16773 8x12 gable with large overhang - costco€¦ · recommended methods and materials to level...

80
STOP! STOP! For immediate help with assembly or product information call our toll-free number: or email: [email protected] Our staff is ready to provide assistance. April through October M - F 8:00 AM to 6:00 PM EST Saturday 8:30 AM to 4:30 PM EST November through March M - F 8:00 AM to 5:00 PM EST 1-800-844-9273 16773

Upload: hadung

Post on 04-Jun-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

STOP!STOP!

For immediate help with assembly or product information

call our toll-free number:

or email:

[email protected]

Our staff is ready to provide assistance.

April through October M - F 8:00 AM to 6:00 PM EST

Saturday 8:30 AM to 4:30 PM EST

November through March M - F 8:00 AM to 5:00 PM EST

1-800-844-9273

16773

Page 2: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

(This page intentionally left blank.)

Page 3: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

09/23/2013

KEEP THIS MANUAL FOR FUTURE REFERENCEACTUAL FLOOR SIZE IS 96 x 140-5/8" (243,8 x 357,2 cm)

16773

BEFORE YOU BEGIN

IMPORTANT!READ INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING ASSEMBLY.

- CUSTOMER SERVICE -Call: 1-800-844-9273 email: [email protected]

• BUILDING RESTRICTIONS AND APPROVALS

Be sure to check with local building department and homeowners association for specifi c restrictions and/ or requirements before building

. • ENGINEERED DRAWINGS

Contact our Customer Service Team if engineered drawings are needed to pull local permits.

• SURFACE PREPARATION

To ensure proper assembly you must build your shed on a level surface. Recommended methods and materials to level your shed are

listed on page 7.

• CHECK ALL PARTS

Inventory all parts listed on pages 4 - 6. Contact our Customer Service Team if any parts are missing or damaged.

• ADDITIONAL MATERIALS

You will need additional materials to complete your shed. See page 3 for required and optional materials and quantities.

EVERTON GABLE 8' x 12' (244 x 366 cm)

ASSEMBLY MANUALA Backyard Products Company

Page 4: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

2

TOOLS

Safety! Always use approved safety glasses during assembly.

OptionalRequired

HELPFUL REMINDER SYMBOLSLook for these symbols for helpful reminders throughout this manual.

ORIENT LUMBER AND TRIM FOR BEST APPEARANCE

= Assistance Required; two or more people.

= Ensure squareness.

= Important required step or operation.

= Helpful assembly hint.

= Mark part with pencil.

= Beginning of steps for assembly or installation.

= You have nished the assembly or installation.

= Level

❑ Gloves

Framing lumber is graded for structural strength and not appearance. Exterior trim is graded for one good side.

Always install the material leaving the best edge and best surface visible. Please remember that these blemishes in no waynegatively affect the strength or integrity of our product. (See Fig. A, B, C.)

A

❑ Safety Glasses

❑ Tape Measure

❑ Paint Tools

❑ Ladder

❑ Caulk Gun

❑ Hammer

❑ Level

FINISH

BEGIN

❑ Pencil

❑ Phillips Screwdriver

❑ Tool Belt/ Nail Pouch

❑ Chalk Line

❑ Nail Gun

• gun nails

❑ Tin Snips (for drip edge)

❑ Square or

❑ Utility Knife

❑ Shingle Blades

B C

❑ Drill / Driver❑ 1/8" Drill Bit

❑ #2 Philips Drive Bit

❑ 1/4" Drill Bit❑ 5/16" Drill Bit❑ 1/2" Drill Bit

Page 5: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

3

COMPLETING YOUR SHEDYou will need these additional materials:

OPTIONAL MATERIALS

FOUNDATION OR FLOOR MATERIALS

ADDITIONAL MATERIALS

DRIP EDGE ..................... 60 Feet #15 ROOFING FELT To cover 148 Sq. Ft. of roof area.

1" GALVANIZED ROOFING NAILS.........1/4 LbFor roofi ng felt.

REFER TO THE BACK OF THIS MANUAL AND THE MANUFACTURER’S INSTRUCTIONS FOR INSTALLATION OF SHINGLES, DRIP EDGE AND FELT.

3-TAB SHINGLES ............................ 7 Bundles

PAINT FOR SIDING .......................... 2 GallonsUse 100% acrylic latex exterior paint. (2) coats recommended.

CAULK ................................................. 3 TubesUse acrylic latex exterior caulk that is paintable.

1" GALVANIZED ROOFING NAILS.... 3 LbsFor shingles.

PAINT FOR TRIM .............................1 QuartUse 100% acrylic latex exterior paint.

WOOD GLUE ....................... Exterior Rated

REINFORCED WOOD FLOOR FRAME (OPTIONAL)

IMPORTANT! The included fl oor has been designed for general use. Depending on your specifi c use you may want to construct a heavy duty fl oor frame by adding additional fl oor joists (shown below as shaded). Below is a list of additional materials (not included):

x3

x12

2 x 4 x 8' (5 x 10 x 244 cm) Treated LumberCut to (6) 2 x 4 x 93" (5 x 10 x 236 cm)

ea. 3" (7,6 cm) Hot Dipped Galvanized Nails

Optional 12" (30,5 cm) spacing

Standard 16" (40,7 cm) spacing

• This shed kit includes a complete wood fl oor system.

• This shed kit does not include ANY leveling materials.

• See the FLOOR LEVELING section on page 7 for recommended methods and suggested materials to properly level your fl oor, as this will vary depending on your specifi c site.

Page 6: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

WOOD SIZE CONVERSION CHARTNominal Board Size Actual Size

1" x 4".................3/4" x 3-1/2" (1,9 x 8,9 cm)

2" x 4"..............1-1/2" x 3-1/2" (3,8 x 8,9 cm)

2" x 3"..............1-1/2" x 2-1/2" (3,8 x 6,3 cm)

1" x 3".................3/4" x 2-1/2" (3,8 x 6,3 cm)

PARTS IDENTIFICATION AND SIZES

RS RS

Part identi cationletters are stamped on some parts.

Check these locations forpart stamp.

Treated lumber is stamped:

All treated lumber is stamped:

WA

LLS

x3 2 x 4 x 89" (5,1 x 10,2 x 226,1 cm) SZ

x1 2 x 4 x 84" (5,1 x 10,2 x 213,4 cm) TO

x4 2 x 4 x 68-5/8" (5,1 x 10,2 x 174,3 cm) YF

x18 2 x 4 x 68" (5,1 x 10,3 x 172,7 cm) UM

x1 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) SP

x2 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) SP

x1 2 x 4 x 35-3/4" (5,1 x 10,2 x 90,8 cm) RZ

x1 2 x 4 x 19-1/2" (5,1 x 10,2 x 50,2 cm) RGA

PARTS LISTINVENTORY YOUR PARTS before you begin. We suggest sorting parts by the category they are listed in.

RA

FT

ER

S x11 7-1/4 x 18-1/4" (18,4 x 46,4 cm)

TR

IM

x8 3/8 x 1-3/4 x 67-3/4" (1 x 4,4 x 172,1 cm)

x2 19/32 x 3 x 36-3/4" (1,5 x 7,6 x 93,3 cm)

x2 19/32 x 3 x 80-1/4" (1,5 x 7,6 x 203,8 cm)

x2 19/32 x 3 x 69" (1,5 x 7,6 x 175,3 cm)

x2 19/32 x 3 x 9" (1,5 x 7,6 x 22,9 cm)

x12 2 x 4 x 68-7/16" (5,1 x 10,2 x 173,8 cm)YJ

x2 2 x 4 x 69-7/8" (5,1 x 10,2 x 177,5 cm)WW

x1 19/32 x 4 x 69-7/8" (1,5 x 10,2 x 177,5 cm)WML

x1 19/32 x 4 x 69-7/8" (1,5 x 10,2 x 177,5 cm)WMR

x1 2 x 4 x 17-1/2" (5,1 x 10,2 x 44,5 cm)YG

x2 2 x 4 x 16-1/2" (5,1 x 10,2 x 41,9 cm)RD

x1 2 x 4 x 6-1/2" (5,1 x 10,2 x 16,51 cm)UY

x2 3/8 x 2 x 5" (1,0 x 5,1 x 12,7 cm)

WA

WN

WK

EY

x4 2 x 4 x 72" (5,1 x 10,2 x 182,9 cm) TM

3/4"(1,9 cm)

1 x 3 x 5" (2,5 x 7,6 x 12,7 cm) Gauge Block for 3/4" (1,9 cm) measurementx1 GAA

OSB OR WOOD GRAIN

x1 96" (243,8 cm) Z-STRIP

4

FLO

OR

x2

2 x 4 x 93" (5,1 x 10,2 x 236,2 cm)

x2 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm)

x10

2 x 4 x 92-5/8" (5,1 x 10,2 x 235,3 cm)

Page 7: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

x2 1 x 2 x 96" (2,5 x 5,1 x 243,8 cm) ZM

x4 2 x 3 x 68-7/16" (5,1 x 7,6 x 173,8 cm) WE

x2 1 x 2 x 43-1/2" (2,5 x 5,1 x 110,5 cm) WS

x4 19/32 x 3 x 23" (1,5 x 7,6 x 58,4 cm) GI

x2 2 x 3 x 18-3/8" (5,1 x 7,6 x 50,2 cm) WJ

OVE

RH

AN

G x2

x2 19/32 x 6-15/16 x 5-1/2" (1,5 x 17,6 x 13,4 cm)

SH

ELF

LO

FT

SO

FFIT

DO

OR

UN

OO

WR

x3

x2

x1

2 x 4 x 94-1/2" (5,1 x 10,2 x 240 cm)

19/32 x 3 x 63" (1,5 x 7,6 x 160 cm)

PARTS LIST continued...

x2

x4

x2

x2

x2

x2

x2

2 x 3 x 5-1/8" (5,1 x 7,6 x 13 cm)

2 x 3 x 7-7/8" (5,1 x 7,6 x 20 cm)

3/8 x 7-7/8 x 57-7/8" (1 x 20 x 147 cm)

3/8 x 5-3/16 x 69-3/8" (1 x 13,2 x 176,2 cm)

3/8 x 5-3/16 x 72" (1 x 13,2 x 182,9 cm)

3/8 x 7-7/8 x 7-7/8" (1 x 20 x 20 cm)

3/8 x 5-13/16 x 7-7/8" (1 x 14,8 x 20 cm)

WD

DY

PLx1 2 x 3 x 93" (5,1 x 7,6 x 236,2 cm)

2 x 3 x 69" (5,1 x 7,6 x 175,3 cm) Finger Jointed

x1 7-1/4 x 18-1/4" (18,4 x 46,4 cm) WITH WOOD GRAIN ON FACE

19/32 x 6-15/16 x 5-1/2" (1,5 x 17,6 x 13,4 cm)

5

PANEL PARTS LIST

RO

OF P

AN

ELS

SH

ELF A

ND

LO

FT

FLO

OR

NOTE: Panel parts are not stamped.

