AIR-summary template Lic No: P0001-04 Year 2016
Answer all questions and complete all tables where relevant
2
Yes
3Basic air
monitoring
checklist AGN2 Yes
Table A1: Licensed Mass Emissions/Ambient data-periodic monitoring (non-continuous)
Emission
reference no: Parameter/ Substance
Frequency of
Monitoring
ELV in licence or
any revision
thereof Licence Compliance criteria Measured value
Unit of
measurement
Compliant with
licence limit Method of analysis
Annual mass
load (kg)
Comments -reason for change in % mass load from previous
year if applicable
A2-1 volumetric flow Quarterly (from Q3) 620000 100 % of values < ELV 592,584 kg/hour yes CRM 3,615,949,094-2.1% Grab sampling is carried out quarterly, mass emission
varies depending on grab sample.
A2-1 Total Particulates Quarterly 9.4No 30min mean can exceed the
ELV4.8 kg/hour yes CRM 29030.265
-7.3% Grab sampling is carried out quarterly, mass emission
varies depending on grab sample.
A2-1Condensable volatile
organic compoundsQuarterly 61.1
No 30min mean can exceed the
ELV7.8 kg/hour yes EN 1911-1 to 3:2003 47,305.76
-20% Grab sampling is carried out quarterly, mass emission
varies depending on grab sample.
A2-1 Formaldehyde Quarterly 9.4No 30min mean can exceed the
ELV4 kg/hour yes CRM 24545.295
+9.5% Grab sample is carried out quarterly, mass emission
varies depending on grab sample
A2-1 Total Aldehydes (as C) Quarterly 9.4No 30min mean can exceed the
ELV2.6 kg/hour yes CRM 15,743.16
-24% Grab sampling is carried out quarterly, mass emission
varies depending on grab sample
A2-1 Phenols (as total C) Quarterly 2.35No 30min mean can exceed the
ELV0.046 kg/hour yes EN 1911-1 to 3:2003 282.2175
+1.9% Grab sample is carried out quarterly, mass emission
varies depending on grab sample
A2-1 Carbon monoxide (CO) Quarterly 282No 30min mean can exceed the
ELV32.4 kg/hour yes EN 15058:2004 197857.35
-47% Grab sample is carried out quarterly, mass emission
varies depending on grab sample
A2-1Nitrogen oxides
(NOx/NO2)Quarterly 141
No 30min mean can exceed the
ELV9.9 kg/hour yes EN 14792:2005 10.3
-99% Grab sample is carried our quarterly, mass emission
varies depending on grab sample
A2-1Sulphur oxides
(SOx/SO2)Annually N/A N/A 0.2 kg/hour yes EN 14791:2005 1342.44
-73% Grab sample is carried out quarterly, mass emission
varies depending on grab sample.
Was all monitoring carried out in accordance with EPA guidance
note AG2 and using the basic air monitoring checklist?
Additional information
1
Does your site have licensed air emissions? If yes please complete table A1 and A2 below for the current
reporting year and answer further questions. If you do not have licenced emissions and do not complete a
solvent management plan (table A4 and A5) you do not need to complete the tables
Yes
Combined WESP stack reference A2-1, Bag filters and cyclofilter reference A2-2 to
A2-6, permanent ambient dust DG1-DG4 and temporary offsite dust monitoring
(DG5-DG6).
Periodic/Non-Continuous Monitoring
Are there any results in breach of licence requirements? If yes please provide brief details in the comment section of
TableA1 below
The limit for particulates was exceeded at A2-4. DG3 was in exceedence of the limit
of 350mg/m2/day in relation to dust. No other breaches were recorded against
current kg/hr limits.
AIR-summary template Lic No: P0001-04 Year 2016
A2-1 MDI as NCO group Quarterly 0.05No 30min mean can exceed the
ELV0.001 kg/hour yes EN 14792:2005 4.5765
-23.73% Grab sample is carried out quarterly, mass emission
varied depending on grab sample
A2-1 TVOC Quarterly N/A N/A 23.4 kg/hour yes CRM 142786.8This parameter was first monitored in 2016 under the new
licence conditions
A2-2 volumetric flow Annually 47000 100 % of values < ELV 37310 Nm3/hour yes CRM 227,665,620+3.23% Grab sampling is carried out quarterly, mass
emission varies depending on grab sample
A2-2 PM10 Annually 20No 30min mean can exceed the
ELV3.6 mg/Nm3 yes CRM 819.6
+313.15% Grab sampling is carried out quarterly, mass
emission varied depending on grab samples
A2-3 volumetric flow Annually 27000 100 % of values < ELV 920 Nm3/hour yes CRM 5,613,840-91.48% Grab sampling is carried out quarterly, mass
emission varies depending on grab sample
A2-3 PM10 Annually 20No 30min mean can exceed the
ELV7.9 mg/Nm3 yes CRM 44.35
-84.71% Grab sampling is carried out quarterly, mass
emission varied depending on grab samples
A2-4 volumetric flow Annually 32000 100 % of values < ELV 1341 Nm3/hour yes CRM 8,182,782-94.07% Grab sampling is carried out quarterly, mass
emission varies depending on grab sample
A2-4 PM10 Annually 20No 30min mean can exceed the
ELV177.2 mg/Nm3
no (if no please
enter details in
comments box)
CRM 1,449.99
-46.64% Grab sampling is carried out quarterly, mass
emission varied depending on grab samples This was
reported to the EPA as an incident. The cause was due to
failure of abatement equipment.
A2-5 volumetric flow Annually 47000 100 % of values < ELV 2855 Nm3/hour yes CRM 17,421,210-94.70% Grab sampling is carried out quarterly, mass
emission varies depending on grab sample
A2-5 PM10 Annually 20No 30min mean can exceed the
ELV1.9 mg/Nm3 yes CRM 33.1
-99.65% Grab sampling is carried out quarterly, mass
emission varied depending on grab samples
A2-6 volumetric flow Annually 47000 100 % of values < ELV 1746 Nm3/hour yes CRM 10,654,210-95.49% Grab sampling is carried out quarterly, mass
emission varies depending on grab sample
A2-6 PM10 Annually 20No 30min mean can exceed the
ELV3.4 mg/Nm3 yes CRM 36.22
-89.75% Grab sampling is carried out quarterly, mass
emission varied depending on grab samples
DG1 Dust Monthly 350 100 % of values < ELV 163.42 mg/m2/day yes CRM N/A N/A
DG2 Dust Monthly 350 100 % of values < ELV 206.64 mg/m2/day yes CRM N/A N/A
DG3 Dust Monthly 350 100 % of values < ELV 612.95 mg/m2/day
no (if no please
enter details in
comments box)
CRM N/A
This was due to exceedances throughout May, June and July
which was reported to the EPA as an incident and is
attributed to the close proximity of the monitoring point to
the access road.
AIR-summary template Lic No: P0001-04 Year 2016
DG4 DustMonthly from
October350 101 % of values < ELV 30.6 mg/m2/day yes CRM N/A N/A
DG5 DustMonthly from
November350 102 % of values < ELV 40.1 mg/m2/day yes CRM N/A N/A
DG6 DustMonthly from
November350 103 % of values < ELV 17.62 mg/m2/day yes CRM N/A N/A
Upwind (Ambient
Formaldehyde)Formaldehyde Biannually N/A N/A 2.655 mg/Nm3 yes CRM N/A N/A
Downwind
(Ambient
Formaldehyde)
Formaldehyde Biannually N/A N/A 5.835 mg/Nm3 yes CRM N/A N/A
Note 1: Volumetric flow shall be included as a reportable parameter
AIR-summary template Lic No: P0001-04 Year 2016
4No
5No
6No
7No
Table A2: Summary of average emissions -continuous monitoring
Emission
reference no:
Parameter/ Substance
ELV in licence or any
revision thereof
Averaging Period Compliance Criteria Units of
measurement
Annual Emission Annual maximum Monitoring Equipment downtime (hours) Number of ELV
exceedances in
current
reporting year
Comments
SELECT SELECT SELECT
SELECT SELECT
SELECT SELECT
SELECT SELECT
SELECT SELECT
note 1: Volumetric flow shall be included as a reportable parameter.
Table A3: Abatement system bypass reporting table Bypass protocol
Date* Duration** (hours) Location Reason for bypass Corrective actionImpact magnitude
* this should include all dates that an abatement system bypass occurred
** an accurate record of time bypass beginning and end should be logged on site and maintained for future Agency
inspections please refer to bypass protocol link
If yes please review your continuous monitoring data and report the required fields below in Table A2 and compare it
to its relevant Emission Limit Value (ELV)
Did continuous monitoring equipment experience downtime? If yes please record downtime in table A2 below
Do you have a proactive service agreement for each piece of continuous monitoring equipment?
Did your site experience any abatement system bypasses? If yes please detail them in table A3 below
Continuous Monitoring
Does your site carry out continuous air emissions monitoring?
AIR-summary template Lic No: P0001-04 Year 2016
8 Do you have a total Emission Limit Value of direct and fugitive emissions on site? if yes please fill out tables A4 and A5
No
Solvent
regulations
Reporting year Total solvent input on
site (kg)
Total VOC emissions
to Air from entire
site (direct and
fugitive)
Total VOC
emissions as %of
solvent input Total Emission Limit Value
(ELV) in licence or any revision
thereof
Compliance
SELECT
SELECT
(I) Inputs (kg)
Solvent(I) Inputs (kg)
Organic solvent
emission in waste
gases(kg)
Solvents lost in
water (kg)
Collected waste solvent (kg) Fugitive Organic
Solvent (kg)
Solvent released in
other ways e.g. by-
passes (kg)
Solvents destroyed
onsite through
physical reaction
Total emission of Solvent to air (kg)
Total
Solvent use and management on site
Table A5: Solvent Mass Balance summary
Please refer to linked solvent regulations to
complete table 5 and 6
(O) Outputs (kg)
Table A4: Solvent Management Plan Summary
Total VOC Emission limit value
AER Monitoring returns summary template-WATER/WASTEWATER(SEWER) Lic No: P0001-04 Year 2016
2
Yes
Location
reference
Location
relative to site
activities
PRTR ParameterLicenced
ParameterMonitoring date
ELV or trigger
level in licence
or any revision
thereof*
Licence Compliance criteria Measured valueUnit of
measurement
Compliant with
licenceComments
SW-1Aonsite SELECT pH
Jan-16 6 to 9No pH value shall deviate from the
specified range.7.3
pH units yes
SW-1A onsite BOD Jan-16 150 All results < 1.2 x ELV 63 mg/L yes
SW-1A
onsite Suspended Solids
Jan-16 N/A N/A 297
mg/L yes
The emission limit value specified in
the licence is not applicable until
the 20 November 2019.
