14. it support for the reformed ipc status report by the international bureau

26
P.Fiévet October 11, 2006 14. IT Support for the Reformed IPC Status report by the International Bureau Committee of Experts Thirty-Eighth session Geneva, October 9 to 13, 2006 World Intellectual Property Organization

Upload: uzuri

Post on 06-Jan-2016

25 views

Category:

Documents


0 download

DESCRIPTION

Committee of Experts Thirty- Eighth session Geneva, October 9 to 13, 2006. 14. IT Support for the Reformed IPC Status report by the International Bureau. World Intellectual Property Organization. AGENDA. 1. What is new in IPC 2006.01?. 2. IPC8-Core Level CD-ROM. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: 14. IT Support for the Reformed IPC Status report by the International Bureau

P.Fiévet October 11, 2006

14. IT Support for the Reformed IPC

Status report by the International Bureau

Committee of ExpertsThirty-Eighth session

Geneva, October 9 to 13, 2006

World Intellectual Property Organization

Page 2: 14. IT Support for the Reformed IPC Status report by the International Bureau

P.Fiévet October 11, 2006

4. IPC 2007.01 Publication preparation

1. What is new in IPC 2006.01?

2. IPC8-Core Level CD-ROM

AGENDA

5. IPCCAT https Chinese

6. Clarification IPC validity File

3. RIPCIS status update

7. IT operations and support for IPC today

Page 3: 14. IT Support for the Reformed IPC Status report by the International Bureau

P.Fiévet October 11, 2006

1. What is new in IPC 2006.01?

Page 4: 14. IT Support for the Reformed IPC Status report by the International Bureau

P.Fiévet October 11, 2006

1. What is new in IPC 2006.01?

• Transformation of the IPC master files

• Available on-line: http://www.wipo.int/classifications/ipc/en/ITsupport/Version20060101/transformations/index.html

Advanced level of the reformed IPC in PDF format

• Decision to acquire software for production of future versions of the IPC-AL in PDF

• Automation to reduce time to business

Page 5: 14. IT Support for the Reformed IPC Status report by the International Bureau

P.Fiévet October 11, 2006

1. What is new in IPC 2006.01?

• Transformation of the IPC validity file

• Detailed definition of IPC statistics

• Available on-line for viewing/download: http://www.wipo.int/classifications/ipc/en/ITsupport/Version20060101/transformations/stats.html

• Semi-automation to reduce time to business

Reformed IPC Statistics

Page 6: 14. IT Support for the Reformed IPC Status report by the International Bureau

P.Fiévet October 11, 2006

1. What is new in IPC 2006.01?

• Transformation of the definition master file

• Symbol within intervals (e.g. A01N 25/32)

• Available to IPC member states: http://www.wipo.int/listdef_peripc/

• Automation for future updates

List of definitions per IPC symbol

Fievet:

A01H

Fievet:

A01H

Page 7: 14. IT Support for the Reformed IPC Status report by the International Bureau

P.Fiévet October 11, 2006

2. IPC-8 Core level CDROM:

Functionality based on IPC8 Internet Publication

3 levels of installation under Windows or Linux:

•100% from CD: (neither installation nor internet access are required)

•100% intranet: software installation but no internet access required

•100% intranet + internet access for IPC bridge

Page 8: 14. IT Support for the Reformed IPC Status report by the International Bureau

P.Fiévet October 11, 2006

2. IPC-8 Core level CDROM

From ES-IPC8-CL...

Page 9: 14. IT Support for the Reformed IPC Status report by the International Bureau

P.Fiévet October 11, 2006

2. IPC-8 Core level CDROM

•First implementation under Spanish Funds in Trust for Spanish language (March 2006 )

•Decision to re-use ES-IPC8-CL to produce a similar English and French version (data and interface)

…to EN-IPC8-CL and FR-IPC8-CL

Page 10: 14. IT Support for the Reformed IPC Status report by the International Bureau

P.Fiévet October 11, 2006

• RIPCIS : First use by the IB to prepare IPC 2007.01

Reformed IPC revision management system:

• First use by the IB outside WIPO during ALS meeting (Tokyo September 2006)

•Read-only access for IPC Member States: Required IT security checking in progress

3. RIPCIS software status

Page 11: 14. IT Support for the Reformed IPC Status report by the International Bureau

P.Fiévet October 11, 2006

• List of known issues : updated and on-line

• RIPCIS views for minor modifications or new groups

4. IPC 2007.01 publication preparation

• IPC Master files from RIPCIS: Oct.2, 2006

• Early access to Internet publication 2007.01: Oct.6, 2006

• IPCVAL for MS up loaded: Oct.2, 2006

Page 12: 14. IT Support for the Reformed IPC Status report by the International Bureau

P.Fiévet October 11, 2006

Revision of edition

N+2

Public edition N

Early

access to

edition N+1

RIPCIS

IBIS &

Master files

E forum

IPCVAL_4MS

IPC Web site Master files &

transforms

IPC_pub

IPC_Early_pub

IPCCAT

TACSY

TACSY

restricted

IPCVAL

IPCPUBPREP

IPCPUBPREP

IPC 2007.01 publication preparation

Page 13: 14. IT Support for the Reformed IPC Status report by the International Bureau

P.Fiévet October 11, 2006

Reformed IPC Internet publication

preparation: IPCPUBPREP toolkit

AUTOMATION to reduce preparation delays

IPC 20060101 edition:

preparation delay (Outsourcing): ~2 months

Target for 200701 edition (IT meeting July):

