132kv substation inplant training seminar
TRANSCRIPT
![Page 1: 132kv substation inplant training seminar](https://reader034.vdocument.in/reader034/viewer/2022050707/58f0e54e1a28ab3f028b45e7/html5/thumbnails/1.jpg)
INPLANTINPLANT TRAINING TRAINING IN 132KV IN 132KV S/SS/S
BY BY :-:-SHRIKANT SHRIKANT BHANSALIBHANSALI
![Page 2: 132kv substation inplant training seminar](https://reader034.vdocument.in/reader034/viewer/2022050707/58f0e54e1a28ab3f028b45e7/html5/thumbnails/2.jpg)
CONTENTS Single line diagram Lighting arresters Coupling capacitor Wave trap Current transformer Potential transformer Circuit breaker transformerControl roomBattery roomEarthing importance Miscellaneous
![Page 3: 132kv substation inplant training seminar](https://reader034.vdocument.in/reader034/viewer/2022050707/58f0e54e1a28ab3f028b45e7/html5/thumbnails/3.jpg)
Single Line Diagram-132/33/11kv Sub-station PGI
![Page 4: 132kv substation inplant training seminar](https://reader034.vdocument.in/reader034/viewer/2022050707/58f0e54e1a28ab3f028b45e7/html5/thumbnails/4.jpg)
132kv incoming lines through Lightning Arrestor & is 132kv incoming lines through Lightning Arrestor & is connected to the Gantry through insulated discs.connected to the Gantry through insulated discs.
Disc insulators
Lightning Arrestor
Incomer gantryLightning
Arrestors
Bus bar for all 3 incomer & 1 outgoing line
![Page 5: 132kv substation inplant training seminar](https://reader034.vdocument.in/reader034/viewer/2022050707/58f0e54e1a28ab3f028b45e7/html5/thumbnails/5.jpg)
It is connected between the line and earth so diverts the incoming high voltage wave to earth.
Lightning arresters act as safety valves designed to discharge electric surges resulting from lightning strokes, switching or other disturbance .
LIGHTNING ARRESTERS
![Page 6: 132kv substation inplant training seminar](https://reader034.vdocument.in/reader034/viewer/2022050707/58f0e54e1a28ab3f028b45e7/html5/thumbnails/6.jpg)
The communication device used for the communication over the power lines is a MODEM, commonly known as Power Line MODEM (PLM).
It works as both transmitter and receiver, i.e., it transmits and receives data over the power lines
![Page 7: 132kv substation inplant training seminar](https://reader034.vdocument.in/reader034/viewer/2022050707/58f0e54e1a28ab3f028b45e7/html5/thumbnails/7.jpg)
Coupling CapacitorThe modulated carrier is let into power line through coupling capacitor specially designed to with stand line voltage under all-weather condition. The upper end of the coupling capacitor is connected directly to the line and the lower end is connected to the ground through a carrier frequency chock coil or drain coil. Thus coupling capacitor forms the link between the PLCC equipment and power line. The coupling capacitor used in UPSEB is 2200pf capacitance
![Page 8: 132kv substation inplant training seminar](https://reader034.vdocument.in/reader034/viewer/2022050707/58f0e54e1a28ab3f028b45e7/html5/thumbnails/8.jpg)
Wave Trap or Line TrapWave trap is connected in series with power line between the point of connection of coupling capacitor and S/S. Wave trap offers negligible impedance to HF carrier. Wave trap stands electromechanically and thermally for short circuit current in the event of fault on the line. On the basis of blocking frequency bank, the wave trap can be following type:All waveSingle FrequencyDouble Frequency’Broad Band
![Page 9: 132kv substation inplant training seminar](https://reader034.vdocument.in/reader034/viewer/2022050707/58f0e54e1a28ab3f028b45e7/html5/thumbnails/9.jpg)
CURRENT TRANSFORMERA current transformer (CT) is used for measurement of alternating electric currents. When current in a circuit is too high to apply directly to measuring instruments, a current transformer produces a reduced current accurately proportional to the current in the circuit, which can be conveniently connected to measuring and recording instruments. A current transformer isolates the measuring instruments from what may be very high voltage in the monitored circuit.
