1109 BRITANNIA ROAD EAST, MISSISSAUGA, ON, L4W 3X1 TEL: (647) 496-8055 www.floradesigns.net Page - 1 of 10 Development Engineering Department, Town of Oakville 1225 Trafalgar Road Oakville, ON L6H 0H3. RE: Stormwater management brief for the proposed rezoning and lot addition proposal for St.Thomas of Aquinas Catholic Secondary School located at 304 332 Rebecca Street, Town of Oakville, Ont., Issued for ReZoning – May 24, 2017. Dear Sir/Madam, This development application proposes to add adjoining lands previously occupied by four residential dwellings and a portion of a former right of way fronting Rebecca Street to the existing St.Thomas of Aquinas Catholic Secondary School site located at 304 332 Rebecca Street, Town of Oakville, Ontario. This development application proposes to maintain existing grades and overland flow paths of approximately 5,154.72 m 2 lot area added to an existing 55,703.51 m 2 school site. No other alteration is proposed to the existing storm sewer infrastructure serving the current establishments on private property. Predevelopment Conditions Currently the school site is well developed. A fully functional network of storm sewers, sanitary sewers and watermains are serving the existing establishment on the site. Per the original design prepared by Valdor Engineering (SP.1617.028/06, Revised dated January 2009), the portion of the rear yards of all four lots and the entire lands occupied by pedestrian right of way was accounted as contributing stormwater discharge to the private storm sewer infrastructure belongs to the school site. A drainage area plan from the original stormwater management report prepared by Valdor Engineering is included in Appendix. Furthermore, based on review of the existing topographic survey, we have concluded that, the entirety of the lands, including front yards of all four residential lots and the entire lands occupied by former pedestrian right of way slope towards the south property line. The stormwater flows from this portion of lands travel towards the south property limit through overland sheet flow, which subsequently generates uncontrolled discharge into the existing catch basins and private storm sewer infrastructure belonging to the school site. Please refer to the predevelopment drainage area plan included in Appendix. Postdevelopment Conditions In the postdevelopment condition, this development application proposes to maintain the existing grades and flow paths of the land area proposed to be added to the school site. Please refer to the postdevelopment drainage area plan included in Appendix. In an attempt to quantify the increase in the post development stormwater flow conveyed by the private infrastructure of storm sewers belongs to the school site, a postdevelopment composite runoff coefficient of 0.28 is calculated in accordance with the Development Engineering Procedures

Upload: others

Post on 19-Apr-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 17331 SWM St.Thomas Aquinas May 18, 2017

1109 BRITANNIA ROAD EAST, MISSISSAUGA, ON, L4W 3X1 TEL: (647) 496-8055 www.floradesigns.net Page - 1 of 10

Development Engineering Department, Town of Oakville 1225 Trafalgar Road Oakville, ON L6H 0H3.  RE:  Stormwater management  brief  for  the  proposed  re‐zoning  and  lot  addition  proposal  for 

St.Thomas of Aquinas Catholic Secondary School located at 304 ‐ 332 Rebecca Street, Town of Oakville, Ont., Issued for Re‐Zoning – May 24, 2017. 

 Dear Sir/Madam,    This  development  application  proposes  to  add  adjoining  lands  previously  occupied  by  four residential dwellings and a portion of a former right of way fronting Rebecca Street to the existing St.Thomas of Aquinas Catholic Secondary School site located at 304 ‐ 332 Rebecca Street, Town of Oakville, Ontario. This development application proposes to maintain existing grades and overland flow paths of approximately 5,154.72 m2 lot area added to an existing 55,703.51 m2 school site. No other  alteration  is  proposed  to  the  existing  storm  sewer  infrastructure  serving  the  current establishments on private property.  Pre‐development Conditions  Currently  the  school  site  is well developed. A  fully  functional network of  storm  sewers,  sanitary sewers and watermains are serving  the existing establishment on  the site. Per  the original design prepared by Valdor Engineering (SP.1617.028/06, Revised dated January 2009), the portion of the rear yards of all four lots and the entire lands occupied by pedestrian right of way was accounted as contributing stormwater discharge to the private storm sewer  infrastructure belongs to the school site. A drainage  area plan  from  the original  stormwater management  report prepared by Valdor Engineering is included in Appendix.   Furthermore,  based  on  review  of  the  existing  topographic  survey, we  have  concluded  that,  the entirety of the lands, including front yards of all four residential lots and the entire lands occupied by  former pedestrian  right of way  slope  towards  the  south property  line.  The  stormwater  flows from  this portion of  lands    travel  towards  the  south property  limit  through overland  sheet  flow, which  subsequently  generates  uncontrolled  discharge  into  the  existing  catch  basins  and  private storm  sewer  infrastructure  belonging  to  the  school  site.  Please  refer  to  the  pre‐development drainage area plan included in Appendix.   Post‐development Conditions  In the post‐development condition, this development application proposes to maintain the existing grades and flow paths of the land area proposed to be added to the school site. Please refer to the post‐development drainage area plan included in Appendix.  In an attempt to quantify the  increase  in the post development stormwater flow conveyed by the private  infrastructure of  storm  sewers belongs  to  the  school  site, a post‐development  composite runoff coefficient of 0.28 is calculated in accordance with the Development Engineering Procedures 

