  • Brechfa Forest ConnectionDevelopment Consent Order Application - Reference EN020016

    Guide to the Application

    March 2016

    Gui

    de to

    the

    App

    licat

    ion

    1

    .7G

  • Guide to the Application

    This document provides a guide to Western Power Distribution’s Brechfa Forest Connection Project

    Development Consent Order application. The original application was submitted to the Planning

    Inspectorate on 29 May 2015, and accepted for examination by the Examining Authority on 26 June

    2015.

    Since the submission a number of the original application documents have been revised and new

    documents produced. This guide charts the submission of these documents to the Planning

    Inspectorate.

    The following table identifies the documents we produced during the examination for which we

    subsequently provided updates and/or revised documents. The left hand column of this table identifies

    the initial submission with the remaining columns indicating when we submitted additional documents to

    the Examining Authority.

    For ease of navigation these documents are grouped by volumes as follows;

    Volume This volume…

    1. Application Information provides details of the specific application information required by the Planning Inspectorate

    2. Plans, Drawings and Sections contains the plans which show where we propose to undertake the work

    3. Draft Development Consent Order outlines the legal powers we are seeking from the Government to build the proposed connection

    4. Compulsory Acquisition Information provides evidence of why we may require legal powers

    5. Reports and Statements includes the Consultation Report and other reports and statements

    6. Environmental Information shows how we assessed the potential impact on the environment

    7. Other Media contains the 3D model of the proposed development and associated videos and images

    8. Other Documents includes additional documents produced for the application submission

    9. Examination Submissions Documents submitted to the Planning Inspectorate as part ofthe Examination

  • Guide to the Application

    Volume Main Submission 29 May 2015Documents Submitted21 August 2015

    Documents Submitted25 September 2015

    Documents Submittedfor Deadline 19 November 2015

    Documents Submitted for Deadline 224 November 2015

    Documents Accepted as late submissions to Deadline 2

    Documents Submitted for Deadline 317 December 2015

    APP-0011.1 Covering Letter including Schedule of Documents

    APP-0021.2 Application Form

    APP-0031.3 Planning Inspectorate Electronic Application Index

    APP-0041.4 Newspaper Notices

    1.5 Red Line Boundary Shape Files1

    APP-0051.6 Glossary and Abbreviations

    APP-1351.7 Guide to the Application

    REP1-0291.7A Guide to the Application

    REP2-0251.7B Guide to the Application

    REP3-0351.7C Guide to the Application

    APP-0062.1 Works Plans: Overall Location Plan and Master Key to Sections Plan

    APP-0072.1 Works Plans: Section A

    APP-0082.1 Works Plans: Section B

    APP-0092.1 Works Plans: Section C

    APP-0102.2 Land Affected and Land Plans: Section A

    APP-1362.2A Land Affected and Land Plans: Section A

    APP-0112.2 Land Affected and Land Plans: Section B

    APP-1372.2A Land Affected and Land Plans: Section B

    APP-0122.2 Land Affected and Land Plans: Section C

    APP-1382.2A Land Affected and Land Plans: Section C

    APP-0132.2 Land Affected and Land Plans: Overall Location Plan and Master Key to Sections Plan

    APP-1392.2A Land Affected and Land Plans: Overall Location Plan and Master Key to Sections Plan

    APP0142.3 Access and Public Rights of Way Plans: Overall Location Plan and Master Key to Sections Plan

    APP0152.3 Access and Public Rights of Way Plans: Section A

    APP0162.3 Access and Public Rights of Way Plans: Section B

    APP0172.3 Access and Public Rights of Way Plans: Section C

    APP0182.4 Environmental Features Plans: Overall Location Plan and Master Key to Sections Plan

