132-18 41th rd steel shop drawing 11_21_2015

172
4 - ANGLESES - A1 BILL OF MATERIAL MARK QTY DESCRIPTION LENGTH WEIGHT REMARKS A1 4 A1 4 L3-1/2X3-1/2X3/8 14'-6 1/4" 494 A36 SQ-2 ANGLESES a1 20 L3-1/2X3-1/2X3/8 0'-5 1/2" 78 A36 TOTAL WEIGHT THIS DRAWING 572 REV DESCRIPTION DATE FAB-NAME PROJECT NAME DRAWN BY DATE DRAWN JOB No. DRG No. 132-18 41 ROAD FLUSHING 10/28/2015 003 A1 A1 Master Detailing, LLC Phone:201-622-8207 Email:[email protected] Peter Zhang CGS Iron Work 14'-6 1 4 / 2 3 8 / 1 1 8 / 1'-3 1 8 / 3'-0 3'-0 3'-0 3'-0 1'-3 1 8 / 13 16 / 13 16 / 13 16 / 13 16 / 13 16 / 5- a1 (F/S) A A 13 16 / 13 16 / 13 16 / 13 16 / 13 16 / 2 3 8 / 1 1 8 / 1 1 8 / 2 3 8 / A-A

Upload: peter-zhang

Post on 14-Apr-2017

200 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: 132-18 41th RD steel shop drawing 11_21_2015

4 - ANGLESES - A1

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

A1 4

A1 4 L3-1/2X3-1/2X3/8 14'-6 1/4" 494 A36

SQ-2ANGLESES

a1 20 L3-1/2X3-1/2X3/8 0'-5 1/2" 78 A36

TOTAL WEIGHT THIS DRAWING 572

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 A1

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

14'-614/

238/

118/

1'-318/ 3'-0 3'-0 3'-0 3'-0 1'-318/

1316/1316/1316/1316/

1316/5- a1 (F/S)

A

A

1316/1316/1316/1316/1316/

238/

118/

118/ 238/

A - A

Page 2: 132-18 41th RD steel shop drawing 11_21_2015

ONE - BEAM - B1

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B1 1

B1 1 W14X48 23'-11 1/2" 1150 A992

SQ-2BEAM

TOTAL WEIGHT THIS DRAWING 1150

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B1

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

33

331

2/

331

2/

331

2/

22

414/

312/

414/

312/

23'-1112/

4'-914/ 4'-978/ 4'-934/ 4'-934/ 4'-878/

218/ 218/218/ 218/ 218/ 218/ 218/ 218/4 4

4 4

1316/

1316/

1316/1316/1316/ 1316/

B

B

A

A

33

331

2/

4

13

31

4

13

31

A - A B - B

Page 3: 132-18 41th RD steel shop drawing 11_21_2015

ONE - BEAM - B2

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B2 1

B2 1 W14X48 23'-4 1/16" 1120 A992

SQ-2BEAM

TOTAL WEIGHT THIS DRAWING 1120

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B2

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

33

331

2/

331

2/

331

2/

414/

312/

414/

312/

23'-4116/

4'-5916/ 4'-978/ 4'-934/ 4'-934/ 4'-5316/

218/ 218/ 218/ 218/218/ 218/218/ 218/1316/

GA 4

1316/GA 4

1316/1316/

1316/ 1316/ 1316/1316/

A

AA

A

33

218/218/

331

2/

22

22

33

33

23'-4116/218/

22

22

218/1316/

1316/

2 2 2 2

2 2 2 2

A - A

Page 4: 132-18 41th RD steel shop drawing 11_21_2015

ONE - BEAM - B3

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B3 1

B3 1 W14X48 23'-7 3/4" 1135 A992

SQ-2BEAM

TOTAL WEIGHT THIS DRAWING 1135

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B3

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

33

331

2/

331

2/

331

2/

218/2

414/

312/

414/

312/

23'-734/

4'-914/ 4'-978/ 4'-934/ 4'-934/ 4'-518/

218/ 218/218/ 218/218/ 218/218/ 218/4

4

1316/1316/ 1316/ 1316/1316/

1316/

B

BA

A

33

331

2/

33

23'-734/

218/4

22

22

13

31

1316/

A - A

2 2 2 2

2 2 2 2

B - B

Page 5: 132-18 41th RD steel shop drawing 11_21_2015

2 - BEAMS - B4

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B4 2

B4 2 W14X48 23'-7 7/8" 2270 A992

SQ-2BEAMS

TOTAL WEIGHT THIS DRAWING 2270

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B4

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

33

331

2/

331

2/

331

2/

218/

414/

312/

2

414/

312/

23'-778/

4'-9516/ 4'-978/ 4'-934/ 4'-934/ 4'-5316/

218/ 218/ 218/ 218/218/ 218/218/ 218/4

4

1316/1316/ 1316/ 1316/ 1316/1316/

B

BA

A

33

331

2/

33

23'-778/

218/

4

4

13

31

22

22

1316/

A - A2 2 2 2

2 2 2 2

B - B

Page 6: 132-18 41th RD steel shop drawing 11_21_2015

ONE - BEAM - B5

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B5 1

B5 1 W14X48 23'-7 7/8" 1135 A992

SQ-2BEAM

TOTAL WEIGHT THIS DRAWING 1135

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B5

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

33

312/

331

2/

331

2/

331

2/

2

414/

312/

414/

312/

23'-778/

4'-9516/ 4'-978/ 4'-934/ 4'-934/ 4'-5316/

218/ 218/ 218/ 218/218/ 218/218/ 218/4

4

1316/1316/ 1316/ 1316/ 1316/1316/

B

BA

A218/

33

3

33

23'-778/

4 218/1

33

1

4

22

22

1316/

A - A 2 2 2 2

2 2 2 2

B - B

Page 7: 132-18 41th RD steel shop drawing 11_21_2015

ONE - BEAM - B6

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B6 1

B6 1 W14X34 18'-0 7/8" 615 A992

SQ-2BEAM

TOTAL WEIGHT THIS DRAWING 615

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B6

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

33

33

2

412/

312/

218/

412/

312/

331

2/

331

2/

18'-078/

5'-5916/ 6'-4 6'-3516/

218/ 218/ 218/ 218/

4

4

1316/1316/ 1316/ 1316/

B

BA

A

33

18'-078/

4

4218/

1 2/27

8/27

8/1 2/

138/

22

138/ 1316/

138/ 2 2 138/

138/ 2 2 138/

A - A

B - B

Page 8: 132-18 41th RD steel shop drawing 11_21_2015

ONE - BEAM - B7

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B7 1

B7 1 W14X34 18'-4 1/2" 625 A992

SQ-2BEAM

TOTAL WEIGHT THIS DRAWING 625

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B7

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

33

33

22

331

2/

331

2/

412/

312/

412/

312/

18'-412/

5'-914/ 6'-4 6'-314/

218/ 218/ 218/ 218/

4 4

4 4

1316/1316/

1316/

1316/

B

BA

A

44278/

278/

278/

278/

A - A

312/

B - B

Page 9: 132-18 41th RD steel shop drawing 11_21_2015

ONE - BEAM - B8

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B8 1

B8 1 W14X34 17'-9" 604 A992

SQ-2BEAM

TOTAL WEIGHT THIS DRAWING 604

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B8

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

33

33

331

2/

218/218/

331

2/

412/

312/

412/

312/

17'-9

5'-512/ 6'-4 5'-1112/

218/ 218/ 218/ 218/

1316/GA 4

1316/GA 4

1316/1316/ 1316/ 1316/

B

BA

A

3333218/ 16'-434/ 218/

138/

22

138/

138/

22

138/

1316/1316/

138/ 2 2 138/

A - A

Page 10: 132-18 41th RD steel shop drawing 11_21_2015

3 - BEAMS - B9

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B9 3

B9 3 W14X34 17'-9 1/8" 1813 A992

SQ-2BEAMS

TOTAL WEIGHT THIS DRAWING 1813

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B9

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

33

33

218/218/

412/

312/

331

2/

331

2/

412/

312/

17'-918/

5'-5916/ 6'-4 5'-11916/

218/ 218/ 218/ 218/

1316/1316/ 1316/ 1316/

B

BA

A

33 33

138/

22

138/

138/

22

138/

218/ 16'-478/ 218/

1316/1316/

138/ 2 2 138/

A - A

2 2

B - B

Page 11: 132-18 41th RD steel shop drawing 11_21_2015

6 - BEAMS - B10

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B10 6

B10 6 W14X26 12'-11 7/8" 2040 A992

SQ-2BEAMS

TOTAL WEIGHT THIS DRAWING 2040

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B10

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

33

33

2218/

438/

312/

438/

312/

331

2/

331

2/

12'-1178/

4'-1316/ 4'-51116/ 4'-5

218/ 218/218/ 218/

1316/GA 3

1316/1316/ 1316/1316/

B

BA

A

33218/ 12'-334/11

2/11

2/ 1316/

112/ 112/

A - A

B - B

Page 12: 132-18 41th RD steel shop drawing 11_21_2015

2 - BEAMS - B11

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B11 2

B11 2 W14X26 12'-11 3/4" 679 A992

SQ-2BEAMS

TOTAL WEIGHT THIS DRAWING 679

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B11

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

33

33

438/

312/

438/

312/

331

2/

331

2/

2218/

12'-1134/

4'-1316/ 4'-51116/ 4'-41516/

218/ 218/218/ 218/

1316/GA 3

1316/

1316/1316/

1316/

B

BA

A

33

12'-1134/

218/

112/

112/

1316/

112/ 112/

A - A

B - B

Page 13: 132-18 41th RD steel shop drawing 11_21_2015

2 - BEAMS - B12

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B12 2

B12 2 W14X26 13'-3 1/2" 696 A992

SQ-2BEAMS

TOTAL WEIGHT THIS DRAWING 696

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B12

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

33

33

438/

312/

438/

312/

331

2/

331

2/

13'-312/

2RD

13'-112/ 2

4'-41516/ 4'-51116/ 4'-41516/

218/ 218/218/ 218/

1316/1316/

1316/1316/

A

AA

A

312/

A - A

Page 14: 132-18 41th RD steel shop drawing 11_21_2015

2 - BEAMS - B13

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B13 2

B13 2 W10X15 7'-8 15/16" 232 A992

SQ-2BEAMS

a3 4 L4X3-1/2X5/16 0'-6" 15 A36

p24 4 L4X3-1/2X5/16 0'-6" 15 A36

TOTAL WEIGHT THIS DRAWING 263

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B13

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

7'-81516/

114/

712/

114/

312/

331

2/

2316/ 7'-4916/ 2316/

2716/ 7'-334/ 234/

312/

331

2/ 1316/

1316/p24 (B/S)

a3 (B/S)

B

BA

A

112/

311

2/2

218/ 218/

a3 a3

1316/

A - A

112/

311

2/2

218/ 218/

p24p24

1316/

B - B

Page 15: 132-18 41th RD steel shop drawing 11_21_2015

2 - BEAMS - B14

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B14 2

B14 2 W10X22 15'-10 1/4" 700 A992

SQ-2BEAMS

P2 2 FL3/8"X5" 1'-1 3/4" 15 A36

TOTAL WEIGHT THIS DRAWING 715

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B14

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

15'-1014/

1'-1118/ 3'-0 3'-0 3'-0 3'-0 1'-1118/

15'-834/ 112/

114/

738/

112/

358/

331

2/

5

5

1316/

A

A

212/ 212/

118/

134/

212/ 1'-858/ 3'-0 3'-0 3'-0 3'-0 1'-618/ 5

247

8/47

8/2

15'-1014/

38/TYP

34/

1316/1316/1316/1316/

1316/

P2

A - A

Page 16: 132-18 41th RD steel shop drawing 11_21_2015

12 - BEAMS - B15

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B15 12

B15 12 W10X22 15'-10 3/8" 4205 A992

SQ-2BEAMS

P2 12 FL3/8"X5" 1'-1 3/4" 88 A36

p24 24 L4X3-1/2X5/16 0'-6" 92 A36

TOTAL WEIGHT THIS DRAWING 4384

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B15

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

15'-8316/ 2316/

15'-1038/

15'-512/ 478/

114/

738/

112/

358/

331

2/1316/

p24 (B/S)

A

A

15'-1038/

212/ 212/

247

8/47

8/2 38/

TYP

34/

P2

112/

331

2/

218/ 218/1316/

A - A

Page 17: 132-18 41th RD steel shop drawing 11_21_2015

2 - BEAMS - B16

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B16 2

B16 2 W10X22 15'-0 13/16" 666 A992

SQ-2BEAMS

a3 8 L4X3-1/2X5/16 0'-6" 31 A36

TOTAL WEIGHT THIS DRAWING 696

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B16

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

2316/ 14'-8716/ 2316/

358/

331

2/

15'-01316/

358/

331

2/ 1316/1316/

a3 (B/S)

a3 (B/S)

B

B

A

A

218/ 218/

358/

331

2/

a3 a3

1316/

A - A

358/

331

2/

218/ 218/

a3

a3

1316/

B - B

Page 18: 132-18 41th RD steel shop drawing 11_21_2015

ONE - BEAM - B17

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B17 1

B17 1 W10X30 13'-3 15/16" 401 A992

SQ-2BEAM

a3 4 L4X3-1/2X5/16 0'-6" 15 A36

TOTAL WEIGHT THIS DRAWING 416

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B17

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

811

4/

178/ 12'-11516/ 234/

331

2/

43

312/

13'-31516/

114/

811

4/

331

2/

43

312/

4'-5316/ 4'-51116/ 4'-518/

218/ 218/218/ 218/

1316/1316/ 1316/1316/

a3 (B/S)

a3 (B/S)

B

BA

A

2316/2316/ 114/

43

312/

218/ 2316/

a3

a3

1316/

A - A

312/

1316/

Page 19: 132-18 41th RD steel shop drawing 11_21_2015

2 - BEAMS - B18

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B18 2

B18 2 W10X22 18'-6 1/4" 818 A992

SQ-2BEAMS

P2 2 FL3/8"X5" 1'-1 3/4" 15 A36

a3 4 L4X3-1/2X5/16 0'-6" 15 A36

TOTAL WEIGHT THIS DRAWING 848

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B18

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

18'-4116/ 2316/

18'-614/

358/

331

2/

1316/

a3 (B/S)

A

A

212/ 212/ 18'-114/

247

8/47

8/2

18'-614/

38/TYP

34/P2

358/

331

2/

218/ 218/

a3

a3

1316/

A - A

Page 20: 132-18 41th RD steel shop drawing 11_21_2015

2 - BEAMS - B19

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B19 2

B19 2 W10X15 18'-2 11/16" 547 A992

SQ-2BEAMS

a3 8 L4X3-1/2X5/16 0'-6" 31 A36

TOTAL WEIGHT THIS DRAWING 578

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B19

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

2316/ 17'-10516/ 2316/

114/

712/

114/

312/

331

2/

18'-21116/

312/

331

2/

31516/

1316/

1316/ a3 (B/S)

a3 (B/S)

B

BA

A

312/

331

2/

218/ 218/ a3

a3

1316/

A - A

312/

331

2/

218/ 218/

a3

a3

1316/

B - B

Page 21: 132-18 41th RD steel shop drawing 11_21_2015

2 - BEAMS - B20

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B20 2

B20 2 W10X15 18'-2 11/16" 547 A992

SQ-2BEAMS

a3 8 L4X3-1/2X5/16 0'-6" 31 A36

TOTAL WEIGHT THIS DRAWING 578

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B20

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

2316/ 17'-10516/ 2316/

312/

331

2/

18'-21116/

114/

712/

114/

312/

331

2/

314/

1316/1316/

a3 (B/S)

a3 (B/S)

B

BA

A

312/

331

2/

218/ 218/

1316/

A - A

312/

331

2/

218/ 218/

a3a3

1316/

B - B

Page 22: 132-18 41th RD steel shop drawing 11_21_2015

2 - BEAMS - B21

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B21 2

B21 2 W10X15 18'-2 13/16" 547 A992

SQ-2BEAMS

a3 8 L4X3-1/2X5/16 0'-6" 31 A36

TOTAL WEIGHT THIS DRAWING 578

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B21

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

2316/ 17'-10716/ 2316/

114/

712/

114/

312/

331

2/

18'-21316/

312/

331

2/

31516/

1316/

1316/ a3 (B/S)

a3 (B/S)

B

BA

A

312/

331

2/

218/ 218/

1316/

A - A

312/

331

2/

218/ 218/

a3

a3

1316/

B - B

Page 23: 132-18 41th RD steel shop drawing 11_21_2015

2 - BEAMS - B22

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B22 2

B22 2 W10X15 18'-2 13/16" 547 A992

SQ-2BEAMS

a3 8 L4X3-1/2X5/16 0'-6" 31 A36

TOTAL WEIGHT THIS DRAWING 578

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B22

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

312/

331

2/

2316/ 17'-10716/ 2316/

114/

712/

114/

18'-21316/

312/

331

2/

314/

1316/

1316/

a3 (B/S)

a3 (B/S)

B

BA

A

218/ 218/

312/

331

2/

a3 a3

1316/

A - A

312/

331

2/

218/ 218/

a3

a3

1316/

B - B

Page 24: 132-18 41th RD steel shop drawing 11_21_2015

2 - BEAMS - B23

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B23 2

B23 2 W10X15 18'-2 15/16" 548 A992

SQ-2BEAMS

a3 8 L4X3-1/2X5/16 0'-6" 31 A36

TOTAL WEIGHT THIS DRAWING 578

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B23

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

312/

331

2/

18'-21516/

2316/ 17'-10916/ 2316/

114/

712/

114/

312/

331

2/

31516/

1316/1316/

a3 (B/S)

a3 (B/S)

B

BA

A

312/

331

2/

218/ 218/

a3 a3

1316/

A - A

312/

331

2/

218/ 218/

a3a3

1316/

B - B

Page 25: 132-18 41th RD steel shop drawing 11_21_2015

2 - BEAMS - B24

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B24 2

B24 2 W10X15 18'-2 15/16" 548 A992

SQ-2BEAMS

a3 8 L4X3-1/2X5/16 0'-6" 31 A36

TOTAL WEIGHT THIS DRAWING 578

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B24

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

312/

331

2/

2316/ 17'-10916/ 2316/

312/

331

2/

18'-21516/

114/

712/

114/

314/

1316/

1316/

a3 (B/S)

a3 (B/S)

B

BA

A

312/

331

2/

218/ 218/a3

a3

1316/

A - A

312/

331

2/

218/ 218/

a3

a3

1316/

B - B

Page 26: 132-18 41th RD steel shop drawing 11_21_2015

11 - BEAMS - B25

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B25 11

B25 11 W10X22 18'-10 3/8" 4583 A992

SQ-2BEAMS

P2 11 FL3/8"X5" 1'-1 3/4" 80 A36

p24 22 L4X3-1/2X5/16 0'-6" 84 A36

TOTAL WEIGHT THIS DRAWING 4748

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B25

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

18'-8316/ 2316/

358/

331

2/

114/

738/

112/

18'-1038/

478/1316/

p24 (B/S)

A

A

247

8/47

8/2

212/ 212/

18'-1038/

38/TYP

34/

P2

358/

331

2/

218/ 218/

p24

p24

1316/

A - A

Page 27: 132-18 41th RD steel shop drawing 11_21_2015

5 - BEAMS - B26

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B26 5

B26 5 W10X15 18'-6 7/8" 1394 A992

SQ-2BEAMS

a3 10 L4X3-1/2X5/16 0'-6" 38 A36

p24 10 L4X3-1/2X5/16 0'-6" 38 A36

TOTAL WEIGHT THIS DRAWING 1470

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B26

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

2316/ 18'-212/ 2316/

312/

331

2/

114/

712/

114/

18'-678/

312/

331

2/

114/

738/

1516/

2716/ 378/

1316/

1316/

p24 (B/S)

a3 (B/S)

B

BA

A

312/

331

2/

218/ 218/a3

a31316/

A - A

312/

331

2/

218/ 218/

p24

p24

1316/

B - B

Page 28: 132-18 41th RD steel shop drawing 11_21_2015

3 - BEAMS - B27

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B27 3

B27 3 W10X15 18'-6 7/8" 836 A992

SQ-2BEAMS

a3 6 L4X3-1/2X5/16 0'-6" 23 A36

p24 6 L4X3-1/2X5/16 0'-6" 23 A36

TOTAL WEIGHT THIS DRAWING 882

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/29/2015 003 B27

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

312/

331

2/

2316/ 18'-212/ 2316/

114/

738/

1516/

114/

712/

114/

343

8/

18'-678/

9'-612/ 4'-1 4'-1 10716/

218/ 218/218/ 218/218/ 218/

2716/ 378/

a3 (B/S)

p24 (B/S)

1316/1316/

1316/

1316/1316/

B

BA

A

343

8/

343

8/

312/

331

2/

312/

331

2/

218/ 218/a3

a3

1316/

A - A

312/

331

2/

218/ 218/

p24p24

1316/

B - B

Page 29: 132-18 41th RD steel shop drawing 11_21_2015

14 - BEAMS - B28

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B28 14

B28 14 W10X15 18'-6 7/8" 3902 A992

SQ-2BEAMS

a3 28 L4X3-1/2X5/16 0'-6" 107 A36

p24 28 L4X3-1/2X5/16 0'-6" 107 A36

TOTAL WEIGHT THIS DRAWING 4117

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B28

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

312/

331

2/

114/

738/

1516/

18'-678/

2316/ 18'-212/ 2316/

312/

331

2/

114/

712/

114/ 31516/ 378/

1316/

1316/

p24 (B/S)a3 (B/S)

B

BA

A

312/

331

2/

218/ 218/a3

a3

1316/

A - A

312/

331

2/

218/ 218/

p24 p24

1316/

B - B

Page 30: 132-18 41th RD steel shop drawing 11_21_2015

4 - BEAMS - B29

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B29 4

B29 4 W10X15 18'-6 7/8" 1115 A992

SQ-2BEAMS

a3 8 L4X3-1/2X5/16 0'-6" 31 A36

p24 8 L4X3-1/2X5/16 0'-6" 31 A36

TOTAL WEIGHT THIS DRAWING 1176

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/29/2015 003 B29

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

2316/

331

2/

114/

738/

1516/

312/

331

2/

114/

712/

114/

9'-6716/ 4'-1 4'-1 10716/

218/ 218/ 218/ 218/218/ 218/31516/ 378/

1316/1316/

1316/1316/

1316/

p24 (B/S)

a3 (B/S)

