17bp.1.r.86 prm tsh

7
SHEET 1 OF 4 PERMIT DRAWING R A I L R OAD 1148 1149 1159 1162 1 30 2 13 00 1300 1305 1142 1151 1151 1150 1145 1145 1186 1158 1159 1431 1437 1189 1152 1 301 1401 1401 14 00 1159 1164 1160 1161 1161 1160 1302 1303 TRANTERS Col li e Fl at C S X RAI L ROAD 1505 1505 1500 1517 1547 1514 VICINITY MAP OFF-SITE DETOUR 903 903 903 64A 64A 64 13 64 13 F l a t S wa m p SITE PROJECT MA R T I N C OUNT Y P I TC OUNT Y Robersonville DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 0 0 0 PROFILE (HORIZONTAL) STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO. F. A. PROJ. NO. DESCRIPTION NO. TOTAL SHEETS N.C. SHEET 1 PLANS PROFILE (VERTICAL) LOCATION: TYPE OF WORK: DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA 0 0 0 C ONT RA C T : = 25 50 50 100 50 25 50 100 10 5 10 20 PE NCDOT CONTACT: BOB A. MAY, PE PROJECT ENGINEER PROJECT DESIGN ENGINEER ENGINEER ROADWAY DESIGN HYDRAULICS ENGINEER Prepared for: Prepared in the Office of: Bus: 919.851.8077 Fax: 919.851.8107 License No. F-0377 1223 Jones Franklin Rd. Raleigh, N.C. 27606 2012 STANDARD SPECIFICATIONS RIGHT OF WAY DATE: LETTING DATE: PROJECT LENGTH = ADT ADT DESIGN DATA K = % = D % T = % * V MPH = GRAPHIC SCALES ENGINEERING ETHERILL MARTIN COUNTY 17BP.1.R.86 SR 1159 BRIDGE No. 71 OVER FLAT SWAMP ON GRADING, DRAINAGE, PAVING, STRUCTURES. 2015 1,100 60 * TTST = % DUAL = % FUNC. CLASS = LOCAL TOTAL LENGTH PROJECT 17BP.1.R.86 LENGTH STRUCTURE PROJECT 17BP.1.R.86 LENGTH ROADWAY PROJECT 17BP.1.R.86 NOVEMBER 20, 2019 ROBERT O’DELL JR. RYAN SHOOK DIVISION 1 DIVISION OF HIGHWAYS Edenton NC, 27935 113 Airport Drive BEGIN BRIDGE -L- STA. 16+38.32 END BRIDGE -L- STA. 17+08.32 (Subregional Tier) JUNE 20, 2019 A R T M E N N A S O H D E P T O F T R A S P O R T T I O N T A T E O F N R T C A R O L I N A TO ROBERSONVILLE TO SR 1160 MEEKS RD. SR 1159 FLAT SWAMP RD -L- NAD 83 / 2011 FLAT SWAMP FLAT SWAMP See Sheet 1-B for Conventional Symbols See Sheet 1-A For Index of Sheets P REL I M I NARY P L ANS THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES. CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II. = 0.072 MILES = 0.014 MILES = 0.058 MILES 17 B P . 1 . R. 86 17BP.1.R.86 DIVISION PROJECT ENGINEER P ROJ E C T : -L- STA. 15+00.00 BEGIN PROJECT 17BP.1.R.86 -L- STA. 18+80.00 END PROJECT 17BP.1.R.86 P :\ 2018 \ 18160 . 01_ Ma r ti n71 \ Hyd r a u li c s \ P E R MI T S _ E nv i r on me n t a l\ Dr a wi ng s \ 17 B P . 1 . R . 86_p r m_ t s h . dgn F B r ook s 9 / 18 / 2019 WETLAND AND SURFACE WATER IMPACTS PERMIT 4 ON BRIDGE NOTE: NO DECK DRAINS A N I L O R A C H T R O N L A N O I S S E F O R P R E E N I G N E 23993 SEAL E C I R P . S X A M A N I L O R A C H T R O N L A N O I S S E F O R P R E E N I G N E 21116 SEAL Y A M . A B O B

Upload: others

Post on 19-Dec-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

SHEET 1 OF 4PERMIT DRAWINGRAILROAD

1148

1156

1157

1149

11591162

1302

1300

1300

1305

1142

1151

1151

1150

1145

1145

1186

1158

1159

1350

1159

1165

1196

1197

1203

1179

1199

1184

1185

1431

1431

1438 1437

1189

1152130

1

1401

1401

1400

1159

1351

1452

1453

1164

1160

1161

1161

1160

1302

1303

TRANTERS

Collie

Flat

CSX

RAILROAD

1300

1505

1506

1505

1500

1517

1547

1514

VICINITY MAP

OFF-SITE DETOUR

903

903

903

64A

64A

6413

6413

Flat S

wa

mp

SITE

PROJECT

MARTIN COUNTY

PIT COUNTY

Robersonville

DOCUMENT NOT CONSIDERED FINAL

UNLESS ALL SIGNATURES COMPLETED

0

0

0

PROFILE (HORIZONTAL)

STATE STATE PROJECT REFERENCE NO.

