ARCH 2331BUILDING TECHNOLOGY II

Joist Layout Plans

Cite: "Passive House Blanden / HASA Architects" 26 Oct 2018. ArchDaily. Accessed 30 Oct 2018. <https://www.archdaily.com/904328/passive-house-blanden-hasa-architects/> ISSN 0719-8884

Page 2: 14 Joists 2020S PDF - openlab.citytech.cuny.edu

Joist Layout Plan

Page 3: 14 Joists 2020S PDF - openlab.citytech.cuny.edu

Graphic Guide to Frame Construction, Rob Thalon, Taunton Press

ELEMENTS OF A FLOOR SYSTEM

Page 4: 14 Joists 2020S PDF - openlab.citytech.cuny.edu

Crushed stone drainage fill has been placed within this foundation wall of a full basement. The vapor barrier and a concrete slab will be added to provide the basement floor. Pockets to receive first floor beams have been blocked out at the top of the wall.

Page 5: 14 Joists 2020S PDF - openlab.citytech.cuny.edu

Note, the lightwells in this photograph.

Page 6: 14 Joists 2020S PDF - openlab.citytech.cuny.edu

A crawl space isolates the first floor wood platform from the earth and provides space for electrical and plumbing lines. A concrete "rat slab" has been poured over the vapor barrier. The headroom is just sufficient for a small person to stand up.

Page 7: 14 Joists 2020S PDF - openlab.citytech.cuny.edu

TYPICAL WOOD FRAME CONSTRUCTION

Page 8: 14 Joists 2020S PDF - openlab.citytech.cuny.edu

Graphic Guide to Frame Construction, Rob Thalon, Taunton Press

Page 9: 14 Joists 2020S PDF - openlab.citytech.cuny.edu

STUD

SUBFLOOR

FLOOR JOIST

FOUNDATION WALL

ANCHOR BOLT

MINIMUM 8” TO 12” PER CODE

SLOPED GROUND SURFACE

SILL PLATE SEALER

MUDSILL (SILL PLATE)

RIM JOIST (HEADER)

SOLE PLATE

(BOTTOM PLATE)

Page 10: 14 Joists 2020S PDF - openlab.citytech.cuny.edu

A double 2X6 sill has been secured with anchor bolts and the 2X10 floor joists - 16" o.c. are toe- nailed to them. A strip of sealant is seen between the wood and concrete. Back-filling is not done on the outside of the basement wall until the floor framing is in place to serve as bracing.

Page 11: 14 Joists 2020S PDF - openlab.citytech.cuny.edu

Sill sealer being applied and pressed straight through the anchor bolts.

Page 12: 14 Joists 2020S PDF - openlab.citytech.cuny.edu
Page 13: 14 Joists 2020S PDF - openlab.citytech.cuny.edu

http

s://f

ours

even

five.

com

/i-jo

ist-

out

rigge

r-sm

art

-en

clos

ure-

ebo

ok/

Page 14: 14 Joists 2020S PDF - openlab.citytech.cuny.edu

Graphic Guide to Frame Construction, Rob Thalon, Taunton Press

Page 15: 14 Joists 2020S PDF - openlab.citytech.cuny.edu

This foundation wall is forming a crawl space. Porous gravel or crushed stone fill is placed on its floor to assure good drainage and a sheet plastic as a vapor barrier is laid on top. Steel beams may support the first floor wood joists.

Page 16: 14 Joists 2020S PDF - openlab.citytech.cuny.edu

Graphic Guide to Frame Construction, Rob Thalon, Taunton Press

Page 17: 14 Joists 2020S PDF - openlab.citytech.cuny.edu
Page 18: 14 Joists 2020S PDF - openlab.citytech.cuny.edu

Plywood: Plywood subflooring should be installed with its long dimension and face grain perpendicular to the joists. Installing plywood with the subfloor parallel to the joists makes the flooring weaker.

http

://tr

easu

resf

rom

thea

ttic.

co/w

p-co

nte

nt/u

ploa

ds/2

018/

07/c

ost-

to-r

epla

ce-p

lyw

ood

-su

bflo

or-h

ow

-to

-fix

-an-

unev

en.jp

g

Page 19: 14 Joists 2020S PDF - openlab.citytech.cuny.edu

Some of the interior support for the floor framing is provided by the CMU interior walls of the basement space. Beams made up of triple joists provide other support. Where a partition will fall parallel to the floor joists, and around an opening for a stairway, the joists are doubled.

Page 20: 14 Joists 2020S PDF - openlab.citytech.cuny.edu

It is necessary to brace long joist at midspan against twisting or buckling. The method being used here is solid blocking with short pieces of floor joist. The blocking is staggered so that the pieces may be end nailed to the joists.

Page 21: 14 Joists 2020S PDF - openlab.citytech.cuny.edu

Bu

ildin

g C

on

stru

ctio

n Il

lust

rate

d, 5

th E

diti

on

Fra

nci

s D

. K

. C

hin

g

Page 22: 14 Joists 2020S PDF - openlab.citytech.cuny.edu

Graphic Guide to Frame Construction, Rob Thalon, Taunton Press

Page 23: 14 Joists 2020S PDF - openlab.citytech.cuny.edu
Page 24: 14 Joists 2020S PDF - openlab.citytech.cuny.edu

After the floor joist are in place plywood deck is installed on top of them. A mastic adhesive is gunned onto each joist just before the plywood is put down to increase the ridgity of the floor and to prevent squeaks.