Shelf / Loft panels are 7/16" (1,1 cm) thick.

Floor panels are 5/8" (1,6 cm) thick.

Roof panels are 7/16" (1,1 cm) thick.

7/16 x 11-7/8 x 89"(1,1 x 30,2 x 226,1 cm)

7/16 x 35-7/8 x 82"(1,1 x 91,1 x 231,1 cm)

x1

x1

7/16 x 47-7/8 x 48"(1,1 x 121,6 x 121,9 cm)

x2

7/16 x 22 x 46-1/2"(1,1 x 55,9 x 118,1 cm)x2

7/16 x 8-7/8 x 70"(1,1 x 22,5 x 177,8 cm)

x2

7/16 x 22 x 96"(1,1 x 55,9 x 243,8 cm)x2

7/16 x 48 x 94-1/2"(1,1 x 121,9 x 240 cm)

5/8 x 48 x 96"(1,6 x 121,9 x 243,8 cm)

5/8 x 44-5/8 x 96"(1,6 x 113,3 x 243,8 cm)

x2

x2

x1

Page 8: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

x23/8 x 44-5/8 x 72"

(1 x 113,3 x 182,9 cm)

x23/8 x 20 x 72"

(1 x 50,8 x 182,9 cm)

x63/8 x 48 x 72"

(1 x 121,9 x 182,9 cm)

WALL PANEL & DOORS PARTS LIST

x1

x1

x1

x1

x1LEFT DOOR

x1RIGHT DOOR

x2 BOXES

x6 BOXES

x275

x90

x14

x60

x7

x98

x64

x12

NAIL BOXES

VENT, DOOR HARDWARE, AND WINDOW

FASTENER/HARDWARE BAG

6

1-1/4" (3,2 cm)

2" (5,1 cm)

2-1/2" (6,4 cm)

3" (7,6 cm)

3/4" (1,9 cm)

2" (5,0 cm)

3" (7,6 cm)

2" (5,1 cm)

1-1/2" (3,8 cm)

x1x2 x2

x8x1

10-1/2 x 32-1/2" (26,7 x 82,6 cm)

x2

1/2" (1,3 cm)

8 x 16" (20,3 x 35,6 cm)

3/4" (1,9 cm)

x121" (2,5 cm)

x4

x21-1/2" (3,8 cm)

Page 9: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

7

D O O R

FLOOR LEVELING OPTIONSThere are multiple ways to level your oor frame. Our recommended leveling method is shown below.

Leveling materials are not included in this kit.

PREFERRED METHOD - 4x4 TREATED RUNNERS

Measurements tocenters of 4x4's.

• 3" Screws angled into 4x4.

• (2) at each point frame• and 4x4 touch.

12"(30,5 cm)

12"(30,5 cm)

• Level under 4x4 runners only.• Locate leveling material 12" from ends of runners and no more than 48" apart.• Asphalt shingles should be used between 4x4 runners and blocks or treated lumber. Never use shingles in direct contact with ground.• For best results and aiding in water drainage use gravel under each concrete block.

LEVELING METHODS

• If you are building your shed on a concrete foundation see the following page.

CONCRETE

MATERIAL REQUIRED

x2 4" x 4" x 12' (10 x 10 x 366 cm)Treated Lumber

Fasteners for Frame to 4"x 4".(3" Screws shown as one option.) Minimum (40) 3" screws / exterior grade.

Use only wood treated for ground contact and fasteners approved for use with treated wood.

Always support frame seams.

Leveling higher than 16" not recommended.

LEVELING MATERIALS

Gravel

2x4 Treated Lumber

Solid Masonry Blocks in 1", 2", 4" or 8" thickness

Asphalt Shingles

8" Block

4" BlockGravelGravel

Do not exceed 16".

4x4 Runner

Shingle

ShingleMaximum between leveling

material locations.48"

12"

2x4 Treated Lumber

2" Block

Level

12"

Page 10: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

8

CONCRETE FOUNDATIONYour kit contains all materials to construct a wooden oor. If you choose to install your kit

on a concrete slab refer to the diagram below.

• A treated 2 x 4" (5,1 x 10,2 cm) sill plate is required when installing your shed on concrete. Hint: Use treated lumber in your kit or purchase full length treated lumber.

• Use a high quality exterior grade caulk beneath all sill plates.

• Fasten 2 x 4" (5,1 x 10,2 cm) sill plates to slab using approved concrete anchors (fasteners not included).

• Check local code for concrete foundation requirements.

NOTES

Allow new concrete slabs to cure for at least seven (7) days.

2" x 4" x 11'-1-5/8" (5,1 x 10,2 x 339,4 cm)

2" x 4" x 8' (5,1 x 10,2 x 244 cm)

Caulk

Requires:

x2

x2

x1

MUST be treated lumber.

MUST be treated lumber.

96" (243,8 cm)96" x 140-5/8" (243,8 x 357,2 cm) 133-5/8" (339,4 cm)8'x 12' (243,8 x 365,8 cm) 140-5/8" (357,2 cm)

AActual Size B CBuilding Size

A

BC

4"(10,2 cm)

3-1/2"(8,9 cm)

DOOR

Treated Sill Plate

Caulk between sill plate and concrete.

Page 11: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

9

93"(236,2 cm)

96"(243,8 cm)

48"(121,9 cm)

92-5/8(235,3 cm)

OffsetSeam

Offset Seam

140-5/8"(357,2 cm)

124-5/8"(316,6 cm)

92-5/8"(243,8 cm)

108-5/8"(275,9 cm)

48"(121,9 cm)

64"(121,9 cm)

80"(203,2 cm)

32"(81,3 cm)

16"

(40,7 cm)

16"

(40,7 cm)

16"

(40,7 cm)

16"

(40,7 cm)

12-5/8"

(32,1 cm)

48"(121,9 cm)

3" (7,6 cm) x2

x10

x44

2 x 4 x 92-5/8" (5,1 x 10,2 x 235,3 cm)

2 x 4 x 93" (5,1 x 10,2 x 236,2 cm)

x2 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm)

PARTS REQUIRED:

Centeron marks

Note this measurement

FLOOR FRAME

Flush

Flush

Look for

StampTREATED

HINT:For easier nailingstand on frame.

2

1

Use two 3" nails at each mark.

Orient parts as shown on at surface. Measure and mark.

BEGIN

You have nished your oor frame. Proceed to level and square frame.

FINISH

3

DO

OR

Page 12: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

10

DOOR

FINISH

5

LEVEL AND SQUARE FLOOR FRAMEBefore attaching oor decking, it is important to level and square the oor frame.

A level and square oor frame is required to correctly construct your shed.

BEGIN

2

3

4

1

Use level and check the frame is level before applying oor panels.

Check for frame squareness by measuring diagonally across corners. If the measurements are the same, the frame is square. The diagonal measurement will be approximately 170-1/4" (432,4 cm).

When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at ends of each runner. Move to the opposite end of the frame. Secure the frame to 4x4 runners with one fastener at ends of each runner making sure the frame remains square (Fig. A).

Once the oor frame is level and square fasten the frame to the 4x4 runners at each point the frame contacts the 4x4 runners.

See page 7 for the preferred oor leveling method.

First, secureat ends withone fastener.

Second, secureat ends withone fastener.

170-1/4"(432,4 cm)

170-1/4"(432,4 cm)

Fig. A

Page 13: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

11

DO

OR

DO

OR

48"(121,9 cm)

140-5/8"(352,2 cm)

6"(15,2 cm)

Move to the opposite side. Using the long edge of the panel as a lever, move thepanel side-to-side until the top corner is ush to the oor frame (Fig. B).Secure panel with two 2" nails in the corners.

2

BEGIN1

3

4 Continue attaching the panel using 2" nails 6" apart on edges and 12" apart inside panel.Use a chalk line or use pre-painted grid lines to nail into joists under panel.

Ensure your oor frame is square by installing one paneland squaring frame.

Fig. A

Fig. B

Fig. C

Check the oor frame is square by measuring diagonally across the frame corners. If the measurements are the same your oor frame is square. The measurement will be approximately 170-1/4" (432,4 cm) (Fig. C).

PARTS REQUIRED:

x1

x62

5/8 x 48 x 96"(1,6 x 121,9 x 243,8 cm)

Grid lines up

Seam

Seam

12"(30,2 cm)

2" (5,1 cm)

Flush

Flush

Flush

(2) Nails

(2) Nails

FLOOR PANELS

3/4"(1,9 cm)

DOOR

170-1/4" (432,4 cm

170-1/4" (432,4 cm

Attach the 48 x 96" panel with the rough side up (painted-grid lines side) with the 48" edge and corner ush to the oor frame (Fig A). Secure panel with two 2" nails in the corners.

Page 14: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

12

6"(15,2 cm)

12"(30,5 cm)

48"(121,9 cm)

44-5/8"(113,3 cm)

140-5/8"(357,2 cm)

32"(81,3 cm)

12-5/8"

(32,1 cm)

PARTS REQUIRED:

FINISH

7 You have nished attaching your oor panels.

Continue installing panels with rough side up (painted grid lines). Position 44-5/8" panel in middle of oor frame.

Use grid lines on panel for 2" nails 6" apart on edges, and 12" apart inside panels.

5

76

x1 x1

x124

5/8 x 48 x 96"(1,6 x 121,9 x 243,8 cm)

5/8 x 44-5/8 x 96"(1,6 x 113,3 x 243,8 cm)

Grid lines up

2" (5,1 cm)

FLOOR PANELS

Flush

FlushFlush

DO

OR

Page 15: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

13

DOOR

DOOR

Back wall

Front wall

Left wall

Right Wall

Check the oor frame is level after installing oor panels.Re-level if needed.

HINT:

IMPORTANT!

• The oor should be used as a stable work surface for wall construction.

• Organize your assembly procedure during the build process to avoid over-handling of the walls.

Page 16: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

LEFT WALL FRAMEPARTS REQUIRED:

140-5/8”(352,7cm)

120”(304,8 cm)

96”(243,8 cm)

68-5/8”(174,3 cm)

72”(182,9 cm)

48”(121,9 cm)

72”(182,9 cm)

20-5/8”(52,4 cm)

24”(61 cm)

68”(172,7 cm)

1-1/2”(3,8 cm)

1-1/2”(3,8 cm)

1-1/2”(3,8 cm)UM x7

TMYF

TMYF

HINT:For easier nailingstand on frame.

x2 2 x 4 x 72" (5,1 x 10,2 x 182,9 cm) TM

x2 2 x 4 x 68-5/8" (5,1 x 10,2 x 174,3 cm) YF

x7 2 x 4 x 68" (5,1 x 10,2 x 172,7 cm) UM

x32

14

DO

OR

3" (7,6 cm)

BEGIN

1

Use two 3" nails at each mark and four 3" nails at seams

For left wall, orient parts on edge on oor. Measure and mark.

