Ø160 mm comms duct surface waterto stream · cable install Ø150 mm hdpe ... esb mv room lv...
TRANSCRIPT
E
x
i
s
t
i
n
g
1
5
0
m
m
Ø
W
a
t
e
r
m
a
i
n
c
o
n
n
e
c
t
i
o
n
t
o
n
e
w
b
u
i
l
d
i
n
g
Polym
er D
osing S
tation
550
4Fori Ø30
Ø308.33
Ø241.67
483.334Fori Ø28.33 166.671333.33
166.67
550
4Fori Ø30
Ø308.33
Ø241.67
483.334Fori Ø28.33 166.671333.33
166.67
Recessed area for skips leakage
Su
mp
Su
mp
5% falls
5% falls
5% falls
5
%
fa
lls
5
%
f
a
ll
s
5
%
f
a
lls
Sump Sump
3%
fa
lls
3%
fa
lls
5
%
f
a
ll
s
5
%
f
a
lls
5
%
f
a
ll
s
5
%
f
a
ll
s
Internal Partition (12.6 m3)
Internal Partition (12.6 m3)
Post Stripping Tank 1
MSW Liquid Holding Tank
(315 m3)
Top of tank 9.5 m.
(including 0.5 m)
Stairs 2
Pipe Bridge 6
SRV 1800 - 5M
S201
SRV 1800 - 5M
S202
LRV 2500 - 3.5M
L301
P301
VCP HP 800 ED
V301
Ø180
1200100
100
380340
4Fori Ø17Ø220
8Fori Ø18
Ø180
1200100
100
380340
4Fori Ø17Ø220
8Fori Ø18
(720 m3)
Top of tank 9.5 m. (including 0.5 m)
SSO Liquid Holding Tank
(304 m3)
Top of tank 9.5 m.
(including 0.5 m)
Ø180
1200100 100
380340
4Fori Ø17Ø220
8Fori Ø18
Ø180
1200100
100
380340
4Fori Ø17Ø220
8Fori Ø18
IBC
1
Post Stripping Tank 2
(315 m3)
Top of tank 9.5 m.
(including 0.5 m)
Ø180
1200
100100
380340
4Fori Ø17Ø220
8Fori Ø18
Ø180
1200
100100
380340
4Fori Ø17Ø220
8Fori Ø18
Ø180
1200
100100
380340
4Fori Ø17Ø220
8Fori Ø18
Ø180
1200
100100
380340
4Fori Ø17Ø220
8Fori Ø18
Contact Tank
(108 m3)
Top of tank 9.5 m.
(including 0.5 m)
Anoxic Tank
(162 m3)
top of tank 9.5 m
(including 0.5 m)
Aeration Tank
(810 m3)
Top of tank 9.5m
(including 0.5m)
MCC Room 5
Ø180
1200
100100
380340
4Fori Ø
17Ø2
20
8Fori Ø
18
Ø180
1200100 100
380340
4Fori Ø17Ø220
8Fori Ø18
Co
ntro
l p
an
el
De-watering Units
placed on the top
of the tanks
MSW Liquid Buffer Tank
(238 m3)
(top of tank 4 m, including 0.5 m freeboard)
Chemical Tank 1
(Ammonium sulphate)
(100 m3)
Chemical Tank 2
(H2SO4)
(30 m3)
Ø180
1200100 100
380340
4Fori Ø17
Ø220
8Fori Ø18 Ø180
1200100
100
380340
4Fori Ø17Ø220
8Fori Ø18
(Third centrifuge for future)
Chemical cabinet (Molasses)
Double roller shutter door
Pedestrian door
SSO Liquid Buffer Tank
(238 m3)
(top of tank 4 m, including 0.5 m freeboard)
02
0-0
1-P
01
02
0-0
2-P
01
020-02-P02
02
0-0
1-P
02
021-02-P01 021-01-P01
021-02-P02
021-01-P02
02
1-0
1-P
03
02
1-0
2-P
03
02
1-0
1-P
04
02
1-0
2-P
04
Micro screen 2
Micro screen 1
02
0-0
1-P
01
NutrientDosing
Buffer tank 1
H: 13.75 m
Int Ø : 10.5 m
Buffer tank 2
H: 13.75 m
Int Ø : 10.5 m