    APP0192.4 Environmental Features Plans: Section A

    APP0202.4 Environmental Features Plans: Section B

    Volu

    me

    1A

    pplic

    atio

    n In

    form

    atio

    nVo

    lum

    e 2

    Plan

    s, D

    raw

    ings

    and

    Sec

    tions

    1 Submitted electronically only. No PINS reference provided. 1

  • Guide to the Application

    Documents Accepted as late submissions to Deadline 3

    Documents Submitted for Deadline 41 February 2016

    Documents Submitted for Deadline 518 February 2016

    Documents Accepted as late submissions to Deadline 5

    Documents Submitted24 February 2016

    Documents Submitted for Deadline 617 March 2016

    Documents Submitted for Deadline 731 March 2016

    REP4-0231.7D Guide to the Application

    REP5-0191.7E Guide to the Application

    REP6-0121.7F Guide to the Application 1.7G Guide to the Application

    REP5-0202.2B Land Affected and Land Plans: Section A

    REP6-0132.2C Land Affected and Land Plans: Section A

    REP5-0212.2B Land Affected and Land Plans: Section B

    REP6-0142.2C Land Affected and Land Plans: Section B

    REP5-0222.2B Land Affected and Land Plans: Section C

    2

  • Guide to the Application

    Volume Main Submission 29 May 2015Documents Submitted21 August 2015

    Documents Submitted25 September 2015

    Documents Submittedfor Deadline 19 November 2015

    Documents Submitted for Deadline 224 November 2015

    Documents Accepted as late submissions to Deadline 2

    Documents Submitted for Deadline 317 December 2015

    APP0212.4 Environmental Features Plans: Section C

    APP0222.5 Heritage Designations Plans: Overall Location Plan and Master Key to Sections Plan

    APP0232.5 Heritage Designations Plans: Section A

    APP0242.5 Heritage Designations Plans: Section B

    APP-0252.5 Heritage Designations Plans: Section C

    APP-0262.6 Special Category Land Plans and Crown Land Plans: Overall Location Plan and Master Key to Sections Plan

    APP-027 2.6 Special Category Land Plans and Crown Land Plans: Section B

    APP-0282.6 Special Category Land Plans and Crown Land Plans: Section C

    APP-0292.7 132kV Overhead Line Wood Pole Outline

    APP-0302.7 132kV Overhead Line Work no.1 Profiles

    APP-0312.7 132kV Overhead Line Work no.3 Profiles

    APP-0322.7 132kV Underground Cable Work no.2 Design Drawings

    APP-0332.7 Design Drawings Brechfa Forest Satellite Construction Compound

    APP034 2.7 Key Plan for Detailed Design DrawingsAPP0352.8 Trees and Hedges with the Potential to be Affected Plans: Overall Location Plan and Master Key to Sections Plan

    Volu

    me

    2 Pl

    ans,

    Dra

    win

    gs a

    nd S

    ectio

    ns

    3

  • Guide to the Application

    Documents Accepted as late submissions to Deadline 3

    Documents Submitted for Deadline 41 February 2016

    Documents Submitted for Deadline 518 February 2016

    Documents Accepted as late submissions to Deadline 5

    Documents Submitted24 February 2016

    Documents Submitted for Deadline 617 March 2016

    Documents Submitted for Deadline 731 March 2016

    4

  • Guide to the Application

    Volume Main Submission 29 May 2015Documents Submitted21 August 2015

    Documents Submitted25 September 2015

    Documents Submittedfor Deadline 19 November 2015

    Documents Submitted for Deadline 224 November 2015

    Documents Accepted as late submissions to Deadline 2

    Documents Submitted for Deadline 317 December 2015

    APP0362.8 Trees and Hedges with the Potential to be Affected Plans: Section A

    APP-0372.8 Trees and Hedges with the Potential to be Affected Plans: Section B

    APP-0382.8 Trees and Hedges with the Potential to be Affected Plans: Section C

    REP3-0362.9 Deviation Plans

    APP-0393.1 Draft Development Consent Order

    REP2-0273.1A Draft Development Consent Order

    REP3-0483.1B Draft Development Consent Order

    REP2-0263.1A Draft Development Consent Order (Tracked Change)

    REP3-0493.1B Draft Development Consent Order (Tracked Change)

    APP-0403.2 Draft Explanatory Memorandum

    APP-0414.1 Statement of Reasons

    APP-1394.1A Statement of Reasons

    APP-140 4.1A Statement of Reasons (Tracked Change)

    APP-0424.2 Funding Statement

    APP-0434.3 Book of Reference

    APP-1414.3A Book of Reference

    REP2-0294.3B Book of Reference Part 1

    APP-1424.3A Book of Reference (Tracked Change)