Page 25: 14 Joists 2020S PDF - openlab.citytech.cuny.edu

The plywood sheets form the subfloor of the house. The sheets are placed with their long dimension at right angles to the joists and their ends are supported at the mid-line of a joist. An air or electrically powered nailier is used for the nailing.

Page 26: 14 Joists 2020S PDF - openlab.citytech.cuny.edu
Page 27: 14 Joists 2020S PDF - openlab.citytech.cuny.edu

B Final\Perla_Ronald

In this preliminary layout, different bays have different joist spacing.

Page 28: 14 Joists 2020S PDF - openlab.citytech.cuny.edu

Graphic Guide to Frame Construction, Rob Thalon, Taunton Press

Page 29: 14 Joists 2020S PDF - openlab.citytech.cuny.edu

htt

p:/

/ww

w.a

fric

an

-cic

hlid

.com

/wo

od%

20d

efle

ctio

n.jp

g

Page 30: 14 Joists 2020S PDF - openlab.citytech.cuny.edu

2015 IRC - International Residential Code for One and Two Family Dwellingshttps://codes.iccsafe.org/content/document/553?site_type=public

Page 31: 14 Joists 2020S PDF - openlab.citytech.cuny.edu

http://www.fp-supply.com/st-louis-trusjoist-tji-i-joists.html

Page 32: 14 Joists 2020S PDF - openlab.citytech.cuny.edu

Bu

ildin

g C

on

stru

ctio

n Il

lust

rate

d, 5

th E

diti

on

Fra

nci

s D

. K

. C

hin

g

Page 33: 14 Joists 2020S PDF - openlab.citytech.cuny.edu

Graphic Guide to Frame Construction, Rob Thalon, Taunton Press

Half the class will design with TJI or engineered I Joists the other will design with Solid-Sawn Joists.

Page 34: 14 Joists 2020S PDF - openlab.citytech.cuny.edu

Th

e A

rch

itect

's S

tud

io C

om

pa

nion

: Ru

les

of T

hu

mb

for

Pre

limin

ary

De

sign

by

Jose

ph

Ian

o, E

dw

ard

Alle

n

Page 35: 14 Joists 2020S PDF - openlab.citytech.cuny.edu

Perla, Ronald BT2, 2018F

For next class:

• Joist Layout plan

• Joist layout Pinup

Page 36: 14 Joists 2020S PDF - openlab.citytech.cuny.edu

Links: • American Wood Council (AWC)

https://awc.org/codes-standards/calculators-software/spancalc

• Forest Products Supplyhttp://www.fp-supply.com/st-louis-trusjoist-tji-i-joists.html

• The Engineered Wood Association (APA) Advanced Framing Guide

• Span Tables Tutorialhttps://www.awc.org/codes-standards/spantables/tutorial

Page 37: 14 Joists 2020S PDF - openlab.citytech.cuny.edu

Floor Joist Spacing and Layouthttps://awc.org/codes-standards/calculators-software/spancalc

Page 38: 14 Joists 2020S PDF - openlab.citytech.cuny.edu

http

s://

awc.

org

/cod

es-

sta

nda

rds/

calc

ulat

ors

-sof

twa

re/s

panc

alc

Assume:• Species: Douglas

Fir-Larch• Size: PER YOUR

DESIGN• Grade: No. 1 • Member Type:

Floor Joists • Deflection Limit: L/360• Spacing: 12” or 16” or 24” PER YOUR DESIGN• Live Load (psf): 40• Dead Load (psf): 20

Page 39: 14 Joists 2020S PDF - openlab.citytech.cuny.edu

Floor Joist Spacing and Layout

•Forest Products Supplyhttp://www.fp-supply.com/st-louis-trusjoist-tji-i-joists.html

or TJI's

Page 40: 14 Joists 2020S PDF - openlab.citytech.cuny.edu

Assume:• Deformation limit L/360• 40-psf live load • 20-psf dead load• 12” or 16” or 24”

Page 41: 14 Joists 2020S PDF - openlab.citytech.cuny.edu

Be consistent on your project use only one size of TJI (110 or 210 joists)

Page 42: 14 Joists 2020S PDF - openlab.citytech.cuny.edu

BT2 2019S Amir, Tasfia

Page 43: 14 Joists 2020S PDF - openlab.citytech.cuny.edu

BT2 2019S Amir, Tasfia

Page 44: 14 Joists 2020S PDF - openlab.citytech.cuny.edu

BT2 2019F Szpin, Hubert

Page 45: 14 Joists 2020S PDF - openlab.citytech.cuny.edu

Cite: "Passive House Blanden / HASA Architects" 26 Oct 2018. ArchDaily. Accessed 30 Oct 2018. <https://www.archdaily.com/904328/passive-house-blanden-hasa-architects/> ISSN 0719-8884