THAI BINH – HAM RONG GAS DISTRIBUTION

AND GATHERING SYSTEM PROJECT – PHASE 1

DATASHEET FOR

FIREWATER JOCKEY PUMP

(P-402J)

Document Number

125355-07-DAS-04-102

Project No.: 125355

Issued for Review NQ NDK

Rev Date Purpose of Issued Prepared By Checked By EM/PM Appv Client Appv

A0 24-Dec-12

Page 2: 125355-07-DAS-04-102Mechanical Datasheet for Firewater Jockey Pump.pdf

DATASHEET FOR FIREWATER JOCKEY PUMP1 Tag No. : P-402 J Client: Petrovietnam Gas Joint Stock Corporation

2 Service: Firewater Jockey Pump Plant Location: Thai Binh, Vietnam

3 P & ID No. : TBA Manufacturer:

4 No. of Units: One (1)

5 Service Description: Firewater Jockey Pump

6 APPLICABLE TO: PROPOSALS PURCHASE AS BUILT

7 PUMP SIZE TYPE NO. STAGES

8 MANUFACTURER MODEL SERIAL NO.

9

10 DATA SHEETS

11 NO.

12 PUMP 1

13 MOTOR 2

14 GEAR 3

15 TURBINE 4

16 APPLICABLE OVERLAY STANDARD(S): NFPA 20 5

17 OPERATING CONDITIONS SITE AND UTILITY DATA (CONT'D)

18 CAPACITY, NORMAL 12 (m3/hr) RATED (m3/hr) WATER SOURCE

19 OTHER CHLORIDE CONCENTRATION (PPM)

20 SUCTION PRESSURE MIN/MAX TBA / TBA (kPag) INSTRUMENT AIR: MAX/MIN PRESS / (kPaa)

21

22 DISCHARGE PRESSURE (kPag) LIQUID (HOLD)

23 DIFFERENTIAL PRESSURE (kPa) TYPE OR NAME OF LIQUID Fire water

24 DIFF. HEAD TBA (m) NPSHA 10 (m) PUMPING TEMPERATURE (PT)

25 PROCESS VARIATIONS NORMAL (°C) MAX. (°C) MIN. (°C)

26 STARTING CONDITIONS VAPOR PRESSURE 50 (kPaa) @ 30 (°C)

27 SERVICE: CONT. INTERMITTENT (STARTS/DAY) RELATIVE DENSITY (SPECIFIC GRAVITY):

28 PARALLEL OPERATION REQ'D NORMAL 0.99 MIN MAX

29 SITE AND UTILITY DATA SPECIFIC HEAT J/kgK

30 LOCATION: VISCOSITY 0.81 (cP) @ 30 (°C)

31 INDOOR HEATED UNDER ROOF MAX. VISCOSITY

32 OUTDOOR UNHEATED PARTIAL SIDES CORROSIVE/EROSIVE AGENT

33 GRADE MEZZANINE CHLORIDE CONCENTRATION (PPM)

34 ELECTRIC AREA CLASSIFICATION: HAZARDOUS H2S CONCENTRATION (PPM)

35 ZONE 2 GR D TEMP CLASS T3 LIQUID HAZARDOUS FLAMMABLE

36 WINTERIZATION REQ'D TROPICALIZATION REQ'D. OTHER

37 SITE DATA

38 ALTITUDE (m) BAROMETER (mbar) PERFORMANCE

39 RANGE OF AMBIENT TEMPS: MIN/MAX. / (°C) PROPOASAL CURVE NO. RPM

40 RELATIVE HUMIDITY: MIN / MAX 72 / (%) IMPELLER DIA. RATED MAX. MIN. (mm)

41 UNUSUAL CONDITIONS: DUST FUMES RATED POWER (kW) EFFICIENCY (%)

42 OTHER MINIMUM CONTINUOUS FLOW:

43 THERMAL (m3/hr) STABLE (m

3/hr)