2

TOENAILING

YOU WILL ASSEMBLE ONE LEFT AND ONE RIGHT WALL SEPARATELY.YOU MUST BUILD THE LEFT AND RIGHT SIDE WALLS EXACTLY AS SHOWN!

IMPORTANT MEASUREMENT

Page 17: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

15

For squareness maintain Flush and 3/4" measurement along panel edges.

LEFT SIDE WALL PANELS

48 x 72"(121,9 x 213,4 cm)

PARTS REQUIRED:

x1

x452" (5,1 cm)

Fig. B

BEGIN HERE

Fig. A

3/4"(1,9 cm)

3/4"(1,9 cm)

2 Nails

2 Nails

Flush

DO

OR

48"(121,9 cm)3/4"

(1,9 cm)1”

(2,5 cm)

3/4"(1,9 cm)

12"(30,5 cm) 6"

(15,2 cm)

20-5/8"(52,4 cm)

Place 48 x 72" panel onto wall frame ush to top of frame with primed side up as shown.

Use the gauge block to mark the 3/4" measurement on the wall stud. Secure panel with two 2" nails in the corners (Fig. A).

Nail the panel using 2" nails 6" apart on edges and 12" apart inside panel.

Ensure your wall frame is square by installing one panel and squaring frame.

YOU WILL ASSEMBLE ONE LEFT AND ONE RIGHT WALL SEPARATELY.

Move to the opposite end. Using the long edge of the panel as a lever move the panel side-to-side until you have a 3/4" measurement on the wall stud. Secure corner with two 2" nails (Fig. B).

4

5

3

3/4" GAUGE BLOCK

GAA

3/4" GAUGE BLOCK

Primedside up

Page 18: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

16

3/4"(1,9 cm)

48"(121,9 cm)

12"(30,5 cm)

6"(15,2 cm)

Flush

44-5/8"(113,3 cm)

12"(30,5 cm)

6"(15,2 cm)

Flush

For squareness maintain ush and 3/4" measurement along panel edges.

For squareness maintain ush along panel edges.

Place center 48" x 72" panel on frame as shown with primed side facing up.

Nail using 2" nails 6" apart on edges and 12" apart inside panel.

6

Place end 44-5/8" x 72" panel on frame as shown with primed side facing up. Nail using 2" nails 6" apart on edges and 12" apart inside panel.

7

You have nished building your LEFT WALL.FINISH

9

Primedside up

Primedside up

48 x 72"(121,9 x 213,4 cm)

44-5/8 x 72"(121,9 x 213,4 cm)

x1 x1

x90

LEFT SIDE WALL PANELS

PARTS REQUIRED:2" (5,1 cm)

8 Carefully ip the LEFT wall over.

DO

OR

DO

OR

3/4" GAUGE BLOCK

GAA

3/4" GAUGE BLOCK

Page 19: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

17

DO

OR

RIGHT WALL FRAMEPARTS REQUIRED:

140-5/8”(352,7cm)

120”(304,8 cm)

96”(243,8 cm)

68-5/8”(174,3 cm)

72”(182,9 cm)

48”(121,9 cm)

72”(182,9 cm)

20-5/8”(52,4 cm)

24”(61 cm)

68”(172,7 cm)

1-1/2”(3,8 cm)

1-1/2”(3,8 cm)

1-1/2”(3,8 cm)

UM x7

TMYF

TMYF

HINT:For easier nailingstand on frame.

x2 2 x 4 x 72" (5,1 x 10,2 x 182,9 cm) TM

x2 2 x 4 x 68-5/8" (5,1 x 10,2 x 174,3 cm) YF

x7 2 x 4 x 68" (5,1 x 10,2 x 172,7 cm) UM

x323" (7,6 cm)

BEGIN

1

Use two 3" nails at each mark and four 3" nails at seams

For right wall, orient parts on edge on oor. Measure and mark.

2

TOENAILING

IMPORTANT MEASUREMENT

Page 20: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

18

RIGHT SIDE WALL PANELS

48 x 72"(121,9 x 213,4 cm)

PARTS REQUIRED:

x1

x452" (5,1 cm)

Fig. BFig. A

Flush

3/4"(1,9 cm) 3/4"

(1,9 cm)

2 Nails

2 Nails

DO

OR

BEGIN HERE

48"(121,9 cm)

3/4"(1,9 cm)

3/4"(1,9 cm)

20-5/8"(52,4 cm)

12"(30,5 cm)

1”(2,5 cm)

6"(15,2 cm)

Nail the panel using 2" nails 6" apart on edges and 12" apart inside panel.

Ensure your wall frame is square by installing one panel and squaring frame.

Move to the opposite end. Using the long edge of the panel as a lever move the panel side-to-side until you have a 3/4" measurement on the wall stud. Secure corner with two 2" nails (Fig. B).

4

5

3

3/4" GAUGE BLOCK

GAA

3/4" GAUGE BLOCK

Primedside up

For squareness maintain ush and 3/4" measurement along panel edges.

Place 48 x 72" panel onto wall frame ush to top of frame with primed side up as shown.

Use the gauge block to mark the 3/4" measurement on the wall stud. Secure panel with two 2" nails in the corners (Fig. A).

Page 21: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

19

3/4"(1,9 cm)

48"(121,9 cm)

12"(30,5 cm)

6"(15,2 cm)

Flush

44-5/8"(113,3 cm)

12"(30,5 cm)

6"(15,2 cm)

Flush

For squareness maintain ush and 3/4" measurement along panel edges.

For squareness maintain ush along panel edges.

Place center 48" x 72" panel on frame as shown with primed side facing up.

Nail using 2" nails 6" apart on edges and 12" apart inside panel.

6

Place end 44-5/8" x 72" panel on frame as shown with primed side facing up. Nail using 2" nails 6" apart on edges and 12" apart inside panel.

7

You have nished building both of your sidewalls.FINISH

9

Primedside up

Primedside up

48 x 72"(121,9 x 213,4 cm)

44-5/8 x 72"(121,9 x 213,4 cm)

x1 x1

x90

RIGHT SIDE WALL PANELS

PARTS REQUIRED:2" (5,1 cm)

8 Carefully ip the RIGHT wall over.

DO

OR

DO

OR

3/4" GAUGE BLOCK

3/4" GAUGE BLOCK

GAA

Page 22: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

48"(121,9 cm)

19-1/2"(50,2 cm)1-1/2"

(3,8 cm)

(2) 3" (7,6 cm)Nails

(2) 3" (7,6 cm)Nails 1-1/2"

(3,8 cm)

1-1/2"(3,8 cm)

1-1/2"(3,8 cm)

PARTS REQUIRED:

2

Orient SP and SZ on edge on oor as shown.

Orient RGA and SZ on edge on oor as shown.

Secure using two 3" nails.

Secure using two 3" nails.

BEGIN

x12 x 4 x 48" (5 x 10,2 x 121,9 cm)

SP

x22 x 4 x 89" (5 x 10,2 x 226,1 cm)

SZ

SZ

SZ

44-1/2"(113,1 cm)

44-1/2"(113,1 cm)

89"(226,1 cm)

89"(226,1 cm)

44-1/2"(113,1 cm)

44-1/2"(113,1 cm)

RGAx12 x 4 x 19-1/2" (5,1 x 10,2 x 50,2 cm)

x43" (7,6 cm)

20

BACK WALL FRAME

RGA

SP

Page 23: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

PARTS REQUIRED:

3

4

5

Secure panel to bottom frame 1" (2,5 cm) from panel bottom using 2" (5,1 cm) nails 6" (15,2 cm) apart along edge and 12" (30,5 cm) apart inside panel.

Place panel with primed side up onto frames with a 1/2" gap as shown.

Maintain 1" measurement at bottom and 3/4 measurement along edge.

x1

3/8 x 48 x 72" (1 x 121,9 x 182,9 cm)

x262" (5,1 cm)

21

BACK WALL PANELS

20"(50,8 cm)

19-1/2"(50,2 cm)

20"(50,8 cm)

49"(124,5 cm)

48"(122 cm)

1-1/2"(3,8 cm)

1-1/2"(3,8 cm)

3-1/2"(8,9 cm)

1-1/2"(3,8 cm)

12"(30,5 cm)

1-1/2"(3,8 cm)

3/4"(1,9 cm)

3/4"(1,9 cm)

1"(2,5 cm)

1/2" (1,3 cm)

6"(15,2 cm)

Ensure 1/2" gap between top and bottom frame. Hold the 20" (50,8 cm) measurement and secure with 2" (5,1 cm) nails 6" (15,2 cm) apart.

3/4" GAUGE BLOCK

GAA

IMPORTANT MEASUREMENT

3/4" GAUGE BLOCK

BEGIN HERE

Primedside up

Page 24: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

22

20"(50,8 cm)

PARTS REQUIRED:

BACK WALL PANELS

6"(15,2 cm)

6"(15,2 cm)

Flush

49"(124,5 cm)

12"(30,5 cm)

x1

3/8 x 48 x 72" (1 x 121,9 x 182,9 cm)

Secure using 2" (5,1 cm) nails 6" (15,2 cm) apart on edges and 12" (30,5 cm) apart on inside of panel.

Place right panel ush to left panel with primed side up.

x262" (5,1 cm)

6

You have nished installing your back wall panels.FINISH

7

Page 25: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

UNx12 x 4 x 94-1/2" (5,1 x 10,2 x 240 cm)

23

3" (7,6 cm)x8

BACK WALL

PARTS REQUIRED:

Flush

Center UN on back wall top plate and ush to inside of back of wall panel (Fig. A).

While keeping UN ush, secure to top plate using eight 3" screws.2

1

BEGIN

3" (7,6 cm)Screws

3" (7,6 cm)Screws

CENTER ON TOP PLATE

INSIDE OF SHED

UN

UN

Fig. A

Page 26: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

x42 x 4 x 68" (5,1 x 10,2 x 172,7 cm)

UM

x22 x 4 x 16-1/2" (5,1 x 10,2 x 41,9 cm)

RD

24

89"(226,1 cm)

56"(142,3 cm)

56"(142,3 cm)

68"(172,7 cm)

68"(172,7 cm)

HINT:For easier nailingstand on frame.

16-1/2"(41,9 cm)

16-1/2"(41,9 cm)

16-1/2"(41,9 cm)

16-1/2"(41,9 cm)

x12 x 4 x 89" (5 x 10,2 x 226,1 cm)

SZ

3" (7,6 cm) PARTS REQUIRED: x16

FRONT WALL

BEGIN

1

Use two 3" nails at each mark.

Orient parts on edge on oor. Measure and mark.