STATE PROJ. NO. F. A. PROJ. NO. DESCRIPTION

NO.TOTALSHEETS

N.C.SHEET

1

PLANS

PROFILE (VERTICAL)

LOCATION:

TYPE OF WORK:

DIVISION OF HIGHWAYSSTATE OF NORTH CAROLINA

0

00

CO

NT

RA

CT:

=2550 50 100

50 25 50 100

10 5 10 20

PE

NCDOT CONTACT:

BOB A. MAY, PE

PROJECT ENGINEER

PROJECT DESIGN ENGINEER

ENGINEERROADWAY DESIGN

HYDRAULICS ENGINEERPrepared for:Prepared in the Office of:

Bus: 919.851.8077 Fax: 919.851.8107

License No. F-0377

1223 Jones Franklin Rd. Raleigh, N.C. 27606

2012 STANDARD SPECIFICATIONS

RIGHT OF WAY DATE:

LETTING DATE:

PROJECT LENGTH

=ADT

ADT

DESIGN DATA

K = %

=D %

T = % *

V MPH=

GRAPHIC SCALESENGINEERING

ETHERILL

MARTIN COUNTY

17BP.1.R.86

SR 1159BRIDGE No. 71 OVER FLAT SWAMP ON

GRADING, DRAINAGE, PAVING, STRUCTURES.

2015 1,100

60

* TTST = % DUAL = %

FUNC. CLASS = LOCAL

TOTAL LENGTH PROJECT 17BP.1.R.86

LENGTH STRUCTURE PROJECT 17BP.1.R.86LENGTH ROADWAY PROJECT 17BP.1.R.86

NOVEMBER 20, 2019

ROBERT O’DELL JR.

RYAN SHOOK

DIVISION 1DIVISION OF HIGHWAYS

Edenton NC, 27935

113 Airport Drive

BEGIN BRIDGE-L- STA. 16+38.32

END BRIDGE-L- STA. 17+08.32

(Subregional Tier)

JUNE 20, 2019 AR

TM

E

N

N

A

S

O H

DE

P

TOF TRA

SPO

RT

TIO

N

TA

TE

OF N RTC

A

RO

LIN

A

TO ROBERSONVILLE

TO SR 1160 MEEKS RD. SR 1159 FLAT SWAMP RD-L-

NAD 83/ 2011

FLAT SWAMP

FLAT SWAMP

See Sheet 1-B for Conventional SymbolsSee Sheet 1-A For Index of Sheets

PR

ELI

MIN

AR

Y P

LA

NS

THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.

CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II.

= 0.072 MILES

= 0.014 MILES= 0.058 MILES

17B

P.1.R.86

17BP.1.R.86

DIVISION PROJECT ENGINEER

PR

OJE

CT:

-L- STA. 15+00.00BEGIN PROJECT 17BP.1.R.86

-L- STA. 18+80.00END PROJECT 17BP.1.R.86

P:\

2018\18

160.0

1_M

artin

71\

Hydra

ulics\

PER

MIT

S_Environ

mental\

Dra

win

gs\

17BP.1.R.8

6_prm

_tsh.d

gn

FBro

oks

9/18/2

019

WETLAND AND SURFACE WATER IMPACTS PERMIT

4

ON BRIDGENOTE: NO DECK DRAINS

ANI

LORAC HTR

ON

LA

NOISSEFO

RP

REENIGNE

23993

SEAL

ECIRP .S

XA

M

ANI

LORAC HTR

ON

LA

NOISSEFO

RP

REENIGNE

21116

SEAL

YAM .A B

OB

EXISTING R/W

EXISTING R/WEXISTING R/W

EXISTING R/W

EXISTING R/W

21’ GR

SR 1159 FLAT SWAMP ROAD 21’ PAVED ROADWAY

SR 1159 FLAT SWAMP ROAD 20’ PAVED ROADWAY

EUGENE ROBERSON

EUGENE ROBERSON

(ABANDONED)

1 2

WOODS

CULTIVATED

CULTIVATED

WOODS

WOODS

WOODS

WOODS

WOODS

TO ROBERSONVILLE

TO SR 1160 MEEKS RD.

WOODS

10" P

VC

10" P

VC

18" C

LA

Y (A

BA

ND

ON

ED)

18" C

LA

Y (A

BA

ND

ON

ED)

60.0

0’

BARBARA JAMES, ET AL

BARBARA JAMES, ET AL

PYLONSWOOD OLD

EXISTING R/W

55.0

0’

WOODS

115’ DOMINION POWER EASEMENT

TO

WN

OF

RO

BE

RS

ON

VIL

LE

EA

SE

ME

NT

WID

TH

UN

KN

OW

N

SUPPORTS

4- CONC

POWER EASEMENT

115’ DOMINION

SHEET 2 OF 4PERMIT DRAWING

TT

FLAT SWAMP

FLAT SWAMP

DETERMINED BY PHYSICAL OR PAROLE EVIDENCE

THE HISTORIC HIGH WATER MARK COULD NOT BE

TT

CL II RIP RAP KEY-IN 3.5’

EXCAVATIONBANK STABILIZATION

REMOVE REMNANT EXIST. ABUT.