B

BA

A

343

8/

343

8/

343

8/

18'-678/

18'-212/ 2316/

312/

312/

331

2/

218/ 218/a3

a3

1316/

A - A 312/

331

2/

218/ 218/

p24p24

1316/

B - B

Page 31: 132-18 41th RD steel shop drawing 11_21_2015

6 - BEAMS - B30

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B30 6

B30 6 W10X15 18'-6 7/8" 1672 A992

SQ-2BEAMS

a3 12 L4X3-1/2X5/16 0'-6" 46 A36

p24 12 L4X3-1/2X5/16 0'-6" 46 A36

TOTAL WEIGHT THIS DRAWING 1764

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B30

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

2316/ 18'-212/ 2316/

18'-678/

312/

331

2/

114/

738/

1516/

312/

331

2/

114/

712/

114/

314/ 378/

1316/

1316/p24 (B/S)

a3 (B/S)

B

BA

A

312/

331

2/

218/ 218/

a3a3 1316/

A - A

312/

331

2/

218/ 218/

p24 p24

1316/

B - B

Page 32: 132-18 41th RD steel shop drawing 11_21_2015

ONE - BEAM - B31

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B31 1

B31 1 W10X22 17'-10 1/2" 395 A992

SQ-2BEAM

a3 4 L4X3-1/2X5/16 0'-6" 15 A36

TOTAL WEIGHT THIS DRAWING 410

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B31

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

2316/ 17'-618/ 2316/

358/

331

2/

358/

331

2/

17'-1012/

1316/1316/

a3 (B/S)

a3 (B/S)

B

BA

A

358/

331

2/

218/ 218/a3

a31316/

A - A

4/

218/

1316/

- B

Page 33: 132-18 41th RD steel shop drawing 11_21_2015

3 - BEAMS - B32

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B32 3

B32 3 W10X30 17'-10 1/2" 1613 A992

SQ-2BEAMS

a3 12 L4X3-1/2X5/16 0'-6" 46 A36

TOTAL WEIGHT THIS DRAWING 1659

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B32

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

17'-1012/

2316/ 17'-618/ 2316/

43

312/

43

312/

1316/

1316/a3 (B/S)

a3 (B/S)

B

BA

A

43

312/

218/ 218/a3

a31316/

A - A

43

312/

218/ 218/

a3

a3

1316/

B - B

Page 34: 132-18 41th RD steel shop drawing 11_21_2015

ONE - BEAM - B33

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B33 1

B33 1 W10X30 17'-10 7/16" 538 A992

SQ-2BEAM

a3 4 L4X3-1/2X5/16 0'-6" 15 A36

p6 2 FL3/8"X3 3/4" 0'-6" 5 A36

p17 3 FL1/2"X5 1/4" 1'-7 1/4" 43 A36

p18 6 FL1/2"X5 1/4" 0'-7 15/16" 36 A36

TOTAL WEIGHT THIS DRAWING 636

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/29/2015 003 B33

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

218/

43

312/

1316/

a3 (B/S)

a3 (B/S)

A

AD

D

C

C

B

B

9'-2316/ 4'-1 4'-112/ 534/

9'-01316/ 234/ 3'-1014/ 234/ 3'-1014/ 234/ 478/

343

8/

343

8/

17'-618/ 2316/

43

312/

17'-10716/

218/ 218/ 218/ 218/

38/TYP

12/TYP

12/TYP

1316/1316/GA 3

p17p17p17

1316/

1316/ 1316/

1316/

p18

p18

p18

p18

p18

p18

218/ 3 3

112/

112/

1316/

1316/1316/

33

958/

138/

112/ 518/ 518/ 112/

12/TYP

p18p18

p17

B - B

33

318/

343

8/

2716/ 2716/

958/

138/

112/ 518/ 518/ 112/

p6 p6

C - C

112/ 3 518/ 518/ 3 112/

918/

138/

p17

p18p18

D - D

43

312/

218/ 218/

112/ 112/a3

a3

1316/

A - A

Page 35: 132-18 41th RD steel shop drawing 11_21_2015

2 - BEAMS - B34

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B34 2

B34 2 W10X30 17'-10 5/8" 1076 A992

SQ-2BEAMS

a3 8 L4X3-1/2X5/16 0'-6" 31 A36

p6 4 FL3/8"X3 3/4" 0'-6" 10 A36

p17 6 FL1/2"X5 1/4" 1'-7 1/4" 86 A36

p18 12 FL1/2"X5 1/4" 0'-7 15/16" 71 A36

TOTAL WEIGHT THIS DRAWING 1274

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/29/2015 003 B34

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

218/

43

312/

1316/a3 (B/S)

a3 (B/S)

A

A D

D

C

C

B

B

3 3 8'-478/ 234/ 3'-1014/ 234/ 3'-1014/ 234/ 5

2316/218/

43

312/

9'-2516/ 4'-1 4'-112/ 578/

343

8/

343

8/

17'-1058/

218/ 218/218/ 218/

212/

12/TYP

12/TYP

38/TYP

p17p17

p6 (B/S) 1316/1316/ 1316/

p18

p17

p18

p18

p17

p18

p18

218/ 3 3

112/

112/

1316/

1316/ 1316/1316/ p17

p18

3 3

918/

138/

112/ 518/ 518/ 112/

12/TYP

12/TYP

p18p18

p17

B - B

3412/ 518/ 518/ 112/

318/

343

8/

918/

138/

238/ 238/

p17

p18 p18

p6

p6

C - C

938/

138/

112/ 3 518/ 518/ 3 112/

p17

p18p18

D - D

43

312/

218/ 2316/

112/ 112/a3

a3

1316/

A - A

Page 36: 132-18 41th RD steel shop drawing 11_21_2015

ONE - BEAM - B35

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B35 1

B35 1 W10X30 17'-10 7/8" 539 A992

SQ-2BEAM

a3 4 L4X3-1/2X5/16 0'-6" 15 A36

p6 2 FL3/8"X3 3/4" 0'-6" 5 A36

p17 3 FL1/2"X5 1/4" 1'-7 1/4" 43 A36

p18 6 FL1/2"X5 1/4" 0'-7 15/16" 36 A36

TOTAL WEIGHT THIS DRAWING 637

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/29/2015 003 B35

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

218/

43

312/

1316/

a3 (B/S)

a3 (B/S)

A

A D

D

C

C

B

B

43

312/

3 3 8'-5 234/ 3'-1014/ 234/ 3'-1014/ 234/ 518/

343

8/

343

8/

2316/218/

9'-2716/ 4'-1 4'-112/ 6

17'-1078/

218/ 218/218/ 218/

12/TYP

12/TYP

38/TYP

1316/1316/

1316/

1316/

1316/ 1316/

p18

p17

p18

p18

p17

p18

p18

218/ 3 3

112/

112/

1316/

1316/ 1316/1316/ p17

p18

3 3

938/

138/

112/ 518/ 518/ 112/

12/TYP 12/

TYP

p18p18

p17

B - B518/ 33

918/

138/

112/ 518/ 112/

318/

343

8/

238/ 238/

p6 p6

p18p18

C - C

918/

138/

112/ 3 518/ 518/ 3 112/

p17

p18p18

D - D

43

312/

218/ 218/

112/ 112/

1316/

A - A

Page 37: 132-18 41th RD steel shop drawing 11_21_2015

ONE - BEAM - B36

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B36 1

B36 1 W10X30 17'-10 7/8" 539 A992

SQ-2BEAM

a3 4 L4X3-1/2X5/16 0'-6" 15 A36

TOTAL WEIGHT THIS DRAWING 554

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/29/2015 003 B36

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

218/ 17'-6916/ 2316/

17'-1078/

43

312/

43

312/

1316/GA 3

1316/GA 3

1316/

1316/

a3 (B/S)

a3 (B/S)

B

BA

A

218/ 3 3

17'-1078/

138/

112/ 11

2/13

8/

1316/

43

312/

218/ 218/

112/ 112/a3

a3

1316/

A - A 43

312/

218/ 218/

a3

a3

1316/

B - B

Page 38: 132-18 41th RD steel shop drawing 11_21_2015

ONE - BEAM - B37

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B37 1

B37 1 W10X30 17'-10 7/16" 538 A992

SQ-2BEAM

a3 4 L4X3-1/2X5/16 0'-6" 15 A36

p6 2 FL3/8"X3 3/4" 0'-6" 5 A36

p17 3 FL1/2"X5 1/4" 1'-7 1/4" 43 A36

p18 6 FL1/2"X5 1/4" 0'-7 15/16" 36 A36

TOTAL WEIGHT THIS DRAWING 636

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/29/2015 003 B37

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

218/

43

312/ 1316/

a3 (B/S)

a3 (B/S)

A

A D

D

C

C

B

B

3 3 8'-434/ 234/ 3'-1014/ 234/ 3'-1014/ 234/ 478/

321

2/17

8/

321

2/17

8/

9'-2316/ 4'-1 4'-078/ 638/

2316/218/

43

312/

17'-10716/

218/ 218/

218/ 218/

12/TYP

38/TYP

12/TYP

1316/GA 3

1316/

1316/ 1316/

17'-10716/

p18

p17

p18

p18

p17

p18

p18

218/ 3 3

112/

112/

1316/

1316/1316/1316/

p18

p17

3 3

918/

138/

112/ 518/ 518/ 112/

12/TYP 12/

TYP

p17

p18p18

B - B

518/ 33

318/

321

2/17

8/

112/ 518/ 112/

918/

138/

238/ 238/

p18

p18

p17

p6

p6

C - C

112/ 3 518/ 518/ 3 112/

918/

138/

p17

p18p18

D - D

43

312/

2316/ 2316/

112/ 112/a3

a3

1316/

A - A

Page 39: 132-18 41th RD steel shop drawing 11_21_2015

2 - BEAMS - B38

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B38 2

B38 2 W10X30 17'-10 5/8" 1076 A992

SQ-2BEAMS

a3 8 L4X3-1/2X5/16 0'-6" 31 A36

p6 4 FL3/8"X3 3/4" 0'-6" 10 A36

p17 6 FL1/2"X5 1/4" 1'-7 1/4" 86 A36

p18 12 FL1/2"X5 1/4" 0'-7 15/16" 71 A36

TOTAL WEIGHT THIS DRAWING 1274

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/29/2015 003 B38

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

218/

43

312/

1316/

a3 (B/S)

a3 (B/S)

A

A D

D

C

C

B

B

3 3 8'-478/ 234/ 3'-1014/ 234/ 3'-1014/ 234/ 5

9'-2516/ 4'-1 4'-078/ 612/

2316/218/

343

8/

343

8/

43

312/

17'-1058/

218/ 218/ 218/ 218/

38/TYP12/

TYP

12/TYP

p6

1316/GA 3

1316/

1316/

1316/

17'-1058/

p18

p17

p18

p18

p17

p18

p18

218/ 3 3

112/

112/

1316/

1316/ 1316/1316/ p17

p18

3 3

918/

138/

112/ 518/ 518/ 112/

12/TYP

12/TYP

p17

p18p18

1316/

B - B

518/ 33

318/

321

2/17

8/

918/

138/

112/ 518/ 112/

238/ 238/

p6

p6

p18p18

C - C

112/ 3 518/ 518/ 3 112/

918/

138/

p17p18

p18

D - D

43

312/

2316/ 2316/

112/ 112/a3

a3

1316/

A - A

Page 40: 132-18 41th RD steel shop drawing 11_21_2015

ONE - BEAM - B39

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B39 1

B39 1 W10X30 17'-10 7/8" 539 A992

SQ-2BEAM

a3 4 L4X3-1/2X5/16 0'-6" 15 A36

p6 2 FL3/8"X3 3/4" 0'-6" 5 A36

p17 3 FL1/2"X5 1/4" 1'-7 1/4" 43 A36

p18 6 FL1/2"X5 1/4" 0'-7 15/16" 36 A36

TOTAL WEIGHT THIS DRAWING 637

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/29/2015 003 B39

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

218/

218/4

331

2/

a3 (B/S)

A

A D

D

C

C

B

B

3 3 8'-5 234/ 3'-1014/ 234/ 3'-1014/ 234/ 518/

7'-3516/ 1'-9 4'-1 4'-078/ 4716/ 2316/

343

8/

343

8/

331

2/

43

312/

17'-1078/

218/ 218/218/ 218/ 218/ 218/

12/TYP

38/TYP

38/TYP

1316/GA 3

1316/

1316/

1316/

1316/

1316/

a3 (B/S)

1316/

p18

p18

p17

p18

p18

218/ 3 3

112/

112/ 1316/

1316/1316/

p17

p18

p18

p17

3 3

918/

138/

112/ 518/ 518/ 112/

12/TYP

12/TYP

p18p18

p17

B - B

518/ 33

318/

321

2/17

8/

918/

138/

112/ 518/ 112/

238/ 238/

p6p6

p18 p18

C - C

918/

138/

112/ 3 518/ 518/ 3 112/

p17

p18p18

D - D

43

312/

2316/ 2316/

112/ 112/a3

a3

1316/

A - A

Page 41: 132-18 41th RD steel shop drawing 11_21_2015

2 - BEAMS - B40

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B40 2

B40 2 W10X15 18'-2 7/8" 548 A992

SQ-2BEAMS

a3 4 L4X3-1/2X5/16 0'-6" 15 A36

p24 4 L4X3-1/2X5/16 0'-6" 15 A36

TOTAL WEIGHT THIS DRAWING 578

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B40

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

2316/ 17'-1012/ 2316/

312/

331

2/

114/

738/

1516/

18'-278/

312/

331

2/

378/

1316/

1316/p24 (B/S)

a3 (B/S)

B

BA

A

312/

331

2/

218/ 218/

a3a3

1316/

A - A

312/

331

2/

218/ 218/

p24

p24

1316/

B - B

Page 42: 132-18 41th RD steel shop drawing 11_21_2015

ONE - BEAM - B41

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B41 1

B41 1 W10X15 18'-2 7/8" 274 A992

SQ-2BEAM

a3 2 L4X3-1/2X5/16 0'-6" 8 A36

p24 2 L4X3-1/2X5/16 0'-6" 8 A36

TOTAL WEIGHT THIS DRAWING 289

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B41

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

2316/ 17'-1012/ 2316/

312/

331

2/

114/

738/

1516/

18'-278/

312/

331

2/

312/

331

2/

7'-512/ 10'-9716/

218/ 2316/ 378/1316/1316/

1316/

p24 (B/S)a3 (B/S)

B

BA

A

312/

331

2/

218/ 218/a3

a31316/

A - A

312/

331

2/

218/ 218/

p24

p24

1316/

B - B

Page 43: 132-18 41th RD steel shop drawing 11_21_2015

ONE - BEAM - B42

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B42 1

B42 1 W10X30 18'-2 13/16" 549 A992

SQ-2BEAM

a3 2 L4X3-1/2X5/16 0'-6" 8 A36

p24 2 L4X3-1/2X5/16 0'-6" 8 A36

TOTAL WEIGHT THIS DRAWING 564

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/29/2015 003 B42

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

18'-21316/

43

312/

218/ 17'-1012/ 2316/

43

312/

134/

7716/

1516/

378/1316/GA 3

1316/GA 3

1316/1316/

p24 (B/S)

a3 (B/S)

B

BA

A

218/ 3 3

18'-21316/

112/

112/

1316/

43

312/

218/ 218/

112/ 112/a3

a3

1316/

A - A

43

312/

218/ 218/

p24

p24

1316/

B - B

Page 44: 132-18 41th RD steel shop drawing 11_21_2015

4 - BEAMS - B43

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B43 4

B43 4 W10X15 18'-2 3/4" 1094 A992

SQ-2BEAMS

a3 8 L4X3-1/2X5/16 0'-6" 31 A36

p24 8 L4X3-1/2X5/16 0'-6" 31 A36

TOTAL WEIGHT THIS DRAWING 1156

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B43

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

2316/ 17'-1038/ 2316/

312/

331

2/

114/

738/

1516/

18'-234/31

2/3

312/

378/

1316/

1316/

p24 (B/S)

a3 (B/S)

B

BA

A

312/

331

2/

218/ 218/a3

a3

1316/

A - A

312/

331

2/

218/ 218/

p24

p24

1316/

B - B

Page 45: 132-18 41th RD steel shop drawing 11_21_2015

2 - BEAMS - B44

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B44 2

B44 2 W10X22 18'-2 5/8" 805 A992

SQ-2BEAMS

a3 4 L4X3-1/2X5/16 0'-6" 15 A36

p24 4 L4X3-1/2X5/16 0'-6" 15 A36

TOTAL WEIGHT THIS DRAWING 835

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B44

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

2316/ 17'-1014/ 2316/

358/

331

2/

114/

738/

112/

358/

331

2/

18'-258/

478/

1316/

1316/

p24 (B/S)a3 (B/S)

B

BA

A

358/

331

2/

218/ 218/a3

a3

1316/

A - A

358/

331

2/

218/ 218/

p24p24

1316/

B - B

Page 46: 132-18 41th RD steel shop drawing 11_21_2015

4 - BEAMS - B45

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B45 4

B45 4 W10X15 18'-2 5/8" 1094 A992

SQ-2BEAMS

a3 8 L4X3-1/2X5/16 0'-6" 31 A36

p24 8 L4X3-1/2X5/16 0'-6" 31 A36

TOTAL WEIGHT THIS DRAWING 1155

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B45

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

312/

331

2/

114/

738/

1516/

2316/ 17'-1014/ 2316/

18'-258/

312/

331

2/378/

1316/

1316/

p24 (B/S)a3 (B/S)

B

BA

A

312/

331

2/

218/ 218/a3

a3

1316/

A - A

312/

331

2/

218/ 218/

p24p24

1316/

B - B

Page 47: 132-18 41th RD steel shop drawing 11_21_2015

24 - BEAMS - B46

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B46 24

B46 24 W8X18 5'-6 5/16" 2374 A992

SQ-2BEAMS

a3 48 L4X3-1/2X5/16 0'-6" 184 A36

p24 48 L4X3-1/2X5/16 0'-6" 184 A36

TOTAL WEIGHT THIS DRAWING 2742

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/29/2015 003 B46

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

3 4916/

7 8/61

4/1

258/

321

2/

7 8/61

4/1

258/

321

2/

5'-6516/

2316/ 5'-11516/ 2316/

212/ 5'-1116/ 234/

1316/GA 234/ (FS)

1316/1316/

p24 (B/S)a3 (B/S)

B

BA

A258/

321

2/218/ 218/

a3a3

1316/

A - A

258/

321

2/

218/ 218/

138/ 138/

p24

p24

1316/

B - B

Page 48: 132-18 41th RD steel shop drawing 11_21_2015

12 - BEAMS - B47

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B47 12

B47 12 W8X18 4'-8 9/16" 1013 A992

SQ-2BEAMS

a3 24 L4X3-1/2X5/16 0'-6" 92 A36

p24 24 L4X3-1/2X5/16 0'-6" 92 A36

TOTAL WEIGHT THIS DRAWING 1196

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/29/2015 003 B47

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

258/

321

2/

7 8/71

4/

3 178/4916/

2316/ 4'-4316/ 2316/

7 8/61

4/1

258/

321

2/

4'-8916/

234/

1316/GA 234/ (NS)

1316/

1316/

a3 (B/S)

p24 (B/S)

B

BA

A

258/

321

2/

218/ 218/

138/ 138/

p24

p24

1316/

A - A

258/

321

2/

218/ 218/

a3 a31316/

B - B

Page 49: 132-18 41th RD steel shop drawing 11_21_2015

12 - BEAMS - B48

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B48 12

B48 12 W8X18 4'-4 5/8" 942 A992

SQ-2BEAMS

a3 24 L4X3-1/2X5/16 0'-6" 92 A36

p24 24 L4X3-1/2X5/16 0'-6" 92 A36

TOTAL WEIGHT THIS DRAWING 1126

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/29/2015 003 B48

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

3

7 8/61

4/

258/

3

2316/ 4'-014/ 2316/

4916/

4'-458/

7 8/61

4/1

258/

321

2/

234/

178/1316/GA 234/ (FS)

1316/1316/

a3 (B/S)

p24 (B/S)

B

BA

A

258/

321

2/

218/ 218/

138/ 138/

1

p24

p24

1316/

A - A

258/

321

2/

218/ 218/

a3

a3

1316/

B - B

Page 50: 132-18 41th RD steel shop drawing 11_21_2015

2 - BEAMS - B49

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B49 2

B49 2 W10X15 10'-10 7/16" 326 A992

SQ-2BEAMS

P2 2 FL3/8"X5" 1'-1 3/4" 15 A36

p24 4 L4X3-1/2X5/16 0'-6" 15 A36

TOTAL WEIGHT THIS DRAWING 356

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B49

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

10'-814/ 2316/

114/

738/

1516/

312/

331

2/

10'-10716/

378/

P2

1316/

p24 (B/S)

A

A

212/ 10'-71516/

247

8/47

8/2

10'-10716/

38/TYP

34/

P2

312/

331

2/

218/ 218/

p24

p24

1316/

A - A

Page 51: 132-18 41th RD steel shop drawing 11_21_2015

ONE - BEAM - B50

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B50 1

B50 1 W10X15 10'-8 7/8" 161 A992

SQ-2BEAM

p24 4 L4X3-1/2X5/16 0'-6" 15 A36

TOTAL WEIGHT THIS DRAWING 176

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B50

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

2316/ 10'-412/ 2316/

10'-878/

312/

331

2/

114/

738/

1516/

312/

331

2/

7 8/71

5 16/13

16/

234/ 378/

1316/

1316/

p24 (B/S)

p24 (B/S)