2

UM

RD

SZ

UM

RD

3" (7,6 cm)Nails

Page 27: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

3/8 x 20 x 72" (1 x 50,8 x 182,9 cm)

x2

OOx12 x 3 x 69" (5,1 x 7,6 x 175,3 cm) TEMPORARY SUPPORT

25

56"(142,3 cm)

Maintain Flush

Maintain Flush

Flush Flush

72"(182,9 cm)

72"(182,9 cm)

20"(50,8 cm)

20"(50,8 cm)

6"(15,2 cm)

6"(15,2 cm)

PARTS REQUIRED:

FRONT WALL

x60

x2

2" (5,1 cm)

Primedside up

Primedside up

Install OO after panels for temporary brace.

3" (7,6 cm)

For squareness maintain ush along panel edges.

Place 20 x 72" panel onto wall frame ush to SZ with primed side up as shown.

Secure panel with two 2" nails 6" (15,2 cm) apart.

Repeat step 3 to attach the remaining panel.4

5

3

3/4" GAUGE BLOCK

Use OO as a brace to maintain 56" (142,3 cm) opening. Use two 3" screws to attach.

GAA

Maintain 56" dimension

Page 28: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

x12 x 4 x 84" (5,1 x 10,2 x 213,4 cm)

TO

26

14"(35,6 cm)

14"(35,6 cm)

PARTS REQUIRED:

FRONT WALL

x53" (7,6 cm)

NOTE:Drive screws at an angle to avoid

screw points protrudinginto the door opening.

CENTER CENTER

Center TO on SZ on at and ush (Fig.A).

Secure using ve 3" screws on angle spaced evenly.7

6

You have nished building your front wall.FINISH

8

Flush to 2x4

Flush

Flush

Front wall panel

TOUMTO

SZ

TO

Fig. A

Page 29: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

27

2" (5,1 cm)

PARTS REQUIRED (TEMPORARY):

2 x 4 x 94-1/2" (5,1 x 10,2 x 240 cm)

x1

3" (7,6 cm)

UN

First, nail lower edge of panel to oor frame using 2" nails 6" apart.Angle nail to hit oor frame (Fig. A).

3

You have nished standing your right side wall.FINISH

5

Secure side wall bottom plates to oor using three 3" nails (Fig. A). 4

3" (7,6 cm)x12

x2

x25

RIGHT SIDE WALL INSTALLATION

3" (7,6 cm)Screws

UN

3" Nails into bottom plate.

DOOR

DOOR

Panel Flush

3" (7,6 cm) Screw

BEGINStand right sidewall on oor. It is important to secure the right sidewall in the following order. ENSURE 20-5/8" MEASUREMENT IS TOWARD BACK OF SHED

Center right sidewall assembly on the 140-5/8" (357,2 cm) oor dimension.

Use UN as a temporary brace. Secure with two 3" screws.2

1

140-5/8"(357,2 cm)

20-5/8"(52,4 cm)

Nail 2" nails rst.

2" (5,1 cm) Nails

3" (7,6 cm) Nails

Fig. A

Page 30: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

28

2" (5,1 cm)

3" (7,6 cm)PARTS REQUIRED (TEMPORARY):

2 x 4 x 94-1/2" (5,1 x 10,2 x 240 cm) x1

3" (7,6 cm)

UN

First, nail lower edge of panel to oor frame using 2" nails 6" apart.Angle nail to hit oor frame (Fig. A).

3

You have nished standing your left side wall.FINISH

5

Secure side wall bottom plates to oor using three 3" nails (Fig. A). 4

x12

x2

x25

LEFT SIDE WALL INSTALLATION

3" (7,6 cm)Screws

UN

3" Nails into bottom plate.

DOOR

DOOR

Panel Flush

3" (7,6 cm) Screw

BEGINStand left sidewall on oor. It is important to secure the left sidewall in the following order. ENSURE 20-5/8" MEASUREMENT IS TOWARD BACK OF SHED.

Center left sidewall assembly on the 140-5/8" (357,2 cm) oor dimension.

Use UN as a temporary brace. Secure with two 3" screws.2

1

140-5/8"(357,2 cm)

20-5/8"(52,4 cm)

Nail 2" nails rst.

2" (5,1 cm) Nails

3" (7,6 cm) Nails

Fig. A

Page 31: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

Set back wall on side wall top plates and secure using two 3" screws on each side (Fig A).Set back wall on side wall top plates and secure using two 3" screws on each side (Fig A).1

You have nished standing your back wall.FINISH

6

29

BACK WALL INSTALLATION

3" (7,6 cm)

2" (5,1 cm)x17

x10

x261-1/2" (3,8 cm)

PARTS REQUIRED:

2 Nail lower edge of panel to oor using 2" nails 6" apart. Angle nail to hit oor frame (Fig. B).ENSURE WALL IS CENTERED ON FLOOR BEFORE NAILING.

Secure back wall upright to oor using two 3" screws (Fig. C).

Nail back wall panel to side wall stud using 1-1/2" nails at 6" apart.

Secure back wall center horizontal 2 x 3" using two 3" screws into back wall frame at an angle as shown (Fig. D).

3

4

5

BEGINStand back wall on oor. It is important to secure the back wall in the following order.

6"(15,2 cm) 6"

(15,2 cm)

(2) 3" (7,6 cm) Screws

(2) 3" (7,6 cm) Screws

(2) 3" (7,6 cm) Screws

Fig. A

Flush

Fig. B

2" (5,1 cm) Nail

2" (5,1 cm) Nails

1-1/2"(3,8 cm) Nails

1-1/2"(3,8 cm) Nails

Fig. C

Fig. D

Nail 2" nails rst.

DOOR

BE SURE TOP PLATES ARE FLUSH.

Page 32: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

Center front wall on oor side-to-side.

Secure top plate to side walls using four 3" screws (Fig. A, B).

Secure lower edge of panel to oor frame using eight 2" nails 6" apart Angle nail to hit oor frame (Fig. C).

Secure bottom plates with three 3" nails on each side (Fig. C).

Nail front wall to side wall using 1-1/2" nails 6" apart (Fig. D). Remove temporary brace OO.

1

2

3

4

5

You have nished standing your front wall.FINISH

6

30

3" (7,6 cm)

FRONT WALL INSTALLATION

2" (5,1 cm)x8

x4x261-1/2" (3,8 cm)

PARTS REQUIRED:

Center wall assembly on oor.

3" (7,6 cm)x6

BEGINStand frontwall on oor. It is important to secure the frontwall in the following order.

(2) 3" (7,6 cm) Screws

1-1/2" (3,8 cm) Nails

3" (7,6 cm) Nails

3" (7,6 cm) Nails

Nail 2" nails rst.Angle nail to hit

oor frame.

Maintain 56" dimension

Fig. A

Flush

Fig. B

Fig. C

Fig. D

2" (5,1 cm) Nails

Flush

Page 33: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

x12 x 3 x 7-7/8" (5,1 x 7,6 x20 cm)TEMPORARY SUPPORT

DY

x117-1/4 x 18-1/4" (18,4 x 46,4 cm)

x122 x 4 x 68-7/16" (5,1 x 10,2 x 173,8 cm)

YJ

OSB OR WOOD GRAIN

31

Fit base of Rafters in cornersof back wall and jig.

PARTS REQUIRED: x132

RAFTERS

FINISH

6 You have fi nished assembling your rafters.

Flip over rafter assembly and repeat STEPS 2-4 to attach second gusset to other side. SET ONE RAFTER ASSEMBLY ASIDE WITH ONLY ONE GUSSET ATTACHED.

Repeat STEPS 2-4 to build three additional rafter assemblies. Remove DY.

Apply glue to rafters where gusset will fi t. NOTE: BE SURE TO SET ASIDE ONE GUSSET WITH FINISHED WOOD GRAIN PATTERN.Secure gusset to rafters using twelve 2" (5,1 cm) Nails as shown.

4

5

3

2

107-1/8"(272,1 cm)

YJTemporarysupport DY YJ

Flush

Contact at peak

Flush

2" (5,1 cm)

You will build SIX assemblies. (5) with two gussets, and (1) with one gusset.

Place two rafter halves (YJ) in the corner of back and side wall and DY. Rafters contact at peak.

BEGIN

Glue

Glue

Center

Gusset

Flush

2" (5,1 cm)Nails

(12) per side

x2

HINT:Use fl oor and walls to help assemble rafters!

3" (7,6 cm)

Position and square DY as temporary jig using two 3" (7,6 cm) screws as shown.

Page 34: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

32

DO

OR

3" (7,6 cm)PARTS REQUIRED:

RAFTERS

x5 x1x24

FINISH

3

Place remaining rafters on top plate, aligned over studs as shown and secure with 3" screws (Fig. B).

Secure rafter to top plate with two 3" screws above notch (Fig. A, B).

You have nished attaching your rafters.

2

BEGIN

Align over studs.

Fig. AFig. B

Flush to inside of panel.

Locate rst (1) GUSSET rafter directly over front stud, ush to inside of front wall panels, and tight to side wall (Fig. A, B). Face gusset inward. Rest notch on top plate.

(2) 3" (7,6 cm)Screws

(2) 3" (7,6 cm)Screws

Tight to side wall

24"(61 cm)

24"(61 cm)

24"(61 cm)

24"(61 cm)

23-1/4"(59 cm)

Rafter with ONE GUSSET facing inward.

MEASUREMENTS ARE TO CENTER OF RAFTER

PreassembledPreassembled(1) GUSSET

Page 35: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

x1 x1

x141-1/2" (3,8 cm)

x1

x1

2 x 4 x 17-1/2" (5,1 x 10,2 x 44,5 cm)

2 x 4 x 6-1/2" (5,1 x 10,2 x 18,4 cm)

YG

UY

TEMPORARY SUPPORT

x22 x 3 x 18-3/8" (5,1 x 7,6 x 50,2 cm)

WJ

33

FRONT WALL GABLE

PARTS REQUIRED:

Primedside up

Primedside up

Flush

Flush

Flush

Orient parts on at as shown.

NOTE: UY may partially extend into window opening.

Place LEFT front gable panel as shown and secure using 1-1/2" nails, 6" apart.2

1

BEGIN

3 Place RIGHT front gable panel ush to left panel. Secure using 1-1/2" nails, 6" apart.

You have nished assembling your front wall gable.

FINISH

4

1-3/4"(4,5 cm)

1-3/4"(4,5 cm)

1-5/8"(3,8 cm)

6-1/2"(16,5 cm)

17-1/2" (44,5 cm)

UY

YG

6" (15,2 cm)

6" (15,2 cm)

WJ

WJ

WJ

Page 36: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

x12

x12 x 4 x 35-3/4" (5,1 x 10,2 x 90,8 cm)

RZ

1-1/2" (3,8 cm)TEMPORARY SUPPORT

x22 x 3 x 18-3/8" (5,1 x 7,6 x 50,2 cm)

WJ

34

x1 x1

BACK WALL GABLE

PARTS REQUIRED:

Primedside up

Primedside up

Flush

Flush

Orient parts on at as shown.

Place LEFT back gable panel on RZ as shown and secure using 1-1/2" nails, 6" apart.2

1

BEGIN

3 Place RIGHT back gable panel on RZ and ush to left panel. Secure using 1-1/2" nails, 6" apart.

You have nished assembling your back wall gable.