CHORDLOWEST LOW

EXCAVATE TO EL. 43.5’

GRADEROADWAYPROPOSED

CL II RIP RAP KEY-IN 3.5’

EXCAVATE TO EL. 43.5’

OPENINGUPSTREAM FACE

W.S. =45.4’PROP. 25YR.

ELEV. =39.7’W.S. ON 1/7/19

(SEE DETAIL A)

SPECIAL CUT DITCH

TO SHLD. PT. (TYP.)CLASS II RIP RAP

TO SHLD. PT. (TYP.)CLASS II RIP RAP

10 11 12 13 14 15 16 17 18 19 20 21 22 23

0

10

20

30

40

50

(+)0.5900%

(+)1.5631% (-)1.8353%

(-)0.1900%

2’-6" DEEP CAPS1@70’ 24" CORED SLABSKEW = 90CL ELEV = 48.73’STA. 16+73.5 -L-

EL = 46.99

-L- STA. 15+00.00

BEGIN GRADE

EL = 46.60

-L- STA. 18+80.00

END GRADE

2’-6" DEEP CAPS1@70’ 24" CORED SLABSKEW = 90CL ELEV = 48.73’STA. 16+73.5 -L-

0.30%5.12%

ELEV.=44.31’

BEGIN DITCH STA. 15+00 (RT)

ELEV.=44.01

DITCH STA. 16+00 (RT)

ELEV.=41.45

DITCH STA. 16+50 (RT)

ELEV.=41.45’

END DITCH STA. 16+55 (RT)

0.30%ELE

V.=

44.0

1DIT

CH

STA. 16

+00 (R

T)

ELE

V.=

41.45

DIT

CH

STA. 16

+50 (R

T)

ELE

V.=

41.45’

EN

D

DIT

CH

STA. 16

+55 (R

T)

5.12%

ELE

V.=

44.3

1’BE

GIN

DIT

CH

STA. 15

+00 (R

T)

12" HDPE

TOP OF WATER TO LOW BEAM BRIDGE CLEARANCE=7.02’

LOW WOOD BEAM=45.93’

8’ WW

6’ WW 8’ WW

WW

8’

WITH 4 WOODEN WINGWALLS

3-SPAN CONCRETE AND WOOD

BRIDGE #71

Flatter4:

1 or

D3:1

( Not to Scale)

SPECIAL CUT DITCH

FROM STA. 15+50 TO STA. 16+55 -L- RT.

DETAIL A

Min. D=1.5 Ft.

Ground

Natural Slope

Ditch

Front

15" RC

P-IV

15" RC

P-IV

15"

15"

TB 2GI

TB 2GI TB 2GI

TB 2GI

EST. 38 CY

EXCAVATION

STRUCTURE

EST. 5 SY GEOTEXTILE

EST. 1 TN RIP RAP

CLASS B RIP RAP

EST. 50 CY

EXCAVATION

STRUCTURE

EST. 7 SY GEOTEXTILE

EST. 2 TN RIP RAP

CLASS B RIP RAP

RE

VISIO

NS

0

10

20

30

40

50

Fax: 919 851 8107

Bus: 919 851 8077

License No. F-0377

Raleigh, N.C. 27606

1223 Jones Franklin Rd.

CIVIL/SITE DESIGN - GIS/GPS - CONSTRUCTION OBSERVATION

TRANSPORTATION PLANNING/DESIGN - BRIDGE/STRUCTURE DESIGN

ENGINEERINGETHERILL

0

10

20

30

40

50

TYPE-IIIGREU TL-3

TYPE-IIITYPE-III

TYPE-III

GREU TL-3

GREU TL-3

25:1

25:1

25:1

25:1

11’

11’

5.5’

5.5’

.025

.025

OU

T O

T O

UT

33’ 11’

11’

.025

.025

11’

11’

.025

.025

-L- STA. 16+38.32

BEG. BRIDGE

-L- STA. 17+08.32

END BRIDGE

-L- STA. 16+26.32

BEG. APP. SLAB

-L- STA. 17+20.32

END APP. SLAB-L- PT Sta. 15+82.96

SKETCH SHOWING PAVEMENT / STRUCTURE RELATIONSHIP

SEE SHEET S1- THRU S-? FOR STRUCTURE PLANS

GREU TL-3

SHEET NO.PROJECT REFERENCE NO.

