THAI BINH – HAM RONG GAS DISTRIBUTION
AND GATHERING SYSTEM PROJECT – PHASE 1
DATASHEET FOR
FIREWATER JOCKEY PUMP
(P-402J)
Document Number
125355-07-DAS-04-102
Project No.: 125355
Issued for Review NQ NDK
Rev Date Purpose of Issued Prepared By Checked By EM/PM Appv Client Appv
A0 24-Dec-12
DATASHEET FOR FIREWATER JOCKEY PUMP1 Tag No. : P-402 J Client: Petrovietnam Gas Joint Stock Corporation
2 Service: Firewater Jockey Pump Plant Location: Thai Binh, Vietnam
3 P & ID No. : TBA Manufacturer:
4 No. of Units: One (1)
5 Service Description: Firewater Jockey Pump
6 APPLICABLE TO: PROPOSALS PURCHASE AS BUILT
7 PUMP SIZE TYPE NO. STAGES
8 MANUFACTURER MODEL SERIAL NO.
9
10 DATA SHEETS
11 NO.
12 PUMP 1
13 MOTOR 2
14 GEAR 3
15 TURBINE 4
16 APPLICABLE OVERLAY STANDARD(S): NFPA 20 5
17 OPERATING CONDITIONS SITE AND UTILITY DATA (CONT'D)
18 CAPACITY, NORMAL 12 (m3/hr) RATED (m3/hr) WATER SOURCE
19 OTHER CHLORIDE CONCENTRATION (PPM)
20 SUCTION PRESSURE MIN/MAX TBA / TBA (kPag) INSTRUMENT AIR: MAX/MIN PRESS / (kPaa)
21
22 DISCHARGE PRESSURE (kPag) LIQUID (HOLD)
23 DIFFERENTIAL PRESSURE (kPa) TYPE OR NAME OF LIQUID Fire water
24 DIFF. HEAD TBA (m) NPSHA 10 (m) PUMPING TEMPERATURE (PT)
25 PROCESS VARIATIONS NORMAL (°C) MAX. (°C) MIN. (°C)
26 STARTING CONDITIONS VAPOR PRESSURE 50 (kPaa) @ 30 (°C)
27 SERVICE: CONT. INTERMITTENT (STARTS/DAY) RELATIVE DENSITY (SPECIFIC GRAVITY):
28 PARALLEL OPERATION REQ'D NORMAL 0.99 MIN MAX
29 SITE AND UTILITY DATA SPECIFIC HEAT J/kgK
30 LOCATION: VISCOSITY 0.81 (cP) @ 30 (°C)
31 INDOOR HEATED UNDER ROOF MAX. VISCOSITY
32 OUTDOOR UNHEATED PARTIAL SIDES CORROSIVE/EROSIVE AGENT
33 GRADE MEZZANINE CHLORIDE CONCENTRATION (PPM)
34 ELECTRIC AREA CLASSIFICATION: HAZARDOUS H2S CONCENTRATION (PPM)
35 ZONE 2 GR D TEMP CLASS T3 LIQUID HAZARDOUS FLAMMABLE
36 WINTERIZATION REQ'D TROPICALIZATION REQ'D. OTHER
37 SITE DATA
38 ALTITUDE (m) BAROMETER (mbar) PERFORMANCE
39 RANGE OF AMBIENT TEMPS: MIN/MAX. / (°C) PROPOASAL CURVE NO. RPM
40 RELATIVE HUMIDITY: MIN / MAX 72 / (%) IMPELLER DIA. RATED MAX. MIN. (mm)
41 UNUSUAL CONDITIONS: DUST FUMES RATED POWER (kW) EFFICIENCY (%)
42 OTHER MINIMUM CONTINUOUS FLOW:
43 THERMAL (m3/hr) STABLE (m
3/hr)