SW-1A onsite Mineral oils Jan-16 20 All results < 1.2 x ELV <10 µg/L yes
SW-1Aonsite pH
Feb-16 6 to 9No pH value shall deviate from the
specified range.7.2
pH units yes
SW-1A onsite BOD Feb-16 150 All results < 1.2 x ELV 11 mg/L yes
SW-1A
onsite Suspended Solids
Feb-16 N/A
N/A
35
mg/L yes
The emission limit value specified in
the licence is not applicable until
the 20 November 2019.
SW-1A onsite Mineral oils Feb-16 20 All results < 1.2 x ELV <10 µg/L yes
SW-1A onsite Phenols Feb-16 1 All results < 1.2 x ELV 0.047 mg/L yes
SW-1A onsite Formaldehyde Feb-16 N/A All results < 1.2 x ELV <1 mg/L yes
SW-1A onsite Nitrite (as N) Feb-16 N/A All results < 1.2 x ELV 0.52 mg/L yes
SW-1A
onsite
Ortho-phosphate
(as PO4)
Feb-16 N/A N/A <1
mg/L yes
SW-1A onsite Total ammonia Feb-16 10 All results < 1.2 x ELV 0.73 mg/L yes
SW-1Aonsite pH
Mar-16 6 to 9No pH value shall deviate from the
specified range.7.3
pH units yes
SW-1A onsite BOD Mar-16 150 All results < 1.2 x ELV 11 mg/L yes
SW-1A
onsite Suspended Solids
Mar-16 N/A
N/A
19
mg/L yes
The emission limit value specified in
the licence is not applicable until
the 20 November 2019.
SW-1A onsite Mineral oils Mar-16 20 All results < 1.2 x ELV 0.057 µg/L yes
SW-1Aonsite ph
Apr-16 6 to 9No pH value shall deviate from the
specified range.8.2
pH units yes
SW-1A onsite BOD Apr-16 150 All results < 1.2 x ELV 17 mg/L yes
SW-1A
onsite Suspended Solids
Apr-16 N/A
N/A
19
mg/L yes
The emission limit value specified in
the licence is not applicable until
the 20 November 2019.
SW-1A onsite Mineral oils Apr-16 20 All results < 1.2 x ELV 0.072 µg/L yes
SW-1Aonsite ph
May-16 6 to 9No pH value shall deviate from the
specified range.7
pH units yes
SW-1A onsite BOD May-16 150 All results < 1.2 x ELV 39 mg/L yes
SW-1A
onsite Suspended Solids
May-16 N/A
N/A
101
mg/L yes
The emission limit value specified in
the licence is not applicable until
the 20 November 2019.
SW-1A onsite Mineral oils May-16 20 All results < 1.2 x ELV 0.256 µg/L yes
SW-1Aonsite ph
Jun-16 6 to 9No pH value shall deviate from the
specified range.7.1
pH units yes
SW-1A onsite BOD Jun-16 150 All results < 1.2 x ELV 33 mg/L yes
SW-1A
onsite Suspended Solids
Jun-16 N/A
N/A
32
mg/L yes
The emission limit value specified in
the licence is not applicable until
the 20 November 2019.
SW-1A onsite Mineral oils Jun-16 20 All results < 1.2 x ELV 0.315 µg/L yes
SW-1Aonsite ph
Jul-16 6 to 9No pH value shall deviate from the
specified range.7.7
pH units yes
Was it a requirement of your licence to carry out visual inspections on any surface water
discharges or watercourses on or near your site? If yes please complete table W2 below
summarising only any evidence of contamination noted during visual inspectionsWeekly visual inspections - No contamination noted
Table W1 Storm water monitoring
Additional information
1
Does your site have licensed emissions direct to surface water or direct to sewer? If yes
please complete table W2 and W3 below for the current reporting year and answer further
questions. If you do not have licenced emissions you only need to complete table W1 and or
W2 for storm water analysis and visual inspectionsNo
No process water emissions. Storm water emissions from emission monitoring point SW-
1A. Emissions monitored from domestic sewage treatment at emission monitoring point
STP, prior to combining with storm water discharge. There were 2 exceedences of the
licence limits at STP for suspended solids
AER Monitoring returns summary template-WATER/WASTEWATER(SEWER) Lic No: P0001-04 Year 2016
Additional informationSW-1A onsite BOD Jul-16 150 All results < 1.2 x ELV 6 mg/L yes
SW-1A
onsite Suspended Solids
Jul-16 N/A
N/A
7
mg/L yes
The emission limit value specified in
the licence is not applicable until
the 20 November 2019.
SW-1A onsite Mineral oils Jul-16 20 All results < 1.2 x ELV 0.344 µg/L yes
SW-1A onsite Phenols Jul-16 1 All results < 1.2 x ELV <0.005 mg/L yes
SW-1A onsite Formaldehyde Jul-16 N/A N/A <0.029 mg/L yes
SW-1A onsite Nitrite (as N) Jul-16 N/A All results < 1.2 x ELV <1 mg/L yes
SW-1A
onsite
Ortho-phosphate
(as PO4)
Jul-16 N/A
All results < 1.2 x ELV
0.05
mg/L yes
SW-1A onsite Total ammonia Jul-16 10 All results < 1.2 x ELV 0.05 mg/L yes
SW-1Aonsite ph
Sep-16 6 to 9No pH value shall deviate from the
specified range.7.5
pH units yes
SW-1A onsite BOD Sep-16 150 All results < 1.2 x ELV 12 mg/L yes
SW-1A
onsite Suspended Solids
Sep-16 N/A
N/A
115
mg/L yes
The emission limit value specified in
the licence is not applicable until
the 20 November 2019.
SW-1A onsite Mineral oils Sep-16 20 All results < 1.2 x ELV 0.221 µg/L yes
SW-1Aonsite ph
Oct-16 6 to 9No pH value shall deviate from the
specified range.7.5
pH units yes
SW-1A onsite BOD Oct-16 150 All results < 1.2 x ELV 19 mg/L yes
SW-1A
onsite Suspended Solids
Oct-16 N/A
N/A
100
mg/L yes
The emission limit value specified in
the licence is not applicable until
the 20 November 2019.
SW-1A onsite Mineral oils Oct-16 20 All results < 1.2 x ELV 1.52 µg/L yes
SW-1A onsite Phenols Oct-16 1 All results < 1.2 x ELV <0.005 mg/L yes
SW-1A onsite Formaldehyde Oct-16 N/A N/A <0.029 mg/L yes
SW-1A onsite Nitrite (as N) Oct-16 N/a All results < 1.2 x ELV <1 mg/L yes
SW-1A
onsite
Ortho-phosphate
(as PO4)
Oct-16 N/A
All results < 1.2 x ELV
2.72
mg/L yes
SW-1A onsite Total ammonia Oct-16 10 All results < 1.2 x ELV 4.48 mg/L yes
SW-1Aonsite ph
Dec-16 6 to 9No pH value shall deviate from the
specified range.7.08
pH units yes
SW-1A onsite BOD Dec-16 150 All results < 1.2 x ELV 23 mg/L yes
SW-1A
onsite Suspended Solids
Dec-16 N/A
N/A
18
mg/L yes
The emission limit value specified in
the licence is not applicable until
the 20 November 2019.
SW-1A onsite Mineral oils Dec-16 20 All results < 1.2 x ELV <10 µg/L yes
SW-1A onsite Phenols Dec-16 1 All results < 1.2 x ELV <1 mg/L yes
SW-1A onsite Formaldehyde Dec-16 N/A N/A <0.5 mg/L yes
SW-1A onsite Nitrite (as N) Dec-16 N/A All results < 1.2 x ELV <0.2 mg/L yes
SW-1A
onsite
Ortho-phosphate
(as PO4)
Dec-16 N/A
All results < 1.2 x ELV
0.13
mg/L yes
SW-1A onsite Total ammonia Dec-16 10 All results < 1.2 x ELV 0.03 mg/L yes
STP onsite BOD Jan-16 20 All results < 1.2 x ELV 15 mg/L yes
STP
onsite Suspended Solids
Jan-16 30
All results < 1.2 x ELV
47
mg/L
no (if no please enter
details in comments
box)
Due to maintenance of plant or
equipment at WWTP. Sewage
treatment plant was cleaned out
STP onsite BOD Apr-16 20 All results < 1.2 x ELV 15 mg/L yes
STP
onsite Suspended Solids
Apr-16 30
All results < 1.2 x ELV
67
mg/L
no (if no please enter
details in comments
box)
Due to plant or equipment issues.
The manufacturing company was
engaged to undertake maintenance
servicing.
STP onsite BOD Jul-16 20 All results < 1.2 x ELV 13 mg/L yes
STPonsite Suspended Solids
Jul-16 30All results < 1.2 x ELV
21mg/L yes
STP onsite BOD Oct-16 20 All results < 1.2 x ELV 9 mg/L yes
STPonsite Suspended Solids
Oct-16 30All results < 1.2 x ELV
13mg/L yes
*trigger values may be agreed by the Agency outside of licence conditions
Table W2 Visual inspections-Please only enter details where contamination was observed.
AER Monitoring returns summary template-WATER/WASTEWATER(SEWER) Lic No: P0001-04 Year 2016
Additional informationLocation
Reference
Date of
inspectionSource of contamination
SELECT
SELECT
3SELECT
4
External /Internal
Lab Quality
checklist
Assessment of
results checklist SELECT
Table W3: Licensed Emissions to water and /or wastewater (sewer)-periodic monitoring (non-continuous)
Emission
reference no:
Emission
released toParameter/ Substance
Note 1 Type of sampleFrequency ofmonitoring Averaging period
ELV or trigger values in licence or
any revision therofNote 2 Licence Compliance criteria Measured value Unit of measurement Compliant with licence Method of analysis
SELECT SELECT SELECT SELECT SELECT SELECT SELECT SELECT
Note 1: Volumetric flow shall be included as a reportable parameter
Note 2: Where Emission Limit Values (ELV) do not apply to your licence please compare results against EQS for Surface water or relevant receptor quality standards
Licensed Emissions to water and /or wastewater(sewer)-periodic monitoring (non-continuous)
Was there any result in breach of licence requirements? If yes please provide brief details in the
comment section of Table W3 below Additional information
Was all monitoring carried out in accordance with EPA
guidance and checklists for Quality of Aqueous Monitoring
Data Reported to the EPA? If no please detail what areas
require improvement in additional information box
CommentsDescription of contamination Corrective action
AER Monitoring returns summary template-WATER/WASTEWATER(SEWER) Lic No: P0001-04 Year 2016
Additional information
5 No
6SELECT
7SELECT
8SELECT
Table W4: Summary of average emissions -continuous monitoring
Emission
reference no:
Emission
released to Parameter/ Substance
ELV or trigger
values in licence or
any revision
thereof Averaging Period
Compliance
Criteria Units of measurement
Annual Emission for current
reporting year (kg)
% change +/- from
previous reporting
year Monitoring Equipment
downtime (hours)
Number of ELV exceedances in
reporting year
SELECT SELECT SELECT SELECT SELECT
SELECT SELECT SELECT SELECT SELECT
note 1: Volumetric flow shall be included as a reportable parameter.