B

B

A

A

312/

331

2/

218/ 218/

p24

p24

1316/

A - A

312/

331

2/

218/ 218/

p24

p24

1316/

B - B

Page 52: 132-18 41th RD steel shop drawing 11_21_2015

ONE - BEAM - B51

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B51 1

B51 1 W10X15 10'-8 7/8" 161 A992

SQ-2BEAM

p24 4 L4X3-1/2X5/16 0'-6" 15 A36

TOTAL WEIGHT THIS DRAWING 176

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/29/2015 003 B51

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

2316/

312/

331

2/

114/

738/

1516/

10'-878/

312/

331

2/

7 8/71

5 16/13

16/

1'-8716/ 4'-1 4'-1 10716/

218/ 218/ 218/ 218/218/ 218/234/ 378/

1316/

1316/

1316/

1316/

1316/ p24 (B/S)

p24 (B/S)

A

AA

A

343

8/

343

8/

343

8/

2316/ 10'-412/

312/

331

2/

218/ 218/p24

p24

1316/

A - A

Page 53: 132-18 41th RD steel shop drawing 11_21_2015

2 - BEAMS - B53

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B53 2

B53 2 W10X68 19'-9 3/16" 2677 A992

SQ-2BEAMS

P1 4 FL3/8"X3 1/2" 0'-8 13/16" 13 A36

TOTAL WEIGHT THIS DRAWING 2690

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B53

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

2 4'-678/ 4'-1012/ 4'-1012/ 5'-178/ 112/

331

2/

331

2/

331

2/

378/

331

2/

378/

331

2/

19'-9316/

218/ 218/218/ 218/ 218/ 218/

3 3

3 338/

TYP

1316/

1316/1316/1316/

1316/

A

A

3 19'-3316/ 3

19'-4316/ 5

2116/

2116/

2116/

2116/

P1

P1

378/

331

2/

214/ 214/

1316/

P1

P1

A - A

Page 54: 132-18 41th RD steel shop drawing 11_21_2015

8 - BEAMS - B54

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B54 8

B54 8 W8X18 12'-11 3/16" 1852 A992

SQ-2BEAMS

TOTAL WEIGHT THIS DRAWING 1852

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/29/2015 003 B54

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

321

2/

321

2/

258/

321

2/

258/

321

2/

12'-11316/

358/ 4'-1 4'-1 4'-2 358/

218/ 218/ 218/ 218/ 218/ 218/218/ 218/

1316/1316/ 1316/ 1316/

A

AA - A

Page 55: 132-18 41th RD steel shop drawing 11_21_2015

8 - BEAMS - B55

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B55 8

B55 8 W8X18 5'-5 15/16" 787 A992

SQ-2BEAMS

a3 16 L4X3-1/2X5/16 0'-6" 61 A36

TOTAL WEIGHT THIS DRAWING 848

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/29/2015 003 B55

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

3

2316/ 5'-214/ 112/

4316/7 8/61

4/1

258/

321

2/

5'-51516/

258/

321

2/

212/

212/212/

1

1316/GA 234/ (FS)

1316/

1316/

a3 (B/S)

B

BA

A

258/

321

2/

218/ 218/a3

a31316/

A - A

138/ 138/1316/

B - B

Page 56: 132-18 41th RD steel shop drawing 11_21_2015

4 - BEAMS - B56

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B56 4

B56 4 W8X18 4'-8 3/16" 335 A992

SQ-2BEAMS

a3 8 L4X3-1/2X5/16 0'-6" 31 A36

TOTAL WEIGHT THIS DRAWING 366

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/29/2015 003 B56

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

3

4'-8316/

258/

321

2/

112/ 4'-412/ 2316/

414/

258/

321

2/

212/178/

7 8/1

1316/GA 234/ (NS)

1316/

1316/

a3 (B/S)

B

BA

A

138/ 138/1316/

A - A

258/

321

2/

218/ 218/

a3a3

1316/

B - B

Page 57: 132-18 41th RD steel shop drawing 11_21_2015

4 - BEAMS - B57

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B57 4

B57 4 W8X18 4'-4 1/4" 312 A992

SQ-2BEAMS

a3 8 L4X3-1/2X5/16 0'-6" 31 A36

TOTAL WEIGHT THIS DRAWING 342

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/29/2015 003 B57

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

3

258/

321

2/

112/ 4'-0916/ 2316/

4'-414/

414/

258/

321

2/

212/178/

7 8/1

1316/GA 234/ (FS)

1316/

1316/

a3 (B/S)

B

BA

A

138/ 138/1316/

A - A 258/

321

2/

218/ 218/

a3a3

1316/

B - B

Page 58: 132-18 41th RD steel shop drawing 11_21_2015

2 - BEAMS - B58

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B58 2

B58 2 W10X68 21'-3 5/16" 2882 A992

SQ-2BEAMS

a3 4 L4X3-1/2X5/16 0'-6" 15 A36

TOTAL WEIGHT THIS DRAWING 2897

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B58

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

331

2/

378/

331

2/

378/

331

2/

2 5'-1716/ 5'-418/ 5'-4316/ 5'-1716/ 2316/

21'-3516/

114/

778/

114/

218/ 218/ 218/ 218/218/ 218/

4378/

4378/

1316/1316/1316/ 1316/ 1316/

a3 (B/S)

B

BA

A

331

2/

331

2/

4

4

3116/

3116/

312/

A - A

378/

331

2/

214/ 214/

a3

a3

1316/

B - B

Page 59: 132-18 41th RD steel shop drawing 11_21_2015

ONE - BEAM - B59

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B59 1

B59 1 W10X68 19'-1 1/2" 1295 A992

SQ-2BEAM

TOTAL WEIGHT THIS DRAWING 1295

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B59

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

2 6'-214/ 6'-5 6'-214/ 2

331

2/

331

2/

378/

331

2/

378/

331

2/

19'-112/

218/ 218/218/ 218/

4 4

4 4

1316/

1316/

1316/ 1316/

A

AA

A

4 18'-512/ 4

3116/

3116/

3116/

3116/

312/

A - A

Page 60: 132-18 41th RD steel shop drawing 11_21_2015

2 - BEAMS - B60

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B60 2

B60 2 W10X45 19'-1 1/2" 1731 A992

SQ-2BEAMS

TOTAL WEIGHT THIS DRAWING 1731

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B60

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

2 4'-718/ 4'-934/ 4'-934/ 4'-678/ 2

331

2/

331

2/

331

2/

358/

331

2/

358/

331

2/

19'-112/

218/ 218/ 218/ 218/218/ 218/

4 4

4 4

1316/

1316/

1316/ 1316/

1316/

A

AA

A

4 18'-512/ 4

33

33

312/

A - A

Page 61: 132-18 41th RD steel shop drawing 11_21_2015

4 - BEAMS - B61

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B61 4

B61 4 W10X45 19'-1 5/8" 3464 A992

SQ-2BEAMS

TOTAL WEIGHT THIS DRAWING 3464

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B61

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

331

2/

331

2/

331

2/

358/

331

2/

358/

331

2/

2 4'-7316/ 4'-934/ 4'-934/ 4'-61516/ 2

19'-158/

218/ 218/ 218/ 218/218/ 218/

4 4

4 4

1316/

1316/ 1316/ 1316/1316/

A

AA

A

4 18'-558/ 4

33

33

312/

A - A

Page 62: 132-18 41th RD steel shop drawing 11_21_2015

ONE - BEAM - B62

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B62 1

B62 1 W10X68 17'-4 1/2" 1177 A992

SQ-2BEAM

TOTAL WEIGHT THIS DRAWING 1177

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B62

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

331

2/

331

2/

378/

331

2/

378/

331

2/

2 6'-114/ 6'-4 4'-714/ 2

17'-412/

218/ 218/218/ 218/

4 4

4 4

1316/

1316/ 1316/ 1316/

A

AA

A

4 16'-812/ 438/

3116/

3116/

3116/

3116/

312/

A - A

Page 63: 132-18 41th RD steel shop drawing 11_21_2015

2 - BEAMS - B63

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B63 2

B63 2 W10X45 17'-4 1/2" 1573 A992

SQ-2BEAMS

TOTAL WEIGHT THIS DRAWING 1573

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B63

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

358/

331

2/

358/

331

2/

2 6'-114/ 6'-4 4'-714/ 2

331

2/

331

2/

17'-412/

218/ 218/218/ 218/

4 4

44

1316/1316/

1316/ 1316/

A

AA

A

4 16'-812/ 4

33

33

312/

A - A

Page 64: 132-18 41th RD steel shop drawing 11_21_2015

4 - BEAMS - B64

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B64 4

B64 4 W10X45 17'-4 5/8" 3148 A992

SQ-2BEAMS

TOTAL WEIGHT THIS DRAWING 3148

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B64

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work3

312/

331

2/

358/

331

2/

358/

331

2/

2 6'-1516/ 6'-4 4'-7516/ 2

17'-458/

218/ 218/218/ 218/

4 4

4 4

1316/

1316/

1316/

1316/

A

AA

A

4 16'-858/ 4

33

33

312/

A - A

Page 65: 132-18 41th RD steel shop drawing 11_21_2015

ONE - BEAM - B65

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B65 1

B65 1 W10X68 19'-1 1/2" 1295 A992

SQ-2BEAM

TOTAL WEIGHT THIS DRAWING 1295

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B65

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

2 4'-21516/ 4'-51116/ 4'-51116/ 5'-714/ 2

331

2/

331

2/

331

2/

378/

331

2/

378/

331

2/

19'-112/

218/ 218/218/ 218/218/ 218/

4 4

4 4

1316/

1316/

1316/ 1316/ 1316/

A

AA

A

4 18'-512/ 4

3116/

3116/

3116/

3116/

312/

A - A

Page 66: 132-18 41th RD steel shop drawing 11_21_2015

2 - BEAMS - B66

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B66 2

B66 2 W10X45 19'-1 1/2" 1731 A992

SQ-2BEAMS

TOTAL WEIGHT THIS DRAWING 1731

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B66

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

331

2/

331

2/

331

2/

358/

331

2/

358/

331

2/

2 4'-21516/ 4'-51116/ 4'-51116/ 5'-714/ 2

19'-112/

218/ 218/218/ 218/218/ 218/

4 4

4 4

1316/

1316/1316/ 1316/ 1316/

A

AA

A

4 18'-512/ 4

33

33

312/

A - A

Page 67: 132-18 41th RD steel shop drawing 11_21_2015

3 - BEAMS - B67

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B67 3

B67 3 W10X45 19'-1 5/8" 2598 A992

SQ-2BEAMS

TOTAL WEIGHT THIS DRAWING 2598

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B67

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

331

2/

331

2/

331

2/

358/

331

2/

358/

331

2/2 4'-3 4'-51116/ 4'-51116/ 5'-7516/ 2

19'-158/

218/ 218/ 218/ 218/ 218/ 218/

4 4

4 4

1316/

1316/

1316/1316/1316/

A

AA

A

4 18'-558/ 4

33

33

312/

A - A

Page 68: 132-18 41th RD steel shop drawing 11_21_2015

ONE - BEAM - B68

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B68 1

B68 1 W10X45 19'-1 5/8" 866 A992

SQ-2BEAM

TOTAL WEIGHT THIS DRAWING 866

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B68

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

358/

331

2/

358/

331

2/

2 8516/ 6'-3 6'-3 5'-7516/ 2

331

2/

331

2/

331

2/19'-158/

218/ 218/ 218/ 218/218/ 218/

4 4

4 4

1316/

1316/

1316/

1316/

A

AA

A

4 18'-558/ 4

33

33

312/

A - A

Page 69: 132-18 41th RD steel shop drawing 11_21_2015

ONE - BEAM - B69

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B69 1

B69 1 W10X15 4'-10 7/8" 74 A992

SQ-2BEAM

p24 4 L4X3-1/2X5/16 0'-6" 15 A36

TOTAL WEIGHT THIS DRAWING 89

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B69

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

312/

331

2/

114/

738/

1516/

4'-1078/

2316/ 4'-612/ 2316/

312/

331

2/

7 8/71

5 16/13

16/

234/ 378/

1316/1316/

p24 (B/S)

p24 (B/S)

B

BA

A

312/

331

2/218/ 218/

p24

p24

1316/

A - A

312/

331

2/

218/ 218/p24

p241316/

B - B

Page 70: 132-18 41th RD steel shop drawing 11_21_2015

ONE - BEAM - B70

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B70 1

B70 1 W10X15 4'-10 7/8" 74 A992

SQ-2BEAM

p24 4 L4X3-1/2X5/16 0'-6" 15 A36

TOTAL WEIGHT THIS DRAWING 89

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/29/2015 003 B70

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

2316/ 1'-614/ 3'-014/ 2316/

312/

331

2/

343

8/

4'-1078/

312/

331

2/

114/

738/

1516/

7 8/71

5 16/13

16/

218/ 218/

234/ 378/

1316/

1316/1316/

p24 (B/S)

p24 (B/S)

B

BA

A

312/

331

2/218/ 218/

p24

p24

1316/

A - A

312/

331

2/

218/ 218/p24

p24

1316/

B - B

Page 71: 132-18 41th RD steel shop drawing 11_21_2015

2 - BEAMS - B71

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B71 2

B71 2 W10X15 4'-11 11/16" 149 A992

SQ-2BEAMS

P2 2 FL3/8"X5" 1'-1 3/4" 15 A36

p24 4 L4X3-1/2X5/16 0'-6" 15 A36

TOTAL WEIGHT THIS DRAWING 179

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B71

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

4'-912/ 2316/

4'-111116/

312/

331

2/

114/

738/

1516/

378/

1316/

p24 (B/S)

A

A

212/ 212/ 4'-61116/

247

8/47

8/2

4'-111116/

38/TYP

34/

P2

312/

331

2/

218/ 218/

p24p24

1316/

A - A

Page 72: 132-18 41th RD steel shop drawing 11_21_2015

2 - BEAMS - B72

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B72 2

B72 2 W8X10 4'-9 15/16" 97 A992

SQ-2BEAMS

a3 8 L4X3-1/2X5/16 0'-6" 31 A36

TOTAL WEIGHT THIS DRAWING 128

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B72

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

1

2316/ 4'-5916/ 2316/

238/

321

2/

4'-91516/

238/

321

2/

178/

1316/

1316/ a3 (B/S)

a3 (B/S)

B

BA

A

238/

321

2/

218/ 218/

a3

a3

1316/

A - A

238/

321

2/

218/ 218/

1

a3a3

1316/

B - B

Page 73: 132-18 41th RD steel shop drawing 11_21_2015

2 - BEAMS - B73

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B73 2

B73 2 W8X10 4'-9 7/8" 97 A992

SQ-2BEAMS

a3 8 L4X3-1/2X5/16 0'-6" 31 A36

TOTAL WEIGHT THIS DRAWING 128

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B73

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

1

2316/ 4'-512/ 2316/

238/

321

2/

4'-978/

238/

321

2/

178/

1316/

1316/ a3 (B/S)

a3 (B/S)

B

BA

A

238/

321

2/

218/ 218/

a3a3 1316/

A - A

238/

321

2/

218/ 218/

1

a3 a31316/

B - B

Page 74: 132-18 41th RD steel shop drawing 11_21_2015

3 - BEAMS - B74

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B74 3

B74 3 W8X10 4'-9 3/4" 145 A992

SQ-2BEAMS

a3 12 L4X3-1/2X5/16 0'-6" 46 A36

TOTAL WEIGHT THIS DRAWING 191

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B74

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

2316/ 4'-538/ 2316/

1

238/

321

2/

238/

321

2/

4'-934/

178/

1316/

1316/

a3 (B/S)a3 (B/S)

B

BA

A

238/

321

2/

218/ 218/

a3a3

1316/

A - A

238/

321

2/

218/ 218/

1

a3a3

1316/

B - B

Page 75: 132-18 41th RD steel shop drawing 11_21_2015

2 - BEAMS - B75

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B75 2

B75 2 W10X39 15'-0 13/16" 1180 A992

SQ-2BEAMS

a3 8 L4X3-1/2X5/16 0'-6" 31 A36

TOTAL WEIGHT THIS DRAWING 1210

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B75

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

2316/ 14'-8716/ 2316/

331

2/

15'-01316/33

8/3

312/

338/

331

2/

12'-4716/ 2'-8716/

214/ 214/

1316/1316/

1316/

a3 (B/S)

a3 (B/S)

B

BA

A

338/

331

2/

2316/ 2316/

a3a3

1316/

A - A

312/

1316/

Page 76: 132-18 41th RD steel shop drawing 11_21_2015

2 - BEAMS - B76

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B76 2

B76 2 W10X22 15'-10 1/4" 700 A992

SQ-2BEAMS

P2 2 FL3/8"X5" 1'-1 3/4" 15 A36

TOTAL WEIGHT THIS DRAWING 715

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B76

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

15'-834/ 112/

1'-1118/ 3'-0 3'-0 3'-0 3'-0 1'-1118/

358/

331

2/

114/

738/

112/

5

5

1316/GA 312/ (FS)

1316/

A

A

134/

118/

212/ 212/

247

8/47

8/2

15'-1014/

38/TYP34/ 1316/1316/

1316/1316/

1316/

P2

2 478/ 478/ 2

A - A

Page 77: 132-18 41th RD steel shop drawing 11_21_2015

ONE - BEAM - B77

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B77 1

B77 1 W10X15 11'-2" 168 A992

SQ-2BEAM

a3 4 L4X3-1/2X5/16 0'-6" 15 A36

TOTAL WEIGHT THIS DRAWING 183

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B77

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

2316/ 10'-958/ 2316/

11'-2

312/

331

2/

114/

712/

114/

321

2/

312/

331

2/

114/

712/

114/

4'-912/ 6'-412/

2116/ 2116/178/ 11516/

1316/

1316/ 1316/

a3 (B/S)

a3 (B/S)

B

BA

A

312/

331

2/

218/ 218/a3

a31316/

A - A

312/

331

2/

218/ 218/

a3

a31316/

B - B

Page 78: 132-18 41th RD steel shop drawing 11_21_2015

6 - BEAMS - B78

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B78 6

B78 6 W10X15 9'-6 7/8" 862 A992

SQ-2BEAMS

a3 24 L4X3-1/2X5/16 0'-6" 92 A36

TOTAL WEIGHT THIS DRAWING 954

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B78

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

9'-678/

2316/ 9'-212/ 2316/

321

2/

312/

331

2/

114/

712/

114/

312/

331

2/

114/

712/

114/

4'-912/ 4'-938/

218/ 2116/178/

11516/

1316/1316/

1316/

a3 (B/S)

a3 (B/S)

B

BA

A

312/

331

2/

218/ 218/a3

a3

1316/

A - A

312/

331

2/

218/ 218/

1316/

B - B

Page 79: 132-18 41th RD steel shop drawing 11_21_2015

7 - BEAMS - B79

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B79 7

B79 7 W8X10 6'-2 5/8" 438 A992

SQ-2BEAMS

a3 14 L4X3-1/2X5/16 0'-6" 54 A36

TOTAL WEIGHT THIS DRAWING 492

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B79

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

2316/ 5'-101516/ 112/

6'-258/

238/

321

2/

238/

321

2/

11516/ 134/

1

1316/1316/

a3 (B/S)

A

A

238/

321

2/

2116/ 2116/

a3

a3

1316/

A - A

Page 80: 132-18 41th RD steel shop drawing 11_21_2015

2 - BEAMS - B80

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B80 2

B80 2 W10X15 12'-2 5/8" 367 A992

SQ-2BEAMS

a3 4 L4X3-1/2X5/16 0'-6" 15 A36

p6 2 FL3/8"X3 3/4" 0'-6" 5 A36

p24 4 L4X3-1/2X5/16 0'-6" 15 A36

TOTAL WEIGHT THIS DRAWING 402

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B80

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

6'-6516/ 5'-8516/

2316/ 6'-10116/ 5'-014/ 2316/

312/

331

2/

12'-258/

331

2/

312/

331

2/

114/

738/

1516/

218/ 218/

378/

378/

38/TYP

1316/1316/

1316/

p24 (B/S)a3 (B/S)

C

CA

A B

B

412/

321

2/

238/

1316/p6

B - B

312/

331

2/

218/ 218/

a3a3

1316/

A - A

312/

331

2/

218/ 218/p24

p24

1316/

C - C

Page 81: 132-18 41th RD steel shop drawing 11_21_2015

2 - BEAMS - B81

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B81 2

B81 2 W10X19 12'-2 5/8" 467 A992

SQ-2BEAMS

a3 4 L4X3-1/2X5/16 0'-6" 15 A36

p24 4 L4X3-1/2X5/16 0'-6" 15 A36

TOTAL WEIGHT THIS DRAWING 498

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B81

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

2316/ 5'-4916/ 6'-534/ 2316/

334/

331

2/

112/

7716/

1516/

12'-258/

331

2/

334/

331

2/

218/ 218/

378/

1316/

1316/ 1316/

p24 (B/S)

a3 (B/S)

B

BA

A

334/

331

2/

218/ 218/

a3a3

1316/

A - A

334/

331

2/

218/ 218/p24

p24

1316/

B - B

Page 82: 132-18 41th RD steel shop drawing 11_21_2015

ONE - BEAM - B82

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B82 1

B82 1 W10X15 12'-2 5/8" 183 A992

SQ-2BEAM

a3 2 L4X3-1/2X5/16 0'-6" 8 A36

p6 1 FL3/8"X3 3/4" 0'-6" 2 A36

p24 2 L4X3-1/2X5/16 0'-6" 8 A36

TOTAL WEIGHT THIS DRAWING 201

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B82

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

12'-258/

331

2/

2316/ 6'-10116/ 5'-0316/ 2316/

6'-6516/ 5'-814/

312/

331

2/

118/

738/

112/

312/

331

2/

218/ 218/478/

38/TYP

1316/1316/ 1316/

p24 (B/S)a3 (B/S)

