150309-db s&s ag i.sbp station green_engl
TRANSCRIPT
DB Station&Service AG | I.SBP Architects and Engineers Edition March 2015
StationGreen
StationGreen HorremFirst Carbon-Free Train Station Building in Europe
DB Station&Service AG | I.SBP Architects and Engineers Edition March 2015
StationGreen
Station&Service AGFuture of StationsStationGreen ProgrammThe develpment of StationGreenNext StepsContact
DB Station&Service AG | I.SBP Architects and Engineers Edition March 2015
StationGreen
DB Station&Service AG 5.400 Railwaystations in use
1.500 Station buildings
15 M. Travelers per day
3 Bill. Travelers and Visitors per annum
4.600 Employees
1 Office for Architecture
DB Station&Service AG | I.SBP Architekten und Ingenieure | StationGreen | Edition August 2013
DB Station&Service AG | I.SBP Architects and Engineers Edition March 2015
StationGreen
Activities
- new stations
- retrofittings
- Masterplanungen
- Traffic infrastructure
- Mobility design
- Programming
The Team
- Architects
- Engineers
- Transport Engineers
- Quantity Surveyor
- Administrative Staff
I.SBP
- 40 Employees
DB Station&Service AG | I.SBP Architekten und Ingenieure | StationGreen | Edition August 2013
DB Station&Service AG | I.SBP Architects and Engineers Edition March 2015
StationGreenFuture of StationsWhat is a Railstation?
A piece of city Lifecycle
A buildingMobilitätssynapse
Image of the city
Gate to the city
Entrance to the system
Meetingpoint
Arrivalspace
Attractor
Local Identifier
Place to Stay
sanctuary
marketplace
Place to Work
Orientation
Infrastructure
Complex functionality
Emotionalspace
place of remembrance
Space of the future
Urban funtions
DB Station&Service AG | I.SBP Architects and Engineers Edition March 2015
StationGreen
Category 1
Category 3
Category 4
Category 6
Category 7
StationsCategory Relationen traveler per day [M.]
Category 2
Category 5
∏
20
77
227
598
1.075
2.529
849
5.375
2,9
2,4
2,9
3,9
2,1
1,1
0,1
17% of Stations78% of Travelers
83% of Stations22% of travelers
15,4 M. per day
StationGreen
StationGreen
StationGreen
Clustering of Stations
DB Station&Service AG | I.SBP Architects and Engineers Edition March 2015
StationGreenObjective
StationGreen…
7
… shall accomplish a measurable contribution to the DB 2020 strategy
… shall be the first station reducing CO2 emissions (operates carbon-free)
… shall set new standards for future stations as a pilot project
… shall be a testbed for new technologies
… shall be the billboard for DB‘s sustainable actions
… shall improve the image of a region and city
DB Station&Service AG | I.SBP Architects and Engineers Edition March 2015
StationGreen
8
EnvironmentEconomy Social Concerns
StationGreen serves the three pillars of the DB 2020 strategy.
Guiding Principles
Modular, extendibleconcept
Easy conversion due toflexible floor plan
Regionally customizedmarketing and operationconcept
Reduced operational costs due to self-sufficient energyproduction / internalpower supply
Construction
Roof canopy givesshade
„Light Catcher“ steersdaylight into back areas
Green roof reducesheat-island-effect andregulates the climate in/ around the building
Heated rooms areembedded in a climateshell (space in spaceconcept)
Materials
Carbon-free primary-construction made oftimber
Use of recyclable or renewable materials
Use of emission-freematerials
Use of regional materials
Avoidance of compositematerials
Technology
Rainwater storage andits use for lavatory flush
Heating and cooling ofroom temperature andwater with renewableenergy (geothermy/ solarthermy)
Use of solar panels forelectricity
LED lighting technology
Concept for maintenance and disposal
Intermodality
Barrier-free access for all passengers with restricted mobility
Digital reception
Wireless internet
Comfortable waitingarea with pleasantseating (includingcharging facilities formobile devices)
DB Station&Service AG | I.SBP Architects and Engineers Edition March 2015
StationGreenModules
StationGreen
DB Station&Service AG | I.SBP Architects and Engineers Edition October 2014
DB Station&Service AG | I.SBP Architects and Engineers Edition March 2015
StationGreenS
US
TAIN
AB
LIT
Y
CO
MF
OR
T
+
DB Station&Service AG | I.SBP Architects and Engineers Edition March 2015
StationGreenLayout
Ground Floor
DB Station&Service AG | I.SBP Architects and Engineers Edition March 2015
StationGreenElevation (City Side)
DB Station&Service AG | I.SBP Architects and Engineers Edition March 2015
StationGreen
13
North Germany
Bavaria
Industrial HeritageSite
ColoursAppearance integral to surroundings Ambience Texture Vegetation Fassade Construction
Adaptability
The Scheme StationGreen stands for: • Accessible station layout• Carbon-free operation of the station• Combination of custumer comfort and sustainabilityA basic module is adabted to the floor plan according to the space available and usage requirements. The station design takes into account local climate and architectural traditions.
Horrem
Station- 11.870 travellers per day
- 5 Plattforms
- Category 3 Station
- 1.100 Park+Ride Parking Spaces
DB Station&Service AG | I.SBP Architects and Engineers Edition March 2015
StationGreen
Foto 11.06.13
DB Station&Service AG | I.SBP Architects and Engineers Edition March 2015
StationGreen
Foto 13.06.13
DB Station&Service AG | I.SBP Architects and Engineers Edition March 2015
StationGreenNext steps
StationGreen Lutherstadt Wittenberg
DB Station&Service AG | I.SBP Architects and Engineers Edition March 2015
StationGreenNext steps
StationGreenLutherstadt Wittenberg
DB Station&Service AG | I.SBP Architects and Engineers Edition March 2015
StationGreenNext steps
StationGreen Lutherstadt Wittenberg Opening2017
DB Station&Service AG | I.SBP Architects and Engineers Edition March 2015
StationGreen
I.SBP CONCEPTION AND DESIGNArchitects and Engineers
Head Architect Marc UlrichDB Station&Service AGWashingtonplatz 2, D-10557 Berlin
Tel. ++49 (0)30 297-65550Fax ++49 (0)30 297-65560Mail: [email protected]
© Copyright 2015 DB Station&Service AG, I.SBP: Any duplication of the StationGreen concept or elements thereof as presented in this document requires the approval of DB Station&Service AG.
StationGreen