FINISH

41-3/4"

(4,5 cm)

3-1/2"(8,9 cm)

4" (10,2 cm)

35-3/4" (90,8 cm)

48" (121,9 cm)

6" (15,2 cm)

6" (15,2 cm)

96" (243,8 cm)

RZ

WJ

WJWJ

Page 37: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

x42

x11-1/2" (3,8 cm)

35

You have nished attaching your front wall gable panels.

Wipe excess caulk from panels.

FRONT WALL GABLE

PARTS REQUIRED:

Place front gable assembly centered on front wall panel and ush to rafter peak (Fig. A).

While supporting rafter and assembly, secure gable panels to rafter using 1-1/2" nails, 6" apart.

Caulk above front wall panels rst as shown.

Secure front gable panels into top plate using 1-1/2" nails, 6" (15,2 cm) apart.2

3

1

BEGIN

FINISH

4

Fig. A 1-1/2" (3,8 cm) Nails

Panels will be slightly offset

from rafter.

6" (15,2 cm)

6" (15,2 cm)

Preassembled

Flush

Flush

Page 38: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

36

2" (5,1 cm)x7PARTS REQUIRED:

x196" (243,8 cm) Z-STRIP

BACK WALL (Gable Z-Strip)

Center Z-Strip on back wall panels (Fig. A).

Secure to UN using eight 2" nish nails, 16" apart2

1

BEGIN

2" (5,1 cm)Finish Nails

16" (40,6 cm)

2" (5,1 cm)Finish Nails

CENTER ON WALL PANELS

OUTSIDE OF SHED

Fig. A

UN

You have nished attaching your Gable Z-Strip.FINISH

3

Page 39: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

x1

x171-1/2" (3,8 cm)

37

Flush

Fig. A

BACK WALL GABLE

PARTS REQUIRED:

Center back wall gable assembly on z-strip. Gable panels should be ush to wall panel as shown (Fig. A).

You have nished attaching your back wall gable panels.

While keeping panels ush, secure gable assembly to UN using 2" nails, 6" (15,2 cm) apart.

2

1

BEGIN

FINISH

3

Preassembled

2" (5,1 cm) Nails

2" (5,1 cm) Nails

1/2" (1,3 cm) Gap for Loft Deck

1/2" (1,3 cm) Gap for Loft Deck 6"

(15,2 cm)

Page 40: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

3" (7,6 cm)x8

UNx22 x 4 x 94-1/2" (5,1 x 10,2 x 240 cm)

38

LOFT SUPPORTS

PARTS REQUIRED:

Center rst loft support UN on top plate and ush against rafter as shown (Fig. A).

You have nished attaching your loft supports.

Secure UN to rafter using four 3" screws (Fig. A).

Center second loft support UN on top plate and 13" (33 cm) from rafter (Fig. A).Secure UN to top plate using four 3" screws (Fig. A).

2

1

BEGIN

FINISH

3

3" (7,6 cm)Screws

3" (7,6 cm)Screws

3" (7,6 cm)Screws

Flush

13"(33 cm)

13"(33 cm)

Flush

Flush

Fig. A

Page 41: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

x22 x 3 x 18-3/8" (5,1 x 7,6 x 50,2 cm)

WJ

x12 x 3 x 93" (5 x 7,6 x 236,2 cm)

PL

x8

x4

39

SHELF

PARTS REQUIRED:3" (7,6 cm)

2

3

Place shelf support WJ at same height as horizontal wall brace and secure using two 3" screws into back stud and two 3" nails into rst stud as shown.

SAME HEIGHT

Repeat Step 1 to attach second shelf support WJ.

Place PL ush to shelf supports and 8-5/8" (21,9 cm) from back stud as shown.

(2) 3" (7,6 cm)

Nails

(2) 3" (7,6 cm)

Nails

(2) 3" (7,6 cm)Screws

Flush

(2) 3" (7,6 cm)Screws

(2) 3" (7,6 cm)Screws

8-5/8"(21,9 cm)

8-5/8"(21,9 cm)

(2) 3" (7,6 cm)Screws

WJ WJ

PL

Flush

3" (7,6 cm)

BACK WALLSAME

HEIGHT

BEGIN

1

Page 42: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

7/16 x 11-7/8 x 89" (1,1 x 30,2 x 226,1 cm)

x1x10

1-1/2" (3,8 cm)

40

SHELF

PARTS REQUIRED:

4 Place shelf panel on support and t into groove.

Secure front of panel with 1-1/4" screws, 9" apart.

Secure back of panel with 1-1/2" nails, 9" apart.

11-7/8" (30,2 cm)

Flush against back wall(10) 1-1/2" (3,8 cm)

Nails

(10) 1-1/4" (3,2 cm)Screws

BACK WALL

x101-1/4" (3,2 cm)

FINISH

5 You have nished installing your shelf.

Page 43: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

41

82"(208,3 cm)

Fit panel into gap.

CENTER

Attention: Load not to exceed 300 lbs evenly distributed across loft.

PARTS REQUIRED:

LOFT PANEL

2" (5,1 cm)

7/16 x 35-7/8 x 82"(1,1 x 91,1 x 208,3 cm)x1

x6

Place loft panel onto the three loft supports centered from side-to-side and ush with the back wall panel. Fit panel into gap.

IMPORTANT! Use only SIX 2" nails in the panel, to allow squaring the roof. You will complete nailing the loft panels later.

FINISH

3

2

BEGIN

1

You have temporarily nished your loft panels.

3/4"(1,9 cm)

Overhang

Page 44: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

42

BEGIN

1

HINT:Clamp in position before screwing.

1-1/4" (3,2 cm)Screws

3" (7,6 cm)Screws

BACK GABLE TRIM

FINISH

4

Position one WW ush to back gable panel edge and center with panel seam (Fig. A). Attach trim with ten 1-1/4" screws from inside approximately 7" (17,8 cm) apart.

Position second WW ush to panel edge and ush to WW already attached (Fig. A). Attach trim with ten 1-1/4" screws from inside approximately 7" (17,8 cm) apart.

Reinforce WW with one 3" screw through loft support at each end (Fig. B).

You have nished attaching your back gable trim.

2

3

PARTS REQUIRED:

1-1/4" (3,2 cm)

WW

Fig. A

Fig. B

7"(17,8 cm)

Flush

Flush with panel edges.

Flush with panel edges.

x22 x 4 x 69-7/8" (5,1 x 10,2 x 177,5 cm)

WW

x20

x23" (7,6 cm)

Page 45: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

43

3" (7,6 cm)

4" (10,2 cm)

FRONT WALL OVERHANG FRAMING

PARTS REQUIRED:

Flush

Orient parts on at as shown. Ensure WE is oriented with 4" at edge contacting DY.

Secure DY ush to WE using one 3" (7,6 cm) screw.2

1

BEGIN

3 Repeat Step 1-2 to make three additional assemblies.

BUILD FOUR OVERHANG FRAMES.

You have nished assembling your overhang framing.FINISH

4

x4 DY

Flat

WE

x42 x 3 x 68-7/16" (5,1 x 7,6 x 173,8 cm)

WE

x42 x 3 x 7-7/8" (5,1 x 7,6 x 20 cm)

DY

3" (7,6 cm) Screw

7-7/8"(20 cm)

2-1/2" (6,4 cm)

3-3/16" (8,1 cm)

68-7/16"

(173,8 cm)

x4

HINT:Pre drill to avoid splitting wood.

Page 46: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

44

3" (7,6 cm)x10

x4

PARTS REQUIRED:

FRONT WALL OVERHANG

Fig. AFig. B

3" (7,6 cm) Screws

2" (5,1 cm) Nails

2 x 5"

Flush

Flush

x2 x23/8 x 2 x 5"(1 x 5,1 x 30,2 cm)

HINT:Clamp in position before screwing.

Fig. C

Flush

Flush

BEGIN

1 Position 2 x 5" spacer ush to front of rafter and wall panel. Secure using two 2" (5,1 cm) nails (Fig. A).

Position overhang framing ush to rafter (Fig. B, C).Secure using ve 3" screws

Repeat steps 1-2 on opposite side.

2

3

Pre-assembled

3" (7,6 cm) Screws

Flush to top of rafter

Flush

2" (5,1 cm)

Page 47: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

45

PARTS REQUIRED:

FRONT WALL OVERHANG

1-1/4" (3,2 cm) Screws

1-1/4" (3,2 cm) Screws

Position right 57-7/8" overhang board Primed Side Down ush to front walland framing assembly (Fig A). Secure using six 1-1/4" screws.

Position left 57-7/8" overhang board Primed Side Down ush to front wall, framing assembly and right overhang board (Fig. A). Secure using six 1-1/4" screws.

Ensure overhang boards meet at peak (Fig. A).

5

4

x23/8 x 7-7/8 x 57-7/8" (1 x 20 x 147 cm)

Primed Side Down

x121-1/4" (3,2 cm)

Fig. A

Center and Flush at peak.

Flush to wall.

Page 48: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

46

1-1/4" (3,2 cm)

Fig. B

PARTS REQUIRED:

FRONT WALL OVERHANG

1-1/4" (3,2 cm) Screws

1-1/4" (3,2 cm) Screws

Flush

Flush

Flush

Position right 7-7/8" overhang board Primed Side Down ush to front walland sof t block (Fig. A). Secure using two 1-1/4" (3,2 cm) screws.

Position left 7-7/8" overhang board Primed Side Down ush to front walland sof t block (Fig. B). Secure using two 1-1/4" (3,2 cm) screws.

7

6

x4

x2 3/8 x 7-7/8 x 7-7/8" (1 x 20 x 20 cm)

Primed Side Down Primed Side

Down

Fig. A

Sof t Block

Sof t Block

Page 49: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

47

Fig. B

PARTS REQUIRED:

FRONT WALL OVERHANG

Flush Flush FlushFlush

Position right 5-13/16" overhang board Primed Side Out ush to front walland previously installed overhand boards (Fig. A). Secure using two 1-1/4" screws

Position left 5-13/16" overhang board Primed Side Out ush to front walland previously installed overhand boards (Fig. B). Secure using two 1-1/4" screws.

9

8

x4

Primed Side Out

Fig. A

x2 3/8 x 5-13/16 x 7-7/8" (1 x 14,8 x 20 cm)

1-1/4" (3,2 cm)

1-1/4" (3,2 cm) Screws 1-1/4" (3,2 cm)

Screws

Primed Side Out

Page 50: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

48

3" (7,6 cm)x1PARTS REQUIRED:

FRONT WALL OVERHANG

12

11

10

x2

Preassembled

Position overhang framing ush to front of overhang boards. (Fig. A). Secure bottom of overhang framing rst as shown using three 1-1/4" screws.

Repeat Step 10 on opposite side.

