  • 8/10/2019 175052675-GP004-ID-3200-MC-EL-0001-Anexo-3-Estudio-Carga (1).pdf

    1/12

    Location:

    Engineer:Study Case: LF

    7.0.0

    Page: 1

    SN: 12345678

    Filename: ATA_CHILE_EB2

    Project: ETAP

    Contract:

    Date: 12-07-2013

    Revision: Base

    Config.: Normal

    Electrical Transient Analyzer Program

    Load Flow Analysis

    Number of Buses:

    Swing V-Control Load Total

    Number of Branches:

    XFMR2 Reactor Line/Cable Impedance Tie PDXFMR3 Total

    1 0 12 13

    3 0 0 8 0 1 12

    Loading Category (1): Design

    Generation Category (1): Design

    Load Diversity Factor: None

    Maximum No. of Iteration: 99

    System Frequency: 50 Hz

    Unit System: Metric

    Project Filename: ATA_CHILE_EB2

    Output Filename: B:\ETAP 700\ATA_CHILE_EB2\Untitled.lfr

    Precision of Solution: 0.0001000

    Method of Solution: Newton-Raphson Method

  • 8/10/2019 175052675-GP004-ID-3200-MC-EL-0001-Anexo-3-Estudio-Carga (1).pdf

    2/12

    Location:

    Engineer:Study Case: LF

    7.0.0

    Page: 2

    SN: 12345678

    Filename: ATA_CHILE_EB2

    Project: ETAP

    Contract:

    Date: 12-07-2013

    Revision: Base

    Config.: Normal

    Adjustments

    Transformer Impedance:

    Reactor Impedance:

    Adjustments

    Apply

    /Global

    Individual

    PercentTolerance

    Overload Heater Resistance:

    Transmission Line Length:

    Cable Length:

    Temperature Correction

    Transmission Line Resistance:

    Cable Resistance:

    Apply

    Adjustments

    Individual

    /Global Degree C

    Individual

    Individual

    Individual

    Individual

    Yes

    Yes

    No

    No

    No

    Yes

    Yes

  • 8/10/2019 175052675-GP004-ID-3200-MC-EL-0001-Anexo-3-Estudio-Carga (1).pdf

    3/12

    Location:

    Engineer:Study Case: LF

    7.0.0

    Page: 3

    SN: 12345678

    Filename: ATA_CHILE_EB2

    Project: ETAP

    Contract:

    Date: 12-07-2013

    Revision: Base

    Config.: Normal

    Bus Input Data

    Sub-sys

    GenericConstant IConstant ZConstant kVAInitial VoltageBus

    MvarMWMvarMWMvarMWMvarMWAng.% Mag.kVID

    Load

    110.000Bus3 1 100.0 0.0

    4.160Bus5 1 100.0 0.0

    4.160Bus7 1 100.0 0.0

    1.999 0.9764.160Bus8 1 100.0 0.0

    4.160Bus9 1 100.0 0.0

    110.000Bus13 1 100.0 0.0

    110.000Bus14 1 100.0 0.0

    4.160Bus15 1 100.0 0.0

    0.400Bus16 1 100.0 0.0

    220.000Bus ST Cerro Negro Norte 1 100.0 0.0

    4.160C.D.C (MC-3201) 1 100.0 0.0

    0.230 0.1430.380CCM BT (MC-3102) 1 100.0 0.0

    220.000ST-Tapp off 1 100.0 0.0

    0.1430.976 0.230Total Number of Buses: 13 1.999 0.000 0.000 0.000 0.000

    ID kV

    Generation Bus

    Sub-sysType

    Voltage

    % Mag. Angle MW Mvar Max Min

    Generation Mvar Limits

    % PF

    Bus ST Cerro Negro Norte 1220.000 Swing 100.0 0.0

    0.000 0.000

  • 8/10/2019 175052675-GP004-ID-3200-MC-EL-0001-Anexo-3-Estudio-Carga (1).pdf

    4/12

    Location:

    Engineer:Study Case: LF

    7.0.0

    Page: 4

    SN: 12345678

    Filename: ATA_CHILE_EB2

    Project: ETAP

    Contract:

    Date: 12-07-2013

    Revision: Base

    Config.: Normal

    Line/Cable Input Data

    ID Library Size T (C)

    Line/Cable

    Ohms or Siemens/1000 m per Conductor (Cable) or per Phase (Line)

    Adj. (m) #/Phase% Tol.