44 UTILITY CONDITIONS: PREFERRED OPERATING REGION TO (m3/hr)
45 STEAM: DRIVERS HEATING ALLOWABLE OPERATING REGION TO (m3/hr)
46 MIN (KPAA) (°C) (KPAA) (°C) MAX (SHUT-IN) HEAD @ RATED IMPELLER (m)
47 MAX (KPAA) (°C) (KPAA) (°C) MAX POWER @ RATED IMPELLER (kW)
48 ELECTRICITY DRIVERS HEATING CONTROL SHUTDOWN NPSHR AT RATED CAPACITY (m)
49 VOLTAGE SUCTION SPECIFIC SPEED
50 HERTZ MAX. SOUND PRESS. LEVEL REQ'D @1m (dBA)
51 PHASE EST MAX SOUND PRESS. LEVEL @1m (dBA)
52 COOLING WATER:
53 TEMP. INLET (°C) MAX. RETURN (°C)
54 PRESS. NORM (kPaa) DESIGN (kPaa)
55 MIN RETURN (kPaa) MAX ALLOW DP (kPa)
56 REMARKS: 1. - TBC: To be advised; TBC: To be confirmed; VTA: Vendor to advised; VTC: Vendor to confirmed.
57 2. - Motor with Enclosure&Protection: Min IP55, totally enclosed fan cooled, Exd
58 Terminal Box: Cast Iron/ Sheet Steel, Min IP55, Exd
59
60
61
62
63
64
PETROVIETNAM GAS JOINT STOCK CORPORATION
Thai Binh - Ham Rong Gas Distribution & Gathering System Project - Phase 1
Project No: SHEET
Datasheet No: 125355-07-DS-04-102
Purchase Order No. :
ITEM NO.
P-402 J
REVISIONS
ATTACHED
2 of 9
125355
DATE BYITEM NO. ATTACHED ITEM NO. ATTACHED
12
TBA
Rev
A0
4.0 38
92
TBA
DATASHEET FOR FIREWATER JOCKEY PUMP1 Tag No. : P-402 J Client:
2 Service: Firewater Jockey Pump Plant Location: Thai Binh, Vietnam
3 P & ID No. : TBA Manufacturer:
4 Process Datasheet Ref:
5 No. of Units: One (1)
6 Service Description: Firewater Jockey Pump
7 APPLICABLE STANDARD: SHAFT DIAMETER BETWEEN BEARINGS (mm)
8 API 610 SPAN BETWEEN BEARING CENTERS (mm)
9 OTHER NFPA 20 SPAN BETWEEN BEARING & IMPELLER (mm)
10 PUMP TYPE: (BASE ON API 610 DEFINITION) (VTA) REMARKS
11 OH2 BB1 VS1 VS6
12 OH3 BB2 VS2 VS7 COUPLINGS:
13 OH6 BB3 VS3 OTHER MAKE
14 BB4 VS4 TYPE: Flexible Spacer coupling
15 BB5 VS5 MODEL
16 NOZZLE CONDITIONS: RATING (kW/100 RPM)
17 SIZE (NPS) FLANGE FAC'G POSITION LUBRICATION
18 RATING LIMITED END FLOAT REQUIRED
19 SUCTION SPACER LENGTH (mm)
20 DISCHARGE SERVICE FACTOR
21 BALANCE DRUM DRIVER HALF COUPLING MOUNTED BY:
22 PRESSURE CASING CONNECTIONS: (2.3.3) PUMP MFR. DRIVER MFR. PURCHASER
23 NO. SIZE (NPS) TYPE COUPLING PER API 671
24 DRAIN VTA BASEPLATES:
25 VENT VTA API BASEPLATE NUMBER
26 PRESSURE GAUGE NON-GROUT CONSTRUCTION:
27 TEMP GAUGE REMARKS:
28 WARM-UP
29 BALANCE / LEAK-OFF
30
31 CYLINDRICAL THREADS REQUIRED MATERIAL
32 CASING MOUNTING: ( SEE SEPARATE SHEET FOR VERTICLES) GENERAL: CARBON STEEL (VTA)
33 CENTERLINE NEAR CENTERLINE MIN DESIGN METAL TEMP (°C)
34 FOOT SEPARATE MOUNTING PLATE BARREL/CASE IMPELLER
35 IN-LINE CASE/IMPELLER WEAR RINGS
36 CASING SPLIT: SHAFT
37 AXIAL RADIAL DIFFUSERS