C

C

A

A B

B

112/ 238/

412/

321

2/ 1316/

p6

B - B

312/

331

2/

218/ 218/

a3

a3

1316/

A - A

312/

331

2/

218/ 218/p24p24

1316/

C - C

Page 83: 132-18 41th RD steel shop drawing 11_21_2015

ONE - BEAM - B83

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B83 1

B83 1 W10X19 12'-2 5/8" 234 A992

SQ-2BEAM

a3 2 L4X3-1/2X5/16 0'-6" 8 A36

p24 2 L4X3-1/2X5/16 0'-6" 8 A36

TOTAL WEIGHT THIS DRAWING 249

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B83

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

12'-258/

2316/ 5'-4916/ 6'-51116/ 2316/

331

2/

334/

331

2/

1516/

7716/

112/

334/

331

2/

218/ 218/

478/

478/

1316/

1316/1316/

p24 (B/S)

a3 (B/S)

B

BA

A

334/

331

2/

218/ 218/

a3

a3

1316/

A - A

334/

331

2/

218/ 218/p24

p24

1316/

B - B

Page 84: 132-18 41th RD steel shop drawing 11_21_2015

2 - BEAMS - B84

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B84 2

B84 2 W10X15 12'-2 3/4" 367 A992

SQ-2BEAMS

a3 4 L4X3-1/2X5/16 0'-6" 15 A36

p6 2 FL3/8"X3 3/4" 0'-6" 5 A36

p24 4 L4X3-1/2X5/16 0'-6" 15 A36

TOTAL WEIGHT THIS DRAWING 403

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B84

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

6'-6716/ 5'-8516/

312/

331

2/

12'-234/

114/

738/

1516/

312/

331

2/

331

2/

2316/ 6'-10316/ 5'-014/ 2316/

218/ 218/

378/

38/TYP

p6

1316/

1316/

1316/ p24 (B/S)

a3 (B/S)

C

CA

A B

B

412/

321

2/

238/

1316/p6

B - B

312/

331

2/

218/ 218/

a3

a31316/

A - A

312/

331

2/

218/ 218/

p24

p241316/

C - C

Page 85: 132-18 41th RD steel shop drawing 11_21_2015

2 - BEAMS - B85

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B85 2

B85 2 W10X19 12'-2 3/4" 468 A992

SQ-2BEAMS

a3 4 L4X3-1/2X5/16 0'-6" 15 A36

p24 4 L4X3-1/2X5/16 0'-6" 15 A36

TOTAL WEIGHT THIS DRAWING 498

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B85

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

12'-234/

2316/ 5'-41116/ 6'-534/ 2316/33

4/3

312/

331

2/

334/

331

2/

112/

7716/

1516/

218/ 218/

378/

1316/1316/

1316/ p24 (B/S)

a3 (B/S)

B

B

A

A

334/

331

2/

218/ 218/

a3

a3

1316/

A - A

334/

331

2/

218/ 218/p24

p241316/

B - B

Page 86: 132-18 41th RD steel shop drawing 11_21_2015

2 - BEAMS - B86

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B86 2

B86 2 W10X15 12'-2 7/8" 367 A992

SQ-2BEAMS

a3 4 L4X3-1/2X5/16 0'-6" 15 A36

p6 2 FL3/8"X3 3/4" 0'-6" 5 A36

p24 4 L4X3-1/2X5/16 0'-6" 15 A36

TOTAL WEIGHT THIS DRAWING 403

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B86

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

6'-6916/ 5'-8516/

2316/ 6'-10516/ 5'-014/ 2316/

312/

331

2/

12'-278/

312/

331

2/

331

2/

114/

738/

1516/

218/ 218/

378/

38/TYP

p61316/

1316/

1316/p24 (B/S)

a3 (B/S)

C

CA

A B

B

412/

321

2/238/

1316/p6

B - B

312/

331

2/

218/ 218/

a3a3

1316/

A - A

312/

331

2/

218/ 218/p24

p241316/

C - C

Page 87: 132-18 41th RD steel shop drawing 11_21_2015

ONE - BEAM - B87

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B87 1

B87 1 W10X19 12'-2 7/8" 234 A992

SQ-2BEAM

a3 2 L4X3-1/2X5/16 0'-6" 8 A36

p24 2 L4X3-1/2X5/16 0'-6" 8 A36

TOTAL WEIGHT THIS DRAWING 249

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B87

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

331

2/

331

2/

2316/ 5'-41316/ 1'-812/ 4'-914/ 2316/

12'-278/

334/

331

2/

334/

331

2/

112/

7716/

1516/

218/ 218/ 218/ 218/

378/

1316/

1316/

1316/ 1316/ p24 (B/S)

a3 (B/S)

B

B

A

A

334/

331

2/

218/ 218/

a3a3

1316/

A - A

334/

331

2/

218/ 218/

p24 p24

1316/

B - B

Page 88: 132-18 41th RD steel shop drawing 11_21_2015

ONE - BEAM - B88

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B88 1

B88 1 W10X30 12'-2 13/16" 368 A992

SQ-2BEAM

a3 2 L4X3-1/2X5/16 0'-6" 8 A36

p24 2 L4X3-1/2X5/16 0'-6" 8 A36

TOTAL WEIGHT THIS DRAWING 383

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/29/2015 003 B88

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

218/ 5'-41316/ 6'-534/ 2316/

134/

7716/

1516/

43

312/

43

312/

12'-21316/

331

2/

218/ 218/

378/

1316/1316/

1316/

p24 (B/S)

a3 (B/S)

B

BA

A

218/ 3 3

12'-21316/

112/

112/

1316/

43

312/

2316/ 2316/

112/ 112/a3

a3

1316/

A - A

43

312/

218/ 218/p24

p24

1316/

B - B

Page 89: 132-18 41th RD steel shop drawing 11_21_2015

ONE - BEAM - B89

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B89 1

B89 1 W10X15 11'-10 1/2" 178 A992

SQ-2BEAM

a3 4 L4X3-1/2X5/16 0'-6" 15 A36

TOTAL WEIGHT THIS DRAWING 194

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B89

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

2316/ 11'-618/ 2316/

312/

331

2/

11'-1012/

312/

331

2/

1316/

1316/

a3 (B/S)

a3 (B/S)

B

BA

A

312/

331

2/

218/ 218/

a3 a3

1316/

A - A

312/

331

2/

218/ 218/a3

a31316/

B - B

Page 90: 132-18 41th RD steel shop drawing 11_21_2015

3 - BEAMS - B90

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B90 3

B90 3 W10X30 11'-10 1/2" 1072 A992

SQ-2BEAMS

a3 12 L4X3-1/2X5/16 0'-6" 46 A36

TOTAL WEIGHT THIS DRAWING 1118

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B90

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

2316/ 11'-618/ 2316/

11'-1012/

43

312/

43

312/

1316/1316/

a3 (B/S)

a3 (B/S)

B

BA

A

43

312/

218/ 218/a3

a31316/

A - A

43

312/

4516/

218/ 218/

1316/

B - B

Page 91: 132-18 41th RD steel shop drawing 11_21_2015

2 - BEAMS - B91

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B91 2

B91 2 W10X30 11'-10 7/16" 714 A992

SQ-2BEAMS

a3 8 L4X3-1/2X5/16 0'-6" 31 A36

p17 2 FL1/2"X5 1/4" 1'-7 1/4" 29 A36

p18 4 FL1/2"X5 1/4" 0'-7 15/16" 24 A36

TOTAL WEIGHT THIS DRAWING 797

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/29/2015 003 B91

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

234/ 8'-101316/

2316/ 2'-8116/ 8'-10116/ 218/

11'-10716/

43

312/

43

312/

218/ 218/

12/TYP

12/TYP

1316/GA 3

1316/GA 3

1316/1316/

1316/

a3 (B/S)a3 (B/S)

C

CA

A B

B

343

8/2'-878/

3 3 218/

112/

112/

1316/

1316/

p17

p18

p18

33

858/

178/

112/ 518/ 518/ 112/

p18p18

p17

1316/

B - B

43

312/

218/ 218/a3

a31316/

A - A 43

312/

218/ 218/

112/ 112/

1316/

C - C

Page 92: 132-18 41th RD steel shop drawing 11_21_2015

4 - BEAMS - B92

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B92 4

B92 4 W10X30 11'-10 5/8" 1431 A992

SQ-2BEAMS

a3 16 L4X3-1/2X5/16 0'-6" 61 A36

p17 4 FL1/2"X5 1/4" 1'-7 1/4" 57 A36

p18 8 FL1/2"X5 1/4" 0'-7 15/16" 47 A36

TOTAL WEIGHT THIS DRAWING 1597

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/29/2015 003 B92

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

8'-101516/

2316/ 2'-8316/ 8'-10316/ 218/

343

8/

11'-1058/

334/

331

2/

43

312/

218/ 218/

12/TYP

12/TYP

1316/GA 3

1316/1316/ 1316/

a3 (B/S)a3 (B/S)

C

CA

A B

B

2'-9 234/

3 3 218/

112/

112/

1316/

1316/

p17

p18 p18

33

918/

138/

112/ 518/ 518/ 112/

12/TYP 12/

TYP

p18p18

p17

B - B

43

312/

218/ 218/

a3 a31316/

A - A

43

312/

218/ 218/

112/ 112/a3

a3

1316/

C - C

Page 93: 132-18 41th RD steel shop drawing 11_21_2015

ONE - BEAM - B93

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B93 1

B93 1 W10X30 11'-10 7/8" 358 A992

SQ-2BEAM

a3 4 L4X3-1/2X5/16 0'-6" 15 A36

p17 1 FL1/2"X5 1/4" 1'-7 1/4" 14 A36

p18 2 FL1/2"X5 1/4" 0'-7 15/16" 12 A36

TOTAL WEIGHT THIS DRAWING 400

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/29/2015 003 B93

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

218/ 8'-10516/ 2'-8516/ 2316/

8'-11116/ 234/ 2'-918/

11'-1078/

43

312/

43

312/

218/ 218/

12/TYP

12/TYP1316/

GA 3

1316/GA 3

1316/1316/

1316/

a3 (B/S)

a3 (B/S) C

CA

A B

B

343

8/

218/ 3 3

112/

112/

1316/

1316/

p17

p18

p18

518/ 33

918/

138/

112/ 518/ 112/

12/TYP12/

TYP

1316/p17

p18p18

B - B

43

312/

218/ 218/

112/ 112/a3

a3

1316/

A - A

43

312/

218/ 218/a3

a3

1316/

C - C

Page 94: 132-18 41th RD steel shop drawing 11_21_2015

ONE - BEAM - B94

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B94 1

B94 1 W10X30 11'-10 7/8" 358 A992

SQ-2BEAM

a3 4 L4X3-1/2X5/16 0'-6" 15 A36

TOTAL WEIGHT THIS DRAWING 374

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/29/2015 003 B94

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

218/ 11'-6916/ 2316/

11'-1078/

43

312/

43

312/

1316/GA 3

1316/GA 3

1316/1316/

a3 (B/S)a3 (B/S)

B

BA

A

218/ 3 3

112/

112/

1316/

43

312/

2316/ 2316/

112/ 112/

a3

a3

1316/

A - A

43

312/

2316/ 2316/a3

a31316/

B - B

Page 95: 132-18 41th RD steel shop drawing 11_21_2015

ONE - BEAM - B95

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B95 1

B95 1 W10X30 11'-10 7/8" 358 A992

SQ-2BEAM

a3 4 L4X3-1/2X5/16 0'-6" 15 A36

p17 1 FL1/2"X5 1/4" 1'-7 1/4" 14 A36

p18 2 FL1/2"X5 1/4" 0'-7 15/16" 12 A36

TOTAL WEIGHT THIS DRAWING 400

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/29/2015 003 B95

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

43

312/

1'-9 7'-1516/ 218/

343

8/

11'-1078/

43

312/

218/ 218/ 218/ 218/

12/TYP

12/TYP

1316/GA 3

1316/1316/ 1316/

1316/

a3 (B/S)

a3 (B/S)

C

CA

A B

B

2'-918/ 234/ 8'-11116/

331

2/

2316/ 2'-8516/

3 3 218/

11'-101516/

112/

112/

1316/

1316/

p17

p18

p18

33

918/

138/

112/ 518/ 518/ 112/

12/TYP

12/TYP

1316/

p17

p18p18

B - B

43

312/

2316/ 2316/a3

a31316/

A - A

43

312/

2316/ 2316/

112/ 112/

1316/

a3

a3

1316/

C - C

Page 96: 132-18 41th RD steel shop drawing 11_21_2015

8 - BEAMS - B96

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B96 8

B96 8 W10X15 12'-6 7/8" 1509 A992

SQ-2BEAMS

a3 16 L4X3-1/2X5/16 0'-6" 61 A36

p24 16 L4X3-1/2X5/16 0'-6" 61 A36

TOTAL WEIGHT THIS DRAWING 1632

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B96

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

2316/ 12'-212/ 2316/

12'-678/

312/

331

2/

114/

738/

1516/

312/

331

2/

114/

712/

114/

31516/ 378/

31516/ 378/

1316/1316/

p24 (B/S)a3 (B/S)

B

BA

A

312/

331

2/

218/ 218/

a3

a3

1316/

A - A

312/

331

2/

218/ 218/p24

p24

1316/

B - B

Page 97: 132-18 41th RD steel shop drawing 11_21_2015

4 - BEAMS - B97

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B97 4

B97 4 W10X15 12'-6 7/8" 755 A992

SQ-2BEAMS

a3 8 L4X3-1/2X5/16 0'-6" 31 A36

p24 8 L4X3-1/2X5/16 0'-6" 31 A36

TOTAL WEIGHT THIS DRAWING 816

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/29/2015 003 B97

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

2316/ 9'-214/ 3'-014/ 2316/

343

8/

312/

331

2/

114/

738/

1516/

312/

331

2/

114/

712/

114/

12'-678/

218/ 218/

31516/ 378/

31516/ 378/

1316/

1316/1316/

p24 (B/S)

a3 (B/S)

B

BA

A

312/

331

2/

218/ 218/

a3a3

1316/

A - A

312/

331

2/

218/ 218/p24

p241316/

B - B

Page 98: 132-18 41th RD steel shop drawing 11_21_2015

6 - BEAMS - B98

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B98 6

B98 6 W10X19 12'-6 7/8" 1443 A992

SQ-2BEAMS

a3 12 L4X3-1/2X5/16 0'-6" 46 A36

p24 12 L4X3-1/2X5/16 0'-6" 46 A36

TOTAL WEIGHT THIS DRAWING 1535

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B98

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

2316/ 7'-214/ 5'-014/ 2316/

12'-678/

331

2/

334/

331

2/

114/

734/

114/

334/

331

2/

112/

7716/

1516/

218/ 218/31516/

378/

31516/ 378/

1316/

1316/1316/

p24 (B/S)

a3 (B/S)

B

BA

A

334/

331

2/

218/ 218/

a3a3

1316/

A - A

334/

331

2/

218/ 218/p24

p241316/

B - B

Page 99: 132-18 41th RD steel shop drawing 11_21_2015

6 - BEAMS - B99

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B99 6

B99 6 W10X19 12'-6 7/8" 1443 A992

SQ-2BEAMS

a3 12 L4X3-1/2X5/16 0'-6" 46 A36

p24 12 L4X3-1/2X5/16 0'-6" 46 A36

TOTAL WEIGHT THIS DRAWING 1535

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B99

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

2316/ 5'-614/ 2316/

12'-678/

331

2/

321

2/

334/

331

2/

112/

7716/

1516/

334/

331

2/

114/

734/

114/

218/ 218/

2116/ 2116/

314/378/

314/ 378/

1316/1316/

1316/p24 (B/S)

a3 (B/S)

B

BA

A

5'-834/ 1112/

334/

331

2/

218/ 218/

a3

a3

1316/

A - A

334/

331

2/

218/ 218/p24

p24

1316/

B - B

Page 100: 132-18 41th RD steel shop drawing 11_21_2015

5 - BEAMS - B100

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B100 5

B100 5 W10X15 12'-6 7/8" 944 A992

SQ-2BEAMS

a3 10 L4X3-1/2X5/16 0'-6" 38 A36

p24 10 L4X3-1/2X5/16 0'-6" 38 A36

TOTAL WEIGHT THIS DRAWING 1020

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B100

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

2316/ 12'-212/ 2316/

12'-678/

312/

331

2/

114/

738/

1516/

312/

331

2/

114/

712/

114/

2716/ 378/

2716/ 378/

1316/1316/

p24 (B/S)

a3 (B/S)

B

BA

A

312/

331

2/

218/ 218/

a3a3

1316/

A - A

312/

331

2/

218/ 218/p24

p24

1316/

B - B

Page 101: 132-18 41th RD steel shop drawing 11_21_2015

3 - BEAMS - B101

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B101 3

B101 3 W10X15 12'-6 7/8" 566 A992

SQ-2BEAMS

a3 6 L4X3-1/2X5/16 0'-6" 23 A36

p24 6 L4X3-1/2X5/16 0'-6" 23 A36

TOTAL WEIGHT THIS DRAWING 612

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/29/2015 003 B101

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

2316/ 9'-2516/ 3'-014/ 2316/

312/

331

2/

312/

331

2/

12'-678/

114/

738/

1516/

114/

712/

114/

438/

218/ 218/

2716/ 378/

2716/ 378/

1316/1316/

1316/

p24 (B/S)

a3 (B/S)

B

BA

A

312/

331

2/218/ 218/

a3

a3

1316/

A - A

312/

331

2/

218/ 218/p24

p241316/

B - B

Page 102: 132-18 41th RD steel shop drawing 11_21_2015

9 - BEAMS - B102

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B102 9

B102 9 W10X15 12'-10 3/8" 1738 A992

SQ-2BEAMS

P2 9 FL3/8"X5" 1'-1 3/4" 66 A36

p24 18 L4X3-1/2X5/16 0'-6" 69 A36

TOTAL WEIGHT THIS DRAWING 1872

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B102

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

12'-8316/ 2316/

12'-1038/

312/

331

2/

118/

738/

112/

478/

478/

1316/

p24 (B/S)

A

A

247

8/47

8/2

212/ 212/12'-1038/

38/TYP

34/

P2

312/

331

2/

218/ 218/p24

p241316/

A - A

Page 103: 132-18 41th RD steel shop drawing 11_21_2015

ONE - BEAM - B103

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B103 1

B103 1 W10X19 12'-10 3/8" 246 A992

SQ-2BEAM

P2 1 FL3/8"X5" 1'-1 3/4" 7 A36

p24 2 L4X3-1/2X5/16 0'-6" 8 A36

TOTAL WEIGHT THIS DRAWING 261

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B103

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

7'-8 5'-0316/ 2316/

12'-1038/

334/

331

2/

1516/

7716/

112/

331

2/

218/ 218/478/

478/

1316/

1316/

p24 (B/S)

A

A

247

8/47

8/2

212/ 212/

12'-1038/

38/TYP

34/

P2

334/

331

2/

218/ 218/p24

p24

1316/

A - A

Page 104: 132-18 41th RD steel shop drawing 11_21_2015

ONE - BEAM - B104

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B104 1

B104 1 W10X19 12'-10 3/8" 246 A992

SQ-2BEAM

P2 1 FL3/8"X5" 1'-1 3/4" 7 A36

p24 2 L4X3-1/2X5/16 0'-6" 8 A36

TOTAL WEIGHT THIS DRAWING 261

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B104

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

331

2/

6'-212/ 1112/ 5'-6316/ 2316/

321

2/

12'-1038/

334/

331

2/

1516/

7716/

112/

218/ 218/2116/ 2116/

478/

478/

1316/

1316/

p24 (B/S)

A

A

212/ 212/

247

8/47

8/2

12'-1038/

38/TYP

34/

P2

334/

331

2/

218/ 218/p24

p241316/

A - A

Page 105: 132-18 41th RD steel shop drawing 11_21_2015

ONE - BEAM - B105

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B105 1

B105 1 W10X15 12'-0 15/16" 181 A992

SQ-2BEAM

a3 4 L4X3-1/2X5/16 0'-6" 15 A36

TOTAL WEIGHT THIS DRAWING 197

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B105

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

2316/ 11'-8916/ 2316/

12'-01516/234/

312/

331

2/

114/

712/

114/

312/

331

2/

114/

712/

114/

234/11516/

11516/

1316/

1316/

a3 (B/S)

a3 (B/S)

B

BA

A

312/

331

2/

218/ 218/a3

a31316/

A - A

312/

331

2/

218/ 218/

a3

a3

1316/

B - B

Page 106: 132-18 41th RD steel shop drawing 11_21_2015

6 - BEAMS - B106

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B106 6

B106 6 W10X15 12'-1" 1088 A992

SQ-2BEAMS

a3 24 L4X3-1/2X5/16 0'-6" 92 A36

TOTAL WEIGHT THIS DRAWING 1180

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B106

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

2316/ 11'-858/ 2316/

12'-1

312/

331

2/

114/

712/

114/

312/

331

2/

114/

712/

114/

11516/ 11516/

11516/ 11516/

1316/

1316/

a3 (B/S)

a3 (B/S)

B

BA

A

312/

331

2/

218/ 218/a3

a31316/

A - A

312/

331

2/

218/ 218/

a3a3

1316/

B - B

Page 107: 132-18 41th RD steel shop drawing 11_21_2015

2 - BEAMS - B107

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B107 2

B107 2 W10X15 7'-6 15/16" 227 A992

SQ-2BEAMS

a3 4 L4X3-1/2X5/16 0'-6" 15 A36

p24 4 L4X3-1/2X5/16 0'-6" 15 A36

TOTAL WEIGHT THIS DRAWING 258

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B107

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

7'-61516/

2316/ 7'-2916/ 2316/

312/

331

2/

7 8/71

5 16/13

16/

312/

331

2/

114/

712/

114/

2716/234/

2716/ 234/

1316/

1316/

p24 (B/S)

a3 (B/S)