Grit Units
Pipe B
ridge 5
Pipe B
ridge 3
Lightening
Protection Pole
Pump
Room 1
Sta
irwell
Pip
e Brid
ge 4
Buffer Tank 1
Buffer Tank 2
Lightening
Protection Pole
CHP
CHP
Boiler
Ba
ck-u
p
Bo
ile
r
Gas Dome
Hea
t E
xcha
nge
r
Heat E
xcha
nge
r
MCC Room 1
Cooling For Heat Exchanger
Cooling For Heat Exchanger
R. Tank
D
E
L
IV
E
R
Y
EXIT
Y
I
E
L
D
N
O
E
X
IT
WH
EE
L W
AS
H
Storage Area
S T A F F P A R K I N G (22 SLOTS)
W
A
Y
S
W/Br
A B
Stre
ams
Sepa
ratio
n Fen
ce
Door 2Door 1 Door 3 Door 4 Door 5
Transformers
RAM
PRAM
P
A
L
L
O
N
E
W
A
Y
O
N
E
W
A
Y
W/Br
RAM
PRAM
P
Oil Tank
Traffic lights
NER
Quarantine
Tank
Pipe Bridge 2
Pipe Bridge 1
Biofilter
Weightbridges
Sec. Digester Tank 1
H: 19.30 m
Int Ø : 17.50 m
Sec. Digester Tank 2
H: 19.30 m
Int Ø : 17.50 m
Primary Digester 2
Primary Digester 1
Pump
Room 2
Prm. Digester Tank 3
H: 19.30 m
Int Ø : 18.00 m
Sec. Digester Tank 4
H: 19.30 m
Int Ø : 18.00 m
Prm. Digester Tank 1
H: 19.30 m
Int Ø : 18.00 m
Prm. Digester Tank 2
H: 19.30 m
Int Ø : 18.00 m
Secondary Digester 2
Secondary Digester 1
Primary Digester 4
Primary Digester 3
JJ
J
J
J
J
J
J
J
J
JJJ
J
J
J
J
q
q
BOP = +78.482
BOP = +78.428
BOP = +78.448
BOP = +78.406
BOP = +78.362
BOP = +78.246
Ø150 mm
HDPE
Ø150 mm
HDPE
Ø150 mm
HDPE
Ø150 mm
HDPE
Ø150 mm
HDPE
BOP = +78.318
1:100
1
:
8
0
1
:
8
0
1:8
0
Ba
cku
p B
oile
r
TB
C
CHP
Boiler
CHP
1
:
1
0
0
1:8
0
BOP = +78.034
BOP = +78.022
BOP = +78.298
2no Ø125mm LV Duct
2no Ø125mm LV Duct
2no Ø125mm LV Duct
2no Ø125mm
stacked LV Ducts
BOP = +78.294
2no Ø125mm Duct
Ø160mm MV Duct
Ø160mm MV Duct
800 x 800mm OPE FOR
MANHOLE COVER
Drain Pop Up refer
to section detail
Lighting Pole
Lighting Pole
BOP = +78.227
Ø150 mm
HDPE
1:100
2no Ø125mm
additional stacked
LV Ducts between
A Panels
Plinth cut out &
trench for
cable install
Ø150 mm
HDPE
2no Ø100mm Duct
1
HT-TPH-06-15
2No 100mmØ
Comms Ducts
Transformer
Transformer
Back-up
Generator
NER
Ø160mm
Comms Duct
Ø160mm
LV Elec Duct
Ø110mm LV Elec Duct
3
N
o
Ø
1
6
0
m
m
&
3
N
o
Ø
1
2
5
m
m
L
V
E
le
c
D
u
c
ts
1No Ø160mm &
1No Ø125mm
LV Elec Ducts
Driver
Terminal
Driver
Terminal
2No Ø160mm
LV Elec Ducts
Ø160mm Comms Duct
Ø160mm LV Elec Duct
Ø160mm Comms Duct
Ø160mm LV Elec Duct
1No Ø160mm &
1No Ø125mm
LV Elec Ducts
5No Ø125mm
LV Elec Ducts
2No Ø160mm
LV Elec Ducts
2No Ø125mm
LV Elec Ducts
2N
o Ø
16
0m
m &
2N
o Ø
12
5m
m
sta
cke
d L
V E
le
c
Du
cts
1No Ø160mm
Comms Duct
Oil T
an
k
Rainwater
Harvesting & Fire
Water Tank
Water Tank
1No Ø160mm
Comms Duct