HYDRAULICSROADWAY DESIGN

ENGINEER ENGINEER

417BP.1.R.86

R/W SHEET NO.8/17/99

GRAPHIC SCALE

0’ 100’100’

P:\

2018\18

160.0

1_M

artin

71\

Hydra

ulics\

PER

MI T

S_Environ

mental\

Dra

win

gs\

17BP.1. R.8

6_pr m

_PS

H_04.d

gn

FBro

oks

9/18/2

019

F

C

F

C

F

F

F

F

F

F

1

1

2

2

-L- PC Sta. 14+74.93

-L- PT Sta. 15+82.96

-L- PC Sta. 19+17.80

-L- PT Sta. 13+33.43

-L- PC Sta. 10+00.00

-L- PC Sta. 11+61.19

-L- PT Sta. 11+46.42

-L- PT Sta. 21+98.14

-L- POT Sta. 23+40.49

10 11 12 13 14 15 16 17 18 19 20 21 22 23

PI = 15+45.00

EL = 47.26’

(+)0.5900%

VC = 80’K = 82

PI = 16+80.00

EL = 49.37’

(+)1.5631% (-)1.8353%

VC = 150’K = 44

PI = 18+25.00

EL = 46.70’

(-)0.1900%

VC = 110’K = 67

*DS = 45MPH *DS = 40MPH *DS = 40MPH

MEETS WITHIN 20MPH

* SUB REGIONAL TIER

EL = 46.99

-L- STA. 15+00.00

BEGIN GRADE

EL = 46.60

-L- STA. 18+80.00

END GRADE

-L- STA. 16

+37.3

8

BE

GIN

BRID

GE

-L- STA. 17

+09.6

3

EN

D

BRID

GE

1.5:1

1.5:1

1.5:1

2’-6" DEEP CAPS1@70’ 24" CORED SLABSKEW = 90CL ELEV = 48.73’STA. 16+73.5 -L-

DITCH LEGEND

RIGHT DITCH

MILLING

60’ VAR.

MILLING

90’ VAR.

DESIGN DISCHARGE

DESIGN FREQUENCY

BASE DISCHARGE

CFS

YRS

YRS

BASE FREQUENCY

OVERTOPPING ELEVATION

OVERTOPPING FREQUENCY

OVERTOPPING DISCHARGE CFS

CFS

YRS

FT

FT

FT

DESIGN HW ELEVATION

BASE HW ELEVATION

BRIDGE HYDRAULIC DATA

FT

DATE OF SURVEY

W.S. ELEVATION

AT DATE OF SURVEY FT

= 1400

= 25

= 45.4

= 2100

= 100

= 46.3

= 2400

= 100+

= 46.5

=

= 1/7/2019

= 39.7

EXISTING R/W

EXISTING R/WEXISTING R/W

EXISTING R/W

EXISTING R/W

21’ GR

SR 1159 FLAT SWAMP ROAD 21’ PAVED ROADWAY

SR 1159 FLAT SWAMP ROAD 20’ PAVED ROADWAY

EUGENE ROBERSON

EUGENE ROBERSON

(ABANDONED)

1 2

WOODS

CULTIVATED

CULTIVATED

WOODS

WOODS

WOODS

WOODS

WOODS

TO ROBERSONVILLE

TO SR 1160 MEEKS RD.

WOODS

10" P

VC

10" P

VC

18" C

LA

Y (A

BA

ND

ON

ED)

18" C

LA

Y (A

BA

ND

ON

ED)

60.0

0’

BARBARA JAMES, ET AL

BARBARA JAMES, ET AL

PYLONSWOOD OLD

EXISTING R/W

55.0

0’

WOODS

115’ DOMINION POWER EASEMENT

TO

WN

OF

RO

BE

RS

ON

VIL

LE

EA

SE

ME

NT

WID

TH

UN

KN

OW

N

SUPPORTS

4- CONC

POWER EASEMENT

115’ DOMINION

SHEET 3 OF 4PERMIT DRAWING

TT

FLAT SWAMP

FLAT SWAMP

DETERMINED BY PHYSICAL OR PAROLE EVIDENCE

THE HISTORIC HIGH WATER MARK COULD NOT BE

TT

CL II RIP RAP KEY-IN 3.5’

EXCAVATIONBANK STABILIZATION

REMOVE REMNANT EXIST. ABUT.

CHORDLOWEST LOW

EXCAVATE TO EL. 43.5’

GRADEROADWAYPROPOSED

CL II RIP RAP KEY-IN 3.5’

EXCAVATE TO EL. 43.5’

OPENINGUPSTREAM FACE

W.S. =45.4’PROP. 25YR.