B

B

A

A

312/

331

2/

218/ 218/

a3

a3

1316/

A - A

312/

331

2/

218/ 218/p24

p24

1316/

B - B

Page 108: 132-18 41th RD steel shop drawing 11_21_2015

ONE - BEAM - B108

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B108 1

B108 1 W14X48 23'-11 1/2" 1150 A992

SQ-2BEAM

TOTAL WEIGHT THIS DRAWING 1150

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B108

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

33

33

331

2/

331

2/

331

2/

2 9'-518/ 4'-934/ 4'-934/ 4'-678/ 2

414/

312/

414/

312/

23'-1112/

218/ 218/ 218/ 218/218/ 218/

4 4

44

1316/1316/1316/ 1316/1316/

A

AA

A

4 23'-312/ 4

33

33

312/

A - A

Page 109: 132-18 41th RD steel shop drawing 11_21_2015

ONE - BEAM - B109

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B109 1

B109 1 W14X48 23'-4 1/16" 1120 A992

SQ-2BEAM

TOTAL WEIGHT THIS DRAWING 1120

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B109

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

3

33

218/ 9'-1516/ 4'-934/ 4'-934/ 4'-3116/ 218/

414/

312/

414/

312/

331

2/

331

2/

331

2/

23'-4116/

218/ 218/ 218/ 218/218/ 218/1316/GA 4

1316/GA 4

1316/GA 4

1316/GA 4

1316/1316/1316/ 1316/1316/

A

A

3

33 33218/ 21'-111316/ 218/

22

22

1316/

1316/

2 2

A - A

Page 110: 132-18 41th RD steel shop drawing 11_21_2015

ONE - BEAM - B110

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B110 1

B110 1 W14X48 23'-7 3/4" 1135 A992

SQ-2BEAM

TOTAL WEIGHT THIS DRAWING 1135

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B110

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

33

33

331

2/

331

2/

331

2/

2 23'-358/ 218/

414/

312/

414/

312/

23'-734/

9'-718/ 4'-934/ 4'-934/ 4'-518/

218/ 218/ 218/ 218/218/ 218/4

4

1316/GA 4

1316/GA 4

1316/1316/

1316/

1316/1316/

B

BA

A

33

4

438/ 22'-758/ 218/

22

33

1316/

312/

A - A 2 2

B - B

Page 111: 132-18 41th RD steel shop drawing 11_21_2015

2 - BEAMS - B111

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B111 2

B111 2 W14X48 23'-7 7/8" 2270 A992

SQ-2BEAMS

TOTAL WEIGHT THIS DRAWING 2270

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B111

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

33

33

414/

312/

2 9'-5316/ 4'-934/ 4'-934/ 4'-3116/ 218/41

4/31

2/

23'-778/31

2/

312/

312/

218/ 218/ 218/ 218/218/ 218/4

4

1316/GA 4

1316/GA 4

1316/1316/

1316/

1316/1316/

B

BA

A

33

4

4 22'-734/ 218/

22

33

1316/31

2/

A - A2 2

B - B

Page 112: 132-18 41th RD steel shop drawing 11_21_2015

ONE - BEAM - B112

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B112 1

B112 1 W14X48 23'-7 7/8" 1135 A992

SQ-2BEAM

TOTAL WEIGHT THIS DRAWING 1135

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B112

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

33

33

331

2/

331

2/

331

2/

2 9'-5316/ 4'-934/ 4'-934/ 4'-3116/ 218/41

4/31

2/

414/

312/

23'-778/

218/ 218/ 218/ 218/218/ 218/4

4

1316/GA 4

1316/GA 4

1316/1316/

1316/

1316/1316/

B

BA

A

33

4

4 22'-734/ 218/

22

33

1316/

312/

A - A 2 2

B - B

Page 113: 132-18 41th RD steel shop drawing 11_21_2015

ONE - BEAM - B113

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B113 1

B113 1 W14X34 18'-0 7/8" 615 A992

SQ-2BEAM

TOTAL WEIGHT THIS DRAWING 615

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B113

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

33

33

218/ 11'-7716/ 6'-1516/ 2

412/

312/

412/

312/

18'-078/

312/

218/ 218/

4

41316/GA 4

1316/GA 4

1316/

1316/1316/

B

BA

A

33218/ 17'-034/ 438/

22

278/

278/1316/

1316/

2 2

A - A

312/

B - B

Page 114: 132-18 41th RD steel shop drawing 11_21_2015

ONE - BEAM - B114

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B114 1

B114 1 W14X34 18'-4 1/2" 625 A992

SQ-2BEAM

TOTAL WEIGHT THIS DRAWING 625

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B114

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

33

33

2 11'-1114/ 6'-114/ 2

331

2/

412/

312/

412/

312/

18'-412/

218/ 218/

4 4

4 4

1316/1316/

1316/

A

AA

A

4 17'-812/ 4

278/

278/

278/

278/

312/

A - A

Page 115: 132-18 41th RD steel shop drawing 11_21_2015

ONE - BEAM - B115

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B115 1

B115 1 W14X34 17'-9" 604 A992

SQ-2BEAM

TOTAL WEIGHT THIS DRAWING 604

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B115

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

33

33

218/ 11'-738/ 5'-938/ 218/

331

2/

412/

312/

412/

312/

17'-9

218/ 218/

1316/GA 4

1316/GA 4

1316/GA 4

1316/GA 4

1316/1316/ 1316/

B

BA

A

33 33218/ 16'-434/ 218/

22

22

1316/

1316/

1316/

1316/

2 2

A - A

Page 116: 132-18 41th RD steel shop drawing 11_21_2015

3 - BEAMS - B116

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B116 3

B116 3 W14X34 17'-9 1/8" 1813 A992

SQ-2BEAMS

TOTAL WEIGHT THIS DRAWING 1813

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 B116

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

33

33

218/ 11'-7716/ 5'-9716/ 218/

412/

312/

412/

312/

331

2/

17'-918/

218/ 218/

1316/GA 4

1316/GA 4

1316/GA 4

1316/GA 4

1316/1316/ 1316/

B

BA

A

33 33218/ 16'-478/ 218/

22

22

1316/

1316/

1316/

1316/

2 2

A - A

2 2

B - B

Page 117: 132-18 41th RD steel shop drawing 11_21_2015

ONE - BEAM - B117

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B117 1

B117 1 W10X30 13'-3 15/16" 401 A992

SQ-2BEAM

a3 4 L4X3-1/2X5/16 0'-6" 15 A36

TOTAL WEIGHT THIS DRAWING 416

REV DESCRIPTION DATE

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

11/05/2015 003 B117

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

234/12'-11316/11516/

331

2/

331

2/

218/218/

4'-518/4'-51116/4'-5316/

114/

114/

8

218/ 218/

43

312/

43

312/

13'-31516/

a3 (B/S)

a3 (B/S)

A

A B

B

1316/

1316/ 1316/

1316/

1316/

1316/

2316/2316/ 114/

811

4/

43

312/

218/ 2316/1316/ 1316/

a3

a3

A - A

43

312/

2316/2316/a3

a3

1316/1316/

B - B

Page 118: 132-18 41th RD steel shop drawing 11_21_2015

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

C1 1

C1 1 W6X25 11'-11 1/2" 299 A992

SQ-2COLUMN

BP2 1 PL1 1/2"X12" 1'-0" 61 A36

TOTAL WEIGHT THIS DRAWING 360

ONE - COLUMN - C1

GRID LOCATION BOTTOM ELEVATION

A/5 17'-5"13/16

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 C1

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

33

2'-0

1 2/9'

-241

2/

12'-1

EL 2

9'-6

1316/

+17'-51316/

516/TYP

1316/GA 414/ (FS)

1316/GA 414/

BB

A A

12'-1

414/

414/

112/ 412/ 412/ 112/

112/

412/

412/

112/ 516/

516/

1 14/

BP2

A - A

218/

218/

1316/

B - B

Page 119: 132-18 41th RD steel shop drawing 11_21_2015

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

C2 1

C2 1 W8X58 24'-7 1/2" 1433 A992

SQ-2COLUMN

BP1 1 PL1 1/2"X14" 1'-2" 83 A36

P6 1 FL1/2"X4" 0'-10" 6 A36

p11 2 PL1/2"X7 1/8" 1'-1 7/8" 27 A36

p13 1 PL1/2"X7 7/8" 1'-2 1/8" 13 A36

p22 2 FL1/2"X6" 0'-10" 17 A36

TOTAL WEIGHT THIS DRAWING 1579

ONE - COLUMN - C2

GRID LOCATION BOTTOM ELEVATION

A/4 17'-5"13/16

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/29/2015 003 C2

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

24'-7

1 2/

24'-9

3'-4

5116/ 334/

278/ 112/112/

278/

2

431

2/3 8/

38/TYP

38/TYP

516/

38/516/

TYP

1316/

1316/

1316/

1316/

1316/

EE

A A

DD

DD

BB

3

312/

312/

33

112/

2'-7

9'-5

9'-5

5116/ 31116/

33

3

24'-9

12'-0

9'-5

3'-4

112/ 234/

158/ 212/212/

158/

231

2/

414/

312/

3 8/

658/

p11

p11

1316/

1316/

p13

P6

33

33

3

33

4916/ 414/

234/

2316/

218/

P6 1316/

B - B

33

33

658/

112/

112/ 4 112/

4916/ 4316/ 212/ 112/

112/

112/

1316/

p22

p11

D - D

112/ 512/ 512/ 112/

112/

512/

512/

112/

516/

516/

1 14/

BP1

A - A

3278/ 278/

212/

212/

1316/

E - E

Page 120: 132-18 41th RD steel shop drawing 11_21_2015

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

C3 1

C3 1 W8X48 18'-10" 904 A992

SQ-2COLUMN

p11 4 PL1/2"X7 1/8" 1'-1 7/8" 54 A36

p13 2 PL1/2"X7 7/8" 1'-2 1/8" 26 A36

p22 4 FL1/2"X6" 0'-10" 34 A36

TOTAL WEIGHT THIS DRAWING 1017

ONE - COLUMN - C3

GRID LOCATION BOTTOM ELEVATION

A/4 42'-2"13/16

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/29/2015 003 C3

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work112/ 112/

p22

p22

p22

p22

1316/GA 5"(NS)

1316/

1316/

1316/GA 4516/ (FS)

1316/GA 4516/ (FS)

AA

A A

CC

BB

BB

731

2/3

23@

3

43 8/

312/

3 8/

EL 4

2'-2

1316/

EL 6

1'-0

1316/

6'-1

9'-5

3'-4

112/ 112/

38/TYP

316/

38/316/

TYP

316/

38/316/

TYP18'-1

0

9'-5

6916/

212/ 212/

212/ 212/

p11

p11

p11

p11

1316/

1316/

1316/

1316/

p13

p13

23@

3

33

414/

312/

3 8/

6'-1

33

3

33

2

414/

312/

3 8/

3'-4

6916/

33

33

6916/

112/

4716/ 4116/ 212/ 112/

112/

112/

2316/ 178/

1316/p22

p11

B - B

6916/

33

112/

316/ 4116/212/

3 3 112/

112/

112/

2316/ 178/

1316/

p22

p11

C - C

212/

212/

1316/

A - A

Page 121: 132-18 41th RD steel shop drawing 11_21_2015

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

C4 1

C4 1 W8X40 15'-8" 624 A992

SQ-2COLUMN

p11 4 PL1/2"X7 1/8" 1'-1 7/8" 54 A36

p13 2 PL1/2"X7 7/8" 1'-2 1/8" 26 A36

p22 4 FL1/2"X6" 0'-10" 34 A36

TOTAL WEIGHT THIS DRAWING 738

ONE - COLUMN - C4

GRID LOCATION BOTTOM ELEVATION

A/4 61'-0"13/16

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/29/2015 003 C4

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

2

15'-8

112/ 112/

38/TYP

316/

38/316/

TYP316/

38/316/

TYP

1316/GA 4516/ (FS)

p22

p22

p22

p22

1316/

1316/GA 4516/ (FS)

A A

EE

EE

EE

EE

312/

312/

23@

3

33

43 8/

43 8/

EL 6

1'-0

1316/

EL 7

6'-8

1316/

6'-1

9'-5

331

2/31

2/3 8/

15'-8

6'-1

9'-5

2

6916/

6916/

212/ 212/

p11

p11

p11

p11

1316/

1316/

1316/

p13

p13

3

23@

3

414/

33

3 8/41

4/

33

33

4516/ 31516/212/

112/

6916/

112/

2 2

112/

112/

1316/

p11

p22

E - E

212/

212/1316/

A - A

Page 122: 132-18 41th RD steel shop drawing 11_21_2015

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

C5 1

C5 1 W8X58 24'-7 1/2" 1433 A992

SQ-2COLUMN

BP1 1 PL1 1/2"X14" 1'-2" 83 A36

P6 3 FL1/2"X4" 0'-10" 17 A36

p11 2 PL1/2"X7 1/8" 1'-1 7/8" 27 A36

p14 1 PL1/2"X7 7/8" 1'-2 3/8" 13 A36

TOTAL WEIGHT THIS DRAWING 1574

ONE - COLUMN - C5

GRID LOCATION BOTTOM ELEVATION

A/3 17'-5"13/16

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 C5

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

22'-2

12'-0

9'-5

3'-4

24'-9

4916/ 4316/

231

2/

5116/ 334/

312/

112/ 112/

38/TYP

38/TYP

1316/

1316/

1316/

EE

A A

CC

DD

BB

312/

33

33

3

2'-7

33

3

24'-9

12'-0

9'-5

3'-4

658/ 234/

2

312/

412/

312/

3 8/

212/ 212/

p11

p11

1316/

1316/

P6

p14

P6P6

33

33

3

33

4916/ 414/

234/

234/

218/

218/

P6

P6 1316/

B - B

33

218/

218/

412/ 4316/

234/

658/

112/

2 2

P6

1316/

p11

D - D

33

4916/ 414/

658/

112/

2 2

P6

p14

1316/

p11

C - C

112/

512/

512/

112/

112/ 512/ 512/ 112/

516/

516/

1 14/

BP1

A - A

212/

212/

1316/

E - E

Page 123: 132-18 41th RD steel shop drawing 11_21_2015

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

C6 1

C6 1 W8X48 18'-10" 904 A992

SQ-2COLUMN

P6 2 FL1/2"X4" 0'-10" 11 A36

p11 4 PL1/2"X7 1/8" 1'-1 7/8" 54 A36

p14 2 PL1/2"X7 7/8" 1'-2 3/8" 26 A36

TOTAL WEIGHT THIS DRAWING 995

ONE - COLUMN - C6

GRID LOCATION BOTTOM ELEVATION

A/3 42'-2"13/16

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 C6

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

6'-1

9'-5

3'-4

112/ 112/

112/ 112/

1316/GA 414/ (FS)

1316/GA 414/ (FS)

1316/GA 5"(NS)

1316/

1316/

AA

A A

FF

EE

BB

CC

23

33

33

3

33

18'-1

0

2

4716/ 4116/

4716/ 4116/

312/

33

312/

EL 4

2'-2

1316/

EL 6

1'-0

1316/

18'-1

0

9'-5

212/

212/ 212/

38/TYP

38/TYP

316/

38/316/

TYP

p11

p11

p11

p11

1316/

1316/

1316/

1316/

p14

P6

p14

P6

33

23@

3

6916/ 21116/

412/

312/

3 8/

6'-1

33

3

33

2

412/

312/

3 8/

6916/ 21116/

3'-4

212/

33

2 2

4716/ 418/

211 16/

6916/

112/

218/

218/

p14

P61316/

p11

C - C

33

4716/ 418/

6916/

112/

2 2

p14

P6

1316/

p11

B - B

4716/ 418/

6916/

33

112/

2 2

P6

1316/

p11

E - E

211 16/

6916/

33

112/

218/

218/

2 2

1316/

p11

F - F

212/

212/

1316/

A - A

Page 124: 132-18 41th RD steel shop drawing 11_21_2015

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

C7 1

C7 1 W8X40 15'-8" 624 A992

SQ-2COLUMN

P6 2 FL1/2"X4" 0'-10" 11 A36

p11 4 PL1/2"X7 1/8" 1'-1 7/8" 54 A36

p13 1 PL1/2"X7 7/8" 1'-2 1/8" 13 A36

p14 1 PL1/2"X7 7/8" 1'-2 3/8" 13 A36

TOTAL WEIGHT THIS DRAWING 715

ONE - COLUMN - C7

GRID LOCATION BOTTOM ELEVATION

A/3 61'-0"13/16

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 C7

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

4516/ 31516/

4516/ 31516/

231

2/

15'-8

EL 6

1'-0

1316/

EL 7

6'-8

1316/

6'-1

9'-7

15'-6

2

112/ 112/

1316/GA 414/ (FS)

1316/GA 414/ (FS)

1316/

A A

CC

BB

EE

FF

3@3

33

312/

33

3

6916/ 21116/

412/

312/

3 8/

15'-8

15'-6

2

6'-1

9'-7

212/ 212/

316/

38/316/

TYP

38/TYP

38/TYP

p11

1316/

1316/

1316/

P6

p14

p13

P6

23@

3

3

33

414/

312/

3 8/

21116/ 6916/

33

4516/ 4

2 2112/

6916/

211 16/

218/

218/

P61316/

p11

F - F

33

4516/ 4

112/

6916/

4116/

2 2

p13

P6

1316/p11

E - E

33

2 2

6916/

112/

4516/ 4

p14

P6

1316/

p11

B - B

33

2 2

4516/ 4

211 16/

6916/

112/

218/

218/

p14

P6

1316/

p11

C - C

212/

212/

1316/

A - A

Page 125: 132-18 41th RD steel shop drawing 11_21_2015

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

C8 1

C8 1 W8X58 24'-7 1/2" 1433 A992

SQ-2COLUMN

BP1 1 PL1 1/2"X14" 1'-2" 83 A36

P6 3 FL1/2"X4" 0'-10" 17 A36

p11 2 PL1/2"X7 1/8" 1'-1 7/8" 27 A36

p14 1 PL1/2"X7 7/8" 1'-2 3/8" 13 A36

TOTAL WEIGHT THIS DRAWING 1574

ONE - COLUMN - C8

GRID LOCATION BOTTOM ELEVATION

A/2 17'-5"13/16

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 C8

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

3'-4

24'-9

12'-0

12'-9

4916/ 414/2

312/

3

112/ 112/

38/TYP

38/TYP

1316/

1316/

1316/

1316/

1316/

EE

A A

DD

CC

BB

312/

312/

33

33

2'-7

18'-1

0

33

3

21'-5

24'-9

12'-0

12'-9

234/ 234/

234/ 658/31

2/31

2/2

412/

312/

3 8/

212/ 212/

p11

1316/

1316/

p14

P6

P6

P6

33

33

33

3

33

3'-4

4916/ 414/

412/ 414/

234/

234/

218/

218/

P6

P61316/

B - B

658/

33

412/ 414/

112/ 2 2

P6

1316/

p11

C - C

218/

658/

33

2 2

412/ 414/

112/

234/

218/

1316/

p11

D - D

112/ 512/ 512/ 112/

112/

512/

512/

112/

516/

516/

1 14/

BP1

A - A

212/

212/

1316/

E - E

Page 126: 132-18 41th RD steel shop drawing 11_21_2015

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

C9 1

C9 1 W8X48 18'-10" 904 A992

SQ-2COLUMN

P6 2 FL1/2"X4" 0'-10" 11 A36

p11 4 PL1/2"X7 1/8" 1'-1 7/8" 54 A36

p14 2 PL1/2"X7 7/8" 1'-2 3/8" 26 A36

TOTAL WEIGHT THIS DRAWING 995

ONE - COLUMN - C9

GRID LOCATION BOTTOM ELEVATION

A/2 42'-2"13/16

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 C9

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

112/ 112/

112/ 112/

316/

316/

38/316/

TYP

1316/GA 5"(NS)

1316/GA 5"(NS)

1316/GA 414/ (FS)

1316/GA 414/ (FS)

1316/GA 5"(NS)

1316/GA 5"(NS)

1316/

1316/

AA

A A

FF

EE

BB

CC3

33

33

3

33

33

18'-1

0

22

4716/ 4116/

312/

312/

EL 4

2'-2

1316/

EL 6

1'-0

1316/

6'-1

9'-5

3'-4

2

18'-1

0

9'-5

212/ 212/

212/ 212/

38/TYP

38/TYP

p11

p11

p11

p11

1316/

1316/

1316/

1316/

P6

p14

P6

p14

33

23@

3

412/

312/

3 8/

21116/ 6916/

6'-1

33

412/

312/

3 8/

21116/ 6916/

3'-4

6916/

33

112/

211 16/

438/ 418/

218/

218/

2 2

P6

1316/ p11

C - C

6916/

33

112/

438/ 418/

2 2

1316/

p11

B - B

112/

33

6916/

2 2

18/ P6

1316/

p11

E - E

18/

112/

33

6916/

211 16/

218/

218/

2 2

P6 1316/

p11

F - F

212/

212/

1316/

A - A

Page 127: 132-18 41th RD steel shop drawing 11_21_2015

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

C10 1

C10 1 W8X40 15'-8" 624 A992

SQ-2COLUMN

P6 1 FL1/2"X4" 0'-10" 6 A36

p11 4 PL1/2"X7 1/8" 1'-1 7/8" 54 A36

p14 2 PL1/2"X7 7/8" 1'-2 3/8" 26 A36

p22 2 FL1/2"X6" 0'-10" 17 A36

TOTAL WEIGHT THIS DRAWING 727

ONE - COLUMN - C10

GRID LOCATION BOTTOM ELEVATION

A/2 61'-0"13/16

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/29/2015 003 C10

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

EL 7

6'-8

1316/

15'-8

6'-1

9'-5

2112/ 112/

316/

38/316/

TYP

316/

38/316/

TYP

38/TYP

p22

p22

1316/GA 5"(NS)

1316/GA 414/ (FS)

1316/

1316/GA 4516/ (NS)