44 UTILITY CONDITIONS: PREFERRED OPERATING REGION TO (m3/hr)

45 STEAM: DRIVERS HEATING ALLOWABLE OPERATING REGION TO (m3/hr)

46 MIN (KPAA) (°C) (KPAA) (°C) MAX (SHUT-IN) HEAD @ RATED IMPELLER (m)

47 MAX (KPAA) (°C) (KPAA) (°C) MAX POWER @ RATED IMPELLER (kW)

48 ELECTRICITY DRIVERS HEATING CONTROL SHUTDOWN NPSHR AT RATED CAPACITY (m)

49 VOLTAGE SUCTION SPECIFIC SPEED

50 HERTZ MAX. SOUND PRESS. LEVEL REQ'D @1m (dBA)

51 PHASE EST MAX SOUND PRESS. LEVEL @1m (dBA)

52 COOLING WATER:

53 TEMP. INLET (°C) MAX. RETURN (°C)

54 PRESS. NORM (kPaa) DESIGN (kPaa)

55 MIN RETURN (kPaa) MAX ALLOW DP (kPa)

56 REMARKS: 1. - TBC: To be advised; TBC: To be confirmed; VTA: Vendor to advised; VTC: Vendor to confirmed.

57 2. - Motor with Enclosure&Protection: Min IP55, totally enclosed fan cooled, Exd

58 Terminal Box: Cast Iron/ Sheet Steel, Min IP55, Exd

59

60

61

62

63

64

PETROVIETNAM GAS JOINT STOCK CORPORATION

Thai Binh - Ham Rong Gas Distribution & Gathering System Project - Phase 1

Project No: SHEET

Datasheet No: 125355-07-DS-04-102

Purchase Order No. :

ITEM NO.

P-402 J

REVISIONS

ATTACHED

2 of 9

125355

DATE BYITEM NO. ATTACHED ITEM NO. ATTACHED

12

TBA

Rev

A0

4.0 38

92

TBA

Page 3: 125355-07-DAS-04-102Mechanical Datasheet for Firewater Jockey Pump.pdf

DATASHEET FOR FIREWATER JOCKEY PUMP1 Tag No. : P-402 J Client:

2 Service: Firewater Jockey Pump Plant Location: Thai Binh, Vietnam

3 P & ID No. : TBA Manufacturer:

4 Process Datasheet Ref:

5 No. of Units: One (1)

6 Service Description: Firewater Jockey Pump

7 APPLICABLE STANDARD: SHAFT DIAMETER BETWEEN BEARINGS (mm)

8 API 610 SPAN BETWEEN BEARING CENTERS (mm)

9 OTHER NFPA 20 SPAN BETWEEN BEARING & IMPELLER (mm)

10 PUMP TYPE: (BASE ON API 610 DEFINITION) (VTA) REMARKS

11 OH2 BB1 VS1 VS6

12 OH3 BB2 VS2 VS7 COUPLINGS:

13 OH6 BB3 VS3 OTHER MAKE

14 BB4 VS4 TYPE: Flexible Spacer coupling

15 BB5 VS5 MODEL

16 NOZZLE CONDITIONS: RATING (kW/100 RPM)

17 SIZE (NPS) FLANGE FAC'G POSITION LUBRICATION

18 RATING LIMITED END FLOAT REQUIRED

19 SUCTION SPACER LENGTH (mm)

20 DISCHARGE SERVICE FACTOR

21 BALANCE DRUM DRIVER HALF COUPLING MOUNTED BY:

22 PRESSURE CASING CONNECTIONS: (2.3.3) PUMP MFR. DRIVER MFR. PURCHASER

23 NO. SIZE (NPS) TYPE COUPLING PER API 671

24 DRAIN VTA BASEPLATES:

25 VENT VTA API BASEPLATE NUMBER

26 PRESSURE GAUGE NON-GROUT CONSTRUCTION:

27 TEMP GAUGE REMARKS:

28 WARM-UP

29 BALANCE / LEAK-OFF

30

31 CYLINDRICAL THREADS REQUIRED MATERIAL

32 CASING MOUNTING: ( SEE SEPARATE SHEET FOR VERTICLES) GENERAL: CARBON STEEL (VTA)

33 CENTERLINE NEAR CENTERLINE MIN DESIGN METAL TEMP (°C)

34 FOOT SEPARATE MOUNTING PLATE BARREL/CASE IMPELLER

35 IN-LINE CASE/IMPELLER WEAR RINGS

36 CASING SPLIT: SHAFT

37 AXIAL RADIAL DIFFUSERS

38 CASING TYPE: COUPLING SPACER/HUBS

39 SINGLE VOLUTE MULTIPLE VOLUTE DIFFUSER COUPLING DIAPHAGMS (DISKS)

40 OVERHUNG BETWEEN BEARINGS BARREL REMARKS:

41 CASE PRESSURE RATING:

42 MAX ALLOWABLE WORKING PRESSURE (kPaa)

43

44 @ (°C) BEARINGS AND LUBRICATION

45 HYDROTEST PRESSURE (kPaa) BEARING (TYPE/NUMBER):

46 SUCT'N PRESS. REGIONS MUST BE DESIGNED FOR MAWP RADIAL /

47 ROTATION: (VIEWED FROM COUPLING END) THRUST /

48 CW CCW REVIEW AND APPROVE THRUST BEARING SIZE

49 IMPELLERS INDIVIDUALLY SECURED LUBRICATION:

50 REMARKS: GREASE FLOOD RING OIL

51 FLINGER PURGE OIL MIST PURE OIL MIST

52 BOLT OH3 PUMP TO PAD/FOUNDATION CONSTANT LEVEL OILER PREFERENCE

53 SHAFT: PRESSURE LUBE SYS API-610 API-614

54 SHAFT DIAMETER AT COUPLING (mm) OIL VISC. ISO GRADE

55

56 REMARKS:

57

58

59

60

PETROVIETNAM GAS JOINT STOCK CORPORATION

Thai Binh - Ham Rong Gas Distribution & Gathering System Project - Phase 1

Project No: SHEET

Datasheet No: 125355-07-DS-04-102 3 of 9

Rev

VTA

VTA

Purchase Order No. :

VTA

VTA

125355

Petrovietnam Gas Joint Stock Corporation

(HOLD)

VTA

VTA

A0

RF

RF

150

150

150#

150#

VTA

Page 4: 125355-07-DAS-04-102Mechanical Datasheet for Firewater Jockey Pump.pdf

DATASHEET FOR FIREWATER JOCKEY PUMP1 Tag No. : P-402 J Client: Petrovietnam Gas Joint Stock Corporation