38 CASING TYPE: COUPLING SPACER/HUBS
39 SINGLE VOLUTE MULTIPLE VOLUTE DIFFUSER COUPLING DIAPHAGMS (DISKS)
40 OVERHUNG BETWEEN BEARINGS BARREL REMARKS:
41 CASE PRESSURE RATING:
42 MAX ALLOWABLE WORKING PRESSURE (kPaa)
43
44 @ (°C) BEARINGS AND LUBRICATION
45 HYDROTEST PRESSURE (kPaa) BEARING (TYPE/NUMBER):
46 SUCT'N PRESS. REGIONS MUST BE DESIGNED FOR MAWP RADIAL /
47 ROTATION: (VIEWED FROM COUPLING END) THRUST /
48 CW CCW REVIEW AND APPROVE THRUST BEARING SIZE
49 IMPELLERS INDIVIDUALLY SECURED LUBRICATION:
50 REMARKS: GREASE FLOOD RING OIL
51 FLINGER PURGE OIL MIST PURE OIL MIST
52 BOLT OH3 PUMP TO PAD/FOUNDATION CONSTANT LEVEL OILER PREFERENCE
53 SHAFT: PRESSURE LUBE SYS API-610 API-614
54 SHAFT DIAMETER AT COUPLING (mm) OIL VISC. ISO GRADE
55
56 REMARKS:
57
58
59
60
PETROVIETNAM GAS JOINT STOCK CORPORATION
Thai Binh - Ham Rong Gas Distribution & Gathering System Project - Phase 1
Project No: SHEET
Datasheet No: 125355-07-DS-04-102 3 of 9
Rev
VTA
VTA
Purchase Order No. :
VTA
VTA
125355
Petrovietnam Gas Joint Stock Corporation
(HOLD)
VTA
VTA
A0
RF
RF
150
150
150#
150#
VTA
DATASHEET FOR FIREWATER JOCKEY PUMP1 Tag No. : P-402 J Client: Petrovietnam Gas Joint Stock Corporation
2 Service: Firewater Jockey Pump Plant Location: Thai Binh, Vietnam
3 P & ID No. : TBA Manufacturer:
4 Process Datasheet Ref. : Purchase Order No. : 0
5 No. of Units: One (1)
6 Service Description: Firewater Jockey Pump
7 OIL HEATER REQ'D ELECTRIC STEAM VAPOR PRESSURE (kPaa) @ (°C)
8 OIL PRESS TO BE GREATER THAN COOLANT PRESS HAZARDOUS FLAMMABLE OTHER
9 REMARKS FLOW RATE MAX/MIN / (m3/hr)
10 PRESSURE REQUIRED MAX/MIN / (kPaa)
11 TEMPERATURE REQUIRED MAX/MIN / (°C)
12 MECHANICAL SEAL OR PACKING QUENCH FLUID:
13 SEAL DATA: NAME OF FLUID
14 SEE ATTACHED API-682 DATA SHEET FLOW RATE (m3/hr)
15 NON-API 682 SEAL SEAL FLUSH PIPING:
16 SEAL CODE VTA SEAL FLUSH PIPING PLAN VTA
17 SEAL MANUFACTURER VTA TUBING CARBON STEEL
18 SIZE AND TYPE VTA / PIPE STAINLESS STEEL
19 MANUFACTURER CODE AUXILIARY FLUSH PLAN
20 SEAL CHAMBER DATA: TUBING CARBON STEEL
21 TEMPERATURE (°C) PIPE STAINLESS STEEL
22 PRESSURE (kPaa) PIPING ASSEMBLY:
23 FLOW (m3/hr) THREADED UNIONS SOCKET WELDED
24 SEAL CHAMBER SIZE FLANGED TUBE TYPE FITTINGS
25 TOTAL LENGTH CLEAR LENGTH (mm) PRESSURE SWITCH (PLAN 52/53) TYPE
26 SEAL CONSTRUCTION: PRESSURE GUAGE (PLAN 52/53)
27 SLEEVE MATERIAL LEVEL SWITCH (PLAN 52/53) TYPE
28 GLAND MATERIAL LEVEL GUAGE (PLAN 52/53)
29 AUX SEAL DEVICE
30 JACKET REQUIRED HEAT EXCHANGER (PLAN 52/53)
31 GLAND TAPS: REMARKS
32 FLUSH (F) DRAIN (D) BARRIER/BUFF. (B)
33 QUENCH (Q) COOLING (C) LUBRICATION (G)