A A

CC

BB

FF

EE

312/

23@

3

3

33

312/

4516/ 31516/

4516/ 31516/

43 8/

EL 6

1'-0

1316/

341

2/31

2/3 8/

15'-8

6'-1

9'-5

2

6916/

212/ 212/

38/TYP

p11

p11

p11

p11

1316/

1316/

1316/

p14

P6

p14

3

23@

3

33

21116/ 6916/

412/

312/

3 8/3

33

3

112/

6916/

2 2

4516/ 31516/212/

112/

112/

112/

1316/

p22

p11

E - E

33

33

4516/ 31516/212/

112/

6916/

2 2

112/

112/

1316/

p22

p11

F - F

33

112/

6916/

2 2

414/ 4

1316/

p11

B - B

33

414/ 4

112/ 4 112/

112/

6916/

211 16/

218/

218/

P6

1316/

p11

C - C

212/

212/

1316/

A - A

Page 128: 132-18 41th RD steel shop drawing 11_21_2015

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

C11 1

C11 1 W8X58 24'-7 1/2" 1433 A992

SQ-2COLUMN

BP1 1 PL1 1/2"X14" 1'-2" 83 A36

P6 1 FL1/2"X4" 0'-10" 6 A36

p10 2 PL1/2"X7 1/8" 1'-1 7/8" 24 A36

p15 1 PL1/2"X7 7/8" 1'-2 1/4" 13 A36

p22 2 FL1/2"X6" 0'-10" 17 A36

TOTAL WEIGHT THIS DRAWING 1576

ONE - COLUMN - C11

GRID LOCATION BOTTOM ELEVATION

A/1 17'-5"13/16

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/29/2015 003 C11

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

24'-9

3'-4

414/

2

43 8/

112/ 112/

18/

38/TYP

316/

38/316/

TYP

316/

38/316/

TYP

1316/

p22

p22

P6

1316/

1316/

1316/

1316/

1316/

DD

A A

CC

BB

312/

312/

33

33

312/

2'-7

9'-5

9'-5

412/

33

3

3

33

3

21'-5

3'-4

24'-9

438/

312/

3 8/

2

658/

212/ 212/

2316/ 2316/

234/

p10

p10

1316/

1316/

p15

P6

3

138/

234/

412/ 414/

P6

B - B

3

33

3

112/ 112/

112/

658/

412/ 414/ 212/ 112/

112/

112/

1316/

p10

p22

C - C

112/

512/

512/

112/

112/ 512/ 512/ 112/

516/

516/

1 14/

BP1

A - A

212/

212/

1316/

D - D

Page 129: 132-18 41th RD steel shop drawing 11_21_2015

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

C12 1

C12 1 W8X48 18'-10" 904 A992

SQ-2COLUMN

p10 4 PL1/2"X7 1/8" 1'-1 7/8" 49 A36

p15 2 PL1/2"X7 7/8" 1'-2 1/4" 26 A36

p22 4 FL1/2"X6" 0'-10" 34 A36

TOTAL WEIGHT THIS DRAWING 1012

ONE - COLUMN - C12

GRID LOCATION BOTTOM ELEVATION

A/1 42'-2"13/16

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/29/2015 003 C12

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

112/ 112/

316/

38/316/

TYP

1316/GA 5"(NS)

p22

p22

p22

p22

1316/

1316/

1316/GA 4516/ (NS)

1316/GA 4516/ (NS)

AA

A A

CC

BB

18'-1

0

312/

312/

23@

33

33

33

2

43 8/

43 8/

EL 4

2'-2

1316/

EL 6

1'-0

1316/

6'-1

9'-5

3'-4

112/ 112/

18/

18/

38/TYP

316/

38/316/

TYP

18'-1

0

9'-5

212/ 212/

212/ 212/

p10

p10

p10

p10

1316/

1316/

1316/

1316/

p15

p15

33

438/

312/

3 8/

6'-1

2

6916/

33

3

33

2

6916/

438/

312/

3 8/

3'-4

33

33

18/ 418/ 212/ 112/

112/

6916/

112/ 112/

112/

112/

1316/p22

p10

B - B

3

33

3

112/

6916/

112/ 112/

418/ 212/ 112/

112/

112/

1316/

p22

p10

C - C

212/

212/

1316/

A - A

Page 130: 132-18 41th RD steel shop drawing 11_21_2015

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

C13 1

C13 1 W8X40 6'-3" 249 A992

SQ-2COLUMN

p10 2 PL1/2"X7 1/8" 1'-1 7/8" 24 A36

p15 1 PL1/2"X7 7/8" 1'-2 1/4" 13 A36

p22 2 FL1/2"X6" 0'-10" 17 A36

TOTAL WEIGHT THIS DRAWING 303

ONE - COLUMN - C13

GRID LOCATION BOTTOM ELEVATION

A/1 61'-0"13/16

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/29/2015 003 C13

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

312/

3

23@

3

6'-3

EL 6

1'-0

1316/

EL 6

7'-3

1316/

18/

6'-1

2

47 8/

112/ 112/

38/TYP

316/

38/316/

TYP

316/

38/316/

TYP

p22

p22

1316/GA 5"(NS)

1316/GA 5"(NS)

1316/

1316/GA 4516/ (NS)

A A

CC

CC

23@

3

33

6'-3

6'-1

2

438/

312/

3 8/

6916/

212/ 212/

p10

p10

1316/

1316/

p15

212/

33

33

112/

6916/

112/ 112/

18/ 4 112/

112/

112/

1316/

p22

p10

C - C

212/

212/1316/

A - A

Page 131: 132-18 41th RD steel shop drawing 11_21_2015

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

C14 1

C14 1 W6X25 11'-11 1/2" 299 A992

SQ-2COLUMN

BP2 1 PL1 1/2"X12" 1'-0" 61 A36

P4 2 FL1/2"X3 1/2" 0'-7" 7 A36

TOTAL WEIGHT THIS DRAWING 367

ONE - COLUMN - C14

GRID LOCATION BOTTOM ELEVATION

B/6 17'-5"13/16

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 C14

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

12'-1

C C

38/TYP

BB

A A

2'-7

9'-5

1

218/

218/

331

2/3

312/

1316/

P4

P4

1516/

218/

14/

P4

A - A

218/

14/ P41316/

B - B

112/ 412/ 412/ 112/

112/

412/

412/

112/516/

516/

1 14/

C - C

Page 132: 132-18 41th RD steel shop drawing 11_21_2015

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

C15 1

C15 1 W6X25 19'-10 5/16" 496 A992

SQ-2COLUMN

BP2 1 PL1 1/2"X12" 1'-0" 61 A36

P5 2 FL1/2"X5" 0'-7" 10 A36

TOTAL WEIGHT THIS DRAWING 567

ONE - COLUMN - C15

GRID LOCATION BOTTOM ELEVATION

B/5 9'-7"

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 C15

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

EL 9

'-7

112/

10'-4

5 16/9'

-51

331

2/3

312/

EL 2

9'-6

1316/

19'-1

113 16/

14/

14/

38/TYP

1316/GA 414/ (NS)

1316/GA 414/ (NS)

1316/GA 4516/ (FS)

1316/GA 4516/

BB

A A

414/

414/

31116/

10'-5

1316/

9'-5

1

331

2/3

312/

31116/

1316/

1316/

P5

P5

112/

412/

412/

112/

112/ 412/ 412/ 112/

516/

516/

1 14/

BP2

A - A

3716/ 21516/

1516/

218/ 21

8/

1516/

7 8/23

16/ 2316/

7 8/

P5

1316/

B - B

Page 133: 132-18 41th RD steel shop drawing 11_21_2015

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

C16 1

C16 1 W8X58 32'-6 5/16" 1893 A992

SQ-2COLUMN

BP1 1 PL1 1/2"X14" 1'-2" 83 A36

P3 5 FL1/2"X4" 0'-7" 20 A36

TOTAL WEIGHT THIS DRAWING 1996

ONE - COLUMN - C16

GRID LOCATION BOTTOM ELEVATION

C/4 9'-7"

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 C16

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

29'-2

5 16/

10'-4

5 16/

32'-7

1316/

112/ 112/

14/

14/

316/

38/316/

TYP

38/TYP

1316/GA 5"(NS)

1316/GA 4516/ (NS)

1316/GA 4516/ (FS)

1316/GA 4516/ (NS)

1316/GA 4516/ (FS)

1316/GA 414/ (NS)

1316/GA 414/ (FS)

1316/

EE

A A

CC

BB

DD

112/

112/

312/

33

3

3

3'-4

9'-5

12'-9

23

312/

331

2/

32'-7

1316/

9'-5

158/ 212/212/

158/

218/ 218/

218/ 218/

218/ 218/

1316/

1316/

1316/

1316/

P3

P3

P3

P3

P3

234/ 234/

234/ 234/

331

2/3

312/

10'-5

1316/

9'-5

33

3

234/

3'-4

331

2/2

218/

218/

234/

316/

P3

1316/

D - D

234/

234/

218/

218/

14/

P3

P3

1316/

B - B

234/

234/

218/

218/

316/P3

P3 1316/

C - C

112/

512/

512/

112/

112/ 512/ 512/ 112/

516/

516/

1 14/

BP1

A - A

212/

212/1316/

E - E

Page 134: 132-18 41th RD steel shop drawing 11_21_2015

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

C17 1

C17 1 W8X48 18'-10" 904 A992

SQ-2COLUMN

P3 2 FL1/2"X4" 0'-7" 8 A36

TOTAL WEIGHT THIS DRAWING 912

ONE - COLUMN - C17

GRID LOCATION BOTTOM ELEVATION

C/4 42'-2"13/16

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 C17

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

3@3

2

331

2/3

312/

EL 4

2'-2

1316/

EL 6

1'-0

1316/

6'-1

9'-5

3'-4

112/ 112/

112/ 112/

38/TYP

1316/GA 5"(NS)

1316/GA 4516/ (FS)

1316/GA 4516/ (FS)

1316/GA 5"(NS)

1316/

1316/

AA

A A

BB

BB

2

33

3

3@3

18'-1

0

212/ 212/

23

312/

331

2/

6'-1

9'-5

3'-4

212/ 212/

218/ 218/

218/ 218/

1316/

1316/

1316/

1316/

P3

P3

2

33

3

218/

218/

211 16/

316/

P3

1316/

B - B

212/

212/

1316/

A - A

Page 135: 132-18 41th RD steel shop drawing 11_21_2015

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

C18 1

C18 1 W8X40 15'-8" 624 A992

SQ-2COLUMN

P3 2 FL1/2"X4" 0'-7" 8 A36

TOTAL WEIGHT THIS DRAWING 632

ONE - COLUMN - C18

GRID LOCATION BOTTOM ELEVATION

C/4 61'-0"13/16

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 C18

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

312/

312/

3@3

33

316/

316/

2

15'-8

EL 6

1'-0

1316/

EL 7

6'-8

1316/

6'-1

9'-5

2

112/ 112/

38/TYP

1316/GA 4516/ (FS)

1316/GA 4516/ (FS)

1316/GA 4516/ (NS)

1316/GA 4516/ (NS)

1316/GA 5"(NS) 1316/

BB

A A

BB

23@

3

331

2/3

312/

6'-1

9'-5

2

212/ 212/

2316/ 2316/

2316/ 2316/

1316/

1316/

1316/

P3

P3

2316/

2316/

211 16/

316/P3

1316/

B - B

212/

212/

1316/

A - A

Page 136: 132-18 41th RD steel shop drawing 11_21_2015

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

C19 1

C19 1 W8X58 32'-6 5/16" 1893 A992

SQ-2COLUMN

BP1 1 PL1 1/2"X14" 1'-2" 83 A36

P3 6 FL1/2"X4" 0'-7" 24 A36

TOTAL WEIGHT THIS DRAWING 2000

ONE - COLUMN - C19

GRID LOCATION BOTTOM ELEVATION

C/3.1 9'-7"

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 C19

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

10'-5

1316/

32'-7

1316/

3'-4

14/

316/

38/TYP

1316/GA 5"(NS)

1316/GA 414/ (NS)

1316/GA 4316/ (FS)

1316/GA 414/ (NS)

1316/GA 4316/ (FS)

1316/GA 4316/ (FS)

1316/GA 414/ (NS)

1316/DD

A A

CC

BB

CC

EL 9

'-7

212/

212/

212/

33

33

33

EL 4

2'-2

1316/

112/ 112/

331

2/3

312/

331

2/

2

316/

9'-5

9'-5

32'-7

1316/

9'-5

5

218/ 218/

218/ 218/

218/ 218/

1316/

1316/

1316/

1316/

P3

P3

P3P3

P3

P3

331

2/3

312/

10'-5

1316/

9'-5

33

32

331

2/

3'-4

234/

234/

218/

218/

316/

P3

P3

1316/

C - C

234/

234/

218/

218/

14/P3

P3

1316/

B - B

112/

512/

512/

112/

112/ 512/ 512/ 112/

516/

516/

1 14/

BP1

A - A

212/

212/

1316/

D - D

Page 137: 132-18 41th RD steel shop drawing 11_21_2015

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

C20 1

C20 1 W8X48 18'-10" 904 A992

SQ-2COLUMN

P3 4 FL1/2"X4" 0'-7" 16 A36

TOTAL WEIGHT THIS DRAWING 920

ONE - COLUMN - C20

GRID LOCATION BOTTOM ELEVATION

C/3.1 42'-2"13/16

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 C20

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

18'-1

0

EL 4

2'-2

1316/

EL 6

1'-0

1316/

6'-1

9'-5

3'-4

112/ 112/

316/

38/TYP

1316/GA 414/ (NS)

1316/GA 414/ (NS)

1316/GA 5"(NS)

1316/GA 4316/ (FS)

1316/GA 4316/ (FS)

1316/GA 5"(NS)

1316/

1316/

AA

A A

BB

BB

212/

212/

3@3

33

3@3

2

316/

331

2/3

312/

2

112/ 112/

331

2/3

312/

6'-1

9'-5

3'-4

5

212/ 212/

218/ 218/

218/ 218/

1316/

1316/

1316/

1316/

P3 P3

P3 P3

23@

3

21116/ 21116/

3@3

2

211 16/

211 16/

218/

218/

316/

P3

P3

1316/

B - B

212/

212/

1316/

A - A

Page 138: 132-18 41th RD steel shop drawing 11_21_2015

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

C21 1

C21 1 W8X40 15'-8" 624 A992

SQ-2COLUMN

P3 4 FL1/2"X4" 0'-7" 16 A36

TOTAL WEIGHT THIS DRAWING 640

ONE - COLUMN - C21

GRID LOCATION BOTTOM ELEVATION

C/3.1 61'-0"13/16

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 C21

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

33

2

331

2/3

312/

15'-8

EL 6

1'-0

1316/

EL 7

6'-8

1316/

6'-1

9'-5

2

112/ 112/

316/

316/

38/TYP

1316/GA 414/ (NS)

1316/GA 4316/ (FS)

1316/GA 4316/ (FS)

1316/GA 414/ (NS)

1316/GA 5"(NS)

1316/

BB

A A

BB

212/

212/

3@3

3@3

21116/ 21116/

21116/ 21116/

331

2/3

312/

6'-1

9'-5

2

212/ 212/

218/ 218/

218/ 218/

1316/

1316/

1316/

P3

P3

P3 P3

2

211 16/

211 16/

218/

218/316/

P3

P3

1316/

B - B

1916/

212/

212/

1916/1316/

A - A

Page 139: 132-18 41th RD steel shop drawing 11_21_2015

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

C22 1

C22 1 W8X58 32'-6 5/16" 1893 A992

SQ-2COLUMN

BP1 1 PL1 1/2"X14" 1'-2" 83 A36

P3 6 FL1/2"X4" 0'-7" 24 A36

TOTAL WEIGHT THIS DRAWING 2000

ONE - COLUMN - C22

GRID LOCATION BOTTOM ELEVATION

C/2.1 9'-7"

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 C22

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

10'-4

5 16/

312/

23

312/

331

2/

316/

112/ 112/

32'-7

1316/

14/

316/

38/TYP

1316/GA 414/ (NS)

1316/GA 414/ (NS)

1316/GA 414/ (NS)

1316/GA 5"(NS)

1316/

DD

A A

CC

BB

CC

112/

3@3

9'-5

9'-5

3'-4

3

32'-7

1316/

32'-7

1316/

9'-5

23

312/

331

2/3

312/

218/ 218/

218/ 218/

218/ 218/

1316/

1316/

1316/

1316/

P3

P3

P3

P3

P3

P3

234/ 234/

234/ 234/

10'-5

1316/

9'-5

3@3

212/ 212/

234/ 234/

3'-4

234/

234/

316/

P3

P31316/

C - C

234/

234/

14/

P3

P31316/

B - B

112/

512/

512/

112/

112/ 512/ 512/ 112/

516/

516/

1 14/

BP1

A - A

212/

212/

1316/

D - D

Page 140: 132-18 41th RD steel shop drawing 11_21_2015

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

C23 1

C23 1 W8X48 18'-10" 904 A992

SQ-2COLUMN

P3 4 FL1/2"X4" 0'-7" 16 A36

TOTAL WEIGHT THIS DRAWING 920

ONE - COLUMN - C23

GRID LOCATION BOTTOM ELEVATION

C/2.1 42'-2"13/16

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 C23

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

331

2/3

312/

112/ 112/

316/

EL 4

2'-2

1316/

EL 6

1'-0

1316/

6'-1

9'-5

3'-4

112/ 112/

316/

38/TYP

1316/GA 414/ (NS)

1316/GA 414/ (NS)

1316/GA 5"(NS)

1316/GA 5"(NS)

1316/

1316/

AA

A A

BB

BB

23@

3

3@3

18'-1

0

2

21116/

18'-1

0

212/ 212/

23

312/

331

2/

6'-1

9'-5

3'-4

212/ 212/

218/ 218/

218/ 218/

1316/

1316/

1316/

1316/

P3P3

P3P3

23@

3

21116/

3@3

21116/ 21116/

211 16/

211 16/

316/

P3

P3

1316/

B - B

212/

212/

1316/

A - A

Page 141: 132-18 41th RD steel shop drawing 11_21_2015

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

C24 1

C24 1 W8X40 15'-8" 624 A992

SQ-2COLUMN

P3 4 FL1/2"X4" 0'-7" 16 A36

TOTAL WEIGHT THIS DRAWING 640

ONE - COLUMN - C24

GRID LOCATION BOTTOM ELEVATION

C/2.1 61'-0"13/16

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 C24

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

3@3

15'-8

331

2/3

312/

2EL 6

1'-0

1316/

EL 7

6'-8

1316/

6'-1

9'-5

2

112/ 112/

316/

316/

38/TYP

1316/GA 414/ (NS)

1316/GA 414/ (NS)

1316/GA 5"(NS)

1316/

BB

A A

BB2

3@3

15'-8

21116/ 21116/

21116/ 21116/

331

2/3

312/

6'-1

9'-5

2

212/ 212/

218/ 218/

218/ 218/

1316/

1316/

1316/

P3P3

P3P3 21

1 16/21

1 16/

316/

P3

P3

1316/

B - B

212/

212/

1316/

A - A

Page 142: 132-18 41th RD steel shop drawing 11_21_2015

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

C25 1

C25 1 W8X58 32'-6 5/16" 1893 A992

SQ-2COLUMN

BP1 1 PL1 1/2"X14" 1'-2" 83 A36

P3 3 FL1/2"X4" 0'-7" 12 A36

TOTAL WEIGHT THIS DRAWING 1988

ONE - COLUMN - C25

GRID LOCATION BOTTOM ELEVATION

C/1 9'-7"

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 C25

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

10'-4

5 16/

112/

316/

331

2/3

312/

331

2/

EL 4

2'-2

1316/

32'-7

1316/

14/

316/

38/TYP

1316/GA 5"(NS)

1316/

1316/

1316/

1316/

1316/GA 4516/

1316/GA 4516/

1316/GA 4516/

BB

A A

EL 9

'-7

112/

3@3

9'-5

9'-5

3'-4

2

112/

32'-7

1316/

331

2/3

312/

10'-5

1316/

9'-5

9'-5

3'-4

2316/ 218/

2316/ 2316/

2316/ 2316/

234/

234/

1316/

1316/

1316/

1316/

P3

P3

P3

3@3

2

212/ 212/

234/

331

2/

112/

512/

512/

112/

112/ 512/ 512/ 112/

516/

516/

1 14/

BP1

A - A

234/

212/

212/

P3

B - B

Page 143: 132-18 41th RD steel shop drawing 11_21_2015

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

C26 1

C26 1 W8X48 18'-10" 904 A992

SQ-2COLUMN

P3 2 FL1/2"X4" 0'-7" 8 A36

TOTAL WEIGHT THIS DRAWING 912

ONE - COLUMN - C26

GRID LOCATION BOTTOM ELEVATION

C/1 42'-2"13/16

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 C26

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

312/

2

316/

112/ 112/

EL 4

2'-2

1316/

EL 6

1'-0

1316/

6'-1

9'-5

3'-4

112/ 112/

316/

38/TYP

P3

P3

1316/GA 5"(NS)

1316/GA 5"(NS)

1316/

1316/

1316/

1316/

1316/GA 4516/

1316/GA 4516/

AA

A A

3@3

3@3

18'-1

0

23

312/

3

23

312/

331

2/

212/ 212/

18'-1

0

6'-1

9'-5

3'-4

2316/ 218/

2316/ 2316/

21116/

21116/

212/ 212/

1316/

1316/

1316/

1316/

P3

P3

23@

33@

3

212/

212/

1316/

A - A

Page 144: 132-18 41th RD steel shop drawing 11_21_2015

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

C27 1

C27 1 W8X40 15'-8" 624 A992

SQ-2COLUMN

P3 2 FL1/2"X4" 0'-7" 8 A36

TOTAL WEIGHT THIS DRAWING 632

ONE - COLUMN - C27

GRID LOCATION BOTTOM ELEVATION

C/1 61'-0"13/16

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 C27

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

312/

3

3@3

2

331

2/

EL 6

1'-0

1316/

EL 7

6'-8

1316/

15'-8

6'-1

9'-5

2112/ 112/

316/

316/

1316/GA 5"(NS)