![Page 10: 132kv substation inplant training seminar](https://reader034.vdocument.in/reader034/viewer/2022050707/58f0e54e1a28ab3f028b45e7/html5/thumbnails/10.jpg)
The line ,through the isolators is distributed The line ,through the isolators is distributed in the s/s through Main bus.in the s/s through Main bus.
Main Bus bar
132kv Bay
![Page 11: 132kv substation inplant training seminar](https://reader034.vdocument.in/reader034/viewer/2022050707/58f0e54e1a28ab3f028b45e7/html5/thumbnails/11.jpg)
POTENTIAL OR VOLTAGE TRANSFORMERVoltage transformers (VT) (also called potential transformers (PT)) are a parallel connected type of instrument transformer, used for metering and protection in high-voltage circuits or phasor phase shift isolation. They are designed to present negligible load to the supply being measured and to have an accurate voltage ratio to enable accurate metering. A potential transformer may have several secondary windings on the same core as a primary winding, for use in different metering or protection circuits
![Page 12: 132kv substation inplant training seminar](https://reader034.vdocument.in/reader034/viewer/2022050707/58f0e54e1a28ab3f028b45e7/html5/thumbnails/12.jpg)
CIRCUIT BREAKER CIRCUIT BREAKER
![Page 13: 132kv substation inplant training seminar](https://reader034.vdocument.in/reader034/viewer/2022050707/58f0e54e1a28ab3f028b45e7/html5/thumbnails/13.jpg)
TransformerTransformer
![Page 14: 132kv substation inplant training seminar](https://reader034.vdocument.in/reader034/viewer/2022050707/58f0e54e1a28ab3f028b45e7/html5/thumbnails/14.jpg)
![Page 15: 132kv substation inplant training seminar](https://reader034.vdocument.in/reader034/viewer/2022050707/58f0e54e1a28ab3f028b45e7/html5/thumbnails/15.jpg)
![Page 16: 132kv substation inplant training seminar](https://reader034.vdocument.in/reader034/viewer/2022050707/58f0e54e1a28ab3f028b45e7/html5/thumbnails/16.jpg)
Control roomControl roomThe control room is nerve center of a power station .
The various controls performed from here are voltage adjustment, load control, emergency tripping of turbines etc.
![Page 17: 132kv substation inplant training seminar](https://reader034.vdocument.in/reader034/viewer/2022050707/58f0e54e1a28ab3f028b45e7/html5/thumbnails/17.jpg)
Control roomControl room
![Page 18: 132kv substation inplant training seminar](https://reader034.vdocument.in/reader034/viewer/2022050707/58f0e54e1a28ab3f028b45e7/html5/thumbnails/18.jpg)
EarthingEarthing
![Page 19: 132kv substation inplant training seminar](https://reader034.vdocument.in/reader034/viewer/2022050707/58f0e54e1a28ab3f028b45e7/html5/thumbnails/19.jpg)
MISCELLANEOUSMISCELLANEOUS
![Page 20: 132kv substation inplant training seminar](https://reader034.vdocument.in/reader034/viewer/2022050707/58f0e54e1a28ab3f028b45e7/html5/thumbnails/20.jpg)
NCT (Neutralising Current Transformer)
RVT (Resistive Voltage Transformer)
Capacitor Cells
![Page 21: 132kv substation inplant training seminar](https://reader034.vdocument.in/reader034/viewer/2022050707/58f0e54e1a28ab3f028b45e7/html5/thumbnails/21.jpg)
![Page 22: 132kv substation inplant training seminar](https://reader034.vdocument.in/reader034/viewer/2022050707/58f0e54e1a28ab3f028b45e7/html5/thumbnails/22.jpg)