Page 2: 17331 SWM St.Thomas Aquinas May 18, 2017

1109 BRITANNIA ROAD EAST, MISSISSAUGA, ON, L4W 3X1 TEL: (647) 496-8055 www.floradesigns.net Page - 2 of 10

and Guidelines Manual provided by the Town of Oakville for the entire site based on actual pervious and  impervious surface treatments. Based on the pre‐development site area of 0.284 ha having a composite runoff coefficient of 0.31 per the design documents prepared by Valdor Engineering and the  post‐development  site  area  of  0.515  ha  having  a  composite  runoff  coefficient  of  0.28,  the calculated value of storm runoff during the 5‐year and 100‐year rainfall events are summarised  in the Table‐1 below and detailed post‐development peak flow calculations are included in Appendix.  Table‐5  Peak Flow Summary  

Pre‐development Condition  Post‐development Condition Storm Event  Drainage 

Area (ha) 

Runoff Coefficient 

(C) 

Peak Runoff from  (m3/s) 

Drainage Area (ha) 

Runoff Coefficient 

(C) 

Peak Runoff from  (m3/s) 

5‐year  0.284  0.31  0.028  0.515  0.28  0.046 

100‐year  0.284  0.31  0.049  0.515  0.28  0.081 

 The  above  noted  calculations  concludes  that,  the  amount  of  increase  in  the  post‐development stormwater  runoff  in  comparison  to  the  total discharge  from  the  school  site  is a bare minimum. Also,  the  stormwater discharge  from  the entire  school  site  is  controlled  to  the allowable  release rate. Based on above, we conclude  that,  this  improvement  is not anticipated  to create significant negative  impacts on  the existing  stormwater management controls,  local  surface ponding depths and municipal  infrastructure  of  storm  sewers.  Therefore,  this  development  application  does  not propose  any  additional  on‐site  storm  controls  and  no  other  engineering  design  justification  is produced to support this application.   We trust that the above information is sufficient to support this re‐zoning proposal. Should you have any questions, please feel free to contact the undersigned.  

Sincerely, 

 Chirag C. Patel, P.Eng, PMP 

Project Manager 

FLORA DESIGNS INC.        

Page 3: 17331 SWM St.Thomas Aquinas May 18, 2017

1109 BRITANNIA ROAD EAST, MISSISSAUGA, ON, L4W 3X1 TEL: (647) 496-8055 www.floradesigns.net Page - 3 of 10

APPENDIX                                               

Page 4: 17331 SWM St.Thomas Aquinas May 18, 2017

1109 BRITANNIA ROAD EAST, MISSISSAUGA, ON, L4W 3X1 TEL: (647) 496-8055 www.floradesigns.net Page - 4 of 10

KEY MAP  

                

Page 5: 17331 SWM St.Thomas Aquinas May 18, 2017

1109 BRITANNIA ROAD EAST, MISSISSAUGA, ON, L4W 3X1 TEL: (647) 496-8055 www.floradesigns.net Page - 5 of 10

RUNOFF COEFFICIENT CALCULATIONS  

In accordance with Development Engineering Procedures & Guidelines Manual, Town of Oakville 

Landscape Areas  0.25       

Asphalt, Concrete, Roof Areas  0.90       

 

Pre‐Development Drainage Area 

Area (m2)  Area (ha) Catchment # 

Imp.  Total  Imp.  Total % Imp. 

Runoff Coeff. 

CA‐1‐Pre  0.00  980.00  0.000  0.098  0.00  0.25 

CA‐2‐Pre  250.00  790.00  0.025  0.079  31.65  0.46 

CA‐3‐Pre  0.00  1070.00  0.000  0.107  0.00  0.25 

  250.00  2840.00  0.025  0.284  8.80  0.31 

 

Pre‐development Runoff Coefficient ( C ) 

The runoff coefficients are based on the values allocated in the school site design 

 

 

Post‐Development Drainage Area 

Area (m2)  Area (ha) Catchment # 

Imp.  Total  Imp.  Total % Imp. 

Runoff Coeff. 