    REP2-0284.3B Book of Reference (Tracked Change) Part 1

    APP-0445.1 Consultation Report

    APP-0455.1 Consultation Report Appendix 3.1 to 4.3

    APP-0465.1 Consultation Report Appendix 5.1 to 6.2

    APP-0475.1 Consultation Report Appendix 6.3 to 8.24

    APP-0485.1 Consultation Report Appendix 9.1 to 14.7

    APP-0495.1.1 Consultation Report Summary (Welsh)

    APP-0505.1.1 Consultation Report Summary

    Volu

    me

    2 Pl

    ans,

    Dra

    win

    gs a

    nd S

    ectio

    nsVo

    lum

    e 4

    Com

    puls

    ory

    Acq

    uisi

    tion

    Info

    rmat

    ion

    Volu

    me

    5 R

    epor

    ts a

    nd S

    tate

    men

    tsVo

    lum

    e 3

    Dra

    ft D

    evel

    opm

    ent C

    onse

    nt O

    rder

    5

  • Guide to the Application

    Documents Accepted as late submissions to Deadline 3

    Documents Submitted for Deadline 41 February 2016

    Documents Submitted for Deadline 518 February 2016

    Documents Accepted as late submissions to Deadline 5

    Documents Submitted24 February 2016

    Documents Submitted for Deadline 617 March 2016

    Documents Submitted for Deadline 731 March 2016

    REP3-0523.1C Draft Development Consent Order

    REP4-0243.1D Draft Development Consent Order

    REP5-0233.1E Draft Development Consent Order

    REP3-0533.1C Draft Development Consent Order (Tracked Change)

    REP4-0253.1D Draft Development Consent Order (Tracked Change)

    REP5-0243.1E Draft Development Consent Order (Tracked Change)

    REP6-0153.2A Explanatory Memorandum

    REP6-0163.2A Explanatory Memorandum (Tracked Change)

    4.1B Statement of ReasonsOption A

    4.1B Statement of Reasons Option A(Tracked Change)

    REP5-0264.3C Book of Reference

    REP6-0174.3D Book of Reference

    REP5-0274.3C Book of Reference (Tracked Change)

    REP6-0184.3D Book of Reference (Tracked Change)

    6

  • Guide to the Application

    Volume Main Submission 29 May 2015Documents Submitted21 August 2015

    Documents Submitted25 September 2015

    Documents Submittedfor Deadline 19 November 2015

    Documents Submitted for Deadline 224 November 2015

    Documents Accepted as late submissions to Deadline 2

    Documents Submitted for Deadline 317 December 2015

    APP-0515.1 Consultation Report Addendum

    APP-0525.2 Flood Consequence Assessment

    APP-0535.3 Statement of Statutory Nuisance

    APP-0545.4 Habitat Regulations Assessment - No Significant Effects Report

    REP3-0375.4A Habitat Regulations Assessment - No Significant Effects Report

    APP-0546.1 Environmental Statement Non Technical Summary (Welsh)

    APP-0556.1 Environmental Statement Non Technical Summary

    APP-0566.2 Environmental Statement Chapter 1 - Introduction

    APP-0576.2 Environmental Statement Chapter 2 - Project Description

    APP-0586.2 Environmental Statement Chapter 3 - Project Alternatives

    APP-0596.2 Environmental Statement Chapter 4 - Consultation

    APP-0606.2 Environmental Statement Chapter 5 - Environmental Setting

    APP-0616.2 Environmental Statement Chapter 6 - EIA Process

    APP-0626.2 Environmental Statement Chapter 6 - EIA Process

    APP-0636.2 Environmental Statement Chapter 8 - Land Use, Agriculture and Forestry

