20W Phase 2 RRH Installation Instructions

AXIS COMPANY PROPRIETARY 18/5

A.3 Harting Connector Assembly.

Figure A1: Han Q Cable Connector Assembly Instructions

The local Harting representative should be contacted for further options and installation advice

(http://www.harting.com/en/kontakt/).