ELEV. =39.7’W.S. ON 1/7/19

(SEE DETAIL A)

SPECIAL CUT DITCH

TO SHLD. PT. (TYP.)CLASS II RIP RAP

TO SHLD. PT. (TYP.)CLASS II RIP RAP

35

40

40

40

40

40

40

40

45

45

45

45

45

4545

45

45

45

4545

45 45 454545

45

45

45

45

45

45

45

45

45

45

45

45

45

45

45

45

45

45

4545

4545

45

45

50

50

50

50

50

50

50

50

50

50

55

0.30%5.12%

ELEV.=44.31’

BEGIN DITCH STA. 15+00 (RT)

ELEV.=44.01

DITCH STA. 16+00 (RT)

ELEV.=41.45

DITCH STA. 16+50 (RT)

ELEV.=41.45’

END DITCH STA. 16+55 (RT)

12" HDPE

TOP OF WATER TO LOW BEAM BRIDGE CLEARANCE=7.02’

LOW WOOD BEAM=45.93’

8’ WW

6’ WW 8’ WW

WW

8’

WITH 4 WOODEN WINGWALLS

3-SPAN CONCRETE AND WOOD

BRIDGE #71

Flatter4:

1 or

D3:1

( Not to Scale)

SPECIAL CUT DITCH

FROM STA. 15+50 TO STA. 16+55 -L- RT.

DETAIL A

Min. D=1.5 Ft.

Ground

Natural Slope

Ditch

Front

15" RC

P-IV

15" RC

P-IV

15"

15"

TB 2GI

TB 2GI TB 2GI

TB 2GI

EST. 38 CY

EXCAVATION

STRUCTURE

EST. 5 SY GEOTEXTILE

EST. 1 TN RIP RAP

CLASS B RIP RAP

EST. 50 CY

EXCAVATION

STRUCTURE

EST. 7 SY GEOTEXTILE

EST. 2 TN RIP RAP

CLASS B RIP RAP

RE

VISIO

NS

1310 11 12 14 15 16 17 18 19 20 21 22 23

0

10

20

30

40

50

Fax: 919 851 8107

Bus: 919 851 8077

License No. F-0377

Raleigh, N.C. 27606

1223 Jones Franklin Rd.

CIVIL/SITE DESIGN - GIS/GPS - CONSTRUCTION OBSERVATION

TRANSPORTATION PLANNING/DESIGN - BRIDGE/STRUCTURE DESIGN

ENGINEERINGETHERILL

0

10

20

30

40

50

TYPE-IIIGREU TL-3

TYPE-IIITYPE-III

TYPE-III

GREU TL-3

GREU TL-3

25:1

25:1

25:1

25:1

11’

11’

5.5’

5.5’

.025

.025

OU

T O

T O

UT

33’ 11’

11’

.025

.025

11’

11’

.025

.025

-L- STA. 16+38.32

BEG. BRIDGE

-L- STA. 17+08.32

END BRIDGE

-L- STA. 16+26.32

BEG. APP. SLAB

-L- STA. 17+20.32

END APP. SLAB-L- PT Sta. 15+82.96

SKETCH SHOWING PAVEMENT / STRUCTURE RELATIONSHIP

SEE SHEET S1- THRU S-? FOR STRUCTURE PLANS

GREU TL-3

SHEET NO.PROJECT REFERENCE NO.

HYDRAULICSROADWAY DESIGN

ENGINEER ENGINEER

417BP.1.R.86

R/W SHEET NO.8/17/99

GRAPHIC SCALE

0’ 100’100’

P:\

2018\18

160.0

1_M

artin

71\

Hydra

ulics\

PER

MI T

S_Environ

mental\

Dra

wi n

gs\

17BP.1. R.8

6_pr m

_PS

H_04_con. d

gn

FBro

oks

9/18/2

019

F

C

F

C

F

F

F

F

F

F

1

1

2

2

-L- PC Sta. 14+74.93

-L- PT Sta. 15+82.96

-L- PC Sta. 19+17.80

-L- PT Sta. 13+33.43

-L- PC Sta. 10+00.00

-L- PC Sta. 11+61.19

-L- PT Sta. 11+46.42

-L- PT Sta. 21+98.14

-L- POT Sta. 23+40.49

10 11 12 13 14 15 16 17 18 19 20 21 22 23

PI = 15+45.00

EL = 47.26’

(+)0.5900%

VC = 80’K = 82

PI = 16+80.00

EL = 49.37’

(+)1.5631% (-)1.8353%

VC = 150’K = 44

PI = 18+25.00

EL = 46.70’

(-)0.1900%

VC = 110’K = 67

*DS = 45MPH *DS = 40MPH *DS = 40MPH

MEETS WITHIN 20MPH

* SUB REGIONAL TIER

EL = 46.99

-L- STA. 15+00.00

BEGIN GRADE

EL = 46.60

-L- STA. 18+80.00

END GRADE

-L- STA. 16

+37.3

8

BE

GIN

BRID

GE

-L- STA. 17

+09.6

3

EN

D

BRID

GE

1.5:1

1.5:1

1.5:1

2’-6" DEEP CAPS1@70’ 24" CORED SLABSKEW = 90CL ELEV = 48.73’STA. 16+73.5 -L-

DITCH LEGEND

RIGHT DITCH

MILLING

60’ VAR.

MILLING

90’ VAR.