    Length

    YR X

    Cable B.T. (BP21V01) 0,6NCUN1 250 25.0 2 0.177493 0.108268750.0

    Cable MT (MR20U01) 5,0NCUS1 500 50.0 2 0.093176 0.115103750.0

    Cable MT (MR20U02) 5,0NCUS1 2 25.0 1 0.636740 0.216667750.0

    Cable MT (MR20U03) 5,0NCUS1 250 30.0 2 0.179462 0.124672750.0

    Cable MT (MR20U04) 5,0NCUS1 250 25.0 1 0.179462 0.124672750.0

    Lnea AT-110 KV 115NCUS1 500 50.0 2 0.109521 0.215989750.0

    LAT-110KV-Flint 741 66500.0 1 0.105648 0.360647 0.0000032750.0

    LAT-220KV-Flint 741 66500.0 1 0.105648 0.360647 0.0000032750.0

    Line / Cable resistances are listed at the specified temperatures.

  • 8/10/2019 175052675-GP004-ID-3200-MC-EL-0001-Anexo-3-Estudio-Carga (1).pdf

    5/12

    Location:

    Engineer:Study Case: LF

    7.0.0

    Page: 5

    SN: 12345678

    Filename: ATA_CHILE_EB2

    Project: ETAP

    Contract:

    Date: 12-07-2013

    Revision: Base

    Config.: Normal

    2-Winding Transformer Input Data

    ID MVA Prim. kV Sec. kV % Z X/R Prim. Sec.

    Transformer % Tap Setting

    % Tol.

    Rating Z Variation

    + 5% - 5%

    Phase Shift

    Type Angle% Z

    Adjusted

    Trafo (TF-3201) 7.000 110.000 4.160 8.50 13.55 0 000 0 Std Pos. Seq. 0.0008.5000

    Trafo (TF-3202) 0.300 4.160 0.400 4.80 4.70 0 000 0 Std Pos. Seq. 0.0004.8000

    TR-Tap Off 20.000 220.000 110.000 10.00 18.60 0 000 0 Std Pos. Seq. 0.00010.0000

    2-Winding Transformer Load Tap Changer (LTC) Settings

    ID Secondary Bus IDPrimary Bus ID Tap % Step Regulated Bus ID

    Transformer Connected Buses ("*" LTC Side)

    Tap % V kV

    Transformer Load Tap Changer Setting

    % Min. % Max.

  • 8/10/2019 175052675-GP004-ID-3200-MC-EL-0001-Anexo-3-Estudio-Carga (1).pdf

    6/12

    Location:

    Engineer:Study Case: LF

    7.0.0

    Page: 6

    SN: 12345678

    Filename: ATA_CHILE_EB2

    Project: ETAP

    Contract:

    Date: 12-07-2013

    Revision: Base

    Config.: Normal

    Branch Connections

    ID From Bus To Bus R X ZType

    CKT/Branch % Impedance, Pos. Seq., 100 MVA BaseConnected Bus ID

    Y

    Trafo (TF-3201) Bus14 8.94 121.10 121.43Bus52W XFMR

    Trafo (TF-3202) Bus15 332.97 1564.97 1600.00Bus162W XFMR

    TR-Tap Off ST-Tapp off 2.68 49.93 50.00Bus32W XFMR

    Cable B.T. (BP21V01) Bus16 138.67 84.58 162.43CCM BT (MC-3102)Cable

    Cable MT (MR20U01) Bus5 1.35 1.66 2.14C.D.C (MC-3201)Cable

    Cable MT (MR20U02) C.D.C (MC-3201) 9.20 3.13 9.72Bus15Cable

    Cable MT (MR20U03) Bus7 1.56 1.08 1.89Bus8Cable

    Cable MT (MR20U04) Bus7 2.59 1.80 3.16Bus9Cable

    Lnea AT-110 KV Bus13 0.00 0.00 0.01Bus14Cable

    LAT-110KV-Flint Bus13 5.81 19.82 20.65 2.5805200Bus3Line

    LAT-220KV-Flint ST-Tapp off 1.45 4.96 5.16 10.3220800Bus ST Cerro Negro NorteLine

    Disyuntor bombas (52) C.D.C (MC-3201) Bus7Tie Breakr

  • 8/10/2019 175052675-GP004-ID-3200-MC-EL-0001-Anexo-3-Estudio-Carga (1).pdf

    7/12

    Location:

    Engineer:Study Case: LF

    7.0.0

    Page: 7

    SN: 12345678

    Filename: ATA_CHILE_EB2

    Project: ETAP

    Contract:

    Date: 12-07-2013

    Revision: Base

    Config.: Normal

    LOAD FLOW REPORT

    Bus

    ID kV

    Voltage

    Ang.% Mag.