2No Ø160mm
LV Elec Ducts
1No Ø160mm
Comms Duct
Fire Hydrant Pump
Room
LV SwitchroomMV RoomESB
Workshop and
Storage
Reception
LaboratoryLaundryStorage
Change Room Male Cleaning Room
Change Room
Female
Storege Male WC
Disable WC with
Shower
MCC Room 1
Plinth cut out & trench
for cable install
1
:
8
0
+79.500
+79.500
Die
se
l
Sto
ra
ge
T
BC
Chimney
Base
Oil Tank
Scrubber
Booster
De
hu
mid
ifie
r
+79.500
+79.500
2
HT-TPH-06-09
1
:
1
0
0
24
no
Ø
10
0m
m
LV
E
le
c D
ucts
BO
D +
78
.4
25
Earth Mat
2No Ø125mm
LV Elec Ducts
TOD +78.800
2No Ø125mm
MV Elec Ducts
Diasno LED Site Lighting Lantern
Ø160mm Comms Duct
Diasno LED Site Lighting Lantern
Diasno LED Site Lighting Lantern Ø100mm Lighting Duct
3No Ø125mm
MV Elec Ducts
3
N
o
Ø
1
6
0
m
m
&
3
N
o
Ø
1
2
5
m
m
L
V
E
le
c
D
u
c
t
s
MCC Room 3
1No Ø160mm
Comms Duct
Fire Hydrant
Water Pop-up
Ø150 mm
HDPE
BOP = +78.345
BOP = +78.277
BOP = +78.246
BOP = +78.284
BOP = +78.079
Ø150 mm
HDPE
Ø150 mm
HDPE
BOP = +78.149
Ø150 mm
HDPE
MCW Pop-up
Ø160 mm
SDR 26 PE100
BOP = +78.315
BOP = +78.399
3No Ø125mm
LV Elec Ducts
BOD +78.800
3No Ø125mm
MV Elec Ducts
TOD +78.545
6No Ø125mm &
1No Ø160mm
MV Elec Duct
Ø150mm Firewater
1No Ø100mm
Street lighting Duct
1No Ø100mm
Street lighting Ducts
Fire Hydrant
1No Ø160mm
Comms Duct
1No Ø100mm
Street lighting Duct
Ø150mm Firewater
Ø100mm Lighting Duct
2No Ø125mm
LV Elec Ducts
ACO heavy duty drain
2No Ø160mm
LV Elec Ducts
Ø150 mm
Hydrant Ring
Main - HDPE
Earth Mat
Ø125mm
MV Elec Duct
TOD +78.545
3No Ø125mm
MV Elec Ducts
TOD +78.100
2No Ø125mm
LV Elec Ducts
TOD +78.875
Ø150 mm
MCW - Mains
Cold Water
service pipe
Ø150 mm
Hydrant Ring
Main - HDPE
Ø150 mm
Hydrant Ring
Main - HDPE
Ø150 mm
Hydrant Ring
Main - HDPE
Ø150 mm
Hydrant Ring
Main - HDPE
Ø160 mm
SDR 26 PE100
Overflow brought
back to building
1No Ø160mm &
1No Ø125mm
LV Elec Ducts
Ø80mm LV Elec Duct
Ø80mm LV Elec Duct
Ø160mm LV Elec Duct
Ø160mm LV Elec Duct
Pumped line Ø100mm
Ø160mm LV Elec Duct
Ø160mm LV Elec Duct
Ø150 mm
Hydrant Ring
Main - HDPE
Ø150 mm
Hydrant Ring
Main - HDPE
Ø150 mm
Hydrant Ring
Main - HDPE
1No Ø100mm
Street Lighting Duct
Ø100mm Street
Lighting Duct
1No Ø100mm
Street Lighting Duct
Ø110mm LV Elec Duct
Ø110mm LV Elec Duct
Ø150 mm
Hydrant Ring
Main - HDPE
Ø150 mm
Hydrant Ring
Main - HDPE
1No Ø100mm
Street Lighting Duct
Ø150 mm
Hydrant Ring
Main - HDPE
1No Ø100mm
Street Lighting Duct
1No Ø100mm
Street Lighting Duct
AREA ON-HOLD
MCC Room 4
Ø80mm LV Elec Duct
6N
o Ø
125m
m
LV
E