2 Service: Firewater Jockey Pump Plant Location: Thai Binh, Vietnam

3 P & ID No. : TBA Manufacturer:

4 Process Datasheet Ref. : Purchase Order No. : 0

5 No. of Units: One (1)

6 Service Description: Firewater Jockey Pump

7 OIL HEATER REQ'D ELECTRIC STEAM VAPOR PRESSURE (kPaa) @ (°C)

8 OIL PRESS TO BE GREATER THAN COOLANT PRESS HAZARDOUS FLAMMABLE OTHER

9 REMARKS FLOW RATE MAX/MIN / (m3/hr)

10 PRESSURE REQUIRED MAX/MIN / (kPaa)

11 TEMPERATURE REQUIRED MAX/MIN / (°C)

12 MECHANICAL SEAL OR PACKING QUENCH FLUID:

13 SEAL DATA: NAME OF FLUID

14 SEE ATTACHED API-682 DATA SHEET FLOW RATE (m3/hr)

15 NON-API 682 SEAL SEAL FLUSH PIPING:

16 SEAL CODE VTA SEAL FLUSH PIPING PLAN VTA

17 SEAL MANUFACTURER VTA TUBING CARBON STEEL

18 SIZE AND TYPE VTA / PIPE STAINLESS STEEL

19 MANUFACTURER CODE AUXILIARY FLUSH PLAN

20 SEAL CHAMBER DATA: TUBING CARBON STEEL

21 TEMPERATURE (°C) PIPE STAINLESS STEEL

22 PRESSURE (kPaa) PIPING ASSEMBLY:

23 FLOW (m3/hr) THREADED UNIONS SOCKET WELDED

24 SEAL CHAMBER SIZE FLANGED TUBE TYPE FITTINGS

25 TOTAL LENGTH CLEAR LENGTH (mm) PRESSURE SWITCH (PLAN 52/53) TYPE

26 SEAL CONSTRUCTION: PRESSURE GUAGE (PLAN 52/53)

27 SLEEVE MATERIAL LEVEL SWITCH (PLAN 52/53) TYPE

28 GLAND MATERIAL LEVEL GUAGE (PLAN 52/53)

29 AUX SEAL DEVICE

30 JACKET REQUIRED HEAT EXCHANGER (PLAN 52/53)

31 GLAND TAPS: REMARKS

32 FLUSH (F) DRAIN (D) BARRIER/BUFF. (B)

33 QUENCH (Q) COOLING (C) LUBRICATION (G)

34 HEATING (H) LEAKAGE PUMPED FLUID (P) PACKING DATA:

35 OUTDOOR EXTERNAL FLUID INJECTION (X) MANUFACTURER

36 SEAL FLUIDS REQUIREM'T AND AVAILABLE FLUSH LIQUID: TYPE

37 NOTE: IF FLUSH LIQUID IS PUMPAGE LIQUID (AS IN FLUSH PIPING SIZE NO. OF RINGS

38 PLANS 11 TO 41), FOLLOWING FLUSH LIQUID DATA IS NOT REQ'D. PACKING INJECTION REQUIRED

39 SUPPLY TEMPERATURE MAX/MIN / (°C) FLOW (m3/hr) @ (°C)

40 RELATIVE DENSITY (SPECIFIC GRAVITY) @ (°C) LANTERN RING

41 NAME OF FLUID

42 SPECIFIC HEAT, Cp (kJ/kgK)

43 VAPOR PRESSURE (kPaa) (°C) COOLING WATER PIPING PLAN

44 HAZARDOUS FLAMMABLE OTHER COOLING WATER REQUIREMENTS

45 FLOW RATE MAX/MIN / (m3/hr) SEAL JACKET/BRG HSG (m

3/hr) (kPaa)

46 PRESSURE REQUIRED MAX/MIN / (kPaa) SEAL HEAT EXCHANGER (m3/hr) (kPaa)

47 TEMPERATURE REQUIRED MAX/MIN / (°C) QUENCH (m3/hr) (kPaa)

48 BARRIER/BUFFER FLUID : TOTAL COOLING WATER (m3/hr)

49 SUPPLY TEMPERATURE MAX/MIN / (°C) STEAM PIPING: TUBING PIPE

50 RELATIVE DENSITY (SPECIFIC GRAVITY) @ (°C) REMARKS

51 NAME OF FLUID

52

53 ADDITIONAL REMARKS:

54 Notes:

55

56

57

58

59

60

PETROVIETNAM GAS JOINT STOCK CORPORATION

Thai Binh - Ham Rong Gas Distribution & Gathering System Project - Phase 1

Project No: SHEET

Datasheet No: 125355-07-DS-04-102

STEAM AND COOLING WATER PIPING

TEMP INDICATOR (PLANS 21, 22, 23, 32, 41)

Rev

A0 4 of 9

125355

Page 5: 125355-07-DAS-04-102Mechanical Datasheet for Firewater Jockey Pump.pdf

DATASHEET FOR FIREWATER JOCKEY PUMP1 Tag No. : P-402 J Client: Petrovietnam Gas Joint Stock Corporation

2 Service: Firewater Jockey Pump Plant Location: Thai Binh, Vietnam

3 P & ID No. : TBA Manufacturer:

4 Process Datasheet Ref. : Purchase Order No. : 0

5 No. of Units: One (1)

6 Service Description: Firewater Jockey Pump

7 VIBRATION: REMARKS VENDOR TO COMPLETE SEPARATE MOTOR DATASHEET ON

8 NONCONTACTING (API 670) TRANSDUCER SHEET 6 OF 8.

9 PROVISION FOR MOUNTING ONLY

10 FLAT SURFACE REQ'D SURFACE PREPARATION AND PAINT

11 SEE ATTACHED API 670 DATA SHEET MANUFACTURER'S STANDARD

12 MONITORS AND CABLES OTHER

13 REMARKS PUMP:

14 PUMP SURFACE PREPARATION

15 PRIMER

16 TEMPERATURE AND PRESSURE: FINISH COAT

17 RADIAL BRG METAL TEMP THRUST BRG METAL TEMP BASEPLATE:

18 PROVISION FOR INSTRUMENTS ONLY BASEPLATE SURFACE PREPARATION

19 SEE ATTACHED API-670 DATA SHEET PRIMER

20 TEMP GAUGES (WITH THERMOWELLS) FINISH COAT

21 OTHER SHIPMENT:

22 PRESSURE GAUGE TYPE DOMESTIC EXPORT EXPORT BOXING REQUIRED

23 LOCATION OUTDOOR STORAGE MORE THAN 12 MONTHS

24 REMARKS SPARE ROTOR ASSEMBLY PACKAGED FOR:

25 HORIZONTAL STORAGE VERTICAL STORAGE

26 TYPE OF SHIPPING PREPARATION

27 SPARE PARTS REMARKS

28 START-UP 2 YEAR OPERATION (OPTIONAL)

29 SPECIFY

30 WEIGHTS

31 MOTOR DRIVEN:

32 WEIGHT OF PUMP (kg)

33 MOTOR DRIVE WEIGHT OF BASEPLATE (kg)

34 MANUFACTURER WEIGHT OF MOTOR (kg)

35 (kW) (RPM) WEIGHT OF GEAR (kg)