Continue securing overhang framing while traveling toward peak as shown

Secure overhang framing together using one 3" screw (Fig. A).

x161-1/4" (3,2 cm)

Fig. A

1-1/4" (3,2 cm) Screws

3" (7,6 cm) Screw

Flush

FIRST 1-1/4" SCREW

LAST 1-1/4"SCREW

FlushFlush

Flush

FlushFlush

Flush

1-1/4" (3,2 cm) Screws

1-1/4" (3,2 cm) Screws

Page 51: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

x1 WML

x1 WMR19/32 x 4 x 69-7/8" (1,5 x 10,2 x 177,5 cm)

19/32 x 4 x 69-7/8" (1,5 x 10,2 x 177,5 cm)

49

PARTS REQUIRED:

FRONT WALL OVERHANG

14

13 Position WML with primed side out and ush to peak and overhang framing as shown (Fig. A). Secure using 2" nish nails, 12" apart as shown.

Repeat Step 12 on opposite side with WMR.

You have completed installing your front wall overhang.FINISH

15

x122" (5,1 cm)

Hint: Pre-set nails in trim before nal installation.

FlushFig. A

2" (5,1 cm) Finish Nails Flush

Flush

WMR Flush

WML

Page 52: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

x21 x 2 x 96" (2,5 x 5,1 x 243,8 cm)

ZM

x21 x 2 x 43-1/2" (2,5 x 5,1 x 110,5 cm)

WS

50

PARTS REQUIRED:

SOFFIT NAILER

2" (5,1 cm)x32USE AS GAUGE BLOCK

Place a square ush to bottom side of rafter and side wall (Fig. A). Mark wall at each rafter.

2

3

BEGIN

1

Repeat Steps 1-3 on opposite side.

You have nished installing your sof t nailer

Align WS ush to marks (Fig. A) and use WD as a gauge block as shown (Fig. B). Secure at each rafter using 2" nails angled to hit stud (Fig. C). Use two nails at seam.

Place ZM ush to WS and marks. Secure at each mark using 2" nails angled to hit stud (Fig. C).

FINISH

4

Fig. B

2" (5,1 cm) Nailsat angle

1-1/2(3,8 cm)

Use WD as gauge block

Stud

WS

WS

ZM

ZM

x12 x 3 x 5-1/8" (5,1 x 7,6 x 13 cm)WD

Fig. CTOP VIEW

WS

Fig. A

Mark

Flush to Mark1-1/4" (3,2 cm) Screws 1-1/4" (3,2 cm)

Screws

Page 53: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

51

2-1/2" (6,4cm)

BEGIN

1

SOFFIT BLOCK

FINISH

3

Position WD ush against side wall and bottom of WS. Attach with three 2-1/2" screws as shown (Fig. A).

Repeat Step 1 for opposite side (Fig. B).

You have nished attaching your back wall sof t block.

2

PARTS REQUIRED:x6

Fig. A Fig. B

Flush

WD WD

Flush

(3) 2-1/2" (6,4 cm) Screws

(3) 2-1/2" (6,4 cm) ScrewsFlush Flush

x22 x 3 x 5-1/8" (5,1 x 7,6 x 13 cm)WD

HINT:Pre drill to avoid splitting wood.

Page 54: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

52

x23/8 x 5-3/16 x 72" (1 x 13,2 x 182,9 cm)

PARTS REQUIRED:

SOFFIT

x32

Place 72" sof t board primed side down on bottom side of rafter and nailer (Fig. A) and ush to front overhang (Fig. B) and side wall.

Place 69-3/8" sof t board primed side down on bottom side of rafter and nailer (Fig. A) and ush to back overhang (Fig. C) and side wall.

Secure using 1-1/4" screws 12" (30,5 cm) apart and angle into rafter at rafter (Fig. C).

Secure using 1-1/4" screws 12" (30,5 cm) apart and angle into rafter at rafter (Fig. C).

3

2

BEGIN

1

Repeat Step 1 and Step 2 on opposite side.

You have nished installing your front sof t panels.FINISH

4

Fig. B

72"(182,9 cm)

Fig. AFig. D

1-1/4" (3,2 cm)

69-3/8"(176,2 cm)

x23/8 x 5-3/16 x 69-3/8" (1 x 13,2 x 176,2 cm)

Flush

1-1/4" (3,2 cm) Screws

Fig. C

SIDE VIEW

Primed Side Down

12" (30,5 cm)Sof t

Nailer

CENTER

Rafter

1-1/4" (3,2 cm) Screws

Flush

1-1/4"(3,2 cm) Screws

Page 55: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

53

19/32 x 6-15/16 x 5-1/2" (1,5 x 17,6 x 13,4 cm)

19/32 x 6-15/16 x 5-1/2" (1,5 x 17,6 x 13,4 cm)

BEGIN

1

BACK WALL SOFFIT CAP

FINISH

3

Position LEFT corner soffi t cap primed side up on back wall with 6-15/16" measurement down and fl ush to bottom of soffi t board as shown. Attach cap with three 2" fi nish nails as shown (Fig. A).

Repeat step 1 to install RIGHT corner soffi t cap (Fig. B).

You have fi nished attaching your back wall triangle trim.

2

PARTS REQUIRED:

x1

x1

x6

Fig. BFig. A

Flush to soffi t board

Flush to soffi t board

Primed Side Up

6-15/16"(17,6 cm)

6-15/16"(17,6 cm)

Primed Side Up

2" (5,1 cm)

Page 56: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

54

Move to the opposite end. Using the long edge of the panel as a lever move the panel side-to-side until the top corner is ush to the peak (Fig. C) and panel is ush to back wall gable trim (Fig. D).

You may need to move your back wall gable to make panel ush. Secure panel with two 2" nails in the corners.

2

You must square the roof by attaching one panel rst. You will use the panels’ long edge as a lever to bring your roof into square. Commonly known as “racking”.

Roof panels may cause serious injury until securely fastened.

1BEGIN

2" (5,1 cm)

PARTS REQUIRED:

ROOF PANELS

Fig. C

Two Nails

48"

(121

,9 c

m)

Flush

Fig. D

Fig. A

Flush at peak.

Fig. B

Flush at peak.

7/16 x 47-7/8 x 48"(1,1 x 121,6 x 121,9 cm)

x2

7/16 x 22 x 46-1/2"(1,1 x 55,9 x 118,1 cm)

x2

7/16 x 8-7/8 x 70"(1,1 x 22,5 x 177,8 cm)

x2

7/16 x 22 x 96"(1,1 x 55,9 x 243,8 cm)

x2

x4

7/16 x 48 x 94-1/2"(1,1 x 121,9 x 240 cm)

x2

3/4" GAUGE BLOCK

Attach the 48 x 94-1/2" panel with the rough side up (painted-grid lines side) with a 3/4" (1,9 cm) measurement on the rafter (Fig A) and the panel ush at the peak (Fig. B).

Secure panel with two 2" (5,1 cm) nails inthe corners.

3/4"(1,9 cm)

Gauge Block

Page 57: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

55

x228

Flush at peak.

Flush at peak.

Fig. G

Fig. F

Keep spacing between the center of the rafters at the lower edge of the panel and secure with one 2" nail into each rafter (Fig. E).

Move to the top of the panel and keep spacing between the center of the rafters. Secure with one 2" nail into each rafter (Fig. E).

Nail the roof panel using 2" nails 6" apart on edges and 12" apart inside panel.

Attach the second 47-7/8 x 48"upper roof panel ush to rst panel and peak (Fig. F, G).

3

At back end attach 22 x 46-1/2" roof panel ush to back gable trim and large roof panel (Fig. H)

Nail the roof panel using 2" nails 6" apart on edges and 12" apart inside panel.

Attach 22 x 96" roof panel ush to the installed panel (Fig. I) and front rafter.

Nail the roof panel using 2" nails 6" apart on edges and 12" apart inside panel.

Attach 8-7/8 x 70" roof panel ush to the front overhang trim and peak (Fig. J).

Nail the roof panel using 2" nails 6" apart.

Repeat process to attach roof panelson the opposite side.

You have nished installingyour roof panels.

4

5

6

7

PARTS REQUIRED:

ROOF PANELS

12"(30,5 cm)

12"(30,5 cm)

48" (121,9 cm)

6"(15,2 cm)

6"(15,2 cm)

Fig. E

24"(61 cm)

22-1/2"(57,2 cm)

24"(61 cm)

24"(61 cm)

24"(61 cm)

23-7/8"(60,6 cm)

NOTE: Measurement from outside of trim.

2" Nail

Fig. H

Fig. J

GableTrim

3/4"(1,9 cm)

3/4"(1,9 cm)

Fig. I

7/16 x 47-7/8 x 48"(1,1 x 121,6 x 121,9 cm)

Flush

FINISH

8

2" (5,1 cm)

Flush Flushto trim

Flush

Flush

70"(177,8 cm)

Page 58: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

x22 x 4 x 48" (5,1 x 10,2 x 121,9 cm)

56

Glue

LOFT

Glue

FlushFlush

PARTS REQUIRED:

COLLAR TIES

FINISH

3

2

1BEGIN

Position and level collar tie on second and fourth rafter from back wall.

HINT: For best appearance install collar tie on rafter facing away from door opening.

Glue collar tie and attach with 3" nails as shown.

You have nished installing your collar ties.

3" (7,6 cm)Nails

3" (7,6 cm)x12

SP

SP

Page 59: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

57

PARTS REQUIRED:

LOFT PANEL

Continue nailing 2" nails in each loft panel support as shown.

FINISH

2

BEGIN

1

You have nished your loft panel.

2" (5,1 cm)Nails

Attention: Load not to exceed 300 lbs evenly distributed across loft.

2" (5,1 cm)x18

Page 60: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

x1 7-1/4 x 18-1/4" (18,4 x 46,4 cm)

x1

x1

5-11/16 x 7-13/16" (14,4 x 19,8 cm)

5-11/16 x 7-13/16" (14,4 x 19,8 cm)

WITH WOOD GRAIN ON FACE

58

FINISH

4

BEGIN

1

2

3

Fig. B

PARTS REQUIRED:

FRONT WALL DECORATIVE TRIM

2" (5,1 cm) Finish Nails

2" (5,1 cm) Finish Nails

Flush

Position right corner sof t cap Primed Side Out ush to bottom of overhang as shown. Secure using three 2" nish nails (Fig. A).

Position left corner sof t cap Primed Side Out ush to bottom of overhang as shown. Secure using three 2" nish nails (Fig. B).

Position center gable decorative trim ush to peak of overhang as shown. Secure using six 2" nish nails.