34 HEATING (H) LEAKAGE PUMPED FLUID (P) PACKING DATA:
35 OUTDOOR EXTERNAL FLUID INJECTION (X) MANUFACTURER
36 SEAL FLUIDS REQUIREM'T AND AVAILABLE FLUSH LIQUID: TYPE
37 NOTE: IF FLUSH LIQUID IS PUMPAGE LIQUID (AS IN FLUSH PIPING SIZE NO. OF RINGS
38 PLANS 11 TO 41), FOLLOWING FLUSH LIQUID DATA IS NOT REQ'D. PACKING INJECTION REQUIRED
39 SUPPLY TEMPERATURE MAX/MIN / (°C) FLOW (m3/hr) @ (°C)
40 RELATIVE DENSITY (SPECIFIC GRAVITY) @ (°C) LANTERN RING
41 NAME OF FLUID
42 SPECIFIC HEAT, Cp (kJ/kgK)
43 VAPOR PRESSURE (kPaa) (°C) COOLING WATER PIPING PLAN
44 HAZARDOUS FLAMMABLE OTHER COOLING WATER REQUIREMENTS
45 FLOW RATE MAX/MIN / (m3/hr) SEAL JACKET/BRG HSG (m
3/hr) (kPaa)
46 PRESSURE REQUIRED MAX/MIN / (kPaa) SEAL HEAT EXCHANGER (m3/hr) (kPaa)
47 TEMPERATURE REQUIRED MAX/MIN / (°C) QUENCH (m3/hr) (kPaa)
48 BARRIER/BUFFER FLUID : TOTAL COOLING WATER (m3/hr)
49 SUPPLY TEMPERATURE MAX/MIN / (°C) STEAM PIPING: TUBING PIPE
50 RELATIVE DENSITY (SPECIFIC GRAVITY) @ (°C) REMARKS
51 NAME OF FLUID
52
53 ADDITIONAL REMARKS:
54 Notes:
55
56
57
58
59
60
PETROVIETNAM GAS JOINT STOCK CORPORATION
Thai Binh - Ham Rong Gas Distribution & Gathering System Project - Phase 1
Project No: SHEET
Datasheet No: 125355-07-DS-04-102
STEAM AND COOLING WATER PIPING
TEMP INDICATOR (PLANS 21, 22, 23, 32, 41)
Rev
A0 4 of 9
125355
DATASHEET FOR FIREWATER JOCKEY PUMP1 Tag No. : P-402 J Client: Petrovietnam Gas Joint Stock Corporation
2 Service: Firewater Jockey Pump Plant Location: Thai Binh, Vietnam
3 P & ID No. : TBA Manufacturer:
4 Process Datasheet Ref. : Purchase Order No. : 0
5 No. of Units: One (1)
6 Service Description: Firewater Jockey Pump
7 VIBRATION: REMARKS VENDOR TO COMPLETE SEPARATE MOTOR DATASHEET ON
8 NONCONTACTING (API 670) TRANSDUCER SHEET 6 OF 8.
9 PROVISION FOR MOUNTING ONLY
10 FLAT SURFACE REQ'D SURFACE PREPARATION AND PAINT
11 SEE ATTACHED API 670 DATA SHEET MANUFACTURER'S STANDARD
12 MONITORS AND CABLES OTHER
13 REMARKS PUMP:
14 PUMP SURFACE PREPARATION
15 PRIMER
16 TEMPERATURE AND PRESSURE: FINISH COAT
17 RADIAL BRG METAL TEMP THRUST BRG METAL TEMP BASEPLATE:
18 PROVISION FOR INSTRUMENTS ONLY BASEPLATE SURFACE PREPARATION
19 SEE ATTACHED API-670 DATA SHEET PRIMER
20 TEMP GAUGES (WITH THERMOWELLS) FINISH COAT
21 OTHER SHIPMENT:
22 PRESSURE GAUGE TYPE DOMESTIC EXPORT EXPORT BOXING REQUIRED
23 LOCATION OUTDOOR STORAGE MORE THAN 12 MONTHS
24 REMARKS SPARE ROTOR ASSEMBLY PACKAGED FOR:
25 HORIZONTAL STORAGE VERTICAL STORAGE
26 TYPE OF SHIPPING PREPARATION
27 SPARE PARTS REMARKS
28 START-UP 2 YEAR OPERATION (OPTIONAL)
29 SPECIFY
30 WEIGHTS
31 MOTOR DRIVEN:
32 WEIGHT OF PUMP (kg)
33 MOTOR DRIVE WEIGHT OF BASEPLATE (kg)
34 MANUFACTURER WEIGHT OF MOTOR (kg)
35 (kW) (RPM) WEIGHT OF GEAR (kg)
36 HORIZONTAL VERTICAL TOTAL WEIGHT (kg)
37 FRAME TURBINE DRIVEN:
38 SERVICE FACTOR WEIGHT OF BASEPLATE (kg)
39 VOLTS/PHASE/HERTZ / 3 / 50 WEIGHT OF TURBINE (kg)
40 TYPE WEIGHT OF GEAR (kg)
41 ENCLOSURE TOTAL WEIGHT (kg)
42 MINIMUM STARTING VOLTAGE REMARKS
43 TEMPERATURE RISE
44 FULL LOAD AMPS
45 LOCKED ROTOR AMPS
46 INSULATION OTHER PURCHASE REQUIREMENTS
47 STARTING METHOD COORDINATION MEETING REQUIRED
48 LUBE REVIEW FOUNDATION DRAWINGS
49 VERTICAL THRUST CAPACITY REVIEW PIPING DRAWINGS
50 UP (kg) DOWN (kg) OBSERVE PIPING CHECKS
51 BEARINGS (TYPE / NUMBER): OBSERVE INITIAL ALIGNMENT CHECK
52 RADIAL / CHECK ALIGNMENT AT OPERATING TEMPERATURE
53 THRUST / CONNECTION DESIGN APPROVAL
54 COMPANION FLANGES (IF REQUIRED)
55 ADDITIONAL REMARKS:
56
57
58
59
60
PETROVIETNAM GAS JOINT STOCK CORPORATION
Thai Binh - Ham Rong Gas Distribution & Gathering System Project - Phase 1
Project No: SHEET
Datasheet No: 125355-07-DS-04-102 5 of 9
Rev
A0
380
125355
DATASHEET FOR FIREWATER JOCKEY PUMP1 Tag No. : P-402 J Client:
2 Service: Firewater Jockey Pump Plant Location: Thai Binh, Vietnam
3 P & ID No. : TBA Manufacturer:
4 Process Datasheet Ref. : Purchase Order No. :
5 No. of Units: One (1)
6 Service Description: Firewater Jockey Pump
7 RIGGING DEVICE REQ'D FOR TYPE OH3 PUMP ADDITIONAL INSPECTION REQUIRED FOR:
8 HYDRODYNAMIC THRUST BRG SIZE REVIEW REQ'D
9 LATERAL ANALYSIS REQUIRED MAG PARTICLE LIQUID PENETRANT
10 ROTOR DYNAMIC BALANCE RADIOGRAPHIC ULTRASONIC
11 MOUNT SEAL RESERVOIR OFF BASEPLATE ALTERNATE ACCEPTANCE CRITERIA (SEE REMARKS)
12 INSTALLATION LIST IN PROPOSAL HARDNESS TEST REQUIRED FOR:
13 SPARE ROTOR VERTICAL STORAGE
14 TORSIONAL ANALYSIS/REPORT WETTING AGENT HYDROTEST
15 PROGRESS REPORTS REQUIRED VENDOR SUBMIT TEST PROCEDURES
16 REMARKS: RECORD FINAL ASSEMBLY RUNNING CLEARANCES
17 INSPECTION CHECK-LIST (APPENDIX N)
18 REMARKS
19
20 QA INSPECTION AND TEST
21 REVIEW VENDORS QA PROGRAM
22 PERFORMANCE CURVE APPROVAL GENERAL REMARKS
23 SHOP INSPECTION REMARK 1:
24 TEST WITH SUBSTITUTE SEAL
25 TEST NON-WIT WIT OBSERVE
26 HYDROSTATIC
27 PERFORMANCE
28 NPSH
29 COMPLETE UNIT TEST
30 SOUND LEVEL TEST
31 CLEANLINESS PRIOR TO
32 FINAL ASSEMBLY
33 NOZZLE LOAD TEST
34 BRG HSG RESONANCE
35 OUTDOOR
36 REMOVE/INSPECT
37 HYDRODYNAMIC BEARINGS
38 AFTER TEST
39 AUXILIARY EQUIPMENT
40 TEST
41 VIBRATION WITHIN TOLERANCE
42 IMPELLER.ROTOR BALANCING
43 MATERIAL CERTIFICATION REQUIRED
44 CASING IMPELLER SHAFT
45 OTHER
46 CASTING REPAIR PROCEDURE APPROVAL REQ'D