Table W5: Abatement system bypass reporting tableDate Duration (hours) Location Resultant
emissions
Reason for bypass Corrective
action*
Was a report submitted to the
EPA?
When was this report
submitted?
SELECT
*Measures taken or proposed to reduce or limit bypass frequency
Did continuous monitoring equipment experience downtime? If yes please record downtime in table
W4 below
Do you have a proactive service contract for each piece of continuous monitoring equipment on site?
Did abatement system bypass occur during the reporting year? If yes please complete table W5
below
Comments
Continuous monitoring Additional Information
Does your site carry out continuous emissions to water/sewer monitoring?
If yes please summarise your continuous monitoring data below in Table W4 and compare it to its
relevant Emission Limit Value (ELV)
Bund/Pipeline testing template Lic No: P0001-04 Year 2016
Bund testing Additional information
1 Yes
2 Please provide integrity testing frequency period 3 years Tested in 2017
3 Yes Register of Bund Maintained
4 How many bunds are on site? 17
5 How many of these bunds have been tested within the required test schedule? 17
6 How many mobile bunds are on site? 6 Skid Mounted Units
7 Are the mobile bunds included in the bund test schedule? Yes
8 How many of these mobile bunds have been tested within the required test schedule? All
9 3 Sewage Sumps
10 3
Please list any sump integrity failures in table B1
11 No
12 SELECT
13 Is the Fire Water Retention Pond included in your integrity test programme? Yes Tested in 2016
Bund/Containment
structure ID Type Specify Other type Product containment Actual capacity Capacity required* Type of integrity test Other test type Test date
Integrity reports
maintained on
site? Results of test
Integrity test failure
explanation <50 words Corrective action taken
Scheduled date
for retest
Results of
retest(if in
current
reporting year)
7 Hydraulic Oil Bund reinforced concrete
The bund contains a Steel
37,000 litre "Fill and
Drain" tank
41.8m3 40.7m3 Structural assessment 25/01/2016 Yes Pass N/A N/A N/A
8 Press Pit reinforced concrete
The press pit supports the
press and associated
pipework and electrics.
Hydraulic Oil is contained
in the press
977m3 16.50 Structural assessment 25/01/2016 Yes Pass N/A N/A N/A
11 T&G Chemical
Storage Unitother (please specify) Steel
Two IBCs containing
chemicals related to the
T&G line
2.25m3 1.10m3 Structural assessment 25/01/2016 Yes Pass N/A N/A N/A
12 Emergency Diesel
Generator Bundreinforced concrete
The bund contains the
emergency diesel
generator
5.7m3
N/A - the bund is of
substantially greater
volume than any
spillages which are likely
to occur
Structural assessment 25/01/2016 Yes Pass N/A N/A N/A
9a Oil/Chemical
Storage Unit 1other (please specify) Plastic and Steel Oils, antifoam and putties 16m3 14m3 Structural assessment N/A 25/01/2016 Yes Fail
Considerable corrosion was
noted in the bunded areas,
cills walls and doors with
perforation evident, the
complete floor of the unit
was not visible.
Not scheduled
9b Oil/Chemical
Storage Unit 2other (please specify) Plastic and Steel Oils, antifoam and putties 16m3 14m3 Structural assessment N/A 25/01/2016 Yes Fail
Considerable corrosion was
noted in the bunded areas,
cills walls and doors with
perforation evident, the
complete floor of the unit
was not visible.
Not scheduled
9c Oil/Chemical
Storage Unit 3other (please specify) Plastic and Steel Oils, antifoam and putties 16m3 14m3 Structural assessment N/A 25/01/2016 Yes Fail
Considerable corrosion was
noted in the bunded areas,
cills walls and doors with
perforation evident, the
complete floor of the unit
was not visible.
Not scheduled
The old Hydraulic Oil room will
be turned into a waste oil/chem
storage area as it is a bunded
room. In addition it is intended
that the area outside the room
will be bunded for storage of
empty IBCs. The transportable
containers will remain within
the outdoor bunded area
Does the site maintain a register of bunds, underground pipelines (including stormwater and foul), Tanks, sumps and containers? (containers refers to
"Chemstore" type units and mobile bunds)
Do all sumps and chambers have high level liquid alarms?
If yes to Q11 are these failsafe systems included in a maintenance and testing programme?
dropdown menu click to see options
Are you required by your licence to undertake integrity testing on bunds and containment structures ? if yes please fill out table B1 below listing all new bunds
and containment structures on site, in addition to all bunds which failed the integrity test-all bunding structures which failed including mobile bunds must be
listed in the table below, please include all bunds outside the licenced testing period (mobile bunds and chemstore included)
How many sumps on site are included in the integrity test schedule?
How many of these sumps are integrity tested within the test schedule?
Table B1: Summary details of bund /containment structure integrity test
Bund/Pipeline testing template Lic No: P0001-04 Year 2016
9d Oil/Chemical
Storage Unit 4other (please specify) Plastic and Steel Oils, antifoam and putties 16m3 14m3 Structural assessment N/A 25/01/2016 Yes Fail
Considerable corrosion was
noted in the bunded areas,
cills walls and doors with
perforation evident, the
complete floor of the unit
was not visible.
Not scheduled
9e Oil/Chemical
Storage Unit 5other (please specify) Plastic and Steel Oils, antifoam and putties 16m3 14m3 Structural assessment N/A 25/01/2016 Yes Fail
Considerable corrosion was
noted in the bunded areas,
cills walls and doors with
perforation evident, the
complete floor of the unit
was not visible.
Not scheduled
* Capacity required should comply with 25% or 110% containment rule as detailed in your licence Commentary
15 bunding and storage guidelines Yes
16 Are channels/transfer systems to remote containment systems tested? No
17 Are channels/transfer systems compliant in both integrity and available volume? Yes
1 Yes Tested 2017
2 Please provide integrity testing frequency period 3 years
*please note integrity testing means water tightness testing for process and foul pipelines (as required under your licence)
Structure ID Type system Material of construction:
Does this structure have
Secondary containment?
Type of secondary
containment
Type integrity testing
Integrity reports
maintained on site? Results of test
Integrity test
failure explanation
<50 words
Corrective action
taken
Scheduled date
for retest
Results of retest(if in current
reporting year)
SELECT SELECT SELECT SELECT SELECT SELECT SELECT SELECT
the outdoor bunded area
Please use commentary for additional details not answered by tables/ questions above
Has integrity testing been carried out in accordance with licence requirements and are all structures tested
in line with BS8007/EPA Guidance?
Pipeline/underground structure testing
Are you required by your licence to undertake integrity testing* on underground structures e.g. pipelines or sumps etc. ? if yes please fill out table 2 below listing
all underground structures and pipelines on site which failed the integrity test and all which have not been tested withing the integrity test period as specified
Table B2: Summary details of pipeline/underground structures integrity test
Groundwater/Soil monitoring template Lic No: P0001-04 Year 2016
Comments
1
yes
Quarterly & annual monitoring
requirements (GW-1, GW-2 and GW-
3) Requirement to monitoring
relevant hazardous substances
every 5 years
2
yes
Requirement to monitoring relevant
hazardous substances every 10 years
3yes
For all plant requirements. Site is
not connected to public supply.
4Groundwater
monitoring
template yes
5SELECT
6
7 N/A
8 yes
9Risk assessment is currently being
compiled
10 no
11 no
12 no
Table 1: Upgradient Groundwater monitoring results
Date of
sampling
Sample
location
reference
Parameter/
Substance Methodology
Monitoring
frequency
Maximum
Concentration++
Average
Concentration+ unit GTV's* SW EQS
Upward trend in
pollutant
concentration
over last 5 years
of monitoring data
16/2/16,
5/5/16,
30/8/16,
24/11/16
GW-1 pH pH electrode Annually 6.77 6.695 pH units >6.5<9.5 >6<9 no
16/2/16,
5/5/16,
30/8/16,
24/11/17
GW-1Ammoniacal
Nitrogen
Standard
MethodQuarterly 0.09 0.04425 mg/l 0.065 0.14 no
Please provide an interpretation of groundwater monitoring data
in the interpretation box below or if you require additional space
please include a groundwater/contaminated land monitoring
results interpretation as an additional section in this AER
There was an exceedance of the lower threshold value GTV for
ammoniacal nitrogen at GW-1 in Q3 2016. Given the sites history
that there has been no exceedance of the upper GTV in recent
years, this indicates that in general onsite operations are not
impacting on the groundwater. There were no other exceedances
at GW-1. GW-2 was dry during Q3 and Q4 2016 therefore it was
not analysed for annual parameters or those required every five
years. This well was also dry in Q3 2015. The sampling schedule is
being assessed to ensure this does not take place in 2017. There
was an exceedance of GTV for Chloride indicative of saline
intrusion at GW3 in all quarters in 2016; this was attributed to
saline intrusion which is consistent with the location of the
monitoring well directly adjacent to the River Suir Estuary. There
were no other exceedances at GW3.
Are you required to carry out groundwater monitoring as part of your licence
requirements?
Are you required to carry out soil monitoring as part of your licence requirements?
Have actions been taken to address contamination issues? If yes please summarise
remediation strategies proposed/undertaken for the site
Do monitoring results show that groundwater generic
assessment criteria such as GTVs or IGVs are exceeded or is
there an upward trend in results for a substance? If yes, please
complete the Groundwater Monitoring Guideline Template
Report (link in cell G8) and submit separately through ALDER as
a licensee return AND answer questions 5-12 below.
Do you extract groundwater for use on site? If yes please specify use in comment
section
Has any type of risk assessment been carried out for the site?
SELECT
Please specify the proposed time frame for the remediation strategy
Is there a licence condition to carry out/update ELRA for the site?
Is there evidence that contamination is migrating offsite?
Is the contamination related to operations at the facility (either current and/or
historic)
Have potential receptors been identified on and off site?
Has a Conceptual Site Model been developed for the site?
