DESCRIPTION
specTRANSCRIPT
SECTION 09300 _ TILE
Summary:
1. Provide tile for the following applications:
a. Wall tile over tile backer board at wet areas.
b. Floor tile over concrete slab.
Submittals:
1. Submit product data, samples, 4 foot by 4 foot mockup.
Products:
1. Products: As selected by Architect complying with the following.
2. Tile Materials: ANSI A 118 series standard specifications.
3. Unglazed Ceramic Tile:
a. Type: Porcelain
b. Type: Natural clay
c. Size: 12 by 24 inches
d. Thickness: 1/4 inch nominal.
e. Size: Plain face with cushion edges
4. Tile Accessories:
a. Matching trim units.
b. Marble thresholds.
5. Setting Materials:
a. Latex_Portland cement mortar, ANSI A118.4.
12. Grout:
a. Latex_Portland cement grout, ANSI A118.6.
13. Setting Accessories:
a. Membrane waterproofing under tile.
b. Cementitious tile backer board.
14. Elastomeric Sealants:
a. One_part mildew_resistant silicone sealant for non_traffic areas.
Installation:
1. Comply with requirements of Section 01000 - Project Requirements.
2. Comply with ANSI 108 series standard specifications and Tile Council of America, Handbook
for Ceramic Tile Installation.
3. Layout tile in grid pattern with alignment of grids, to provide uniform joint width, and to
minimize cutting. Refer to finish schedule.
4. Grout, cure, clean and protect tile surfaces.
SECTION 09510 - ACOUSTICAL CEILINGS
Summary:
1. Provide acoustical lay-in ceilings, trim, and metal suspension system.
Submittals:
1. Submit product data, samples.
Products:
1. Products: As selected by Architect complying with the following.
2. Acoustical Panel Ceilings:
a. Size: 24 by 24 inches
b. Thickness: 5/8 inch.
c. Edge Detail: Square.
d. Pattern: Non Directional Fissured
e. Type and Finish, ASTM E 1264: III
3. Suspension Systems:
a. Exposed grid suspension system, ASTM C 635 intermediate duty classification, standard
profile.
b. Fire-Rating: Non-fire-resistance rated suspension system.
c. Suspension System Accessories: Attachment devices and hangers, ASTM C 635.
d. Cap Material: Painted aluminum finish.
e. Edge molding and trim.
Installation:
1. Comply with requirements of Section 01000 - Project Requirements.
2. Measure and layout acoustical ceilings to avoid less than 1/2 panel units whenever practical.
3. Install suspension systems in accordance with ASTM C 636.
4. Install panels with pattern or grain running one-way.
SECTION 09910 - PAINTING
Summary:
1. Provide painting and surface preparation for interior and exterior finished/unfinished
surfaces.
Submittals:
2. Submit product data, samples, 4 foot by 4 foot mockup of each color, extra stock consisting
of 1 unopened gallon of each type of paint used.
Products:
1. Products: Sherwin Williams or approved equal.
2. Regulations: Compliance with VOC and environmental regulations.
Installation:
1. Comply with requirements of Section 01000 - Project Requirements.
2. Provide field-applied mock-ups of each color and finish selected on actual surfaces to be
painted.
3. Test sample area for adhesion for each type of paint.
4. Remove cover plates and protect hardware and adjacent surfaces.
5. Sand before painting until smooth and flat and sand between coats.
6. Apply paint to achieve manufacturer's recommended dry film thicknesses.
7. Paint entire surface where patch painting is required.
8. Recoat areas which show bleed-through or defects.
9. Clean paint spatter from adjacent surfaces and glass.
10. Touch-up damaged surfaces at completion of construction.
Schedule:
1. Provide paint systems complying with the following schedule.
2. Gypsum Drywall Walls:
a. Gloss:
1). Semi
b. System:
1). 1 coat latex primer
2). 2 coats latex finish
3. Gypsum Drywall Walls and Ceilings in Bathrooms, Kitchens and Wet Areas:
a. Gloss:
1). High
b. System:
1). 1 coat latex primer
2). 2 coats latex finish
4. Gypsum Drywall Walls to Receive Wall Covering:
a. System:
1). 1 coat latex primer
5. Gypsum Drywall Ceilings:
a. Gloss:
1). Flat
b. System:
1). 1 coat latex primer
2). 2 coats latex finish
6. Wood for Painted Finish:
a. Gloss:
1). High
b. System:
1). 2 coats latex enamel
7. Wood for Transparent Finish:
a. Gloss:
1). High
b. System:
1). 1 coat oil base sealer
2). 2 coats oil base varnish
8. Wood for Stain Finish:
a. Gloss:
1). High
b. System:
1). 1 coat oil base wood stain
2). 2 coats oil base varnish
9. Concrete Masonry Units:
a. Gloss:
1). Flat
b. System:
1). 1 coat latex block filler
2). 2 coats latex finish
10. Ferrous Metals:
a. Gloss:
1). Flat
b. System:
1). 1 coat rust-inhibiting primer
2). 2 coats alkyd enamel
11. Galvanized Metal:
a. Gloss:
1). Flat
b. System:
1). 1 coat galvanized metal primer
2). 2 coats alkyd enamel
SECTION 10522 - FIRE EXTINGUISHERS AND CABINETS
Summary:
1. Provide fire extinguishers and cabinets
a. Fire extinguishers.
b. Fire extinguisher cabinets.
c. Fire extinguisher mounting brackets.
Submittals:
1. Submit product data.
Products:
1. Products: As selected by Architect complying with the following.
2. Standards: UL and FM listed products.
3. Fire Extinguishers:
a. Type: Multipurpose dry chemical.
b. Rating: Sized for project requirements.
c. Public Area Mounting: Cabinet mounted.
d. Service Area Mounting: Metal brackets.
4. Cabinets:
a. Mounting: Semi-recessed.
b. Trim: Exposed.
c. Doors: Enameled steel, baked enamel.
d. Door Style: Solid panel.
Installation:
1. Comply with requirements of Section 01000 - Project Requirements.
SECTION 10800 - TOILET AND BATH ACCESSORIES
Summary:
1. Provide toilet and bath accessories and metal framed mirrors.
Submittals:
1. Submit product data, samples.
Products:
1. Products: As selected by Architect complying with the following.
2. Toilet Accessories: Refer to Accessory Schedule.
a. Paper towel dispensers.
b. Toilet tissue dispensers, single roll.
c. Toilet tissue dispensers, double roll.
d. Combination towel dispenser/waste receptacle units.
e. Grab bars.
3. Mirrors and Frames:
a. Glazing: Mirror glass, 1/4 inch thick (6 mm), ASTM C 1036.
b. Frames: Stainless steel.
c. Type: Standard wall unit
4. Materials and Finishes:
a. Stainless Steel: AISI Type 302 or 304, No. 4 polished finish.
Installation:
1. Comply with requirements of Section 01000 - Project Requirements.
DIVISION 15 - MECHANICAL - REFERENCE MEP DOCUMENTS
SECTION 15300 - FIRE PROTECTION - REFERENCE MEP DOCUMENTS
SECTION 15400 - PLUMBING - REFERENCE MEP DOCUMENTS
SECTION 15500 - HVAC - REFERENCE MEP DOCUMENTS
DIVISION 16 - ELECTRICAL - REFERENCE MEP DOCUMENTS
A9.22
DATE: 10.04.2013
JOB NO: 13047
REVISIONS:
TEXA
N AL
LERG
Y -
VIST
A 62
0 BU
ILDING
5A
PROJ
ECT
BY H
UFFM
AN B
UILD
ERS
1750
ROU
ND R
OCK
AVEN
UE, SU
ITE
BRO
UND
ROCK
, TE
XAS
7868
1
10.04.2013