    Generation

    MW Mvar

    Load

    MW Mvar

    Load Flow

    MW Mvar AmpID % PF

    XFMR

    % Tap

    Bus3 110.000 -0.8100.919 Bus13 2.246 -1.403 13.8 -84.80 0 0 0

    ST-Tapp off -2.246 1.403 13.8 -84.8

    Bus5 4.160 -2.599.188 C.D.C (MC-3201) 2.237 1.135 351.0 89.20 0 0 0

    Bus14 -2.237 -1.135 351.0 89.2

    Bus7 4.160 -2.599.138 Bus8 2.000 0.976 311.5 89.90 0 0 0

    Bus9 0.000 0.000 0.0 0.0

    C.D.C (MC-3201) -2.000 -0.976 311.5 89.9

    Bus8 4.160 -2.599.096 0.9761.999 Bus7 -1.999 -0.976 311.5 89.90 0

    Bus9 4.160 -2.599.138 Bus7 0.000 0.000 0.0 0.00 0 0 0

    Bus13 110.000 -1.0100.809 Bus14 2.243 1.212 13.3 88.00 0 0 0

    Bus3 -2.243 -1.212 13.3 88.0

    Bus14 110.000 -1.0100.809 Bus13 -2.243 -1.212 13.3 88.00 0 0 0

    Bus5 2.243 1.212 13.3 88.0

    Bus15 4.160 -2.599.111 C.D.C (MC-3201) -0.236 -0.157 39.7 83.20 0 0 0

    Bus16 0.236 0.157 39.7 83.2

    Bus16 0.400 -4.495.886 CCM BT (MC-3102) 0.233 0.145 413.2 85.00 0 0 0

    Bus15 -0.233 -0.145 413.2 85.0

    Bus ST Cerro Negro Norte* 220.000 0.0100.000 -11.6982.254 ST-Tapp off 2.254 -11.698 31.3 -18.90 0

    C.D.C (MC-3201) 4.160 -2.599.138 Bus5 -2.236 -1.134 351.0 89.20 0 0 0

    Bus15 0.236 0.157 39.7 83.2

    Bus7 2.000 0.976 311.5 89.9

    CCM BT (MC-3102) 0.380 -4.4100.443 0.1440.232 Bus16 -0.232 -0.144 413.2 85.00 0

    ST-Tapp off 220.000 -0.1100.291 Bus ST Cerro Negro Norte -2.247 1.369 6.9 -85.40 0 0 0

    Bus3 2.247 -1.369 6.9 -85.4

    * Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it)

    # Indicates a bus with a load mismatch of more than 0.1 MVA

  • 8/10/2019 175052675-GP004-ID-3200-MC-EL-0001-Anexo-3-Estudio-Carga (1).pdf

    8/12

    Location:

    Engineer:Study Case: LF

    7.0.0

    Page: 8

    SN: 12345678

    Filename: ATA_CHILE_EB2

    Project: ETAP

    Contract:

    Date: 12-07-2013

    Revision: Base

    Config.: Normal

    Bus Loading Summary Report

    ID

    Bus

    kV

    Directly Connected Load

    MW Mvar MVA % PF AmpRated Amp LoadingMW Mvar MW Mvar

    Constant kVA Constant Z Constant IPercent

    Generic

    MW Mvar

    Total Bus Load

    Bus3 110.000 2.648 13.884.80 0 0 0 0 0 0 0

    Bus5 4.160 2.508 351.089.20 0 0 0 0 0 0 0

    Bus7 4.160 2.225 311.589.90 0 0 0 0 0 0 0

    Bus8 4.160 2.225 311.589.91.999 0.976 0 0 0 0 0 0

    Bus9 4.160 0 0.00.00 0 0 0 0 0 0 0

    Bus13 110.000 2.549 13.388.00 0 0 0 0 0 0 0

    Bus14 110.000 2.549 13.388.00 0 0 0 0 0 0 0

    Bus15 4.160 0.284 39.783.20 0 0 0 0 0 0 0

    Bus16 0.400 0.274 413.285.00 0 0 0 0 0 0 0

    Bus ST Cerro Negro Norte 220.000 11.913 31.318.90 0 0 0 0 0 0 0

    C.D.C (MC-3201) 4.160 2.507 351.089.20 0 0 0 0 0 0 0

    CCM BT (MC-3102) 0.380 0.273 413.285.00 0 0.232 0.144 0 0 0 0

    ST-Tapp off 220.000 2.632 6.985.40 0 0 0 0 0 0 0

    *Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).

    #Indicates operating load of a bus exceeds the bus marginal limit ( 95.0% of the Continuous Ampere rating).