36 HORIZONTAL VERTICAL TOTAL WEIGHT (kg)

37 FRAME TURBINE DRIVEN:

38 SERVICE FACTOR WEIGHT OF BASEPLATE (kg)

39 VOLTS/PHASE/HERTZ / 3 / 50 WEIGHT OF TURBINE (kg)

40 TYPE WEIGHT OF GEAR (kg)

41 ENCLOSURE TOTAL WEIGHT (kg)

42 MINIMUM STARTING VOLTAGE REMARKS

43 TEMPERATURE RISE

44 FULL LOAD AMPS

45 LOCKED ROTOR AMPS

46 INSULATION OTHER PURCHASE REQUIREMENTS

47 STARTING METHOD COORDINATION MEETING REQUIRED

48 LUBE REVIEW FOUNDATION DRAWINGS

49 VERTICAL THRUST CAPACITY REVIEW PIPING DRAWINGS

50 UP (kg) DOWN (kg) OBSERVE PIPING CHECKS

51 BEARINGS (TYPE / NUMBER): OBSERVE INITIAL ALIGNMENT CHECK

52 RADIAL / CHECK ALIGNMENT AT OPERATING TEMPERATURE

53 THRUST / CONNECTION DESIGN APPROVAL

54 COMPANION FLANGES (IF REQUIRED)

55 ADDITIONAL REMARKS:

56

57

58

59

60

PETROVIETNAM GAS JOINT STOCK CORPORATION

Thai Binh - Ham Rong Gas Distribution & Gathering System Project - Phase 1

Project No: SHEET

Datasheet No: 125355-07-DS-04-102 5 of 9

Rev

A0

380

125355

Page 6: 125355-07-DAS-04-102Mechanical Datasheet for Firewater Jockey Pump.pdf

DATASHEET FOR FIREWATER JOCKEY PUMP1 Tag No. : P-402 J Client:

2 Service: Firewater Jockey Pump Plant Location: Thai Binh, Vietnam

3 P & ID No. : TBA Manufacturer:

4 Process Datasheet Ref. : Purchase Order No. :

5 No. of Units: One (1)

6 Service Description: Firewater Jockey Pump

7 RIGGING DEVICE REQ'D FOR TYPE OH3 PUMP ADDITIONAL INSPECTION REQUIRED FOR:

8 HYDRODYNAMIC THRUST BRG SIZE REVIEW REQ'D

9 LATERAL ANALYSIS REQUIRED MAG PARTICLE LIQUID PENETRANT

10 ROTOR DYNAMIC BALANCE RADIOGRAPHIC ULTRASONIC

11 MOUNT SEAL RESERVOIR OFF BASEPLATE ALTERNATE ACCEPTANCE CRITERIA (SEE REMARKS)

12 INSTALLATION LIST IN PROPOSAL HARDNESS TEST REQUIRED FOR:

13 SPARE ROTOR VERTICAL STORAGE

14 TORSIONAL ANALYSIS/REPORT WETTING AGENT HYDROTEST

15 PROGRESS REPORTS REQUIRED VENDOR SUBMIT TEST PROCEDURES

16 REMARKS: RECORD FINAL ASSEMBLY RUNNING CLEARANCES

17 INSPECTION CHECK-LIST (APPENDIX N)

18 REMARKS

19

20 QA INSPECTION AND TEST

21 REVIEW VENDORS QA PROGRAM

22 PERFORMANCE CURVE APPROVAL GENERAL REMARKS

23 SHOP INSPECTION REMARK 1:

24 TEST WITH SUBSTITUTE SEAL

25 TEST NON-WIT WIT OBSERVE

26 HYDROSTATIC

27 PERFORMANCE

28 NPSH

29 COMPLETE UNIT TEST

30 SOUND LEVEL TEST

31 CLEANLINESS PRIOR TO

32 FINAL ASSEMBLY

33 NOZZLE LOAD TEST

34 BRG HSG RESONANCE

35 OUTDOOR

36 REMOVE/INSPECT

37 HYDRODYNAMIC BEARINGS

38 AFTER TEST

39 AUXILIARY EQUIPMENT

40 TEST

41 VIBRATION WITHIN TOLERANCE

42 IMPELLER.ROTOR BALANCING

43 MATERIAL CERTIFICATION REQUIRED

44 CASING IMPELLER SHAFT

45 OTHER

46 CASTING REPAIR PROCEDURE APPROVAL REQ'D

47 INSPECTION REQUIRED FOR CONNECTION WELDS

48 MAG PARTICLE LIQUID PENETRANT

49 RADIOGRAPHIC ULTRASONIC

50 INSPECTION REQUIRED FOR CASTINGS

51 MAG PARTICLE LIQUID PENETRANT

52 RADIOGRAPHIC ULTRASONIC

53 ADDITIONAL REMARKS:

54

55

56

57

58

59

60

Project No: SHEET

Datasheet No: 125355-07-DS-04-102

Petrovietnam Gas Joint Stock Corporation

125355

6 of 9

PETROVIETNAM GAS JOINT STOCK CORPORATION

Rev

A0

Thai Binh - Ham Rong Gas Distribution & Gathering System Project - Phase 1

Page 7: 125355-07-DAS-04-102Mechanical Datasheet for Firewater Jockey Pump.pdf

1 Tag No. : P-402 J Client: Petrovietnam Gas Joint Stock Corporation

2 Service: Firewater Jockey Pump Plant Location: Thai Binh, Vietnam

3 P & ID No. : TBA Manufacturer:

4 Specification No. : Purchase Order No. :

5 No. of Units: One (1)

6 Service Description: Firewater Jockey Pump

7

8 Location: System Voltage: V

9 Altitude: System Frequency: Hz

10 Ambient air temp: Neutral Earthing:

12 Hazardous area classification:

13 UNITS

14 MODEL / SERIAL NO. -

15 TYPE -

16 CODE AND STANDARD -

17 RATING kW

18 NO OF POLES / SYNCHRONOUS SPEED RPM

19 NO OF PHASES -

20 SERVICE DUTY -

21 STARTING METHOD -

22 ROTATION -

23 TYPE OF CONNECTION -

24 DRIVE TYPE -

25 ENCLOSURE & PROTECTION -

26 COOLING -

27 MOUNTING TYPE -

28 OVERALL DIMENSION (H x W x L) mm

29 WEIGHT Kg

30 FRAME & BRACKET -

31 FAN MATERIAL -

32 TERMINAL BOX -

33 LEAD TERMINALS -

34 LUBRICANT -

35 PAINTING -

36 INSULATION CLASS -

37 ROTOR CONDUCTOR -

38 VIBRATION -

39 OVERLOAD CAPACITY kW

40 STARTING ACC. TIME: sec

41 STARTING TORQUE (% OF FLT): %

42 STARTING POWER FACTOR: pu

43 STARTING CURRENT: A

44 AMPERE FL / ¾ FL / ½ FL A / / / /

45 EFFICIENCY FL / ¾ FL / ½ FL pu / / / /

46 POWER FACTOR FL / ¾ FL / ½ FL pu / / / /

47 SPEED FL / ¾ FL / ½ FL RPM / / / /

48 Yes / No

49 NO. OF GROUND POINTS Yes / No

50 NOISE LEVEL db

51 LIFTING HOOK -

52 INTERFACE CABLE TYPE mm2

53 CABLE SIZE mm2

NOTES:

Rev

A0

DATASHEET FOR FIREWATER JOCKEY PUMP MOTOR

ENVIRONMENTAL CONDITIONS POWER SYSTEM

PARTICULARS OF EQUIPMENT PURCHASER'S REQUIREMENTS VENDOR'S RESPONE

PUMP DRIVER - ELECTRICAL MOTOR

STARTING

PERFORMANE

OPERATING

PERFORMANE

AT RATED 400

VOLTS

ANTI-CONDENSATION HEATER RATING/POWER SUPPLY

PETROVIETNAM GAS JOINT STOCK CORPORATION

Thai Binh - Ham Rong Gas Distribution & Gathering System Project - Phase 1

Project No: SHEET

Datasheet No: 7 of 9

125355

125355-07-DS-04-102

Page 8: 125355-07-DAS-04-102Mechanical Datasheet for Firewater Jockey Pump.pdf

Petrovietnam Gas Joint Stock Corporation

Thai Binh, Vietnam

1

2

3 1. GENERAL

4 This requisition cover the noise limits of the equipment, given below. For definitions, method of measuring etc. reference is made to EEMUA specification

5 no. 140 : Noise procedure specification.