Groundwater/Soil monitoring template Lic No: P0001-04 Year 2016
16/2/16,
5/5/16,
30/8/16,
24/11/18
GW-1Nitrate (as
No)
Standard
MethodQuarterly 6.99 5.945 mg/l 11.29 - no
16/2/16,
5/5/16,
30/8/16,
24/11/19
GW-1Orthophospa
ge (as P)
Standard
MethodQuarterly <0.03 <0.03 mg/l 0.035 - no
16/2/16,
5/5/16,
30/8/16,
24/11/20
GW-1 ChlorideStandard
MethodQuarterly 21.6 19.55 mg/l 24 - no
30/8/16 GW-1 PhenolStandard
MethodAnnually <0.01 <0.01 mg/l 0.5 0.008 no
30/8/16 GW-1
total
Petroleum
Hydrocarbon
s
Standard
MethodEvery 5 years <10 <10 ug/l 7.5 no
30/8/16 GW-1 Mineral oilStandard
MethodEvery 5 years <10 <10 ug/l 10 no
30/8/16 GW-1 BenzeneStandard
MethodEvery 5 years <0.5 <0.5 ug/l 0.75 no
30/8/16 GW-1 TouleneStandard
MethodEvery 5 years <5 <5 ug/l 525 no
30/8/16 GW-1 EthylbenzeneStandard
MethodEvery 5 years <0.5 <0.5 ug/l - no
30/8/16 GW-1 p/m-XyleneStandard
MethodEvery 5 years <1 <1 ug/l - no
30/8/16 GW-1 o-XyleneStandard
MethodEvery 5 years <0.5 <0.5 ug/l - no
30/8/16 GW-1
Methyl
Tertiary
Butyl Ether
Standard
MethodEvery 5 years <0.1 <0.1 ug/l 10 no
30/8/16 GW-1PCBs (sum of
7)
Standard
MethodEvery 5 years <0.7 <0.7 ug/l 0.01 no
30/8/16 GW-1
Bis(2-
ethylhexyl)p
hthalate
Standard
MethodEvery 5 years <5 <5 ug/l 6 no
30/8/16 GW-1
1,2-
Dichloroetha
ne
Standard
MethodEvery 5 years <2 <2 ug/l 2.25 no
30/8/16 GW-1Vinyl
Chloride
Standard
MethodEvery 5 years <0.1 <0.1 ug/l 0.75 no
30/8/16 GW-1
1,2-
Dichloroethe
ne
Standard
MethodEvery 5 years <2 <2 ug/l 7.5 10 no
30/8/16 GW-1Tetrachloroe
thene (PCE)
Standard
MethodEvery 5 years <3 <3 ug/l 7.5 no
30/8/16 GW-1Trichloroethe
ne (TCE)
Standard
MethodEvery 5 years <3 <3 ug/l 7.5 no
Groundwater/Soil monitoring template Lic No: P0001-04 Year 2016
30/8/16 GW-1Dichloromet
hane (DCM)
Standard
MethodEvery 5 years <3 <3 ug/l 15 20 no
16/2/16,
5/5/16,GW-2 pH pH electrode Annually 6.34 6.33 pH units >6.5<9.5 >6<9 no
16/2/16,
5/5/16,GW-2
Ammoniacal
Nitrogen
Standard
MethodQuarterly 0.03 0.024 mg/l 0.065 0.14 no
16/2/16,
5/5/16,GW-2
Nitrate (as
No)
Standard
MethodQuarterly 5.27 5.07 mg/l 11.29 - no
16/2/16,
5/5/16,GW-2
Orthophospa
ge (as P)
Standard
MethodQuarterly <0.03 <0.03 mg/l 0.035 - no
16/2/16,
5/5/16,GW-2 Chloride
Standard
MethodQuarterly 25 24 mg/l 24 - no
.+ where average indicates arithmetic mean
.++ maximum concentration indicates the maximum measured concentration from all monitoring results produced during the reporting year
Table 2: Downgradient Groundwater monitoring results
Date of
sampling
Sample
location
reference
Parameter/
Substance Methodology
Monitoring
frequency
Maximum
Concentration
Average
Concentration unit GTV's* SW EQS
Upward trend in
yearly average
pollutant
concentration
over last 5 years
of monitoring data
16/2/16,
5/5/16,
30/8/16,
24/11/16 GW-3 pH pH electrode Annually
6.7 6.525
pH units >6.5<9.5 >6<9 no
16/2/16,
5/5/16,
30/8/16,
24/11/16 GW-3
Ammoniacal
Nitrogen
Standard
Method Quarterly
0.05 0.0345
mg/l 0.065 0.14 no
16/2/16,
5/5/16,
30/8/16,
24/11/16 GW-3
Nitrate (as
No)
Standard
Method Quarterly
6.87 5.0525
mg/l 11.29 - no16/2/16,
5/5/16,
30/8/16, GW-3
Orthophospa
ge (as P)
Standard
Method Quarterly
<0.03 <0.03
mg/l 0.035 - no
16/2/16,
5/5/16,
30/8/16,
24/11/16 GW-3 Chloride
Standard
Method Quarterly
70.8 46.625
mg/l 24 - no
Drinking water
(public supply)
standards
Interim Guideline
Values (IGV)
Groundwater/Soil monitoring template Lic No: P0001-04 Year 2016
16/2/16,
5/5/16,
30/8/16,
24/11/16 GW-3 Phenol
Standard
Method Annually
<0.01 <0.01
mg/l 0.5 0.008 no
30/8/16 GW-3
total
Petroleum
Hydrocarbon
s
Standard
Method Every 5 years
<10 <10
ug/l 7.5 no
30/8/16 GW-3 Mineral oil
Standard
Method Every 5 years
<10 <10
ug/l 10 no
30/8/16 GW-3 Benzene
Standard
Method Every 5 years
<0.5 <0.5
ug/l 0.75 no
30/8/16 GW-3 Toulene
Standard
Method Every 5 years
<1 <1
ug/l 525 no
30/8/16 GW-3 Ethylbenzene
Standard
Method Every 5 years
<0.5 <0.5
ug/l - no
30/8/16 GW-3 p/m-Xylene
Standard
Method Every 5 years
<1 <1
ug/l - no
30/8/16 GW-3 o-Xylene
Standard
Method Every 5 years
<0.5 <0.5
ug/l - no
30/8/16 GW-3
Methyl
Tertiary
Standard
Method Every 5 years
<0.1 <0.1
ug/l 10 no
30/8/16 GW-3
PCBs (sum of
7)
Standard
Method Every 5 years
<0.7 <0.7
ug/l 0.01 no
30/8/16 GW-3
Bis(2-
ethylhexyl)p
hthalate
Standard
Method Every 5 years
<5 <5
ug/l 6 no
30/8/16 GW-3
1,2-
Dichloroetha
ne
Standard
Method Every 5 years
<2 <2
ug/l 2.25 no
30/8/16 GW-3
Vinyl
Chloride
Standard
Method Every 5 years
<0.1 <0.1
ug/l 0.75 no
30/8/16 GW-3
1,2-
Dichloroethe
ne
Standard
Method Every 5 years
<2 <2
ug/l 7.5 10 no
30/8/16 GW-3
Tetrachloroe
thene (PCE)
Standard
Method Every 5 years
<3 <3
ug/l 7.5 no
30/8/16 GW-3
Trichloroethe
ne (TCE)
Standard
Method Every 5 years
<3 <3
ug/l 7.5 no
30/8/16 GW-3
Dichloromet
hane (DCM)
Standard
Method Every 5 years
<3 <3
ug/l 20 no
Environmental Liabilities template Lic No: P0001-04 Year 2016
Commentary
1
Required but not submitted
ELRA being reviewed
and updated and will
be completed in 2017
2 SELECT
3 Specify
4 SELECT
5 Specify
6 SELECT
7 Enter expiry date
8 SELECT
9 Review required and not completed
DMP being reviewed
and updated and will
be completed in 2017
10 SELECT
11 Specify
12 SELECT
13 Enter expiry dateFinancial provision for Closure expiry date
Financial Provision for Closure - type
ELRA initial agreement status
ELRA review status
Amount of Financial Provision cover required as determined by the latest ELRA
Financial Provision for ELRA status
Financial Provision for ELRA - amount of cover
Financial Provision for ELRA - type
Click here to access EPA guidance on Environmental Liabilities and Financial
provision
Financial provision for ELRA expiry date
Closure plan initial agreement status
Closure plan review status
Financial Provision for Closure status
Financial Provision for Closure - amount of cover
Environmental Management Programme/Continuous Improvement Programme template Lic No: P0001-04 Year 2016
Additional Information
1Yes
2 Yes
3 Yes
4 Yes
Environmental Management Programme (EMP) reportObjective Category Target Status (% completed) How target was progressed Responsibility Intermediate outcomes
Materials Handling/Storage/Bunding
Q 3 2016 - Desludge remaining Emergency
Holding Tank No. 2. to ensure adequate fire
water retention capacity is maintained. 100
Competent companies were engaged
and provided a RFT, Site inspections
were undertaken by the companies,
tenders were received from the
companies. Jenny Byrne
Improved Environmental
Management Practices
Materials Handling/Storage/Bunding EHT 2 Integrity Testing 0
Following desludging breaches were
identified, three quotations received
and review issued to procurement for
review and comment. Following
breach repairs integrity testing will be
completed. Jenny Byrne/John Browne
Improved Environmental
Management Practices
Dust Management
By Q4 2016 - Improved dust monitoring,
review of locations, dust jar holder upgrade
and ensuring representative data is obtained 100
Proposal submitted to the EPA for
relocation of DG3 & the addition of
DG4, 5 & 6. Proposal approved. Dust
Jar analysis laboratory change from
Fitz Scientific to ALS Laboratory's
following damaged jars leading to
missing sampling periods and the
receipt of questionable results. Jenny Byrne
Improved Environmental
Management Practices
Upgrade Obsolete Equipment
By Q 4 2016 - Improved environmental
monitoring and analysis 80
Environmental Equipment upgrade
continuing, with the replacement of
the anti pollution value due in 2017
and the WESP Heist Jenny Byrne
Improved Environmental
Management Practices
Spill Management By Q4 2016 - Improved spill management 80
Oil Spill kits located through out site,
awaiting laboratory, chemical and
maintenance spill kits. Once received
awareness training and weekly spill kit
inspections will commence. Jenny Byrne
Improved Environmental
Management Practices
Do you maintain an environmental documentation/communication system to inform the public on environmental
performance of the facility, as required by the licence
Highlighted cells contain dropdown menu click to view
Does the EMS reference the most significant environmental aspects and associated impacts on-site
Does the EMS maintain an Environmental Management Programme (EMP) as required in accordance with the licence
requirements
Do you maintain an Environmental Management System (EMS) for the site. If yes, please detail in additional information
Environmental Management Programme/Continuous Improvement Programme template Lic No: P0001-04 Year 2016
Highlighted cells contain dropdown menu click to view
Waste Management By Q4 2016 - Improved waste through out site 50
New press waste oil tank in place
including waste collection area and
signage. All but 1 shift co-ordinator
trained on the new procedure in
place. Procedure also emailed to all
managers to implement. Also site
wide waste procedure plan
implemented and submitted to the
EPA for approval. Plan Approved.