le
c D
ucts
T
O
D
+
78.3
75
6N
o Ø
12
5m
m
LV
E
le
c D
ucts
BO
D +
78
.4
00
1No Ø100mm
Street Lighting Duct
2No Ø125mm
LV Elec Ducts
1No Ø125mm
LV Elec Duct
Ø125mm
LV Elec Duct
Ø100mm Street
Lighting Duct
Correct position
and size TBC
4No Ø160mm Pop-up
LV Elec Ducts
3No Ø160mm &
3No Ø125mm Pop-up
LV Elec Ducts
Ø110 mm
SDR 26 PE100
3No Ø125mm
MV Elec Ducts
TOD +78.100
3No Ø125mm
MV Elec Ducts
TOD +78.545
3No Ø125mm
MV Elec Ducts
24no Ø100mm
LV Elec Ducts
6No Ø125mm Pop-up
LV Elec Ducts
6No Ø125mm Pop-up
LV Elec Ducts
3No Ø160mm &
3No Ø125mm Pop-up
LV Elec Ducts
5No Ø160mm &
3No Ø125mm
Pop-up LV Elec Ducts
2No Ø125mm
LV Elec Ducts
2No Ø125mm
LV Elec Ducts
Snad Pit
Ø50 mm
MCW - Mains
Cold Water
service pipe
Correct position TBC
1No Ø160mm
Comms Duct
1No Ø160mm
Comms Duct
500x500mm
Sump Pomp
500x500mm
Sump Pomp
Ø160mm Comms Duct
Ø160mm Comms Duct
Ø50 mm
MCW - Mains
Cold Water
service pipe
Ø150 mm
Hydrant Ring
Main - HDPE
1No Ø100mm
Street Lighting Duct
JCBE
HBL
Ø160mm
MV Elec Duct
TOD +78.800
3No Ø125mm
LV Elec Ducts
TOD +78.665
2No Ø160mm
LV Elec Ducts
2No Ø125mm
LV Elec Ducts
Ø150 mm
MCW - Mains
Cold Water
service pipe
Ø150 mm
MCW - Mains
Cold Water
service pipe
Ø150 mm
MCW - Mains
Cold Water
service pipe
MCW Pop-up
+79.500
+79.500
+79.500
Ø50mm
MV Elec Duct
TOD +78.800
Ø50mm
MV Elec Duct
TOD +78.800
Drawing exported from Revit model on 11.01.19 2:18pm
Drawing exported from Revit model on 11.01.19 2:18pm
1
5
0
m
m
F
o
u
l
R
i
s
i
n
g
M
a
i
n
”
t
o
“
F
o
u
l
R
i
s
i
n
g
M
a
i
n
S
e
w
e
r
E
l
e
c
t
r
i
c
i
t
y
D
u
c
t
i
n
g
1
0
k
V
G
r
i
d
C
o
n
n
e
c
t
i
o
n
S
u
r
f
a
c
e
W
a
t
e
r
T
o
S
t
r
e
a
m
Ø
1
6
0
m
m
C
o
m
m
s
D
u
c
t
Checked by:Drawn by: Job No: File name:
Scale:Issue date:Current review:
Drg No:
TITLE
PROJECT
ANAEROBIC DIGESTION FACILITYHUNTSTOWN
1:1250 @ A1
MGF AW
Date Rev Description Drawn by Chk'd
LEGEND
N
S
EW
0 10 20 40 50 100m
30
Huntstown Bioenergy
Limited
Site Boundary Limit.
SERVICES PLAN
HT-TPH-01-52
P1 22/01/2019
P1 MGF AW
MAP 3
22/01/2019 P1 Huntstown General Site Layout MGF AW
Watermain
Electrical Ducting 10 kV Grid Connection
150mm Foul Rising Main” to “Foul Rising Main
Sewer
External services
Services Within Site
Proposed Fire Hydrant
Proposed Surface Water Sewer
Proposed Street Lighting Duct
Proposed Foul Water Drain
Biofilter and Reception Building Drainage
Electrical Ducts
Surface Water to Stream
Ø160 Comms Duct
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 15-03-2019:03:52:01