DESIGN DISCHARGE

DESIGN FREQUENCY

BASE DISCHARGE

CFS

YRS

YRS

BASE FREQUENCY

OVERTOPPING ELEVATION

OVERTOPPING FREQUENCY

OVERTOPPING DISCHARGE CFS

CFS

YRS

FT

FT

FT

DESIGN HW ELEVATION

BASE HW ELEVATION

BRIDGE HYDRAULIC DATA

FT

DATE OF SURVEY

W.S. ELEVATION

AT DATE OF SURVEY FT

= 1400

= 25

= 45.4

= 2100

= 100

= 46.3

= 2400

= 100+

= 46.5

=

= 1/7/2019

= 39.7

Hand Existing Existing

Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural

Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream

No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design

(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)

1 -L- 16+37 to 17+09 72' Bridge (no impacts)

TOTALS*: 0 0 0

*Rounded totals are sum of actual impacts

NOTES:

Revised 2013 10 24 SHEET 4 OF 4

WETLAND PERMIT IMPACT SUMMARYWETLAND IMPACTS SURFACE WATER IMPACTS

Martin County

BR-4577

9/18/2019

NC DEPARTMENT OF TRANSPORTATION

DIVISION OF HIGHWAYS

4/3/2019

BUFFER IMPACTS PERMIT

SHEET 1 OF 3BUFFER DRAWING

RAILROAD

1148

1156

1157

1149

11591162

1302

1300

1300

1305

1142

1151

1151

1150

1145

1145

1186

1158

1159

1350

1159

1165

1196

1197

1203

1179

1199

1184

1185

1431

1431

1438 1437

1189

1152130

1

1401

1401

1400

1159

1351

1452

1453

1164

1160

1161

1161

1160

1302

1303

TRANTERS

Collie

Flat

CSX

RAILROAD

1300

1505

1506

1505

1500

1517

1547

1514

VICINITY MAP

OFF-SITE DETOUR

903

903

903

64A

64A

6413

6413

Flat S

wa

mp

SITE

PROJECT

MARTIN COUNTY

PIT COUNTY

Robersonville

DOCUMENT NOT CONSIDERED FINAL

UNLESS ALL SIGNATURES COMPLETED

0

0

0

PROFILE (HORIZONTAL)

STATE STATE PROJECT REFERENCE NO.

STATE PROJ. NO. F. A. PROJ. NO. DESCRIPTION

NO.TOTALSHEETS

N.C.SHEET

1

PLANS

PROFILE (VERTICAL)

LOCATION:

TYPE OF WORK:

DIVISION OF HIGHWAYSSTATE OF NORTH CAROLINA

0

00

CO

NT

RA

CT:

=2550 50 100

50 25 50 100

10 5 10 20

PE

NCDOT CONTACT:

BOB A. MAY, PE

PROJECT ENGINEER

PROJECT DESIGN ENGINEER

ENGINEERROADWAY DESIGN

HYDRAULICS ENGINEERPrepared for:Prepared in the Office of:

Bus: 919.851.8077 Fax: 919.851.8107

License No. F-0377

1223 Jones Franklin Rd. Raleigh, N.C. 27606

2012 STANDARD SPECIFICATIONS

RIGHT OF WAY DATE:

LETTING DATE:

PROJECT LENGTH

=ADT

ADT

DESIGN DATA

K = %

=D %

T = % *

V MPH=

GRAPHIC SCALESENGINEERING

ETHERILL

MARTIN COUNTY

17BP.1.R.86

SR 1159BRIDGE No. 71 OVER FLAT SWAMP ON

GRADING, DRAINAGE, PAVING, STRUCTURES.

2015 1,100

60

* TTST = % DUAL = %

FUNC. CLASS = LOCAL

TOTAL LENGTH PROJECT 17BP.1.R.86

LENGTH STRUCTURE PROJECT 17BP.1.R.86LENGTH ROADWAY PROJECT 17BP.1.R.86

NOVEMBER 20, 2019

ROBERT O’DELL JR.

RYAN SHOOK

DIVISION 1DIVISION OF HIGHWAYS

Edenton NC, 27935

113 Airport Drive

BEGIN BRIDGE-L- STA. 16+38.32

END BRIDGE-L- STA. 17+08.32

(Subregional Tier)

JUNE 20, 2019 AR

TM

E

N

N

A

S

O H

DE

P

TOF TRA

SPO

RT

TIO

N

TA

TE

OF N RTC

A

RO

LIN

A

TO ROBERSONVILLE

TO SR 1160 MEEKS RD. SR 1159 FLAT SWAMP RD-L-

NAD 83/ 2011

FLAT SWAMP

FLAT SWAMP

See Sheet 1-B for Conventional SymbolsSee Sheet 1-A For Index of Sheets

PR

ELI

MIN

AR

Y P

LA

NS

THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.

CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II.