Waste management remains an issue
on site, continued efforts to be made
to encourage improvement. Jenny Byrne/Christy Murphy
Improved Environmental
Management Practices
Additional improvements
Improve plant housekeeping through use of
internal housekeeping audits and utilisation of
internal IT safety issues record system. 90
Housekeeping and recording system has
been set up where issues can be logged
and tracked to completion. Audits on-
going. Section Head
Improved Environmental
Management Practices
Lic No: P0001-04 Year 2016
1 Yes
2
Noise
Guidance
note NG4
Yes
3 Yes
4 Noise reduction plan is being compiled and will be completed in 2017
5 No
Date of
monitoring Time period
Noise location
(on site)
Noise
sensitive
location -NSL
(if applicable) LAeq LA90 LA10 LAmax
Tonal or Impulsive
noise* (Y/N)
If tonal /impulsive noise was
identified was 5dB penalty
applied?
Comments (ex. main
noise sources on site,
& extraneous noise
ex. road traffic)
Is site compliant with
noise limits
(day/evening/night)?
30/08/2016 16:04-16:34 NM1 53 48 55 69 No N/A Yes
30/08/2016 16:34-17:04 NM1 53 48 56 72 No N/A Yes
30/08/2016 17:04-17:34 NM1 51 45 54 67 No N/A Yes
30/08/2016 12:42-13:12 NM2 57 44 49 64 No N/A Yes
30/08/2016 13:12-13:42 NM2 44 42 46 56 No N/A Yes
30/08/2016 13:42-14:12 NM2 47 45 49 58 No N/A Yes
30/08/2016 14:27-14:57 NM3 54 45 57 72 No N/A Yes
30/08/2016 14:57-15:27 NM3 54 46 56 78 No N/A Yes
30/08/2016 15:27-15:57 NM3 57 45 55 83 No N/A Yes
30/08/2016 22:04-22:34 NM1 47 42 50 57 No N/A Site activity audible Yes
30/08/2016 20:45-21:15 NM2 42 40 43 53
No N/A
No noise noted from
Site. Other factory in
area audible
Yes
15/09/2016 21:59-22:26 NM3 38 37 39 49No N/A
Traffic and Site noise
audibleYes
31/08/2016 02:30-02:45 NM1 41 40 42 54 No N/A Yes
31/08/2016 02:45-03:00 NM1 41 40 43 40 No N/A Yes
15/09/2016 23:00-23:15 NM1 38 36 40 54 No N/A Yes
15/09/2016 23:15-23:30 NM1 45 36 40 71 No N/A Yes
30/08/2016 23:15-23:30 NM2 43 42 45 50 No N/A Yes
30/08/2016 23:30-23:45 NM2 43 42 44 47 No N/A Yes
30/08/2016 23:45-00:00 NM2 42 41 44 46 No N/A Yes
16/09/2016 00:04-00:19 NM2 38 36 40 51 No N/A Yes
31/08/2016 00:13-00:28 NM3 40 37 42 54 No N/A Yes
31/08/2016 00:28-00:43 NM3 44 38 48 62 No N/A Yes
31/08/2016 01:45-02:00 NM3 41 38 43 58 No N/A Yes
15/09/2016 23:40 - 23:55 NM3 41 37 43 51 No N/A Yes
Other factory in area
audible. Some Site
activity audible
When was the noise reduction plan last updated?
Noise monitoring summary report
Have there been changes relevant to site noise emissions (e.g. plant or operational changes) since the last
noise survey?
Table N1: Noise monitoring summary
Site activity audible
Was noise monitoring a licence requirement for the AER period?
If yes please fill in table N1 noise summary below
Was noise monitoring carried out using the EPA Guidance note, including completion of the
"Checklist for noise measurement report" included in the guidance note as table 6?
Does your site have a noise reduction plan
Traffic audible. Offsite
construction activity
audible
Site activity and offsite
construction and
traffic audible
Offsite construction
and traffic audible
Site Audible
*Please ensure that a tonal analysis has been carried out as per guidance note NG4. These records must be maintained onsite for future inspection
SELECTIf noise limits exceeded as a result of noise attributed to site activities, please choose the corrective action from the following options?
Any additional comments? (less than 200 words)
** please explain the reason for not taking action/resolution of noise issues?
Resource Usage/Energy efficiency summary Lic No: P0001-04 Year 2016
Additional information
1 2014
2
SEAI - Large
Industry Energy
Network (LIEN) Yes SEAI
3 Yes
Stack monitoring of
Oxides of Sulphur is
below the Licence
Limit
Energy Use Previous year Current year
Production +/- %
compared to
previous
reporting year**
Energy
Consumption +/- %
vs overall site
production*
Total Energy Used (MWHrs) 35775.13 37019.69 -18.67%
Total Energy Generated (MWHrs) N/A N/A
Total Renewable Energy Generated (MWHrs)N/A N/A
Electricity Consumption (MWHrs) 35775.13 37019.69 -18.67%
Fossil Fuels Consumption:
Heavy Fuel Oil (m3) N/A N/A
Light Fuel Oil (m3) 77.85 425.034 -18.67%
Natural gas (m3) 117.35 223.639 -18.67%
Coal/Solid fuel (metric tonnes) N/A N/A
Peat (metric tonnes) N/A N/A
Renewable Biomass 90876.81 73130.17 -18.67%
Renewable energy generated on site N/A N/A
* where consumption of energy can be compared to overall site production please enter this information as percentage increase or decrease compared to the previous reporting year.
** where site production information is available please enter percentage increase or decrease compared to previous year
Water Emissions Water Consumption
Water use
Water extracted
Previous year m3/yr.
Water extracted
Current year m3/yr.
Production +/- %
compared to
previous
reporting year**
Energy
Consumption +/- %
vs overall site
production*
Volume Discharged
back to
environment(m3yr):
Volume used i.e. not
discharged to
environment e.g.
released as steam
m3/yr Unaccounted for Water:
Groundwater 65953 65104 -18.67%
Surface water N/A N/A
Public supply N/A N/A
Recycled water
Total 65953 65104 -18.67%
* where consumption of water can be compared to overall site production please enter this information as percentage increase or decrease compared to the previous reporting year.
** where site production information is available please enter percentage increase or decrease compared to previous year
Total Landfill Incineration Recycled Other
Hazardous (Tonnes) 159.596 15.94 143.656
Non-Hazardous (Tonnes) 1343.459 757.275 586.184
Table R3 Waste Stream Summary
Table R2 Water usage on site
When did the site carry out the most recent energy efficiency audit? Please list the recommendations in table 3 below
Is the site a member of any accredited programmes for reducing energy usage/water conservation
such as the SEAI programme linked to the right? If yes please list them in additional information
Where Fuel Oil is used in boilers on site is the sulphur content compliant with licence conditions? Please state percentage
in additional information
Table R1 Energy usage on site
Resource Usage/Energy efficiency summary Lic No: P0001-04 Year 2016
Date of audit Recommendations
Description of
Measures proposed Origin of measures
Predicted energy
savings % Implementation date Responsibility Completion date
Status and
comments
SELECT
SELECT
SELECT
Table R5: Power Generation: Where power is generated onsite (e.g. power generation facilities/food and drink industry)please complete the following information
Unit ID Unit ID Unit ID Unit ID Station Total
Technology
Primary Fuel
Thermal Efficiency
Unit Date of Commission
Total Starts for year
Total Running Time
Total Electricity Generated (GWH)
House Load (GWH)
KWH per Litre of Process Water
KWH per Litre of Total Water used on Site
Table R4: Energy Audit finding recommendations
Complaints and Incidents summary template Lic No: P0001-04 Year 2016
Additional information
Yes
Date Category Other type (please specify)
Brief description of complaint (Free txt
<20 words) Corrective action< 20 words Resolution status Resolution date Further information
03/02/2016 Dust
Complainant stated there was "white
pollution" on his property and issues with
rusting in his shed
Site investigations was undertaken Complete 24/02/2016 Continuous complainant. Detailed investigation undertaken by SmartPly and the EPA throughout 2016
10/03/2016 Odour
Resident in Faithlegg area reported he
could detect a strong odour of wood
burning which escalated in the last month
Maintenance of central louvre in the
press areaComplete 15/13/16
31/03/2016 Dust
The complainant had red dust on his hair
after returning home and a red coloured
water runoff when showering
No evidence red dust emitted from site Complete 04/04/2016
Complainant also stated that on inspection of his cattle that day they were unhappy and not eating which was
unusual behaviour that he attributed to dust on the pasture. He also stated dust was not evident visibly. He
stated that these events occurred on the 8th March which was relevant in relation to the investigation as the
factory was in shutdown at the time of his complaint. When he was contacted following investigation he also
mentioned odour issues and was informed about the issue with the press louvre that was resolved
26/04/2016 OdourBurnt acrid wood smell noticeable during
north westerly winds on 26/03/16
Site investigations were undertaken
which suggest it is unlikely SmartPly was
the source of the odour
Complete 27/04/2016
Site investigation at complainants dwelling carried out. No smell detected. Stack plume was noted as blowing
to the south west. Groundskeeper of neighbouring football club was interviewed and stated he have never
experience this odour. The neighbour of the complainant was also interviewed who had experienced the
odour issues and mentioned the potential health damage of the stack and formaldehyde usage.
18/05/2016 Dust Cattle White dust on land affecting cowsSite investigation showed No evidence of
white dust.Complete 15/16/16 Continuous complainant. Detailed investigation undertaken by SmartPly and the EPA throughout 2016
13/06/2016 NoiseBeeping noise heard between 2am and
4am on Sunday morning
An investigation was undertaken that
suggests there were No unusual noise
events on the night in question
Complete 20/06/2016
19/07/2016 Dust Complaint of black dust and odour in fieldsNo evidence of issues at the location
when a site investigation was undertakenComplete 19/07/2016 Continuous complainant. Detailed investigation undertaken by SmartPly and the EPA throughout 2016
05/08/2016 Vegetation turning blackComplainant claims SmartPly emissions
are turning vegetation on his land black
No evidence of issues at the location,
wind direction was wrong and SmartPly
has invested heavily in emission
mitigation.
