Project: Client: Drawing Title: Construction Sections Scale: as noted on A3 Drawing Number: Construction Sections Shawn Winn Draughtsman Joinery, Engineering, Mechanical & Electrical, Construction Detailing. 7 Havelock Terrace Yondertown, Devon PL21 9SP 07901-725795 / 01752-837494 [email protected] Issue Date: 20 July 2018 Weep joints in bottom course of brick. Weather membrane continuous through rebate. Solid 7.3N conrete blocks. Poured concrete trench base. 150mm min poured concrete slab. Damp Proof Membrane. Compressed hardcore base. Junction Detail 01 Foundation Detail 02 Section AA 1:50 on A3 Section BB 1:50 on A3 Junction Detail 01 1:5 on A3 Foundation Detail 02 1:5 on A3 15mm plasterboard & skim. 34mm service cavity. Multifoil vapour control layer. 150mm timber stud. Actis insulation between studs. External OSB sheathing. External weather membrane. External cladding battens. External cladding. Poured concrete slab. Radon membrane. 100mm Celotex insulation. 60mm screed. Ceramic floor finish. Plasterboard & skim. Vapour control layer. Rockwool insulation. Timber ceiling joists. Chipboard sub floor. 2338 5658 2775 5652 871 2775 5652 871 2343 7208 3027 1308

Upload: others

Post on 17-Jul-2020

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 15mm plasterboard & skim. Shawn Winn Draughtsman Drawings Sections.pdfDraughtsman Joinery, Engineering, Mechanical & Electrical, Construction Detailing. 7 Havelock Terrace Yondertown,

Project:

Client:

Drawing Title:

Construction Sections

Scale:

as noted on A3

Drawing Number:

Construction Sections

Shawn WinnDraughtsman

Joinery, Engineering,Mechanical & Electrical,Construction Detailing.

7 Havelock TerraceYondertown, Devon PL21 9SP07901-725795 / 01752-837494

[email protected]

Issue Date:

20 July 2018Weep joints in

bottom course

of brick.

Weather

membrane

continuous

through rebate.

Solid 7.3N

conrete blocks.

Poured concrete trench base.

150mm min poured concrete slab.

Damp Proof Membrane.

Compressed hardcore base.

Junction Detail 01

Foundation

Detail 02

Section AA1:50 on A3

Section BB1:50 on A3

Junction Detail 011:5 on A3

Foundation Detail 021:5 on A3

15mm plasterboard & skim.

34mm service cavity.

Multifoil vapour control layer.

150mm timber stud.

Actis insulation between studs.

External OSB sheathing.

External weather membrane.

External cladding battens.

External cladding.

Poured concrete slab.

Radon membrane.

100mm Celotex insulation.

60mm screed.

Ceramic floor finish.

Plasterboard & skim.

Vapour control layer.

Rockwool insulation.

Timber ceiling joists.

Chipboard sub floor.

2338

5658

2775

5652

871

2775

5652

871

2343

7208

3027

1308