= 0.072 MILES

= 0.014 MILES= 0.058 MILES

17B

P.1.R.86

17BP.1.R.86

DIVISION PROJECT ENGINEER

PR

OJE

CT:

-L- STA. 15+00.00BEGIN PROJECT 17BP.1.R.86

-L- STA. 18+80.00END PROJECT 17BP.1.R.86

P:\

2018\18

160.0

1_M

artin

71\

Hydra

ulics\

PER

MIT

S_Environ

mental\

Dra

win

gs\

17BP.1.R.8

6_buf_tsh.d

gn

FBro

oks

9/18/2

019

ON BRIDGENOTE: NO DECK DRAINS

4

ANI

LORAC HTR

ON

LA

NOISSEFO

RP

REENIGNE

23993

SEAL

ECIRP .S

XA

M

ANI

LORAC HTR

ON

LA

NOISSEFO

RP

REENIGNE

21116

SEAL

YAM .A B

OB

EXISTING R/W

EXISTING R/WEXISTING R/W

EXISTING R/W

EXISTING R/W

21’ GR

SR 1159 FLAT SWAMP ROAD 21’ PAVED ROADWAY

SR 1159 FLAT SWAMP ROAD 20’ PAVED ROADWAY

EUGENE ROBERSON

EUGENE ROBERSON

N 78°43’20" W

38.36’

N 75°04’12" W

35.07’

S 51°20’06" E46.01’

S 53°01’26" E25.92’

C/L CANAL P/L

C/L CANAL P/L

(ABANDONED)

1 2

WOODS

CULTIVATED

CULTIVATED

WOODS

WOODS

WOODS

WOODS

WOODS

TO ROBERSONVILLE

TO SR 1160 MEEKS RD.

WOODS

LOW WIRE=63.49’

10" P

VC

10" P

VC

18" C

LA

Y (A

BA

ND

ON

ED)

18" C

LA

Y (A

BA

ND

ON

ED)

60.0

0’

BARBARA JAMES, ET AL

BARBARA JAMES, ET AL

PYLONSWOOD OLD

EXISTING R/W

S 51°20’06" E5.01’

55.0

0’

WOODS

115’ DOMINION POWER EASEMENT

TO

WN

OF

RO

BE

RS

ON

VIL

LE

EA

SE

ME

NT

WID

TH

UN

KN

OW

N

SUPPORTS

4- CONC

POWER EASEMENT

115’ DOMINION

(BRIDGE)ALLOWABLE IMPACTS ZONE 1

(ROADWAY)ALLOWABLE IMPACTS ZONE 1

(ROADWAY)ALLOWABLE IMPACTS ZONE 2

SHEET 2 OF 3BUFFER DRAWING

TT

FLAT SWAMP

FLAT SWAMP

DETERMINED BY PHYSICAL OR PAROLE EVIDENCE

THE HISTORIC HIGH WATER MARK COULD NOT BE

TT

CL II RIP RAP KEY-IN 3.5’

EXCAVATIONBANK STABILIZATION

REMOVE REMNANT EXIST. ABUT.

CHORDLOWEST LOW

EXCAVATE TO EL. 43.5’

GRADEROADWAYPROPOSED

CL II RIP RAP KEY-IN 3.5’

EXCAVATE TO EL. 43.5’

OPENINGUPSTREAM FACE

W.S. =45.4’PROP. 25YR.

ELEV. =39.7’W.S. ON 1/7/19

Liner=Grassn=0.045s=0.0512 ft./ft.d=0.4 ft.V=2.6 ft./sQ10=1.6 cfsSta.=16+00 to 16+55

(SEE DETAIL A)

SPECIAL CUT DITCH

TO SHLD. PT. (TYP.)CLASS II RIP RAP

TO SHLD. PT. (TYP.)CLASS II RIP RAP

0.30%5.12%

ELEV.=44.31’

BEGIN DITCH STA. 15+00 (RT)

ELEV.=44.01

DITCH STA. 16+00 (RT)

ELEV.=41.45

DITCH STA. 16+50 (RT)

ELEV.=41.45’

END DITCH STA. 16+55 (RT)

12" HDPE

TOP OF WATER TO LOW BEAM BRIDGE CLEARANCE=7.02’

LOW WOOD BEAM=45.93’

8’ WW

6’ WW 8’ WW

WW

8’

WITH 4 WOODEN WINGWALLS

3-SPAN CONCRETE AND WOOD

BRIDGE #71

Flatter4:

1 or

D3:1

( Not to Scale)

SPECIAL CUT DITCH

FROM STA. 15+50 TO STA. 16+55 -L- RT.

DETAIL A

Min. D=1.5 Ft.

Ground

Natural Slope

Ditch

Front

15" RC

P-IV

15" RC

P-IV

15"

15"

TB 2GI

TB 2GI TB 2GI

TB 2GI

EST. 38 CY

EXCAVATION

STRUCTURE

EST. 5 SY GEOTEXTILE

EST. 1 TN RIP RAP

CLASS B RIP RAP

EST. 50 CY

EXCAVATION

STRUCTURE

EST. 7 SY GEOTEXTILE

EST. 2 TN RIP RAP

CLASS B RIP RAP

RE

VISIO

NS

1310 11 12 14 15 16 17 18 19 20 21 22 23

0

10

20

30

40

50

Fax: 919 851 8107

Bus: 919 851 8077

License No. F-0377

Raleigh, N.C. 27606

1223 Jones Franklin Rd.

CIVIL/SITE DESIGN - GIS/GPS - CONSTRUCTION OBSERVATION

TRANSPORTATION PLANNING/DESIGN - BRIDGE/STRUCTURE DESIGN

ENGINEERINGETHERILL

0

10

20

30

40

50

TYPE-IIIGREU TL-3

TYPE-IIITYPE-III

TYPE-III

GREU TL-3

GREU TL-3

25:1

25:1

25:1

25:1

11’