Complete 10/08/2016 Continuous complainant. Detailed investigation undertaken by SmartPly and the EPA throughout 2016
05/09/2016 Melted blue oily materialComplainant states residue on their jeep
is a result of emissions from SmartPly
Site inspection took place, no evidence of
residue.Complete 05/08/2016 Continuous complainant. Detailed investigation undertaken by SmartPly and the EPA throughout 2016
04/10/2016 Odour Odour driving cows madVet visited and diagnosed cattle with
photosensitivity.Complete 10/08/2016 Continuous complainant. Detailed investigation undertaken by SmartPly and the EPA throughout 2016
25/10/2016 Two sick animals
Complainant stated there was "four
stuffs" coming out of SmartPly which
should not be, and that EPA would test
his land
Animals were getting better, EPA visit
arranged by complainant.Complete 08/11/2016 Continuous complainant. Detailed investigation undertaken by SmartPly and the EPA throughout 2016
11/11/2016 AirComplainant said "black stuff" coming
from SmartPly
Investigated immediately, plume was
steam (and pictured) and moving in
different direction to complainants
property
Complete 11/11/2016 Continuous complainant. Detailed investigation undertaken by SmartPly and the EPA throughout 2016
SELECT
Total complaints
open at start of
reporting year 0
Total new
complaints
received during
reporting year 12
Total complaints
closed during
reporting year 12
Balance of
complaints end of
reporting year 0
Additional information
Yes
What is an incident
Table 2 Incidents summary
Date of occurrence Incident nature Location of occurrence Incident category*please refer to guidance Receptor Cause of incident
Other
cause(please
specify)
Activity in progress at time of incident Communication OccurrenceCorrective action<20
words
Preventative
action <20
words
Resolution
status
Resolution
date
Likelihood of
reoccurrence
01/02/2016Other(DG2 dust jar damaged
during transport)In transit 1. Minor No Uncontrolled release
Other (add
details)
DG2 dust jar
damaged during
transport to
laboratory
Normal activities None New
Fitz Scientific
Laboratories
contacted
Use of
adequate
packaging for
future
transportatio
n of samples
Complete 01/02/2016 Low
Complaints
Have you received any environmental complaints in the current reporting year? If yes please complete summary details of
complaints received on site in table 1 below
Table 1 Complaints summary
Incidents
Have any incidents occurred on site in the current reporting year? Please list all incidents for current reporting year in Table 2
below
*For information on how to report and what
constitutes an incident
Complaints and Incidents summary template Lic No: P0001-04 Year 2016
Complaints
11/01/2016 Breach of ELV STP 1. Minor WaterPlant or
equipment issues
Maintenance of
plant or
equipment at
WWTP
Normal activities EPA NewSewage Treatment
Plant cleaned out
Schedule of
sewage
treatment
plant clean
out emailed
to contractor
Complete 01/04/2016 Low
01/02/2016 Breach of ELV DG3 1. Minor AirOther (add
details)
The root cause is
the ongoing
construction
work and / or the
close proximity
of the access
road to the
monitoring point
Construction EPA RecurringConsultation with
EPA 29th March
Monitoring at
DG3Complete 29/03/2016 Medium
31/03/2016 Breach of ELV STP 1. Minor WaterPlant or
equipment issuesNormal activities EPA Recurring
Manufacturing
company engaged to
undertake
maintenance
servicing
Schedule
compiled to
undertake
required
frequent
maintenance
servicing and
desludging
Complete 31/03/2016 Low
29/04/2016 Breach of ELV DG2 & DG3 1. Minor AirOther (add
details)
DG2 -caused by
construction site
above the
SmartPly facility.
DG3 - location of
dust jar beside
the access road
Normal activities. Construction on going above the SmartPly Facility. Continuous traffic movement occurring at
DG3EPA Recurring
Vegetation
maintenance. Dust
monitoring jar has
been removed to the
perimeter fence
following vegetation
and tree clearance
Vegetation
MaintenanceComplete 05/07/2016 Low
31/05/2016 Breach of ELV DG3 1. Minor AirOther (add
details)
Close proximity
of monitoring
point to the
access road
Normal activities EPA Recurring
Dust monitoring jar
relocated to the
perimeter fence
following vegetation
and tree clearance
July monthly
monitoring
should
indicate
whether the
relocation of
the dust jar is
adequate
Complete 05/07/2016 Low
30/06/2016 ELV Exceedance DG1 DG2 DG3 1.Minor AirOther (add
details)
External
construction
sites and
vegetation
overgrowth
Normal activities EPA RecurringVegetation
maintenance
Vegetation
MaintenanceOngoing N/A Low
01/07/2016
Other(Missed May surface water
sampling round due to courier
damaging samples)
SW1-A 1. Minor No Uncontrolled releaseInadequate
Training
Leading to
damage to
sample
Normal activities EPA NewSample to be
retaken 5th July
ALS
Laboratories
to be
engaged for
future
monitoring
Complete 05/07/2016 Low
31/08/2016 Breach of ELV DG2 1. Minor AirOther (add
details)
Several potential
sources identifiedOther (Ambient Monthly Monitoring) EPA Recurring DG2 was relocated
Monitoring
will be
continued on
a monthly
basis
Complete 30/09/2016 Low
30/09/2016 Monitoring equipment offline DG1 and DG3 1. Minor No Uncontrolled releaseInadequate
Training
Courier
Transportation
damage
Normal activities EPA RecurringALS to be used going
forward
Dust jars are
collected
directly by
the lab so No
courier is
required.
SmartPly
wish to
continue to
use plastic
jars going
forwards to
eliminate jar
damage.
Complete 03/10/2016 Low
04/10/2016 Odour Emergency holding tank two 1. Minor AirOther (add
details)
Movement of
sludge during the
clean out process
Normal activities None New
Sludge to be
removed and
members of the
community
contacted to enquire
about issues and
apologise
EHT will be
free of sludgeOngoing N/A Low
28/10/2016 Breach of ELV P0001-A2-4 1. Minor AirOther (add
details)
Failure of
abatement
equipment (not
WWTP)
Normal activities None New
Bags at BH3 were
changed out and will
be reassessed in the
new year
Continued
monitoring of
BH3 on a
shift basis.
Ongoing N/A Low
Total number of
incidents current
year 12
Total number of
incidents previous
year 9
% reduction/
increase +33.33%
WASTE SUMMARY Lic No: P0001-04 Year 2016
PRTR facility logon
Additional Information
1 No
2 SELECT
3 SELECT
Table 1 Details of waste accepted onto your site for recovery, disposal or treatment (do not include wastes generated at your site, as these will have been reported in your PRTR workbook)EWC code Description of waste
accepted
Please enter an
accurate and detailed
description - which
applies to relevant EWC
code
Quantity of waste
accepted in current
reporting year (tonnes)
Reason for
reduction/ increase
from previous
reporting year
Packaging Content (%)-
only applies if the
waste has a packaging
component
European Waste Catalogue EWC codes European Waste
Catalogue EWC codes
4 SELECT
5 SELECT
6 SELECT
7 Do you have an odour management system in place for your facility? If no why? SELECT
8 Do you maintain a sludge register on site? SELECT
Table 2 Waste type and tonnage-landfill only
Waste types permitted
for disposal
Authorised/licenced annual intake for
disposal (tpa)
Actual intake for disposal in
reporting year (tpa)
Remaining licensed
capacity at end of
reporting year (m3) Comments
Table 3 General information-Landfill only
Total disposal
area occupied
by waste
Lined disposal
area occupied by
waste
Unlined area
SELECT UNIT SELECT UNIT SELECT UNIT
Cell 8
SECTION A-PRTR ON SITE WASTE TREATMENT AND WASTE TRANSFERS TAB- TO BE COMPLETED BY ALL IPPC AND WASTE FACILITIES dropdown list click to see options
SECTION B- WASTE ACCEPTED ONTO SITE-TO BE COMPLETED BY ALL IPPC AND WASTE FACILITIES
Were any wastes accepted onto your site for recovery or disposal or treatment prior to recovery or disposal within the boundaries of your facility ?; (waste generated within your
boundaries is to be captured through PRTR reporting)
If yes please enter details in table 1 below
Did your site have any rejected consignments of waste in the current reporting year? If yes please give a brief explanation in the additional information
Was waste accepted onto your site that was generated outside the Republic of Ireland? If yes please state the quantity in tonnes in additional information
Licenced annual
tonnage limit for your
site (total
tonnes/annum)
Source of waste accepted Quantity of waste accepted in
previous reporting year (tonnes)
Reduction/
Increase over
previous year +/ -
%
Disposal/Recovery or
treatment operation carried
out at your site and the
description of this operation
Quantity of
waste
remaining on
site at the end
of reporting
year (tonnes)
Comments -
SECTION C-TO BE COMPLETED BY ALL WASTE FACILITIES (waste transfer stations, Composters, Material recovery facilities etc) EXCEPT LANDFILL SITES
Is all waste processing infrastructure as required by your licence and approved by the Agency in place? If no please list waste processing infrastructure required onsite
Is all waste storage infrastructure as required by your licence and approved by the Agency in place? If no please list waste storage infrastructure required on site
Does your facility have relevant nuisance controls in place?
SECTION D-TO BE COMPLETED BY LANDFILL SITES ONLY
Area ID Date landfilling commenced Date landfilling ceased Currently landfillingPrivate or Public
OperatedInert or non-hazardous
Predicted date to
cease landfilling
Licence permits
asbestos
Is there a separate cell
for asbestos?
Accepted asbestos in reporting
year
Comments on
liner type
WASTE SUMMARY Lic No: P0001-04 Year 2016
SECTION A-PRTR ON SITE WASTE TREATMENT AND WASTE TRANSFERS TAB- TO BE COMPLETED BY ALL IPPC AND WASTE FACILITIESTable 4 Environmental monitoring-landfill only Landfill Manual-Monitoring StandardsWas meterological
monitoring in
compliance with
Landfill Directive (LD)
standard in reporting
year +
Was leachate monitored in compliance
with LD standard in reporting year
Was Landfill Gas monitored in
compliance with LD standard
in reporting year
Was SW monitored in
compliance with LD
standard in reporting
year
Have GW trigger levels
been established
Were emission limit values agreed with
the Agency (ELVs)
Was topography
of the site
surveyed in
reporting year
Has the statement
under S53(A)(5) of
WMA been
submitted in
reporting year Comments
.+ please refer to Landfill Manual linked above for relevant Landfill Directive monitoring standards
Table 5 Capping-Landfill only
Area uncapped* Area with temporary cap
SELECT UNIT SELECT UNIT
*please note this includes daily cover area
Table 6 Leachate-Landfill only9 Is leachate from your site treated in a Waste Water Treatment Plant? SELECT
10 Is leachate released to surface water? If yes please complete leachate mass load information below SELECT
Volume of leachate in
reporting year(m3) Leachate (BOD) mass load (kg/annum)
Leachate (COD) mass load
(kg/annum)
Leachate (NH4) mass
load (kg/annum)
Leachate (Chloride)
mass load kg/annum Leachate treatment on-site
Specify type of
leachate
treatment Comments
Table 7 Landfill Gas-Landfill only
Gas
Captured&Treated by
LFG System m3 Power generated (MW / KWh) Used on-site or to national grid
Was surface emissions
monitoring performed
during the reporting
year? Comments
SELECT
Area with final cap to LD
Standard m2 ha, a Area capped other
Area with waste that
should be permanently
capped to date under
licence What materials are used in the cap Comments
Please ensure that all information reported in the landfill gas section is consistent with the Landfill Gas Survey submitted in conjunction with PRTR returns
Sheet : Facility ID Activities AER Returns Workbook 28/3/2017 16:35
| PRTR# : P0001 | Facility Name : Smartply Europe Limited | Filename : 17 03 28 E1355
SmartPly PRTR 2016 P0001_2016 1.xls | Return Year : 2016 | 3304 28/03/2017 17:04
Guidance to completing the PRTR workbook
Version 1.1.19
REFERENCE YEAR 2016
1. FACILITY IDENTIFICATION
Parent Company Name Smartply Europe Limited
Facility Name Smartply Europe Limited
PRTR Identification Number P0001
Licence Number P0001-04
Classes of Activity
No. class_name
- Refer to PRTR class activities below
Address 1 Belview
Address 2 Slieverue
Address 3
Address 4
Kilkenny
Country Ireland
Coordinates of Location -7.03300 52.2738
River Basin District IESE
NACE Code 1621
Main Economic Activity Manufacture of veneer sheets and wood-based panels
AER Returns Contact Name Jenny Byrne
AER Returns Contact Email Address [email protected]
AER Returns Contact Position Environmental Officer
AER Returns Contact Telephone Number 051851233
AER Returns Contact Mobile Phone Number
AER Returns Contact Fax Number 051851130
Production Volume 0.0
Production Volume Units
Number of Installations 1
Number of Operating Hours in Year 6102
Number of Employees 160
User Feedback/Comments Variences in emissions of sulphur oxides from 2015 levels is likely due
to the installation of a new wet scrubber abatement system in April
2016.