Delay=2 weeks after Master files availability

Early internet publication for 200701 edition :

Delay= 1 week after Master files availability

Page 14: 14. IT Support for the Reformed IPC Status report by the International Bureau

P.Fiévet October 11, 2006

5. IPCCAT : What is new ?

• IPC8 Retraining of IPCCAT in EN, FR: delayed

• HTTPS: in progress

• Batch server for Spanish version:in progress

• Prototype for Chinese language: ready

Page 15: 14. IT Support for the Reformed IPC Status report by the International Bureau

P.Fiévet October 11, 2006

5. IPCCAT Prototype for Chinese language

94%Coverage (% of Trained Categories)

7’066Total Number of IPC7 Main Groups valid in IPC8

6’665Number of Trained Main Groups

906’866Number of Different Words

1’430’275Total Number of Patents

286’055Number of Testing Patents

1’144’220Number of Training Patents

IPC 8Main Group

Level

CORPUS STATISTICS

Page 16: 14. IT Support for the Reformed IPC Status report by the International Bureau

P.Fiévet October 11, 2006

Top prediction:

IPCCAT’s best prediction is the patent’s real main category

Three guesses:

One of IPCCAT’s best 3 predictions is the patent’s real main category

IPCCAT Prototype for Chinese language

Accuracy measure

Page 17: 14. IT Support for the Reformed IPC Status report by the International Bureau

P.Fiévet October 11, 2006

IPCCAT Prototype for Chinese language

TESTS RESULTS

Top Prediction 8 / 10

Three guesses 8 / 10

6 / 10

7 / 10

Sub-class Main Group

IPC8 Coverage 97% 94%

Demo

Page 18: 14. IT Support for the Reformed IPC Status report by the International Bureau

P.Fiévet October 11, 2006

5. IPCCAT : What comes next ?

• Secure access to IPCCAT : HTTPS

• Dedicated server for Spanish language

• Retraining of IPCCAT with English/French documents and IPC8 classification

Page 19: 14. IT Support for the Reformed IPC Status report by the International Bureau

P.Fiévet October 11, 2006

6. IPC validity file (VF) clarification:

• Clarification version of the specification V1.9

• Until V1.7 (May 2005): NO Version indicator

What in VF?

• V 1.8 decision: From_date= Version indicator

• V 1.9 (August 2006): From_date= Version indicator only for AL

Page 20: 14. IT Support for the Reformed IPC Status report by the International Bureau

P.Fiévet October 11, 2006

6. IPC validity file (VF) clarification:

Why?

• Problem raised at the second IT expert meeting in May 2005 (see item 01)

•In VF, Validity_date_From is “date on which its properties are valid in particular classification level” + (since V1.8) “version indicator”=“version date” in the following slides• Summer 2006: Validity_date_From cannot be Version indicator for both AL and CL

Page 21: 14. IT Support for the Reformed IPC Status report by the International Bureau

P.Fiévet October 11, 2006

Level in VF

Adv. Only

VF from date

Common

VF from date

Core only

VF from date

Advanced

Core

H04L 15/03

Decision=“C” type change for AL and later for CL

01/2006 1/2008 01/2009

H04L 15/03 - 01.2006

H04L 15/03 - 01.2008

TimeVersion

indicator

Version Indicator / VF from_date & level

H04L 15/03 - 2006

2008.01.01

H04L 15/03 - 2006

H04L 15/03 - 2009

H04L 15/03 - 01.2008?

H04L 15/03 - 01.2009?

2008.01.01

2006.01.01 2009.01.01

H04L 15/03

See CONOPS

Page 22: 14. IT Support for the Reformed IPC Status report by the International Bureau

P.Fiévet October 11, 2006

Adv. Only

VF from date

Common

VF from date

Core only

VF from date

Advanced

Core

H04L 15/03

Decision=“C” type change for AL and later for CL

01/2006 1/2008 01/2009

H04L 15/03 - 01.2006

H04L 15/03 - 01.2008

Time

H04L 15/03 - 2006

2008.01.01

H04L 15/03 - 2006

H04L 15/03 - 2009

H04L 15/03 - 01.2008

2008.01.01

H04L 15/03

2009.01.01

2006.01.01

Level in VF

Version indicator

Version Indicator / VF from_date & level

Page 23: 14. IT Support for the Reformed IPC Status report by the International Bureau

P.Fiévet October 11, 2006

+ ITOS 90% dependency on outside partners and other IB business priorities

+ IT team: (Project Manager & 50% consultant)

+ No specific IT budget for further development

Limited flexibility for future actions to IT support IPC in authentic languages:

+ Procurement: New rules, transparency but longer delays

7. IT Operations & Support for IPC today

Page 24: 14. IT Support for the Reformed IPC Status report by the International Bureau

P.Fiévet October 11, 2006

• Need for stability & long term strategies

• Longer notice for changes

• Care in planing

• Priorities

• Reduction in preparation delays

• Price:

• Benefits:

AUTOMATION of IT support operations for IPC

How IT Operations & Support for IPC can address this situation:

Page 25: 14. IT Support for the Reformed IPC Status report by the International Bureau

P.Fiévet October 11, 2006

Questions / Answers

Information Technology matters

Specific : [email protected]

General interest : [email protected]

IT Operations & Support for IPC

Page 26: 14. IT Support for the Reformed IPC Status report by the International Bureau

P.Fiévet October 11, 2006

Thank you

IT Operations & Support for IPC