38/TYP

P3

P3

1316/

1316/

1316/GA 4516/

BB

A A

23@

33

312/

331

2/

6'-1

9'-5

2

15'-8

2316/ 218/

21116/

212/ 212/

1316/

1316/

P3

P3

212/

212/

1316/

A - A

211 16/

1316/

B - B

Page 145: 132-18 41th RD steel shop drawing 11_21_2015

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

C28 1

C28 1 W6X25 11'-11 1/2" 299 A992

SQ-2COLUMN

BP2 1 PL1 1/2"X12" 1'-0" 61 A36

TOTAL WEIGHT THIS DRAWING 360

ONE - COLUMN - C28

GRID LOCATION BOTTOM ELEVATION

D/5 17'-5"13/16

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 C28

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

12'-1

A A

2'-7

9'-5

1

331

2/3

312/

2316/ 2316/

2316/ 2316/

1316/

1316/

112/

412/

412/

112/

112/ 412/ 412/ 112/

516/

516/

1 14/

BP2

A - A

Page 146: 132-18 41th RD steel shop drawing 11_21_2015

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

C29 1

C29 1 W8X58 24'-7 1/2" 1433 A992

SQ-2COLUMN

BP1 1 PL1 1/2"X14" 1'-2" 83 A36

P6 1 FL1/2"X4" 0'-10" 6 A36

p11 2 PL1/2"X7 1/8" 1'-1 7/8" 27 A36

p13 1 PL1/2"X7 7/8" 1'-2 1/8" 13 A36

p22 2 FL1/2"X6" 0'-10" 17 A36

TOTAL WEIGHT THIS DRAWING 1579

ONE - COLUMN - C29

GRID LOCATION BOTTOM ELEVATION

D/4 17'-5"13/16

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/29/2015 003 C29

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

3'-3

5 8/

3@3

24'-9

316/

316/2

112/ 112/

38/TYP

316/

38/316/

TYP

38/TYP

1316/

P6

1316/

1316/

p22

p22

1316/

EE

A A

CC

CC

BB

2'-0

1 2/3

9'-2

38'

-10

107 8/

9'-5

24'-9

9'-5

3 8/

331

2/

312/

212/ 212/

658/

234/

218/ 218/

218/ 218/

218/ 218/

316/

38/316/

TYP

p11

p11

1316/

1316/

1316/

1316/

p13

P6

33

2'-7

9'-1

1 2/

12'-0

33@

3

33

3'-7

1 2/3'-4

23

414/

312/

234/

316/P6 1316/

B - B

33

33

658/

112/

2 2

112/ 212/ 4916/ 4316/

112/

112/

p131316/

p22

p11

C - C

112/

512/

512/

112/

112/ 512/ 512/ 112/

516/

516/

1 14/

BP1

A - A

212/

212/1316/

E - E

Page 147: 132-18 41th RD steel shop drawing 11_21_2015

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

C30 1

C30 1 W8X48 18'-10" 904 A992

SQ-2COLUMN

p11 4 PL1/2"X7 1/8" 1'-1 7/8" 54 A36

p13 2 PL1/2"X7 7/8" 1'-2 1/8" 26 A36

p22 4 FL1/2"X6" 0'-10" 34 A36

TOTAL WEIGHT THIS DRAWING 1017

ONE - COLUMN - C30

GRID LOCATION BOTTOM ELEVATION

D/4 42'-2"13/16

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/29/2015 003 C30

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

316/

38/316/

TYP

p22

p22

p22

p22

1316/GA 5"(NS)

1316/GA 5"(NS)

1316/

1316/

AA

A A

BB

CC

CC

33

3@3

3@3

5'-2

1 2/4

378/

8'-6

1 8/4

378/

3'-3

5 8/

2

316/

316/2

18'-1

0

EL 4

2'-2

1316/

EL 6

1'-0

1316/

112/ 112/

112/ 112/

18'-1

09'-5

9'-5

218/ 218/

38/TYP

316/

38/316/

TYP

p11

p11

p11

p11

1316/

1316/

1316/

1316/

p13

p13

23@

3

33

3

5'-9

1 2/

414/

312/

3 8/

6'-1

6916/

212/ 212/

3@3

33

3

3'-7

1 2/

2

414/

312/

3 8/

3'-4

6916/

212/ 212/

218/ 218/

33

33

6916/

112/2 2

112/ 212/ 4716/ 4116/

112/

112/

1316/

p22

p11

C - C

6916/

33

112/

2 2

112/ 3 3 212/ 414/ 316/

112/

112/

1316/

p22

p11

B - B

212/

212/

1316/

A - A

Page 148: 132-18 41th RD steel shop drawing 11_21_2015

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

C31 1

C31 1 W8X40 15'-8" 624 A992

SQ-2COLUMN

p11 4 PL1/2"X7 1/8" 1'-1 7/8" 54 A36

p13 2 PL1/2"X7 7/8" 1'-2 1/8" 26 A36

p22 4 FL1/2"X6" 0'-10" 34 A36

TOTAL WEIGHT THIS DRAWING 738

ONE - COLUMN - C31

GRID LOCATION BOTTOM ELEVATION

D/4 61'-0"13/16

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/29/2015 003 C31

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

107 8/

8'-6

1 8/10

7 8/15

8/

EL 6

1'-0

1316/

EL 7

6'-8

1316/

15'-8

112/ 112/

38/TYP

316/

38/316/

TYP

1316/GA 5"(NS)

1316/GA 4516/ (NS)

1316/GA 4516/ (NS)

1316/

A A

DD

DD

CC

378/

33

23@

3

378/

316/

316/

5'-2

1 2/

9'-5

312/

6'-1

9'-5

2

6916/

6916/

212/ 212/

2316/ 2316/

2316/ 2316/

316/

38/316/

TYP

p11

p11

1316/

1316/

1316/

p13

p13

23@

3

33

3

5'-9

1 2/

414/

3

512/

414/

33

312/

3 8/3 8/

33

33

316/

6916/

112/2 2

112/ 212/

112/

112/

1316/

p22

p11

C - C

212/33

33

112/ 4516/ 31516/

6916/

112/2 2

112/

112/

1316/

p11

p22

D - D

212/

212/1316/

A - A

Page 149: 132-18 41th RD steel shop drawing 11_21_2015

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

C32 1

C32 1 W8X58 24'-7 1/2" 1433 A992

SQ-2COLUMN

BP1 1 PL1 1/2"X14" 1'-2" 83 A36

P6 3 FL1/2"X4" 0'-10" 17 A36

p11 2 PL1/2"X7 1/8" 1'-1 7/8" 27 A36

p14 1 PL1/2"X7 7/8" 1'-2 3/8" 13 A36

TOTAL WEIGHT THIS DRAWING 1574

ONE - COLUMN - C32

GRID LOCATION BOTTOM ELEVATION

D/3 17'-5"13/16

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 C32

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

24'-9

3'-4

24'-9

23

312/

331

2/

112/ 112/

316/

316/

38/TYP

38/TYP

1316/

1316/

1316/

1316/

1316/

EE

A A

CC

DD

BB

32'

-01 2/

12'-0

9'-5

3@3

22'-2

9'-5

3 8/

23

312/

212/ 212/

218/ 218/

218/ 218/

218/ 218/

p11

p11

1316/

1316/

1316/

1316/

P6

p14

P6

P6

33

2'-7

12'-0

234/ 234/

312/

33

33

3@3

3'-4

658/ 234/

312/

412/

312/

234/

234/

316/ P6

P61316/

B - B

33

2 2

412/ 4316/

234/

658/

112/

P6

1316/

p11

D - D

33

658/

112/

4916/ 414/

2 2

p14

P6

1316/

p11

C - C

112/

512/

512/

112/

112/ 512/ 512/ 112/

516/

516/

1 14/

BP1

A - A

212/

212/

1316/

E - E

Page 150: 132-18 41th RD steel shop drawing 11_21_2015

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

C33 1

C33 1 W8X48 18'-10" 904 A992

SQ-2COLUMN

P6 2 FL1/2"X4" 0'-10" 11 A36

p11 4 PL1/2"X7 1/8" 1'-1 7/8" 54 A36

p14 2 PL1/2"X7 7/8" 1'-2 3/8" 26 A36

TOTAL WEIGHT THIS DRAWING 995

ONE - COLUMN - C33

GRID LOCATION BOTTOM ELEVATION

D/3 42'-2"13/16

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 C33

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

3'-4

112/ 112/

112/ 112/

316/

316/

38/TYP

1316/GA 5"(NS)

1316/GA 414/ (NS)

1316/GA 414/ (NS)

1316/

1316/

AA

A A

FF

BB

CC

3@3

3@3

18'-1

0

22

331

2/3

312/

EL 4

2'-2

1316/

EL 6

1'-0

1316/

6'-1

9'-5

18'-1

0

6'-1

9'-5

3'-4

212/ 212/

316/

38/316/

TYP

p11

p11

p11

p11

1316/

1316/

1316/

1316/

P6p14

P6p14

33

23@

3

33

312/

6916/ 21116/

412/

312/

3 8/

33

3@3

33

312/

6916/ 21116/

2

212/ 212/

412/

312/

3 8/

33

316/

112/ 2 2 112/

6916/

112/

211 16/

1316/

p11

C - C

33

6916/

112/

316/

2 2

P6

1316/

p11

B - B316/

2 2

638/

33

112/

P6

1316/

p11

F - F

212/

212/

1316/

A - A

Page 151: 132-18 41th RD steel shop drawing 11_21_2015

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

C34 1

C34 1 W8X40 15'-8" 624 A992

SQ-2COLUMN

P6 2 FL1/2"X4" 0'-10" 11 A36

p11 4 PL1/2"X7 1/8" 1'-1 7/8" 54 A36

p13 1 PL1/2"X7 7/8" 1'-2 1/8" 13 A36

p14 1 PL1/2"X7 7/8" 1'-2 3/8" 13 A36

TOTAL WEIGHT THIS DRAWING 715

ONE - COLUMN - C34

GRID LOCATION BOTTOM ELEVATION

D/3 61'-0"13/16

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 C34

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

15'-8

6'-1

9'-5

2

312/

23

312/

2EL 6

1'-0

1316/

EL 7

6'-8

1316/

112/ 112/

316/

316/

38/TYP

1316/GA 414/ (NS)

1316/GA 414/ (NS)

1316/

A A

CC

BB

EE

3

3@3

33

15'-8

6916/ 21116/

312/

414/

312/

3 8/

312/

15'-6

2

6'-1

9'-7

212/ 212/

218/ 218/

218/ 218/

38/TYP

316/

38/316/

TYP

p11

p11

p11

p11

1316/

1316/

1316/

P6

p14

P6

p13

33

23@

3

33

412/

33

21116/ 6916/

312/

2

3 8/

33

414/ 31516/

112/

6916/

2 2

P6

1316/

p11

E - E

33

2 2

6916/

112/

414/ 31516/

P6

1316/

p11

B - B

33

112/ 2 2 112/

6916/

112/

414/ 31516/

211 16/ P6

1316/

p11

C - C

212/

212/

1316/

A - A

Page 152: 132-18 41th RD steel shop drawing 11_21_2015

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

C35 1

C35 1 W8X58 24'-7 1/2" 1433 A992

SQ-2COLUMN

BP1 1 PL1 1/2"X14" 1'-2" 83 A36

P6 3 FL1/2"X4" 0'-10" 17 A36

p11 2 PL1/2"X7 1/8" 1'-1 7/8" 27 A36

p14 1 PL1/2"X7 7/8" 1'-2 3/8" 13 A36

TOTAL WEIGHT THIS DRAWING 1574

ONE - COLUMN - C35

GRID LOCATION BOTTOM ELEVATION

D/2 17'-5"13/16

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 C35

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

3@3

3

2'-0

1 2/

12'-0

9'-1

1 2/3'

-71 2/

24'-9

231

2/

112/ 112/

316/

316/

1316/

38/TYP1316/

1316/

1316/

1316/

FF

A A

DD

BB

3

8'-7

1 2/

21'-5

24'-9

234/ 234/

312/

412/

312/

3 8/

331

2/218/ 218/

218/ 218/

218/ 218/

p14

1316/

1316/

1316/

1316/

P6

P6 P6

33

2'-7

9'-5

33

3

33

33

2

212/ 212/

3'-7

1 2/ 3'-4

234/ 658/

234/

234/

18/

P6

P61316/

B - B

33

412/ 414/

112/ 2 2 112/

112/

658/23

4/

P6 1316/

p11

D - D112/

512/

512/

112/

112/ 512/ 512/ 112/

516/

516/

1 14/

BP1

A - A

212/

212/1316/

F - F

Page 153: 132-18 41th RD steel shop drawing 11_21_2015

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

C36 1

C36 1 W8X48 18'-10" 904 A992

SQ-2COLUMN

P6 2 FL1/2"X4" 0'-10" 11 A36

p11 4 PL1/2"X7 1/8" 1'-1 7/8" 54 A36

p14 2 PL1/2"X7 7/8" 1'-2 3/8" 26 A36

TOTAL WEIGHT THIS DRAWING 995

ONE - COLUMN - C36

GRID LOCATION BOTTOM ELEVATION

D/2 42'-2"13/16

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/28/2015 003 C36

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

EL 4

2'-2

1316/

EL 6

1'-0

1316/

112/ 112/

112/ 112/

316/

316/

1316/GA 5"(NS)

1316/GA 414/ (NS)

1316/GA 414/ (NS)

1316/GA 5"(NS)

1316/

1316/

AA

A A

BB

CC

2

3@3

33

3@3

18'-1

0

2

5'-9

1 2/9'

-53'

-71 2/

21116/ 6916/

18'-1

0

9'-5

218/ 218/

218/ 218/

p11

p11

38/TYP

316/

38/316/

TYP

p11

p11

1316/

1316/

1316/

1316/

P6

p14

P6

p14

33

23@

3

21116/ 6916/

412/

312/

3 8/

6'-1

212/ 212/

3@3

33

2

412/

312/

3 8/

3'-4

212/ 212/

18/

6916/

33

112/

211 16/

2 2

p14

P6

1316/

p11

C - C

6916/

33

112/

2 2

18/

p14

P6

1316/p11

B - B

212/

212/

1316/

A - A

Page 154: 132-18 41th RD steel shop drawing 11_21_2015

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

C37 1

C37 1 W8X40 15'-8" 624 A992

SQ-2COLUMN

P6 1 FL1/2"X4" 0'-10" 6 A36

p11 4 PL1/2"X7 1/8" 1'-1 7/8" 54 A36

p14 2 PL1/2"X7 7/8" 1'-2 3/8" 26 A36

p22 2 FL1/2"X6" 0'-10" 17 A36

TOTAL WEIGHT THIS DRAWING 727

ONE - COLUMN - C37

GRID LOCATION BOTTOM ELEVATION

D/2 61'-0"13/16

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/29/2015 003 C37

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

378/

158/

EL 6

1'-0

1316/

EL 7

6'-8

1316/

15'-8

112/ 112/

316/

316/

38/TYP

316/

38/316/

TYP

1316/GA 4516/ (NS)p22

p22

1316/GA 414/ (NS)

1316/GA 5"(NS)1316/

A A

CC

BB

EE

33

23@

3

5'-6

1 2/8'

-10

4

21116/ 6916/

312/

15'-8

6'-1

9'-5

2

6916/

212/ 212/

218/ 218/

218/ 218/

316/

38/316/

TYP p11

p11

p11

p11

1316/

1316/

1316/

p14

P6

p14

23@

3

33

412/

33

412/

312/

3 8/3 8/

212/33

33

112/ 418/ 316/

112/

6916/

2 2

112/

112/ p14

1316/

p22

p11

E - E

33

414/ 4

2 2112/

6916/

p14

P6

1316/p11

B - B

33

112/ 4 112/

414/ 4

112/

6916/

211 16/

p14

P6

1316/p11

C - C

212/

212/1316/

A - A

Page 155: 132-18 41th RD steel shop drawing 11_21_2015

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

C38 1

C38 1 W8X58 24'-7 1/2" 1433 A992

SQ-2COLUMN

BP1 1 PL1 1/2"X14" 1'-2" 83 A36

P6 1 FL1/2"X4" 0'-10" 6 A36

p10 2 PL1/2"X7 1/8" 1'-1 7/8" 24 A36

p15 1 PL1/2"X7 7/8" 1'-2 1/4" 13 A36

p22 2 FL1/2"X6" 0'-10" 17 A36

TOTAL WEIGHT THIS DRAWING 1576

ONE - COLUMN - C38

GRID LOCATION BOTTOM ELEVATION

D/1 17'-5"13/16

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

10/29/2015 003 C38

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

12'-9

24'-9

437

8/3'

-35 8/

2

112/ 112/

18/

18/

38/TYP

316/

38/316/

TYP

38/TYP

1316/

1316/

1316/

1316/

p22

p22

1316/

1316/

DD

A A

CC

BB

312/

33

3

33

12'-0

2'-0

1 2/9'

-28'

-10

3@3

21'-5

12'-9

331

2/

331

2/

658/

212/ 212/

2316/ 2316/

2316/ 2316/

2316/ 2316/

234/

316/

38/316/

TYP

p10

p10

1316/

1316/

1316/

1316/

p15

P6

2'-7

9'-5

33@

3

33

3'-4

2

438/

312/

3 8/

678/

33

33

112/

658/

112/ 112/

112/ 18/

112/

112/ p15

1316/

p10p22

B - B

212/

33

33

112/

658/

112/ 438/ 18/

112/

112/

112/ 112/

p151316/

p10

p22

C - C

112/

512/

512/

112/

112/ 512/ 512/ 112/

516/

516/

1 14/

BP1

A - A

212/

212/

1316/

D - D

Page 156: 132-18 41th RD steel shop drawing 11_21_2015

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

C39 1

C39 1 W8X48 18'-10" 904 A992

SQ-2COLUMN

p10 4 PL1/2"X7 1/8" 1'-1 7/8" 49 A36

p15 2 PL1/2"X7 7/8" 1'-2 1/4" 26 A36

p22 4 FL1/2"X6" 0'-10" 34 A36

TOTAL WEIGHT THIS DRAWING 1012

ONE - COLUMN - C39

GRID LOCATION BOTTOM ELEVATION

D/1 42'-2"13/16

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

11/02/2015 003 C39

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work112/ 112/

38/TYP

316/

38/316/

TYP

1316/GA 4516/ (NS)

1316/GA 4516/ (NS)

p22

p22

p22

p22

1316/

1316/

AA

A A

BB

CC3

3

3@3

3@3

5'-2

1 2/4

378/

8'-6

1 8/4

378/

3'-3

5 8/

2

2

18'-1

0

EL 4

2'-2

1316/

EL 6

1'-0

1316/

112/ 112/

18/

18/

18'-1

0

9'-5

6916/

2316/

2316/ 2316/

316/

38/316/

TYP

p10

p10

p10

p10

1316/

1316/

1316/

1316/

p15

p15

33

23@

3

438/

312/

3 8/

6'-1

6916/

212/ 212/

3@3

33

2

438/

312/

3 8/

3'-4

212/ 212/

2316/

112/ 3 3 212/ 414/ 18/

112/

33

6916/

112/ 112/

112/

112/ p15

1316/

p10

p22

C - C

212/

33

33

112/

6916/

112/ 112/

112/

112/

112/ 414/ 18/

p15

1316/

p10

p22

B - B

212/

212/

1316/

A - A

Page 157: 132-18 41th RD steel shop drawing 11_21_2015

BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

C40 1

C40 1 W8X40 6'-3" 249 A992

SQ-2COLUMN

p10 2 PL1/2"X7 1/8" 1'-1 7/8" 24 A36

p15 1 PL1/2"X7 7/8" 1'-2 1/4" 13 A36

p22 2 FL1/2"X6" 0'-10" 17 A36

TOTAL WEIGHT THIS DRAWING 303

ONE - COLUMN - C40

GRID LOCATION BOTTOM ELEVATION

D/1 61'-0"13/16

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

11/02/2015 003 C40

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

Peter Zhang

CGS Iron Work

3

3@3

5'-2

1 2/4

378/

158/

2

6'-3

EL 6

1'-0

1316/

EL 6

7'-3

1316/

112/ 112/

18/p22

p22 38/TYP

316/

38/316/

TYP

1316/GA 5"(NS)

1316/GA 4516/ (NS)

1316/

A A

CC

BB33

23@

3

438/

312/

3 8/

6'-3

6'-1

2

6916/

212/ 212/

2316/ 2316/

316/

38/316/

TYP

p10

p10

1316/

1316/

p15

212/

33

33

112/

6916/112/

112/

418/ 18/

112/ 112/

p15

1316/

p10

p22

B - B

212/

33

33

112/

6916/

112/ 418/ 18/

112/

112/

112/ 112/

p15

1316/

p10

p22

C - C

212/

212/

1316/

A - A

Page 158: 132-18 41th RD steel shop drawing 11_21_2015

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

11/02/2015 003 S1

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

CGS Iron Work

Peter Zhang

REV DESCRIPTION DATE

DCBA

PLAN AT EL. 9'-6

4

5

6

1

2

2.1

3

3.1

DETAIL A

DETAIL B

19'-3

3'-0

19'-1

112/

21'-4

5 8/

DET. A

C16W8X

58

C15W6X

25

15'-8 12'-8

15'-8 3'-0 12'-8

4'-1

012

'-85'

-10

13'-5

DET. B

C19W8X

58

C22W8X

58

C25W8X

58

112/ 9 112/

112/

911

2/

516/

516/

P3

112/

1111

2/

112/ 11 112/

516/

516/

Page 159: 132-18 41th RD steel shop drawing 11_21_2015

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

11/02/2015 003 S2

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

CGS Iron Work

Peter Zhang

REV DESCRIPTION DATE

DCBA

PLAN AT EL. 20'-41316/

4

5

6

7

DET. B

DET. A

1

2

2.1

3

3.1

DETAIL A

DETAIL B

DETAIL C

3@6'

-524'-1

C29W8X

58

19'-1

112/

3'-0

C15W6X

25

C1 W6X25

4@4'

-101

2/

15'-8

B15 W10X22

B14 W10X22

A1 L3-12/ X3-12/ X38/

512/

7'-1

1

C14W6X

25

B53

W10

X68

B15 W10X22

B15 W10X22

4@5'

-41 8/

21'-4

5 8/ B25 W10X22

C2 W8X58

B16 W10X22

B25 W10X22

B25 W10X22

B31 W10X22

12'-8

DET. C

B15 W10X22

B15 W10X22

B15 W10X22

B76 W10X22

A1 L3-12/ X3-12/ X38/

B102 W10X15

B102 W10X15B58

W10

X68

C28W6X

25

B102 W10X15

B75 W10X39

B102 W10X15

C16W8X

58

3'-0

12'-2

6'-4

5'-1

0

18'-6

C19W8X

58

C22W8X

58

B106

W10

X15

4'-1

06'