Web Address www.smartply.com
2. PRTR CLASS ACTIVITIES
Activity Number Activity Name
6(b)
Industrial plants for the production of paper and board and other
primary wood products (such as chipboard, fibreboard and plywood)
1(c) Thermal power stations and other combustion installations
3. SOLVENTS REGULATIONS (S.I. No. 543 of 2002)
Is it applicable? No
Have you been granted an exemption ? No
If applicable which activity class applies (as per
Schedule 2 of the regulations) ? N/A
Is the reduction scheme compliance route being
used ? N/A
4. WASTE IMPORTED/ACCEPTED ONTO SITE Guidance on waste imported/accepted onto site
Do you import/accept waste onto your site for on-
site treatment (either recovery or disposal
activities) ? No
This question is only applicable if you are an IPPC or Quarry site
PRTR Returns Workbook
| PRTR# : P0001 | Facility Name : Smartply Europe Limited | Filename : Copy of 17 03 28 E1355 SmartPly PRTR 2016 P0001_2016.xls | Return Year : 2016 | Page 1 of 1
4.1 RELEASES TO AIR Link to previous years emissions data | PRTR# : P0001 | Facility Name : Smartply Europe Limited | Filename : 17 03 28 E1355 SmartPly PRTR 2016 P0001_2016 1.xls | Return Year : 2016 | 28/03/2017 16:46
8 10 18 18 26 30 6 6 6 6 6 11 28
SECTION A : SECTOR SPECIFIC PRTR POLLUTANTS
Please enter all quantities in this section in KGs
QUANTITY
A2-1
No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year
02 - Carbon monoxide (CO) M EN 15058:2004 197857.35 197857.35 0.0 0.0
08 Nitrogen oxides (NOx/NO2) M EN 14792:2005 62545.5 62545.5 0.0 0.0
11 Sulphur oxides (SOx/SO2) M EN 14791:2005 1342.44 1342.44 0.0 0.0
* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button
SECTION B : REMAINING PRTR POLLUTANTS
Please enter all quantities in this section in KGs
QUANTITY
A2-1
No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year
71 - Phenols (as total C) M EN 1911-1 to 3:2003 282.2175 282.2175 0.0 0.0
* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button
SECTION C : REMAINING POLLUTANT EMISSIONS (As required in your Licence)
Please enter all quantities in this section in KGs
QUANTITY
A2-1 A2-2 A2-3 A2-4 A2-5 A2-6
Pollutant No. Name M/C/E Method Code Designation or Description Emission Point 1 Emission Point 2 Emission Point 3 Emission Point 4 Emission Point 5 Emission Point 6 T (Total) KG/Year
A (Accidental)
KG/Year
F (Fugitive)
KG/Year
212 Formaldehyde M CRM US EPA M316 24545.295 0.0 0.0 0.0 0.0 0.0 24545.295 0.0 0.0
322 MDI as NCO group M CRM SRM - US EPA CTM 036 4.5765 0.0 0.0 0.0 0.0 0.0 4.5765 0.0 0.0
244 Total Particulates M CRM SRM - EN 13284-1 29030.265 819.6 44.35 1449.99 33.1 36.22 31413.525 0.0 0.0
242 Total Aldehydes (as C) M CRM US EPA M0011 15743.16 0.0 0.0 0.0 0.0 0.0 15743.16 0.0 0.0
208 Condenseable volatile organic compounds M EN 1911-1 to 3:2003 47305.76 0.0 0.0 0.0 0.0 0.0 47305.76 0.0 0.0
* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button
Additional Data Requested from Landfill operators
Landfill: Smartply Europe Limited
Please enter summary data on the
quantities of methane flared and / or utilised
additional_pollutant_no T (Total) kg/Year M/C/E Method Code
Designation or
Description
Facility Total Capacity m3
per hour
Total estimated methane generation (as per site
model) 0.0 N/A
Methane flared 0.0 0.0 (Total Flaring Capacity)
Methane utilised in engine/s 0.0 0.0 (Total Utilising Capacity)
Net methane emission (as reported in Section A
above) 0.0 N/A
Method Used
Method Used
RELEASES TO AIR
POLLUTANT METHOD
Method Used
POLLUTANT
RELEASES TO AIR
RELEASES TO AIR
METHOD
POLLUTANT METHOD
Method Used
For the purposes of the National Inventory on Greenhouse Gases, landfill operators are requested to provide summary data on landfill gas (Methane)
flared or utilised on their facilities to accompany the figures for total methane generated. Operators should only report their Net methane (CH4)
emission to the environment under T(total) KG/yr for Section A: Sector specific PRTR pollutants above. Please complete the table below:
4.2 RELEASES TO WATERS Link to previous years emissions data | PRTR# : P0001 | Facility Name : Smartply Europe Limited | Filename : 17 03 28 E1355 SmartPly PRTR 2016 P0001_2016 1.xls | Return Year : 2016 | 28/03/2017 16:46
8 8 16 16 24 24 6 6 6 6 6
SECTION A : SECTOR SPECIFIC PRTR POLLUTANTS Data on ambient monitoring of storm/surface water or groundwater, conducted as part of your licence requirements, should NOT be submitted under AER / PRTR Reporting as this only concerns Releases from your facility
Please enter all quantities in this section in KGs
QUANTITY
No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year
0.0 0.0 0.0 0.0
* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button
SECTION B : REMAINING PRTR POLLUTANTS
Please enter all quantities in this section in KGs
QUANTITY
No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year
0.0 0.0 0.0 0.0
* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button
SECTION C : REMAINING POLLUTANT EMISSIONS (as required in your Licence)
Please enter all quantities in this section in KGs
QUANTITY
Pollutant No. Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year
M CRM 0.0 0.0 0.0 0.0
* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button
Method Used
POLLUTANT
Method Used
POLLUTANT
POLLUTANT
RELEASES TO WATERS
Method Used
RELEASES TO WATERS
RELEASES TO WATERS
4.3 RELEASES TO WASTEWATER OR SEWER Link to previous years emissions data | PRTR# : P0001 | Facility Name : Smartply Europe Limited | Filename : 17 03 28 E1355 SmartPly PRTR 2016 P0001_2016 1.xls | Return Year : 2016 |28/03/2017 16:46
8 8 16 16 6 6 6 6
SECTION A : PRTR POLLUTANTS
Please enter all quantities in this section in KGs
QUANTITY
No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year
0.0 0.0 0.0 0.0
* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button
SECTION B : REMAINING POLLUTANT EMISSIONS (as required in your Licence)
Please enter all quantities in this section in KGs
QUANTITY
Pollutant No. Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year
0.0 0.0 0.0 0.0
* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button
OFFSITE TRANSFER OF POLLUTANTS DESTINED FOR WASTE-WATER TREATMENT OR SEWER
OFFSITE TRANSFER OF POLLUTANTS DESTINED FOR WASTE-WATER TREATMENT OR SEWER
Method Used
Method Used
POLLUTANT METHOD
POLLUTANT METHOD
4.4 RELEASES TO LAND Link to previous years emissions data | PRTR# : P0001 | Facility Name : Smartply Europe Limited | Filename : 17 03 28 E1355 SmartPly PRTR 2016 P0001_2016 1.xls | Return Year : 2016 | 28/03/2017 16:46
8 8 16 16 6 6 6 6
SECTION A : PRTR POLLUTANTS
Please enter all quantities in this section in KGs
QUANTITY
No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year
0.0 0.0 0.0
* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button
SECTION B : REMAINING POLLUTANT EMISSIONS (as required in your Licence)
Please enter all quantities in this section in KGs
QUANTITY
Pollutant No. Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year
0.0 0.0 0.0
* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button
POLLUTANT METHOD
Method Used
RELEASES TO LAND
RELEASES TO LAND
POLLUTANT METHOD
Method Used
Quantity
(Tonnes per
Year)
Haz Waste : Name and
Licence/Permit No of Next
Destination Facility
Non Haz Waste: Name and
Licence/Permit No of
Recover/Disposer
Haz Waste : Address of Next
Destination Facility
Non Haz Waste: Address of
Recover/Disposer
Name and License / Permit No. and
Address of Final Recoverer /
Disposer (HAZARDOUS WASTE
ONLY)
Actual Address of Final Destination
i.e. Final Recovery / Disposal Site
(HAZARDOUS WASTE ONLY)
Transfer Destination
European Waste
Code Hazardous Quanti ty T/Year Description of Waste
Waste
Treatment
Operation M/C/E Method Used
Location of
Treatment Nam e and L ic enc e / Perm i t No. o f Rec ov erer / Dis pos er / Brok er Addres s of Rec ov erer / Dis pos er / Brok er Nam e and Addres s of Fina l Des tination i .e . Fina l Rec ov ery / Dis pos al Si te (HAZARDOUS WASTE ONLY) Lic enc e / Perm i t No. o f Fina l Des tination i .e . Fina l Rec ov ery / Dis pos al Si te (HAZARDOUS WASTE ONLY)
To Other Countries 08 01 11 Yes 30.0
waste paint and varnish containing organic
solvents or other dangerous substances R12 M Weighed Abroad
Eco-Safe Systems
Ltd,W0054-02
Unit 1A Allied Industrial
Estate,Kylemore
Road,Ballyfermot,Dublin
10,Ireland
Recyfuel
S.A.,D3200/61080/RGPED/2
008/2/AP,Zoning Industriel
d'Ehein,B-4480 Engis ,.,.