You have nished installing your front wall decorative trim.

x12

Primed Side Out

Primed Side Out

2" (5,1 cm)

Fig. A

Primed Side Out

Flush

Flush Flush

Page 61: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

59

2" (5,1 cm)

2" (5,1 cm)Finish nails

PARTS REQUIRED:

FASCIA

x219/32 x 2-1/2 x 80-1/4" (1,5 x 6,4 x 203,8 cm)

x219/32 x 2-1/2 x 69" (1,5 x 6,4 x 175,3 cm)

WN

WK

x56

WK

WN

WN

WK

SEAM

BEGIN

FINISH

3

Attach fascia WN and WK ush to rafters and under roof panels (Fig. A) using two 2" nish nails at each rafter and four 2" nish nails at seam.

Repeat step 1 - 2 to attach fascia on opposite side.

You have attached your fascia.

2

Fig. A

Page 62: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

1 x 3 x 5" (2,5 x 7,6 x 12,7 cm)x1 GAA

60

Orient parts as shown on at surface. 3/8" offset is to top. Look for red (right) and green (left) on hinge board.

PARTS REQUIRED:

x1x1Left Door Right Door

BEGIN1

DOORS

1-1/4" (3,2 cm)

2

3

Attach temporary support OO with 3" screws in middle and at ends as shown. Tighten securely.

Attach temporary support GAA with two 1-1/4" screws as shown. Tighten securely.

HINT:Look for 3/8" SPACER

attached to doors.

OO

GAA

Make sure spacer is attached.

Tighten screws securely.

OFFSET

(4) 3" (7,6 cm)Screws

Screws1-1/4" (3 cm)

Bottom edges ush.

NOTE:Screw holewill beused later.

3/8"(1 cm)3/8"

(1 cm)

3/8"(1 cm)

3/8"(1 cm)

OFFSET

GREEN RED

3" (7,6 cm)

OOx12 x 3 x 69" (5,1 x 7,6 x 175,3 cm)

3/4" (1,9 cm)

23-1/2"(59,7 cm)

23-1/2"(59,7 cm)

3/4"(1,9 cm)

x2

x4

Page 63: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

61

4

PARTS REQUIRED:

x13" (7,6 cm)

DOORS

OO

Flushagainst wall panels.

Fig. AOO

OO2 x 3 x 69" (5,1 x 7,6 x 175,3 cm)

Center doors on panel seam as shown (Fig. B).5Check ledger board is still ush under panels.

Remove temporary supports and check doors open properly.7

FINISH

8 You have nished installing your doors.

Screw hinge boards into wall supports and oor using ten 3" screws as shown. Make sure screws go into framing and oor (Fig. C, D).

6

3" (7,6 cm)Screws into the wall support and oor frame.

Fig. B

SEAM

Fig. C

3/8"(1 cm)

Fig. D

Angle 3" (7,6 cm)Screw

Attach temporary support OO as a ledger board ush under wall panels for doors to rest on, using three 3" screws (Fig. A).

x13

Page 64: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

WRx119/32 x 2-1/2 x 63" (1,5 x 6,4 x 160 cm)

x419/32 x 3 x 23" (1,5 x 7,6 x 58,4 cm)

GI

62

You have nished securing your door and trim.

DOOR

PARTS REQUIRED:

2" (5,1 cm)

FINISH

5

BEGIN

4

3

2

1

3/4" (1,9 cm)

Center trim WR over doors and secure using eight 2" nish nails into framing as shown.

Reinforce the door trim using 3/4" screws through door panel into trim (Fig. A).Locate screws as shown in Fig. B. Use two screws at seams.

Place GI 7" from top and lower cross brace and level (Fig. B). Secure from behind using three 3/4" screws.

Repeat step 1-2 to attach two GI's to other door.

x44

x8

CENTER CENTER

7” (17,8 cm)

7” (17,8 cm)

Center

7"(17,8 cm)

7"(17,8 cm)

2" Nails x8

Fig. B

Nail into framing.

Two Screws

DoorTrim

HingeBoard

Fig. A

DoorPanel

WR

GIGI

Page 65: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

63

x1 10-1/2 x 32-1/2"(26,7 x 82,6 cm)

2 Screws

PARTS REQUIRED:

WINDOWS

1-1/4" (3,2 cm)

HINT: Caulk behind frame near edge before installing.

x2

BEGIN

From outside of shed, position window in opening and level. Use two screws at top of windows.

Do not fully tighten screws.

2

Apply high quality exterior-grade caulk behind frame near edge before installing to seal window.

Page 66: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

64

2" (5,1 cm)

TRIMPARTS REQUIRED:

WINDOWS

Do not nail into window ange.

3

4

5

Center WA 3/4" onto window frame. Secure using two 2" nish nails as shown.

Position EY on inside window frame as shown. Secure using two 2" nish nails.Remove 1-1/4" screws.

Position WA centered on inside window frame as shown. Secure using two 2" nish nails.

Flush Flush

FlushEY x 2

WA

WA Centered

31" (78,7 cm)Centered

Centered

x219/32 x 2-1/2 x 36-3/4" (1,5 x 6,4 x 93,3 cm)

WAx2

19/32 x 2-1/2 x 9" (1,5 x 6,4 x 22,9 cm)

EY x8

3/4"(1,9 cm)

Remove screws

Page 67: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

65

PARTS REQUIRED:

3/4" (1,9 cm) Screws

WINDOWS

x123/4" (1,9 cm)

6

You have nished installing your window.FINISH

7

Install 3/4" screws as shown.

From inside, snip or bend-over protruding nish nails.

Do not screw into window ange.

INSIDE OF SHED

Page 68: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

66

You have nished installing your door weatherstrips.

BEGIN

With left door closed, center a weatherstrip OO vertically on the left door in the door opening (Fig. A). OO will offset the left door 1" OUT past the door trim 1" (Fig. B).

1

PARTS REQUIRED:

2 x 3 x 69" (5,1 x 7,6 x 175,3 cm)x2

x142" (5,1 cm)

DOOR WEATHERSTRIP

OO

FINISH

5

On right door center OO vertically in door opening (Fig. A). OO will offset the right door 1" IN from the door trim (Fig. C).

3

Secure OO using seven 2" screws through outside trim into OO (Fig. C).4

OO

Screws2"

(5,1 cm)

x14

1"(2,5 cm)

OFFSETScrews

2"(5,1 cm)

1"(2,5 cm)

OFFSET

Secure OO using seven 2" screws through outside trim into OO (Fig. B)2

Fig. A C .giFB .giF

Center OO in door

opening.

11" (27,9 cm)

Approximately

Page 69: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

BEGIN

Install bolt with screws supplied and drill 5/16" hole for bolt to extend into.

Install bolt with screws supplied and drill 5/16" hole for bolt to extend into.

Place bolt onto OO in open position with bolt end 1/2" up from oor. Bolt is open when loop is contacting base (Fig B).

3

4

2

Place bolt onto OO in open position with bolt end 3/8" down from frame. Bolt is open when loop is contacting base (Fig A).

Mark and pre-drill holes for screws.

Mark and pre-drill holes for screws.

1

LEFTDOOR

67Fig. B

PARTS REQUIRED:

DOOR

1" (2,5 cm)

x2

x8

5/16" (0,8 cm) Drill Bit

You have nished installing your barrel bolts.FINISH

5

Fig. A

FLOOR

Loop contacts base.

x4

x4

1/2"5/16" drill forbolt: 1" deep.

Loop contacts base.

PRE-DRILL(4) HOLES

PRE-DRILL(4) HOLES

2 x 3 x 69"

2 x 3 x 69"

3/8" with bolt in open position.

OPEN POSITION, Spring is loose.

OPEN POSITION, Spring is loose.

5/16" drill for bolt:1" deep.

OVER DOOR FRAME

OO

OO

LOCATE AND PRE-DRILL HOLES TO AVOID SPLITTING WOOD

Page 70: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

68

1-1/2" (3,8 cm)

SETSCREW

You have nished installing your T-handle and decorative hinges.FINISH

5

Attach inside handle and secure with set screw as shown.

Install decorative hinges on horizontal trim and ush against hinge as shown.

3

4

Insert handle in hole and secure using 1-1/2" (3,8 cm) screws.2

3/4" (1,9 cm)x12

1-1/2" (3,8 cm)

35-3/4"90 cm

RIGHT DOOR.

1-1/2"3,8 cm

TOP VIEW

1/4" Pre-drill and 1/2" Drill-through.

DOOR HARDWARE / DECORATIVE HINGES

x1 x4

x2PARTS REQUIRED:1-1/2" (3,8 cm)

Re-drill hole with 1/2" drill.

Keep drilled hole square to trim to avoid breaking edge of 2x3".

BEGIN

1 Measure and mark location of hole on outside of right door as shown (Fig. A). Pre-drill hole with 1/4" drill.

1/2" (1,3 cm) Drill Bit

1/4" (0,6 cm) Drill Bit

Flushto hinge

Fig. A

Page 71: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

69

TRIM

PARTS REQUIRED: x562" (5,1 cm)

BEGIN

FINISH

4

Position second trim fl ush to top and edge of previously installed trim (Fig. A, B). Secure using two 2" (5,1 cm) fi nish nails as shown.

Attach one trim fl ush under soffi t panel and along adjacent wall (Fig. A, B) using two 2" (5,1 cm) fi nish nails as shown.

Repeat Steps 1-2 to attach trim to all four corners.

Finish attaching trim fl ush to corners (Fig. B ) using six 2" (5,1 cm) fi nish nails as shown.

You have attached your corner trim.

3

2

67-3/4" (172,1 cm)

67-3/4" (172,1 cm)

x43/8 x 1-3/4 x 67-3/4" (1 x 4,4 x 172,1 cm)

Fig. A

Flush under soffi t panel.

Seam is fl ush. Caulk seam before painting trim.

Fig. A

Page 72: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

70

HOOK & EYE

PARTS REQUIRED:x2

HookEye

Install hook on inside face 2" up from bottom and 1" in from inside face into solid 2 x 3" framing.

BEGIN

FINISH

4

Swing door open to locate eye.

Repeat Step 1 and 2 for other hook and eye (Fig.A).

Install hook into endcap and into 2 x 3" behind (Fig.A).

You have nished installing your hook and eye.

2

3

Hook

Eye 2"

1"

Fig. A

Page 73: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

71

PARTS REQUIRED:

FINISH

3

2

BEGIN

1̧ Locate and mark for one vent in side wall and one vent in the back wall gable as shown.

Caulk behind vent anges.

You have nished installing your vents.

Secure using 1/2" (1,3 cm) screws.

x121/2" (1,3 cm)

x2

VENTS

8 x 16" (20,3 x 35,6 cm)

6"(15,2 cm)

3 – 5"(7,6 – 12,7 cm)

14"(35,6 cm)

Caulk

4-1/4"(10,8 cm)

Caulk

Centercutout 6"

(15,2 cm)

14"(35,6 cm)

BACK of Shed

Page 74: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

72

• Use acrylic latex caulk that is paintable. Caulk at all horizontal and vertical seams, between the trim and walls, and all around the door trim.

• Use a high quality exterior acrylic latex paint. When painting your building, there are a few key areas that can be easily overlooked that must be painted: • Bottom edge of all siding and trim • Inside of doors and all 4 edges

Note: Prime all un-primed exterior wood before painting. (Follow directions provided by manufacturer.)