11’

5.5’

5.5’

.025

.025

OU

T O

T O

UT

33’ 11’

11’

.025

.025

11’

11’

.025

.025

-L- STA. 16+38.32

BEG. BRIDGE

-L- STA. 17+08.32

END BRIDGE

-L- STA. 16+26.32

BEG. APP. SLAB

-L- STA. 17+20.32

END APP. SLAB-L- PT Sta. 15+82.96

SKETCH SHOWING PAVEMENT / STRUCTURE RELATIONSHIP

SEE SHEET S1- THRU S-? FOR STRUCTURE PLANS

GREU TL-3

SHEET NO.PROJECT REFERENCE NO.

HYDRAULICSROADWAY DESIGN

ENGINEER ENGINEER

417BP.1.R.86

R/W SHEET NO.8/17/99

9/18/2019

P:\

2018\18160.0

1_

Martin71\

Hydraulics\

PE

RMIT

S_

Environ

mental\

Dra

wings\17

BP.1.R.8

6_buf_P

SH_04.d

gn

US

ER:

FBrooks

GRAPHIC SCALE

0’ 100’100’

F

C

F

C

F

F

F

F

F

F

1

1

2

2

GREU TL-3

GREU TL-3

GREU TL-3

-L- PC Sta. 14+74.93

-L- PT Sta. 15+82.96

-L- PC Sta. 19+17.80

-L- PT Sta. 13+33.43

-L- PC Sta. 10+00.00

-L- PC Sta. 11+61.19

-L- PT Sta. 11+46.42

-L- PT Sta. 21+98.14

-L- POT Sta. 23+40.49

GREU TL-3

.025

.02

.025

.01

.02

.025

.025

10 11 12 13 14 15 16 17 18 19 20 21 22 23

PI = 15+45.00

EL = 47.26’

(+)0.5900%

VC = 80’K = 82

PI = 16+80.00

EL = 49.37’

(+)1.5631% (-)1.8353%

VC = 150’K = 44

PI = 18+25.00

EL = 46.70’

(-)0.1900%

VC = 110’K = 67

*DS = 45MPH *DS = 40MPH *DS = 40MPH

MEETS WITHIN 20MPH

* SUB REGIONAL TIER

EL = 46.99

-L- STA. 15+00.00

BEGIN GRADE

EL = 46.60

-L- STA. 18+80.00

END GRADE

-L- STA. 16

+37.3

8

BE

GIN

BRID

GE

-L- STA. 17

+09.6

3

EN

D

BRID

GE

1.5:1

1.5:1

1.5:1

2’-6" DEEP CAPS1@70’ 24" CORED SLABSKEW = 90CL ELEV = 48.73’STA. 16+73.5 -L-

DITCH LEGEND

RIGHT DITCH

MILLING

60’ VAR.

MILLING

90’ VAR.

DESIGN DISCHARGE

DESIGN FREQUENCY

BASE DISCHARGE

CFS

YRS

YRS

BASE FREQUENCY

OVERTOPPING ELEVATION

OVERTOPPING FREQUENCY

OVERTOPPING DISCHARGE CFS

CFS

YRS

FT

FT

FT

DESIGN HW ELEVATION

BASE HW ELEVATION

BRIDGE HYDRAULIC DATA

FT

DATE OF SURVEY

W.S. ELEVATION

AT DATE OF SURVEY FT

= 1400

= 25

= 45.4

= 2100

= 100

= 46.3

= 2400

= 100+

= 46.5

=

= 1/7/2019

= 39.7

ROAD CROSSING BRIDGE

PARALLEL IMPACT

ZONE 1

(ft2)

ZONE 2

(ft2)

TOTAL

(ft2)

ZONE 1

(ft2)

ZONE 2

(ft2)

TOTAL

(ft2)

ZONE 1

(ft2)

ZONE 2

(ft2)

1 70' bridge -L- 16+00 to 17+40 X 1219 1219

road X 887 1209 2096

TOTAL: 2106 1209 3315 0 0 0

IMPACT

BUFFER IMPACTS SUMMARY

TYPE

SITE NO.STRUCTURE SIZE /

TYPESTATION

(FROM/TO)

ALLOWABLE MITIGABLE

BUFFER REPLACEMENT

SHEET 3 OF 3

PROJECT: BRIDGE 71 over SR 1159 (Flat Swamps Rd)

4/11/2019

N.C. DEPT. OF TRANSPORTATIONDIVISION OF HIGHWAYS

Martin County

Rev. May 2006