,Belgium
Zoning Industriel d'Ehein,B-
4480 Engis ,.,. ,Belgium
Within the Country 10 01 01 No 105.94
bottom ash, slag and boiler dust (excluding
boiler dust mentioned in 10 01 04) D15 M Weighed Offsite in Ireland
M&T Plant Hire Ltd,NWCPO-
08-01116-03
Ballyeden,Davidstown,Ennis
corthy,Co. Wexford,Ireland
To Other Countries 11 01 13 Yes 0.58
degreasing wastes containing dangerous
substances R2 M Weighed Abroad ENVA Ireland,W0184-01
Unit 5 Anton
Road,Tallaght,Dublin
24,Dublin,Ireland
Solvent Resource
Management
Ltd,TP3334SF,Weeland
Rd,Knottingly,West
Yorkshire WF 11
8DZ,.,United Kingdom
Weeland Rd,Knottingly,West
Yorkshire WF 11
8DZ,.,United Kingdom
Within the Country 13 05 07 Yes 25.78 oily water from oil/water separators R9 M Weighed Offsite in Ireland Enva Ireland Ltd ,W0184-01
Clonminam Industrial Estate
,Portlaoise ,Co Laois,.,Ireland
Enva Ireland Ltd ,W0184-
01,Clonminam Industrial
Estate ,Portlaoise ,Co
Laois,.,Ireland
Clonminam Industrial Estate
,Portlaoise ,Co Laois,.,Ireland
To Other Countries 15 01 01 No 6.64 paper and cardboard packaging R3 M Weighed Abroad
Saica Natur UK Ltd,Broker
Permit reg nr IRE/G277/15 .,.,.,.,United Kingdom
Within the Country 15 01 03 No 112.9 wooden packaging R1 M Weighed Offsite in Ireland
Clonmel Waste Disposal
Ltd,WFP-TS-11-0001-03
Lawlesstown,Recycling
Facility,Clonmel Co.
Tipperary,.,Ireland
Within the Country 15 01 06 No 3.18 mixed packaging R3 M Weighed Offsite in Ireland
Killarney Waste
Disposal,W0217-01
Aughacurreen,.,Killarney
Co. Kerry,.,Ireland
Within the Country 15 01 07 No 0.18 glass packaging R5 M Weighed Offsite in Ireland Rehab Glassco,W0279-02
Carragh Road,Unit 4
Oberstown Business
Park,Naas Co.
Kildare,.,Ireland
To Other Countries 15 02 02 Yes 15.94
absorbents, filter materials (including oil
filters not otherwise specified), wiping cloths,
protective clothing contaminated by
dangerous substances D10 M Weighed Abroad Enva Ireland Ltd ,W0184-01
Clonminam Industrial Estate
,Portlaoise ,Co Laois,.,Ireland
R.D.
Recycling,51727/1/KD,Hout
halen,.,.,.,Belgium Houthalen,.,.,.,Belgium
To Other Countries 16 01 07 Yes 0.66 oil filters R4 M Weighed Abroad Enva Ireland Ltd ,W0184-01
Clonminam Industrial Estate
,Portlaoise ,Co Laois,.,Ireland
R.D.
Recycling,51727/1/KD,Hout
halen,.,.,.,Belgium Houthalen,.,.,.,Belgium
Within the Country 17 04 05 No 118.64 iron and steel R4 M Weighed Offsite in Ireland
Cork Metal Company Ltd
,WFP-CK-10-0067-01 Dublin Hill ,.,.,.,Ireland
Within the Country 17 09 04 No 133.44
mixed construction and demolition wastes
other than those mentioned in 17 09 01, 17
09 02 and 17 09 03 R13 M Weighed Offsite in Ireland
CHI Environmental
Ltd,W0260-01
Grannagh,Kilmacow,Waterfo
rd,.,Ireland
Within the Country 20 01 01 No 0.96 paper and cardboard R3 M Weighed Offsite in Ireland
Shred-IT,WFP-MH-10-0012-
02
53 Parkwest Road,.,.,Dublin
12,Ireland
Within the Country 20 01 01 No 0.945 paper and cardboard R3 M Volume Calculation Offsite in Ireland
Rehab Recycle Unit
(Tallaght),WFP-DS-10-0008-
03
77 Broomhill
Road,Tallaght,Dublin
24,.,Ireland
Within the Country 20 01 08 No 7.58 biodegradable kitchen and canteen waste R3 M Weighed Offsite in Ireland
Acorn Recycling Ltd,W0249-
01
Ballybeg Composting
Facility,.,Ballybeg Littleton
Co. Tipperary,.,Ireland
Within the Country 20 01 25 No 0.79 edible oil and fat R9 M Weighed Offsite in Ireland
Frylite (Ireland) Ltd ,WCP-
DC-10-1297
Unit 16,Monaghan Rd Ind
Park,Monaghan Rd ,Co.
Cork,Ireland
Within the Country 20 01 35 Yes 2.496
discarded electrical and electronic
equipment other than those mentioned in 20
01 21 and and 20 01 23 containing
hazardous components R13 M Weighed Offsite in Ireland
Rehab Recycle Unit
(Tallaght),WFP-DS-10-0008-
03
77 Broomhill
Road,Tallaght,Dublin
24,.,Ireland
KMK Metals Recycling
Ltd,W0113-03,Cappincur
Industrial Estate,Daingean
Rd,Tullamore,Co.
Offaly,Ireland
Cappincur Industrial
Estate,Daingean
Rd,Tullamore,Co.
Offaly,Ireland
Within the Country 20 03 01 No 212.38 mixed municipal waste R1 M Weighed Offsite in Ireland Glanway Ltd,P1015-01
.,Units 5 & 6 Belview
Port,Gorteens Slieverue Co.
Kilkenny,.,Ireland
Within the Country 20 03 04 No 65.22 septic tank sludge R3 M Weighed Offsite in Ireland
Ormonde Organics Ltd,WCP-
OY-08-0595-01
Ballinalacken ,Attanagh ,Via
Portlaoise ,Co
Kilkenny,Ireland
Within the Country 10 01 01 No 337.76
bottom ash, slag and boiler dust (excluding
boiler dust mentioned in 10 01 04) D15 M Weighed Offsite in Ireland
Carlow County Council/
Powerscourt Landfill
Site,W0025-04
Kilkenny Road,.,Carlow Co.
Carlow,.,Ireland
Within the Country 10 01 01 No 61.02
bottom ash, slag and boiler dust (excluding
boiler dust mentioned in 10 01 04) D15 M Weighed Offsite in Ireland Bord Na Mona,W0201-03
Drehid Waste Management
Facility,.,Drehid Co.
Kildare,.,Ireland
Within the Country 10 01 01 No 81.32
bottom ash, slag and boiler dust (excluding
boiler dust mentioned in 10 01 04) D15 M Weighed Offsite in Ireland
Acorn Recycling Ltd,W0249-
01
Ballybeg Composting
Facility,.,Ballybeg Littleton
Co. Tipperary,.,Ireland
Within the Country 13 02 08 Yes 2.16 other engine, gear and lubricating oils R9 M Weighed Offsite in Ireland Enva Ireland Ltd ,W0184-01
Clonminam Industrial Estate
,Portlaoise ,Co Laois,.,Ireland
Enva Ireland Ltd ,W0184-
01,Clonminam Industrial
Estate ,Portlaoise ,Co
Laois,.,Ireland
Clonminam Industrial Estate
,Portlaoise ,Co Laois,.,Ireland
Within the Country 18 01 03 Yes 0.144
wastes whose collection and disposal is
subject to special requirements in order to
prevent infection D15 M Weighed Offsite in Ireland
Initial Medical Services
Ltd.,W0165-02
.,.,Ballynagran Coolbeg and
Kilcandra Co.
Wicklow,.,Ireland
Indaver,W0167-
03,Carranstown,.,Duleek,Co.
Meath,Ireland
Carransrtown,.,Duleek,Co.
Meath,Ireland
Within the Country 20 01 21 Yes 0.14
fluorescent tubes and other mercury-
containing waste R4 M Weighed Offsite in Ireland
Irish Lamp Recycling Co.
Ltd.,WFP-KE-14-0072-01
Woodstock Industrial Estate
Kilkenny Road,.,Athy,Co.
Kildare,Ireland
Irish Lamp Recycling Co.
Ltd.,WFP-KE-14-0072-
01,Woodstock Industrial
Estate,Kilkenny
Road,Athy,Co.
Kildare,Ireland
Woodstock Industrial
Estate,Kilkenny
Road,Athy,Co.
Kildare,Ireland
Within the Country 15 01 02 No 10.24 plastic packaging R3 M Weighed Offsite in Ireland
Leinster Environmental,WFP-
LH-11-0002-01
Clermont Park,
,Haggardstown Dundalk
Co. Louth,.,Ireland
Within the Country 15 01 02 No 3.64 plastic packaging R3 M Weighed Offsite in Ireland
Rilta Environmental
Limited,WO-192-03
Grants Drive,Greenogue
Industrial
Estate,Rathcoole,Co.
Dublin,Ireland
Within the Country 20 01 25 No 4.16 edible oil and fat R9 M Weighed Offsite in Ireland
M&T Plant Hire Ltd,NWCPO-
08-01116-03
Ballyeden,Davidstown,Ennis
corthy,Co. Wexford,Ireland
Within the Country 17 04 05 No 74.94 iron and steel R4 M Weighed Offsite in Ireland
United Metals,WFP0LKC-11-
003-01
Monoclino Industrial Estate
Ballysimon
Road,.,Limerick,Co.
Limerick,Ireland
Within the Country 17 04 11 No 1.44
cables other than those mentioned in 17 04
10 R4 M Weighed Offsite in Ireland
United Metals,WFP0LKC-11-
003-01
Monoclino Industrial Estate
Ballysimon
Road,.,Limerick,Co.
Limerick,Ireland
To Other Countries 13 03 07 Yes 81.84
mineral-based non-chlorinated insulating
and heat transmission oils R9 M Weighed Abroad
Oil Salvage
Ltd,EPR/MP3734SC
Lyster
Road,Bootle,Merseyside,L20
1AS,United Kingdom
Oil Salvage
Ltd,EPR/MP3734SC,Lyster
Road,Bootle,Merseyside,L20
1AS,United Kingdom
Lyster
Road,Bootle,Merseyside,L20
1AS,United Kingdom
Method Used