-4

B44 W10X22

B18 W10X22

B25 W10X22

B25 W10X22

B25 W10X22

C5 W8X58

15'-8

3@4'

-511

16/

13'-5

B44 W10X22

B18 W10X22

B25 W10X22

B25 W10X22

C8 W8X58

B32 W10X30C11

W8X58

11'-3

6'-4

B104 W10X19

C32W8X

58

5'-3 7'-5

B59

W10

X68

B103 W10X19

B77

W10

X15

B74 W8X10

5'-9 1112/ 5'-1112/

B82 W10X15

B79

W8X

10

B62

W10

X68

12'-8

6'-812/ 5'-1112/

B65

W10

X68

B102 W10X15

B102 W10X15

B83 W10X19

C35W8X

58

C25W8X

58

B90 W10X30C38

W8X58

112/ 11 112/

112/

1111

2/

516/

516/

112/ 9 112/

112/

911

2/

516/

516/

247

8/47

8/2

12/

34/

Page 160: 132-18 41th RD steel shop drawing 11_21_2015

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

11/03/2015 003 S3

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

CGS Iron Work

Peter Zhang

REV DESCRIPTION DATE

DCBA

PLAN AT EL. 29'-91316/

4

5

6

7

DET. C

1

2

2.1

3

3.1

DETAIL C

4'-9

3 4/

3'-0

4'-1

012/

C16W8X

58

C15W6X

25

C1 W6X25

B53

W10

X68

15'-8

4'-1

012/

A1 L3-12/ X3-12/ X38/

B14 W10X22

512/

4'-1

012/

4'-1

012/

C14W6X

25

B15 W10X22

B15 W10X22

B15 W10X22

5'-4

1 8/5'

-43 16/

5'-4

1 8/5'

-43 16/

4'-9

5 8/

B16 W10X22

B25 W10X22

B25 W10X22

B25 W10X22

B32 W10X30

C2 W8X58

B28 W10X15

12'-8

A1 L3-12/ X3-12/ X38/

B76 W10X22

B15 W10X22

B15 W10X22

B15 W10X22

C28W6X

25

B75 W10X39

B102 W10X15

B102 W10X15

B102 W10X15B58

W10

X68 B90 W10X30

C29W8X

58B96 W10X15

3'-0

5'-1

0

C22W8X

58

C19W8X

58

B7W

14X3

4

B20 W10X15C8 W8X

58

B106

W10

X15

B114

W14

X34

4'-9

7 8/4'

-10

6'-4

6'-4

B28 W10X15

B1W

14X4

8

B28 W10X15

B19 W10X15

B45 W10X15C5 W8X58

B30 W10X15

4'-9

3 4/

15'-8

4'-5

1116/

4'-5

1116/

4'-5

1116/

B12

W14

X26

B26 W10X15

B26 W10X15

B45 W10X15

B32 W10X30C11

W8X58

C32W8X

58

B60

W10

X45

B96 W10X15

B98 W10X19

B78

W10

X15

B74 W8X10B1

08W

14X4

8

B80 W10X15

B79

W8X

10

B63

W10

X45

B99 W10X19

12'-8

6'-812/ 5'-1112/

B66

W10

X45

B81 W10X19

B100 W10X15

B100 W10X15

B12

W14

X26

C35W8X

58

C25W8X

58

B90 W10X30 C38W8X

58

247

8/47

8/2

12/

34/

Page 161: 132-18 41th RD steel shop drawing 11_21_2015

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

11/03/2015 003 S4

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

CGS Iron Work

Peter Zhang

REV DESCRIPTION DATE

1

2

2.1

3

3.1

4

DCBA

PLAN AT EL. 39'-21316/

9'-7

7 8/6'

-412

'-2

12'-8

6'-4

C29W8X

58

C5 W8X58

B79

W8X

10

B110

W14

X48

C32W8X

58

B63

W10

X45

B115

W14

X34

B11

W14

X26

C35W8X

58

C38W8X

5819

'-3

4'-9

3 4/

15'-8

4'-1

C16W8X

58

B29 W10X15

B45 W10X15

4'-9

5 8/

5'-7

3 8/

9'-7

C2 W8X58

B33 W10X30

B46

W8X

18B4

7W

8X18

4'-1

0

4'-9

3 4/4'

-97 8/

4'-1

0

B28 W10X15

B3W

14X4

8

B28 W10X15

B19 W10X15

12'-8

4'-2 9'-5

3'-0

4'-1

B54 W8X18

B46

W8X

18B4

7W

8X18

B55

W8X

18

B46

W8X

18

B56

W8X

18

B47

W8X

18

B91 W10X30

B97 W10X15

5'-3

C19W8X

58

B60

W10

X45

B78

W10

X15

B74 W8X10

7'-5

B96 W10X15

B98 W10X19

B80 W10X15

13'-5

4'-1

4'-5

1116/

15'-8

B11

W14

X26

B45 W10X15

B48

W8X

18B4

6W

8X18

5'-1

0

6'-4

5'-1

04'

-511

16/

B8W

14X3

4

B30 W10X15

B26 W10X15

B20 W10X15C8 W8X58

5'-7

3 8/

9'-7

4'-5

1116/

B27 W10X15

B37 W10X30C11

W8X58

5'-9

6'-812/

B106

W10

X15

B81 W10X19

C22W8X

58

1112/ 5'-1112/

B99 W10X19

5'-1112/

B100 W10X15

4'-2 9'-5

12'-8

C25W8X

58

B55

W8X

18

B46

W8X

18

B46

W8X

18

B66

W10

X45

B57

W8X

18

B48

W8X

18

4'-1

3'-0

B54 W8X18

B101 W10X15

B48

W8X

18

B91 W10X30

Page 162: 132-18 41th RD steel shop drawing 11_21_2015

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

11/03/2015 003 S5

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

CGS Iron Work

Peter Zhang

REV DESCRIPTION DATE

1

2

2.1

3

3.1

4

DCBA

PLAN AT EL. 48'-71316/

6'-4

7'-5

5'-1112/

5'-1112/

12'-8

6'-4

9'-5

12'-8

9'-5

B79

W8X

10

B85 W10X19

15'-8

4'-9

3 4/

19'-3

9'-7 4'-1

C17W8X

48

4'-9

5 8/

5'-7

3 8/

B34 W10X30

B46

W8X

18

B29 W10X15

B47

W8X

18

C3 W8X48

4'-9

3 4/4'

-97 8/

4'-1

0

4'-1

0

B28 W10X15

B4W

14X4

8

B28 W10X15

B21 W10X15

B43 W10X15C6 W8X

48

4'-2

B55

W8X

18

B46

W8X

18

B46

W8X

18

3'-0

4'-1B54 W8X18

B56

W8X

18

B47

W8X

18

B92 W10X30

B97 W10X15

B47

W8X

18

5'-3

B61

W10

X45

B96 W10X15

B98 W10X19

B78

W10

X15

B84 W10X15

B73 W8X10

B64

W10

X45

C20W8X

48

4'-5

1116/

9'-7 4'-1

13'-5

B10

W14

X26

B67

W10

X45

6'-4

5'-1

04'

-511

16/

5'-1

0

B9W

14X3

4

B30 W10X15

B26 W10X15

B22 W10X15

B43 W10X15

C9 W8X48

4'-5

1116/

5'-7

3 8/

B27 W10X15

B38 W10X30C12

W8X48

5'-9

6'-812/

B106

W10

X15

B99 W10X19

C23W8X

48

1112/

B100 W10X15

4'-1 4'-2

B101 W10X15

B54 W8X18

B48

W8X

18B4

6W

8X18

B92 W10X30

B57

W8X

18

B55

W8X

18

B48

W8X

18B4

6W

8X18

B48

W8X

18B4

6W

8X18

C26W8X

48

9'-7

7 8/

B111

W14

X48

C30W8X

48

C33W8X

48

12'-2

B116

W14

X34

B10

W14

X26

C36W8X

48

C39W8X

48

Page 163: 132-18 41th RD steel shop drawing 11_21_2015

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

11/03/2015 003 S6

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

CGS Iron Work

Peter Zhang

REV DESCRIPTION DATE

1

2

2.1

3

3.1

4

DCBA

PLAN AT EL. 58'-01316/

5'-9 1112/

9'-7

7 8/6'

-412

'-2

12'-8

6'-4

6'-4

C30W8X

48

C33W8X

48

B10

W14

X26

C36W8X

48

C39W8X

4819

'-3

4'-9

3 4/

4'-1

B43 W10X15

B96 W10X15

4'-9

5 8/

5'-7

3 8/

C3 W8X48

B46

W8X

18

9'-7

B34 W10X30

B29 W10X15

B47

W8X

18

4'-1

0

4'-9

3 4/4'

-97 8/

4'-1

0

B28 W10X15

B4W

14X4

8

B28 W10X15

B21 W10X15

C6 W8X48

4'-2

C17W8X

48

B55

W8X

18

B46

W8X

18

B46

W8X

18B4

7W

8X18

4'-1

B54 W8X18

B56

W8X

18

B47

W8X

18

9'-5

B92 W10X30

B97 W10X15

5'-318/

B78

W10

X15

B73 W8X10

B61

W10

X45

C20W8X

48

B64

W10

X45

7'-478/

B98 W10X19

B84 W10X15

B79

W8X

10 B99 W10X19

13'-5

4'-1

4'-5

1116/

B10

W14

X26

B27 W10X15

B43 W10X15

B67

W10

X45

B48

W8X

18B4

6W

8X18

B57

W8X

18

B48

W8X

18

B48

W8X

18

5'-1

0

5'-1

04'

-511

16/4'

-511

16/

B9W

14X3

4

B30 W10X15

B26 W10X15

B22 W10X15

C9 W8X48

9'-7

5'-7

3 8/

B38 W10X30

C12W8X

48

6'-812/

B106

W10

X15B85 W10X19

C23W8X

48

5'-1112/

5'-1112/

B101 W10X15

B100 W10X15

4'-1 4'-2 9'-5

B54 W8X18

C26W8X

48

B92 W10X30B55

W8X

18

B46

W8X

18

B46

W8X

18

B111

W14

X48

B116

W14

X34

Page 164: 132-18 41th RD steel shop drawing 11_21_2015

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

11/03/2015 003 S7

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

CGS Iron Work

Peter Zhang

REV DESCRIPTION DATE

1

2

2.1

3

3.1

4

DCBA

PLAN AT EL. 58'-01316/

6'-4

7'-5

5'-1112/

5'-1112/

9'-5

9'-5

12'-8

6'-4

C6 W8X48

B79

W8X

10

C33W8X

48

B64

W10

X45 B99 W10X19

B101 W10X15

4'-1

19'-3

4'-9

3 4/

C17W8X

48

B43 W10X15

5'-7

3 8/

4'-9

5 8/

C3 W8X48

B46

W8X

18

9'-7

B34 W10X30

B29 W10X15

B47

W8X

18

4'-1

0

4'-9

3 4/4'

-97 8/

4'-1

0

B28 W10X15

B4W

14X4

8

B28 W10X15

B21 W10X15

4'-2

B55

W8X

18

B46

W8X

18

B46

W8X

18

4'-1

B54 W8X18

B56

W8X

18

B47

W8X

18

B92 W10X30

B97 W10X15

B47

W8X

18

5'-3

B61

W10

X45

C20W8X

48

B96 W10X15

B98 W10X19

B78

W10

X15

B84 W10X15

B73 W8X10

4'-113

'-5

4'-5

1116/

B43 W10X15

5'-1

0

6'-4

5'-1

04'

-511

16/

B9W

14X3

4

B30 W10X15

B26 W10X15

B22 W10X15

C9 W8X48

5'-7

3 8/

4'-5

1116/

C12W8X

48

B10

W14

X26

B27 W10X15

B38 W10X30

9'-7

5'-9

6'-812/

B106

W10

X15B85 W10X19

C23W8X

48

1112/

B100 W10X15

4'-2

C26W8X

48

B46

W8X

18

B92 W10X30

B57

W8X

18

B55

W8X

18

B48

W8X

18B4

6W

8X18

B48

W8X

18B4

6W

8X18

B67

W10

X45

B48

W8X

18

4'-1

B54 W8X18

C30W8X

48

9'-7

7 8/

B111

W14

X48

12'-2

B116

W14

X34

B10

W14

X26

C36W8X

48

C39W8X

48

Page 165: 132-18 41th RD steel shop drawing 11_21_2015

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

11/03/2015 003 S8

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

CGS Iron Work

Peter Zhang

REV DESCRIPTION DATE

1

2

2.1

3

3.1

4

DCBA

PLAN AT EL. 67'-51316/

5'-1112/

6'-11

7'-5

5'-1112/

6'-4

6'-4

9'-5

9'-512'-8

12'-8

B93 W10X30

C7 W8X40

B96 W10X15

B86 W10X15

B79

W8X

10

C34W8X

40

B64

W10

X45 B99 W10X19

B107 W10X15

B107 W10X15

4'-9

3 4/

9'-7 4'-1

19'-3

C18W8X

40

5'-7

3 8/

4'-9

5 8/

B35 W10X30

C4 W8X40

B46

W8X

18

B29 W10X15

B47

W8X

18

4'-9

3 4/4'

-97 8/

4'-1

0

4'-1

0

B28 W10X15

B5W

14X4

8

B28 W10X15

B23 W10X15

B40 W10X15

1P6

FL3 8/

"X7

4'-2

B55

W8X

18

B46

W8X

18

B46

W8X

18

4'-1

B54 W8X18

B56

W8X

18

B47

W8X

18 B97 W10X15

B47

W8X

18

5'-3 6

5'-3

B61

W10

X45

C21W8X

40

B98 W10X19

B78

W10

X15

B72 W8X10

10'-10

4'-5

1116/

9'-7 4'-115'-8

13'-5

B117

W10

X30

B41 W10X15

B50 W10X15

B51 W10X15

6'-4

5'-1

04'

-511

16/

5'-1

0

B17

W10

X30

B9W

14X3

4

B30 W10X15

B24 W10X15

C10W8X

40

B13 W10X15

7'-10

4'-5

1116/

5'-7

3 8/

B10

W14

X26

B13 W10X15

B39 W10X30C13

W8X40

5'-9

5'-0

C24W8X

40

B106

W10

X15

B69 W10X15

1112/

1'-812/

B87 W10X19

4'-2

B67

W10

X45

B70 W10X15

C27W8X

40

B46

W8X

18

B55

W8X

18

B46

W8X

18

B48

W8X

18B4

6W

8X18

B48

W8X

18

B57

W8X

18

B48

W8X

18

4'-13'-0

B54 W8X18

B95 W10X30

B112

W14

X48

C31W8X

40

9'-7

7 8/12

'-2

B116

W14

X34

B10

W14

X26

C37W8X

40

C40W8X

40

Page 166: 132-18 41th RD steel shop drawing 11_21_2015

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

11/03/2015 003 S9

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

CGS Iron Work

Peter Zhang

REV DESCRIPTION DATE

1

2

2.1

3

3.1

4

DCBA

PLAN AT EL. 76'-101316/

6'-11

7'-5

5'-1112/

5'-1112/

6'-4

12'-8

12'-8

12'-8

B94 W10X30

C7 W8X40

B96 W10X15

B96 W10X15

B98 W10X19

B86 W10X15

B79

W8X

10

C34W8X

40

B64

W10

X45 B99 W10X19

19'-3

15'-8

B36 W10X30

C4 W8X40

B28 W10X15

4'-1

0

B28 W10X15

B2W

14X4

8

B28 W10X15

B23 W10X15

B40 W10X15

3'-0

C18W8X

40

5'-3 6

5'-3

B61

W10

X45C21

W8X40

B78

W10

X15

B72 W8X10

10'-812/

15'-8

6'-3

C10W8X

40

5'-1

0

B6W

14X3

4

B30 W10X15

B24 W10X15

B42 W10X30

212/6'

-311

5'-9 1112/

6'-812/

C24W8X

40

B105

W10

X15

B88 W10X30

4'-934/ 212/

3'-0

B68

W10

X45

B49 W10X15

B71 W10X15

C27W8X

40

B49 W10X15

B71 W10X15

B109

W14

X48

C31W8X

40

9'-7

7 8/12

'-2

B113

W14

X34

C37W8X

40

Page 167: 132-18 41th RD steel shop drawing 11_21_2015

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

11/03/2015 003 S10

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

CGS Iron Work

Peter Zhang

REV DESCRIPTION DATE

76'-10"13/16

67'-5"13/16

58'-0"13/16

48'-7"13/16

39'-2"13/16

29'-9"13/1620'-4"13/16

122.133.1456

ELEVATION ON GRID A

9'-1 9'-5

19'-3

C2

W8X

58C

4W

8X40

C3

W8X

48

C7

W8X

40

C10

W8X

40

19'-1112/ 21'-458/

C1

W6X

25

12'

-11

9'-1

3'-0

9'-5

12'-8

B7 W14X34

B8 W14X34

B9 W14X34

B9 W14X34

B9 W14X34

B3 W14X48

B1 W14X48

4'-10

C5

W8X

58

B4 W14X48

B5 W14X48

B4 W14X48

C6

W8X

48

9'-1 9'-5

13'-5

B12 W14X26

C11

W8X

58

5'-10

C8

W8X

58

1'-9

1 2/10

1 2/ 4

12'

-11

44

9'-5

B11 W14X26

9'-5

B10 W14X26

B10 W14X26C9

W8X

48

4C

12W

8X48

9'-1

44

3'-0

9'-5

B10 W14X26

C13

W8X

40

B6 W14X34B2 W14X48 4

Page 168: 132-18 41th RD steel shop drawing 11_21_2015

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

11/03/2015 003 S11

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

CGS Iron Work

Peter Zhang

REV DESCRIPTION DATE

76'-10"13/16

67'-5"13/16

58'-0"13/16

48'-7"13/16

39'-2"13/16

29'-9"13/1620'-4"13/16

9'-6"

122.133.1456

ELEVATION ON GRID B

178/

9'-5

9'-5

19'-3

B47 W8X18

B47 W8X18

B47 W8X18

B56 W8X18

19'-1112/

B53 W10X68

B53 W10X68

2'-1

19'

-11

4

C14

W6X

25

21'-458/

1C

15W

6X25

B46 W8X18

B46 W8X18

B46 W8X18

B55 W8X18

8'-1

118/

8'-1

118/

9'-5

12'-84'-10

10'-1

013 16/

9'-5

5'-10 13'-5

8'-1

118/

8'-1

118/

178/

8'-1

118/

178/

178/

8'-1

118/

9'-5

B46 W8X18

B48 W8X18 B55 W8X18

B48 W8X18 B46 W8X18

B46 W8X18B48 W8X18

8'-1

118/

9'-5

8'-1

118/

B48 W8X18

Page 169: 132-18 41th RD steel shop drawing 11_21_2015

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

11/03/2015 003 S12

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

CGS Iron Work

Peter Zhang

REV DESCRIPTION DATE

76'-10"13/16

67'-5"13/16

58'-0"13/16

48'-7"13/16

39'-2"13/16

29'-9"13/1620'-4"13/16

9'-6"

122.133.1456

ELEVATION ON GRID C

178/

578/

9'-1

9'-1

9'-5

9'-5

19'-3

B64 W10X45 B67 W10X45 B57 W8X18

8'-1

118/

19'-1112/

B53 W10X68

B53 W10X68

12'

-11

4

C14

W6X

25

21'-458/

B58 W10X68

C15

W6X

25

B58 W10X68 C16

W8X

58

B59 W10X68

B60 W10X45

8'-1

118/

8'-1

118/

178/

178/

C17

W8X

48

8'-1

118/

178/

C18

W8X

40

8'-1

118/

9'-5

12'-8

B67 W10X45

B67 W10X45

4'-10

B62 W10X68

B63 W10X45

C19

W8X

58

B65 W10X68

B66 W10X45

B63 W10X45

B64 W10X45

B66 W10X45

C20

W8X

48

2'-8

10'-1

013 16/

13'-55'-10

C22

W8X

58

17'

-913

16/4

9'-1

4

9'-5

C25

W8X

58

8'-1

118/

9'-5

C23

W8X

48

B57 W8X18

B57 W8X18

C26

W8X

48

B57 W8X18

8'-1

118/

3'-0

9'-5

578/

578/

578/

8'-1

118/

3'-0

C21

W8X

40

B68 W10X45

C24

W8X

40

C27

W8X

40

Page 170: 132-18 41th RD steel shop drawing 11_21_2015

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

11/03/2015 003 S13

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

CGS Iron Work

Peter Zhang

REV DESCRIPTION DATE

20'-4"13/16

76'-10"13/16

67'-5"13/16

58'-0"13/16

48'-7"13/16

39'-2"13/16

29'-9"13/16

122.133.1456

ELEVATION ON GRID D

9'-5

9'-1

24'-1

C34

W8X

40

C31

W8X

40C

29W

8X58

C30

W8X

48

C37

W8X

40

19'-1112/ 21'-458/

C28

W6X

25

12'

-11

3'-0

9'-5

9'-1

12'-8

B116 W14X34

B115 W14X34

B116 W14X34

B116 W14X34

B114 W14X34

B110 W14X48

C32

W8X

58

B111 W14X48

B111 W14X48

B112 W14X48

C33

W8X

48

9'-5

4

9'-1

19'-3

B11 W14X26

B12 W14X26

C38

W8X

58

C35

W8X

58

3'-0

12'

-11

4

9'-5

43'

-0

9'-5

9'-5

9'-1

B10 W14X26

B10 W14X26

B10 W14X26

C36

W8X

48

C39

W8X

48C

40W

8X40

B113 W14X34B109 W14X48

Page 171: 132-18 41th RD steel shop drawing 11_21_2015

FAB-NAME

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

132-18 41 ROAD FLUSHING

11/05/2015 003 S14

A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]

CGS Iron Work

Peter Zhang

REV DESCRIPTION DATE

3d

Page 172: 132-18 41th RD steel shop drawing 11_21_2015