CA‐1‐Post  0.00  2183.42  0.000  0.218  0.00  0.25 

CA‐2‐Post  250.00  790.00  0.025  0.079  31.65  0.46 

CA‐3‐Post  0.00  2181.30  0.000  0.218  0.00  0.25 

TOTAL  250.00  5154.72  0.025  0.515  4.85  0.28 

 

Post‐development Runoff Coefficient ( C ) 

C = 0.9 i + 0.25 (1 ‐ i), Where i=Imperviousness Ratio 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 6: 17331 SWM St.Thomas Aquinas May 18, 2017

1109 BRITANNIA ROAD EAST, MISSISSAUGA, ON, L4W 3X1 TEL: (647) 496-8055 www.floradesigns.net Page - 6 of 10

PRE‐DEVELOPMENT DRAINAGE AREA PLAN FROM ORIGINAL SWM DESIGN  (N.T.S.) Ref: SWM Report prepared by Valdor Engineering (SP.1617.028/06, Revised dated January 2009) 

 

Page 7: 17331 SWM St.Thomas Aquinas May 18, 2017

1109 BRITANNIA ROAD EAST, MISSISSAUGA, ON, L4W 3X1 TEL: (647) 496-8055 www.floradesigns.net Page - 7 of 10

PRE‐DEVELOPMENT DRAINAGE AREA PLAN  (N.T.S.) 

 

Page 8: 17331 SWM St.Thomas Aquinas May 18, 2017

1109 BRITANNIA ROAD EAST, MISSISSAUGA, ON, L4W 3X1 TEL: (647) 496-8055 www.floradesigns.net Page - 8 of 10

POST‐DEVELOPMENT DRAINAGE AREA PLAN  (N.T.S.) 

 

Page 9: 17331 SWM St.Thomas Aquinas May 18, 2017

1109 BRITANNIA ROAD EAST, MISSISSAUGA, ON, L4W 3X1 TEL: (647) 496-8055 www.floradesigns.net Page - 9 of 10

PRE‐DEVELOPMENT PEAK FLOW CALCULATIONS  

Drainage Area

Runoff Coefficient

Time of Concentrati

on

Catchment #

"A" in Hector "C" "Tc" in Minute

CA-Pre 0.284 0.31 10 Rational Method Calculation:

Q = 2.78CIA Where: Q = Runoff Quantity (Flow) in litre/sec A = Drainage Area in Hectors C = Runoff Coefficient I = Average Rainfall Intensity - mm/h Event 5 yr IDF Data Set, Town of Oakville Coefficient, a = 1170.00 Coefficient, b = 5.80 ( I ) = a * (Tc + b)^c Exponent, c = -0.84

Catchment # A

(ha) I

(mm/h) C

Q (L/s)

Q (m3/s)

CA-Pre 0.284 114.21 0.31 27.70 0.028

Event 100 yr IDF Data Set, Town of Oakville Coefficient, a = 2150.00 Coefficient, b = 5.70 ( I ) = a * (Tc + b)^c Exponent, c = -0.86

Catchment # A

(ha) I

(mm/h) C

Q (L/s)

Q (m3/s)

CA-Pre 0.284 200.80 0.31 48.71 0.049

                  

Page 10: 17331 SWM St.Thomas Aquinas May 18, 2017

1109 BRITANNIA ROAD EAST, MISSISSAUGA, ON, L4W 3X1 TEL: (647) 496-8055 www.floradesigns.net Page - 10 of 10

POST‐DEVELOPMENT PEAK FLOW CALCULATIONS  

Drainage Area

Runoff Coefficient

Time of Concentrati

on

Catchment #

"A" in Hector "C" "Tc" in Minute

CA-1-Post 0.515 0.28 10 Rational Method Calculation:

Q = 2.78CIA Where: Q = Runoff Quantity (Flow) in litre/sec A = Drainage Area in Hectors C = Runoff Coefficient I = Average Rainfall Intensity - mm/h Event 5 yr IDF Data Set, Town of Oakville Coefficient, a = 1170.00 Coefficient, b = 5.80 ( I ) = a * (Tc + b)^c Exponent, c = -0.84

Catchment # A

(ha) I

(mm/h) C

Q (L/s)

Q (m3/s)

CA-1-Post 0.515 114.21 0.28 46.03 0.046 TOTAL 0.046

Event 100 yr IDF Data Set, Town of Oakville Coefficient, a = 2150.00 Coefficient, b = 5.70 ( I ) = a * (Tc + b)^c Exponent, c = -0.86

Catchment # A

(ha) I

(mm/h) C

Q (L/s)

Q (m3/s)

CA-1-Post 0.515 200.80 0.28 80.94 0.081 TOTAL 0.081