47 INSPECTION REQUIRED FOR CONNECTION WELDS
48 MAG PARTICLE LIQUID PENETRANT
49 RADIOGRAPHIC ULTRASONIC
50 INSPECTION REQUIRED FOR CASTINGS
51 MAG PARTICLE LIQUID PENETRANT
52 RADIOGRAPHIC ULTRASONIC
53 ADDITIONAL REMARKS:
54
55
56
57
58
59
60
Project No: SHEET
Datasheet No: 125355-07-DS-04-102
Petrovietnam Gas Joint Stock Corporation
125355
6 of 9
PETROVIETNAM GAS JOINT STOCK CORPORATION
Rev
A0
Thai Binh - Ham Rong Gas Distribution & Gathering System Project - Phase 1
1 Tag No. : P-402 J Client: Petrovietnam Gas Joint Stock Corporation
2 Service: Firewater Jockey Pump Plant Location: Thai Binh, Vietnam
3 P & ID No. : TBA Manufacturer:
4 Specification No. : Purchase Order No. :
5 No. of Units: One (1)
6 Service Description: Firewater Jockey Pump
7
8 Location: System Voltage: V
9 Altitude: System Frequency: Hz
10 Ambient air temp: Neutral Earthing:
12 Hazardous area classification:
13 UNITS
14 MODEL / SERIAL NO. -
15 TYPE -
16 CODE AND STANDARD -
17 RATING kW
18 NO OF POLES / SYNCHRONOUS SPEED RPM
19 NO OF PHASES -
20 SERVICE DUTY -
21 STARTING METHOD -
22 ROTATION -
23 TYPE OF CONNECTION -
24 DRIVE TYPE -
25 ENCLOSURE & PROTECTION -
26 COOLING -
27 MOUNTING TYPE -
28 OVERALL DIMENSION (H x W x L) mm
29 WEIGHT Kg
30 FRAME & BRACKET -
31 FAN MATERIAL -
32 TERMINAL BOX -
33 LEAD TERMINALS -
34 LUBRICANT -
35 PAINTING -
36 INSULATION CLASS -
37 ROTOR CONDUCTOR -
38 VIBRATION -
39 OVERLOAD CAPACITY kW
40 STARTING ACC. TIME: sec
41 STARTING TORQUE (% OF FLT): %
42 STARTING POWER FACTOR: pu
43 STARTING CURRENT: A
44 AMPERE FL / ¾ FL / ½ FL A / / / /
45 EFFICIENCY FL / ¾ FL / ½ FL pu / / / /
46 POWER FACTOR FL / ¾ FL / ½ FL pu / / / /
47 SPEED FL / ¾ FL / ½ FL RPM / / / /
48 Yes / No
49 NO. OF GROUND POINTS Yes / No
50 NOISE LEVEL db
51 LIFTING HOOK -
52 INTERFACE CABLE TYPE mm2
53 CABLE SIZE mm2
NOTES:
Rev
A0
DATASHEET FOR FIREWATER JOCKEY PUMP MOTOR
ENVIRONMENTAL CONDITIONS POWER SYSTEM
PARTICULARS OF EQUIPMENT PURCHASER'S REQUIREMENTS VENDOR'S RESPONE
PUMP DRIVER - ELECTRICAL MOTOR
STARTING
PERFORMANE
OPERATING
PERFORMANE
AT RATED 400
VOLTS
ANTI-CONDENSATION HEATER RATING/POWER SUPPLY
PETROVIETNAM GAS JOINT STOCK CORPORATION
Thai Binh - Ham Rong Gas Distribution & Gathering System Project - Phase 1
Project No: SHEET
Datasheet No: 7 of 9
125355
125355-07-DS-04-102
Petrovietnam Gas Joint Stock Corporation
Thai Binh, Vietnam
1
2
3 1. GENERAL
4 This requisition cover the noise limits of the equipment, given below. For definitions, method of measuring etc. reference is made to EEMUA specification
5 no. 140 : Noise procedure specification.