6

7 2. NOISE LIMITS TO BE MET BY THE EQUIPMENT

8 The noise generated by the equipment shall not exceed the more stringent of the noise limits given in the table below, for any of the conditions of operation

9 for which the equipment may normally be expected to be used.

10 Lp is the maximum (A-weighted) sound pressure level, dB re 20 uPa at any location at 1m from the equipment surface. Lw is the maximum (A-weighted)

11 sound power level, dB re 1 pW.

12 If the equipment generates noise with tonal or impulsive components the limits shall be taken 5 dB(A) more stringent.

13

14 3. INFORMATION TO BE SUBMITTED WITH THE TENDER

15 a) This noise data sheet shall be returned with the tender and with guaranteed noise data filled in.

16 b) Supplier shall state which silencing measures were taken to meet the noise requirements.

17

18 4. LOW NOISE ELECTRIC MOTORS ARE REQUIRED.

19

20

21

22 a b Remarks

23 Equipment Noise levels guaranteed by supplier in dB(A) Noise

24 (Items / Locations) (upper tolerance + 0 dB) limit

25 63 125 250 500 1k 2k 4k 8k Total dB (A) Silencing measures

26 Firewater Jockey Pump 1) Lp 85 @ 1m

27 Lw

28 Lp

29 Lw

30 Lp

31 Lw

32 Lp

33 Lw

34 Lp

35 Lw

36 Lp

37 Lw

38 Lp

39 Lw

40 Lp

41 Lw

42 Lp

43 Lw

44 Lp

45 Lw

46 Purchaser shall indicate :

47 - In column "b", the noise limit

48 - In column "a" using the appropriate number, which of the following applies to the required noise levels :

49 1) without acoustic provisions

50 2) with acoustic provisions and / or special low noise design.

51 3) suppliers best estimate, not necessarily guaranteed.

52

53

54

55

56

57

58

59

60

61

62

63

64

65

66

67

68

69

70

71

72

73

74

75

76

Project No:

Datasheet No: 125355-07-DS-04-102

NOISE DATASHEET

PETROVIETNAM GAS JOINT STOCK CORPORATIONThai Binh - Ham Rong Gas Distribution & Gathering System Project - Phase 1

SHEET

8 of 9

125355 Rev

A0

P & ID No. : TBA Manufacturer:

Process Datasheet Ref. : Purchase Order No. :

DATASHEET FOR FIREWATER JOCKEY PUMPTag No. : P-402 J Client:

Service: Firewater Jockey Pump Plant Location:

Page 9: 125355-07-DAS-04-102Mechanical Datasheet for Firewater Jockey Pump.pdf

DATASHEET FOR FIREWATER JOCKEY PUMPTag No.: P-402 J Client: Petrovietnam Gas Joint Stock Corporation

Service: Firewater Jockey Pump Plant Location:

P & ID No. : TBA Manufacturer:

Process Datasheet Ref. : Purchase Order No. :

No. of Units: One (1) Service Description: Firewater Jockey Pump

1

2 NOTES:

3

4 1. Equipment orientation on each skid or item shall be indicated

5 2. COG coordinates shall be clearly shown on the G.A. drawings.

6

7

8

9

10

11

12

13 C.O.G.

14

15

16

17

18

19

20

21

22

23

24

25

26

27 C.O.G.

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49 PLAN

50

51

52

53

54

55

56

57

58

59

60

61

62

63

PETROVIETNAM GAS JOINT STOCK CORPORATION

Thai Binh - Ham Rong Gas Distribution & Gathering System Project - Phase 1

Project No.

Datasheet No. 125355-07-DS-04-102

SHEET

9 of 9

ELEVATION

PERMANENT ACCESS REQUIRED AROUND THE SKID / EQUIPMENT (SPACE ENVELOPE)

Supplier shall indicate orientation by showing location of main connections or prime mover etc.

125355 Rev

A0

Z

Weight

X

Y

DIMENSION Hmax (mm)

PLAN

OVERALL SIZES

Dimension Dry Operating Hydrotest

Thai Binh, Vietnam

WEIGHT DATA SHEET

OVERALL SIZES

DIMENSION Lmax (mm)

DIMENSION Wmax (mm)Y

Wmax

X

Lmax

X

Hmax

A

D

C B