    APP-0646.2 Environmental Statement Chapter 9 - Landscape and Visual Assessment

    APP-0656.2 Environmental Statement Chapter 10 - Ecology

    APP-0666.2 Environmental Statement Chapter 11 - Historic Environment

    Volu

    me

    5 R

    epor

    ts a

    nd S

    tate

    men

    tsVo

    lum

    e 6

    Envi

    ronm

    enta

    l Inf

    orm

    atio

    n

    7

  • Guide to the Application

    Documents Accepted as late submissions to Deadline 3

    Documents Submitted for Deadline 41 February 2016

    Documents Submitted for Deadline 518 February 2016

    Documents Accepted as late submissions to Deadline 5

    Documents Submitted24 February 2016

    Documents Submitted for Deadline 617 March 2016

    Documents Submitted for Deadline 731 March 2016

    8

  • Guide to the Application

    Volume Main Submission 29 May 2015Documents Submitted21 August 2015

    Documents Submitted25 September 2015

    Documents Submittedfor Deadline 19 November 2015

    Documents Submitted for Deadline 224 November 2015

    Documents Accepted as late submissions to Deadline 2

    Documents Submitted for Deadline 317 December 2015

    APP-0676.2 Environmental Statement Chapter 12 - Geology, Hydrogeology and Ground Conditions

    APP-0686.2 Environmental Statement Chapter 13 - Hydrology, Drainage and Flood Risk

    APP-0696.2 Environmental Statement Chapter 14 - Noise and Vibration

    APP-0706.2 Environmental Statement Chapter 15 - Air Quality

    APP-0716.2 Envirnmental Statement Chapter 16 - Traffic and Transport

    APP-0726.2 Environmental Statement Chapter 17 - Socio-economics, Recreation and Tourism

    APP-0736.2 Environmental Statement Chapter 18 - Electric and Magnetic Fields

    APP-0746.2 Environmental Statement Chapter 19 - Cumulative Effects and Inter-relationships

    APP-0756.2 Environmental Statement Chapter 20 - Environmental Management

    APP-0766.3 Environmental Statement Figures 1.1 to 9.4

    APP-0776.3 Environmental Statement Figure 9.5

    APP-0786.3 Environmental Statement Figures 9.6 to 11.5

    APP-0796.3 Environmental Statement Figures 12.1 to 17.1

    APP-0806.3 Environmental Statement Figures 19.1 to 19.3

    APP-0816.3 Environmental Statement Appendix 3.1 - WPD Schedule 9 Statement

    Volu

    me

    6 En

    viro

    nmen

    tal I

    nfor

    mat

    ion

    9

  • Guide to the Application

    Documents Accepted as late submissions to Deadline 3

    Documents Submitted for Deadline 41 February 2016

    Documents Submitted for Deadline 518 February 2016

    Documents Accepted as late submissions to Deadline 5

    Documents Submitted24 February 2016

    Documents Submitted for Deadline 617 March 2016

    Documents Submitted for Deadline 731 March 2016

    10

  • Guide to the Application

    Volume Main Submission 29 May 2015Documents Submitted21 August 2015

    Documents Submitted25 September 2015

    Documents Submittedfor Deadline 19 November 2015

    Documents Submitted for Deadline 224 November 2015

    Documents Accepted as late submissions to Deadline 2

    Documents Submitted for Deadline 317 December 2015

    APP-0826.4 Environmental Statement Appendix 3.2 - Change Request Log

    APP-0836.4 Environmental Statement Appendix 7.1 - Summary of LDP PoliciesAPP-0846.4 Environmental Statement Appendix 7.2 - Compliance with NPS EN1 and NPS EN5

    APP-0856.4 Environmental Statement Appendix 7.3 - Climate Change Resilience Report

    APP-0866.4 Environmental Statement Appendix 9.1 - Effects on Landscape Elements Part 1 of 2

    APP-0876.4 Environmental Statement Appendix 9.1 - Effects on Landscape Elements Part 2 of 2

    APP-0886.4 Environmental Statement Appendix 9.2 - Effects on Landscape Character

    APP-0896.4 Environmental Statement Appendix 9.3 - Effects on Landscape Designations

    APP-0906.4 Environmental Statement Appendix 9.4 - Effects on Representative Viewpoints

    APP-0916.4 Environmental Statement Appendix 9.5 - Visual Effects upon Residents

    APP-0926.4 Environmental Statement Appendix 9.6 - Visual Effects upon Footpath Users