  • 8/10/2019 175052675-GP004-ID-3200-MC-EL-0001-Anexo-3-Estudio-Carga (1).pdf

    9/12

    Location:

    Engineer:Study Case: LF

    7.0.0

    Page: 9

    SN: 12345678

    Filename: ATA_CHILE_EB2

    Project: ETAP

    Contract:

    Date: 12-07-2013

    Revision: Base

    Config.: Normal

    Branch Loading Summary Report

    ID Type

    Loading

    Amp %

    Capability

    (MVA) MVA %

    Loading (output)

    CKT / Branch Cable & Reactor

    Transformer

    Loading (input)

    %MVA

    Ampacity

    (Amp)

    Cable B.T. (BP21V01) Cable 449.99 413.19 91.82

    Cable MT (MR20U01) Cable 994.55 350.96 35.29

    Cable MT (MR20U03) Cable 549.57 311.55 56.69

    Lnea AT-110 KV Cable 994.55 13.27 1.33

    Trafo (TF-3201) Transformer 7.000 2.549 36.4 2.508 35.8

    Trafo (TF-3202) Transformer 0.300 0.284 94.6 0.274 91.5

    TR-Tap Off Transformer 20.000 2.648 13.2 2.632 13.2

    * Indicates a branch with operating load exceeding the branch capability.

  • 8/10/2019 175052675-GP004-ID-3200-MC-EL-0001-Anexo-3-Estudio-Carga (1).pdf

    10/12

    Location:

    Engineer:Study Case: LF

    7.0.0

    Page: 10

    SN: 12345678

    Filename: ATA_CHILE_EB2

    Project: ETAP

    Contract:

    Date: 12-07-2013

    Revision: Base

    Config.: Normal

    Branch Losses Summary Report

    ID MW Mvar MW Mvar kW kvar From To

    CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage% Drop

    Vd

    in Vmag

    2 .246 -1.403 -2.243 -1.212 2.9 -2615.5 100.9 100.8 0.11LAT-110KV-Flint

    -2.246 1.403 2.247 -1.369 1.8 34.4 100.9 100.3 0.63TR-Tap Off

    2.237 1.135 -2.236 -1.134 0.9 1.1 99.2 99.1 0.05Cable MT (MR20U01)

    -2.237 -1.135 2.243 1.212 5.7 77.4 99.2 100.8 1.62Trafo (TF-3201)

    2.000 0.976 -1.999 -0.976 0.8 0.5 99.1 99.1 0.04Cable MT (MR20U03)

    99.1 99.1 0.00Cable MT (MR20U04)

    2.243 1.212 -2.243 -1.212 0.0 0.0 100.8 100.8 0.00Lnea AT-110 KV

    -0.236 -0.157 0.236 0.157 0.1 0.0 99.1 99.1 0.03Cable MT (MR20U02)

    0.236 0.157 -0.233 -0.145 2.7 12.8 99.1 95.9 3.23Trafo (TF-3202)

    0.233 0.145 -0.232 -0.144 1.1 0.7 95.9 100.4 0.46Cable B.T. (BP21V01)

    2.254 -11.698 -2.247 1.369 6.9 -10328.5 100.0 100.3 0.29LAT-220KV-Flint

    23.0 -12817.0

  • 8/10/2019 175052675-GP004-ID-3200-MC-EL-0001-Anexo-3-Estudio-Carga (1).pdf

    11/12

    Location:

    Engineer:Study Case: LF

    7.0.0

    Page: 11

    SN: 12345678

    Filename: ATA_CHILE_EB2

    Project: ETAP

    Contract:

    Date: 12-07-2013

    Revision: Base

    Config.: Normal

    Alert Summary Report

    Cable 95.0100.0

    Bus

    MarginalCritical

    95.0100.0

    Loading

    % Alert Settings

    95.0100.095.0100.0

    95.0100.0

    LineTransformer

    Reactor

    Panel

    95.0100.0

    95.0 98.0

    102.0105.0

    95.0100.0

    95.0100.0

    95.0100.0

    100.0

    Generator Excitation

    Bus Voltage

    UnderExcited (Q Min.)

    OverExcited (Q Max.)

    UnderVoltage

    OverVoltage

    Protective Device

    Generator

    Marginal Report

    Device ID Type Rating/LimitCondition Unit Operating % Operating Phase Type

    0.400 kV 0.384 95.9 3-PhaseUnder VoltageBus16 Bus

  • 8/10/2019 175052675-GP004-ID-3200-MC-EL-0001-Anexo-3-Estudio-Carga (1).pdf

    12/12

    Location:

    Engineer:Study Case: LF

    7.0.0

    Page: 12

    SN: 12345678

    Filename: ATA_CHILE_EB2

    Project: ETAP

    Contract:

    Date: 12-07-2013

    Revision: Base

    Config.: Normal

    0.0000.0000.000

    0.0000.0000.000

    Lagging85.000.273

    Total Generic Load:

    Total Constant I Load:

    0.0000.000

    -12.8170.023

    Number of Iterations: 3

    System Mismatch:

    Apparent Losses:

    SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

    Lagging89.872.225

    Leading

    Leading

    0.1440.232

    0.9761.999

    18.9211.913-11.6982.254

    0.0000.0000.000

    18.9211.913-11.6982.254

    % PFMVAMvarMW

    Total Static Load:

    Total Motor Load:

    Total Demand:

    Source (Non-Swing Buses):

    Source (Swing Buses):