13/12/2013group 4. multi-storey building with large spaces crow’s nest experience transparent...
TRANSCRIPT
Group 413/12/2013
HISTORIC SHIP ENCLOSURE
Group 4
DESIGN REQUIREMENT
• Multi-storey building with large spaces
• Crow’s nest experience
• Transparent enclosure providing an air-conditioned weather-proof environment
13/12/2013
Group 4
INSPIRATIONThe Great Wave off Kanagawa
13/12/2013
Waves created by bow of a ship
Ship in condition of being titled by waves
Group 4
CONCEPTUAL DESIGN
13/12/2013
Progress 1
Progress 2
Progress 4
Progress 3
Group 4
FINAL DESIGN
13/12/2013
Group 4
FINAL DESIGN
Similar to Corporation Street Footbridge , Manchester
13/12/2013
Group 4
STRUCTURE OF THE BUILDING
13/12/2013
Group 4
ELEVATION VIEW OF ADJACENT BUILDING
13/12/2013
Group 4
PLAN VIEW OF ADJACENT BUILDING
13/12/2013
Group 4
THE SEQUENCE OF BRACING
13/12/2013
Group 4
CROW’S NEST
Side view
13/12/2013
Group 4
CROW’S NEST
13/12/2013
Group 4
CRITICAL MEMBERS
13/12/2013
A section of Crow’s nest
Group 4
SWAY SENSITIVITY
13/12/2013
Wind
Foundation
Group 4
SWAY SENSITIVITY
13/12/2013
Wind
FoundationFoundation
Group 4
CONSTRUCTION MATERIALS
13/12/2013
Composite Slabs • Easy to design
• Little restrictions compared to alternatives
Glass Cladding – Hybrid Series 3 curtain wall system• High insulation
timber/aluminium composite system
• Designed to meet current and future building regulationsSteel
members• Using an electric arc furnace
achieving up to 100% recyclable
Group 4
CONSTRUCTION PROCESS
13/12/2013
Group 4
SUSTAINABILITY
Structural Steel Frame :• 80% recycle • Electric arc furnace• reusable
Stimulate Local Economy• Social Benefit
13/12/2013
Group 4
QUESTION TIME!
13/12/2013