6
7 2. NOISE LIMITS TO BE MET BY THE EQUIPMENT
8 The noise generated by the equipment shall not exceed the more stringent of the noise limits given in the table below, for any of the conditions of operation
9 for which the equipment may normally be expected to be used.
10 Lp is the maximum (A-weighted) sound pressure level, dB re 20 uPa at any location at 1m from the equipment surface. Lw is the maximum (A-weighted)
11 sound power level, dB re 1 pW.
12 If the equipment generates noise with tonal or impulsive components the limits shall be taken 5 dB(A) more stringent.
13
14 3. INFORMATION TO BE SUBMITTED WITH THE TENDER
15 a) This noise data sheet shall be returned with the tender and with guaranteed noise data filled in.
16 b) Supplier shall state which silencing measures were taken to meet the noise requirements.
17
18 4. LOW NOISE ELECTRIC MOTORS ARE REQUIRED.
19
20
21
22 a b Remarks
23 Equipment Noise levels guaranteed by supplier in dB(A) Noise
24 (Items / Locations) (upper tolerance + 0 dB) limit
25 63 125 250 500 1k 2k 4k 8k Total dB (A) Silencing measures
26 Firewater Jockey Pump 1) Lp 85 @ 1m
27 Lw
28 Lp
29 Lw
30 Lp
31 Lw
32 Lp
33 Lw
34 Lp
35 Lw
36 Lp
37 Lw
38 Lp
39 Lw
40 Lp
41 Lw
42 Lp
43 Lw
44 Lp
45 Lw
46 Purchaser shall indicate :
47 - In column "b", the noise limit
48 - In column "a" using the appropriate number, which of the following applies to the required noise levels :
49 1) without acoustic provisions
50 2) with acoustic provisions and / or special low noise design.
51 3) suppliers best estimate, not necessarily guaranteed.
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
Project No:
Datasheet No: 125355-07-DS-04-102
NOISE DATASHEET
PETROVIETNAM GAS JOINT STOCK CORPORATIONThai Binh - Ham Rong Gas Distribution & Gathering System Project - Phase 1
SHEET
8 of 9
125355 Rev
A0
P & ID No. : TBA Manufacturer:
Process Datasheet Ref. : Purchase Order No. :
DATASHEET FOR FIREWATER JOCKEY PUMPTag No. : P-402 J Client:
Service: Firewater Jockey Pump Plant Location:
DATASHEET FOR FIREWATER JOCKEY PUMPTag No.: P-402 J Client: Petrovietnam Gas Joint Stock Corporation
Service: Firewater Jockey Pump Plant Location:
P & ID No. : TBA Manufacturer:
Process Datasheet Ref. : Purchase Order No. :
No. of Units: One (1) Service Description: Firewater Jockey Pump
1
2 NOTES:
3
4 1. Equipment orientation on each skid or item shall be indicated
5 2. COG coordinates shall be clearly shown on the G.A. drawings.
6
7
8
9
10
11
12
13 C.O.G.
14
15
16
17
18
19
20
21
22
23
24
25
26
27 C.O.G.
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49 PLAN
50
51
52
53
54
55
56
57
58
59
60
61
62
63
PETROVIETNAM GAS JOINT STOCK CORPORATION
Thai Binh - Ham Rong Gas Distribution & Gathering System Project - Phase 1
Project No.
Datasheet No. 125355-07-DS-04-102
SHEET
9 of 9
ELEVATION
PERMANENT ACCESS REQUIRED AROUND THE SKID / EQUIPMENT (SPACE ENVELOPE)
Supplier shall indicate orientation by showing location of main connections or prime mover etc.
125355 Rev
A0
Z
Weight
X
Y
DIMENSION Hmax (mm)
PLAN
OVERALL SIZES
Dimension Dry Operating Hydrotest
Thai Binh, Vietnam
WEIGHT DATA SHEET
OVERALL SIZES
DIMENSION Lmax (mm)
DIMENSION Wmax (mm)Y
Wmax
X
Lmax
X
Hmax
A
D
C B