Snip bottom side of drip edge andbend over to other side of roof.

(Follow directions provided by manufacturer.)

PAINT & CAULK- NOT INCLUDED -

ROOF FELT- NOT INCLUDED -

DRIP EDGE- NOT INCLUDED -

• Install felt ush to all roof edges overlapping 3". Use minimal amount of roo ng nails to hold in place.

OK to overlap at ridge.3" OVERLAP

Flush

Flush

Edge ush to trim.

• Install drip edge over roof felt on gable side and under roof felt on eave side (Fig. A).• Do not use nails on side of drip edge that hangs over side of building.• Only nail top of drip edge as shown.

Roof Felt

Drip Edge

Drip Edge

Fig. A

Page 75: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

73

• Follow directions provided by manufacturer and these instructions.

SHINGLES- NOT INCLUDED -

Install rst starter row upside down and color up with a 1" overhang at back and bottom of roof panel. Use (4) nails per shingle.Starter row must be straight and level all the way across with lower edge of roof deck.NOTE: If you have installed drip edge install shingles ush to drip edge.

BEGIN

1

TABS UP

Shingle overlaps roof decking.

1" (2,5 cm) overhangpast roof deck.

1" (2,5 cm) overhang or ush with drip edge.

(4) Nails

BACK OF SHEDFRONT OF SHED

NEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS.

Familiarize yourself with a 3-Tab Shingle.

SHINGLE NAIL PATTERN

1"(2,5 cm)

NAILS

Sealing Strip 1"(2,5 cm)

1/2"(1,3 cm)

Full Rain Slot

Half A Rain Slot

NotchNotch

Page 76: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

74

Beginning at front of shed, install rst row of shingles with notch at 1" past roof edge or ush with drip edge.22

FRONT OF SHED BACK OF

SHED

BACK OF SHED

Notch- or -

Drip Edge

Notch

Roof Deck

1"(2,5 cm)

Flush with starter row.

Flush with starter row.

Continue installing rows of shingles by staggering at front.

4

SHINGLEScontinued...

Install second row of shingles ush at top of rst row's rain slots. Ensure 1" overhang or ush to drip edge at front, stagger each row.

3

1"(2,5 cm)

1"(2,5 cm)

FRONT OF SHED

FRONT OF SHED

Flush with rain slots. Flush with rain slots.

Notch

Notch

Page 77: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

75

You have nished shingling your roof. Proceed to capping the ridge.FINISH

9

Continue installing rows of shingles to the peak. At the peak make sure there is a maximum of 5" or less to the rain slot, as shown below. If shingles overlap at ridge cut to peak with a utility knife.

Repeat steps 1 - 5 to shingle the opposite side of your roof. Trim shingles at ridge.

Once both sides are shingled you need to trim ends. Strike a chalk line 1" from edge.

Using your shingle hooked blade carefully cut shingles along chalk line.

5

6

7

8

SHINGLEScontinued...

• If more than 5" to rain slot you must install another row of shingles.

5"(12,7 cm)or less.

5"(12,7 cm) MAX.

Top of rain slot.

Cut Off.CUT

Page 78: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

76

SHINGLES - RIDGE CAP

• You will nish off the top of the roof with a ridge cap made from shingles.

Note: • You will need about 30 - 32 cut pieces.

Cut shingles into THREE pieces. Hint: Use cut-off pieces rst.

Score shingle,then snap-off angled cut.

Install rst ridge cap ush to shingles at front, as shown.

Install second ridge cap 5" back, as shown.

2

3

BEGIN

1

2"(5 cm)

2"(5 cm)

2"(5 cm)

2"(5 cm)

2"(5 cm)

2"(5 cm

Top of slot.Weather Seal

Flush

(1) Nail per side through weather seal.

(1) Nail per side through weather seal.

5"12,7 cm

FRONT OF SHED

FRONT OF SHED

Flush

30 to 32Pieces

Page 79: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

77

SHINGLES - RIDGE CAPcontinued...

Continue installing ridge cap to back of roof.

Make sure there is 4" between the shingle-color and edge of shingles.

When you have 4" minimum of shingle color cut one piece to cap your roof.

Install ush to shingles.

4

5

6

7

(2) Nails per side.

You have nished your ridge cap.FINISH

8

Cut at top of rain slot.

Flush to shingles

Trim cap off ush to shingles

Cap

4"(10 cm)

Page 80: 16773 8x12 Gable with Large Overhang - Costco€¦ · Recommended methods and materials to level your shed are listed on page 7. ... Framing lumber is graded for structural strength

78

WARRANTY B a cky a rd S tor a ge S ol u tion s , LLC w a rr a nt s the following: 1. Every prod u ct i s w a rr a nted from defect s in workm a n s hip a nd m a n u f a ct u ring for one ye a r. 2. All h a rdw a re a nd met a l component s a re w a rr a nted for two ye a r s . 3 . Trim i s w a rr a nted for 15 yea r s . 4. W a fer b o a rd s iding a nd s he a thing i s w a rr a nted for two ye a r s . 5. S m a rt S ide™ s iding i s w a rr a nted for 15 yea r s on a ll M a rco s erie s bu ilding s a nd 15 ye a r s on a ll Premier S erie s bu ilding s . 6. Tim b er s erie s bu ilding s’ s iding a nd trim a re w a rr a nted for 10 ye a r s . 7. S ol a r S hed window s a re w a rr a nted for 1 ye a r. 8 . Ced a r l u m b er i s w a rr a nted for 15 ye a r s . 9. Ced a r door s a nd Ced a r G a rden Center a re w a rr a nted for 10 ye a r s . 10. Met a l roof i s w a rr a nted for 25 ye a r s .

B a cky a rd S tor a ge S ol u tion s , LLC will rep a ir, repl a ce or p a y for the a ffected p a rt. In no event s h a ll B a cky a rd S tor a ge S ol u tion s , LLC p ay the co s t of l ab or or in s t a ll a tion or a ny other co s t s rel a ted thereto. All w a rr a ntie s a re from d a te of p u rch as e. If a c as h ref u nd i s p a id on a n a ffected p a rt, it will b e pror a ted from the d a te of p u rch as e.

CONDITION S The w a rr a nty i s effective only when: 1. The u nit h as b een erected in a ccord a nce with the ass em b ly in s tr u ction s . 2. The u nit h as b een properly s hingled a nd p a inted or s t a ined a nd re as on ab ly a nd reg u l a rly m a int a ined there a fter. 3 . The f a il u re occ u r s when the u nit i s owned b y the origin a l p u rch as er. 4. B a cky a rd S tor a ge S ol u tion s , LLC h as received the w a rr a nty regi s tr a tion c a rd within thirty ( 3 0) d a y s of p u rch as e a nd notific ation

of the f a il u re in writing within the w a rr a nty period s pecified ab ove. 5. B a cky a rd S tor a ge S ol u tion s , LLC h as h a d re as on ab le opport u nity d u ring the s ixty (60) d a y s following receipt of notific ation

to in s pect a nd verify the f a il u re prior to commencement of a ny rep a ir work.

REQUIREMENT S S tora g e Buildin gs & Playhou s e s To v a lid a te yo u r w a rr a nty, it i s nece ssa ry to properly m a int a in yo u r B a cky a rd S tor a ge S ol u tion s , LLC u nit; s hingle the roof a nd p a int or s olid-colored s t a in the s iding us ing 100% a crylic l a tex exterior prod u ct with a minim u m of two (2) co a t s within thirty ( 3 0) d a y s of ass em b ly;

ab ove a ll door s a nd a ll horizont a l a nd vertic a l trim b o a rd s ; p a int a nd s e a l a ll expo s ed edge s , s ide s a nd f a ce s of S m a rt S ide™ and w a fer b o a rd s iding to incl u de a ll exterior w a ll s a nd a ll s ide s a nd a ll edge s of door s .

Gazebo s , Per g ola s & Timber Buildin gs To v a lid a te yo u r w a rr a nty, it i s nece ssa ry to properly m a int a in yo u r B a cky a rd S tor a ge S ol u tion s , LLC u nit. Thi s incl u de s tre a ting all of the expo s ed ced a r a nd pine su rf a ce s on yo u r g a ze b o or tim b er bu ilding with a n exterior gr a de wood pre s erv a tive, a n exterior oil- bas ed s emi-tr a n s p a rent s t a in, a n a crylic l a tex exterior p a int or a n a crylic l a tex s olid color exterior s t a in within 3 0 d a y s of ass em b ly a nd as needed there a fter to m a int a in yo u r w a rr a nty.

Keep veget a tion trimmed a w a y from bu ilding a nd m a ke su re s iding p a nel s a nd trim do not come in cont a ct with m asonry or cement. The minim u m gro u nd cle a r a nce for s iding m us t b e one h a lf inch (½ inch) from concrete s l ab or two a nd one h a lf inche s (2 ½ ” ) from the ground when bu ilding i s erected or con s tr u cted on a tre a ted wood floor kit. W a ter from s prinkler s m us t b e kept off u nit. In no event will B a cky a rd

events, acts or omi ss ion s b eyond o u r control incl u ding, bu t not limited to, mi sus e or improper ass em b ly, improper m a inten a nce (which le a d s to rot or dec a y) a nd a ct s of God. B a cky a rd S tor a ge S ol u tion s , LLC will not b e held re s pon s i b le for a ny l ab or co s t s inc urred

to con s tr u ct your unit. Thi s w a rr a nty give s yo u cert a in s pecific right s th a t v a ry from s t a te to s ta te.

CLAIM PROCEDURE To m a ke a cl a im u nder thi s w a rr a nty, yo u c a n either c a ll 1- 888 - 8 27-9056 or prep a re a letter. Ple as e h a ve re a dy the inform a tion b elow when you c a ll or incl u de the inform a tion when writing: 1. The model a nd s ize of the prod u ct. 2. A li s t of the p a rt( s ) for which the cl a im i s m a de. 3 . Proof of p u rch as e of the B a cky a rd S tor a ge S ol u tion s , LLC item, as s hown on the origin a l invoice. 4. R u n code, as li s ted on the yellow w a rr a nty c a rd enclo s ed in the prod u ct p a ck a ge.

M a il the ab ove inform a tion to: B a cky a rd S tor a ge S ol u tion s , LLC Attn: C us tomer S ervice 1000 Terne s Monroe, MI 4 8162

Limited Conditional Warranty *

*WARRANTY TERM S MAY VARY OUT S IDE THE U. S .A. IMPORTANT: Thi s i s your warranty certificate. Plea s e complete and mail your warranty card to properly validate your warranty.

S tor a ge S ol u tion s , LLC b e re s pon s i b le for a ny indirect, incident a l, con s e qu enti a l or s peci a l d a m a ge s nor for f a il u re( s ) th a t a re c aus ed by eventually

caulk