    APP-0936.4 Environmental Statement Appendix 9.7 - Visual Effects upon Road Users

    APP-0946.4 Environmental Statement Appendix 9.8 - Visual Effects upon other Recreational and Tourist Locations

    APP-0956.4 Environmental Statement Appendix 10.1 - Bat Technical Report

    Volu

    me

    6 En

    viro

    nmen

    tal I

    nfor

    mat

    ion

    11

  • Guide to the Application

    Documents Accepted as late submissions to Deadline 3

    Documents Submitted for Deadline 41 February 2016

    Documents Submitted for Deadline 518 February 2016

    Documents Accepted as late submissions to Deadline 5

    Documents Submitted24 February 2016

    Documents Submitted for Deadline 617 March 2016

    Documents Submitted for Deadline 731 March 2016

    12

  • Guide to the Application

    Volume Main Submission 29 May 2015Documents Submitted21 August 2015

    Documents Submitted25 September 2015

    Documents Submittedfor Deadline 19 November 2015

    Documents Submitted for Deadline 224 November 2015

    Documents Accepted as late submissions to Deadline 2

    Documents Submitted for Deadline 317 December 2015

    APP-0966.4 Environmental Statement Appendix 10.2 - Botany Technical Report

    APP-0976.4 Environmental Statement Appendix 10.3 - Bird Technical Report

    APP-0986.4 Environmental Statement Appendix 10.4 - Dormouse Technical Report

    APP-0996.4 Environmental Statement Appendix 10.5 - Marsh Fritillary Technical Report

    APP-1006.4 Environmental Statement Appendix 10.6 - Otter and Water Vole Technical Report

    APP-1016.4 Environmental Statement Appendix 11.1 - Historic Environment Technical Report

    APP-1026.4 Environmental Statement Appendix 11.2 - Historic Environment Planning Compliance

    APP-1036.4 Environmental Statement Appendix 12.1 - Geo-Environmental Information Part 1 of 6

    APP-1046.4 Environmental Statement Appendix 12.1 - Geo-Environmental Information Part 2 of 6

    APP-1056.4 Environmental Statement Appendix 12.1 - Geo-Environmental Information Part 3 of 6

    APP-1066.4 Environmental Statement Appendix 12.1 - Geo-Environmental Information Part 4 of 6

    APP-1076.4 Environmental Statement Appendix 12.1 - Geo-Environmental Information Part 5 of 6

    APP-1086.4 Environmental Statement Appendix 12.1 - Geo-Environmental Information Part 6 of 6

    APP-1096.4 Environmental Statement Appendix 13.1 - Hydrology, Flood Risk and Drainage Data Table

    APP-1106.4 Environmental Statement Appendix 14.1 - Noise Supporting Information

    Volu

    me

    6 En

    viro

    nmen

    tal I

    nfor

    mat

    ion

    13

  • Guide to the Application

    Documents Accepted as late submissions to Deadline 3

    Documents Submitted for Deadline 41 February 2016

    Documents Submitted for Deadline 518 February 2016

    Documents Accepted as late submissions to Deadline 5

    Documents Submitted24 February 2016

    Documents Submitted for Deadline 617 March 2016

    Documents Submitted for Deadline 731 March 2016

    14

  • Guide to the Application

    Volume Main Submission 29 May 2015Documents Submitted21 August 2015

    Documents Submitted25 September 2015

    Documents Submittedfor Deadline 19 November 2015

    Documents Submitted for Deadline 224 November 2015

    Documents Accepted as late submissions to Deadline 2

    Documents Submitted for Deadline 317 December 2015

    APP-1116.4 Environmental Statement Appendix 15.1 - Air Quality Assessment

    APP-1126.4 Environmental Statement Appendix 16.1 - Clarification of Traffic and Transport Scope

    APP-1136.4 Environmental Statement Appendix 16.2 - Brechfa Forest Construction Programme

    APP-1446.4 Environmental Statement Appendix 17.1 - Review of Socio-economic, Recreation and Tourism Assessments

    APP-1146.4 Environmental Statement Appendix 18.1 - EMF Calculations

    APP-1156.5 Environmental Statement Scoping Report

    APP-1166.6 Environmental Statement Scoping Opinion

    APP-1176.7 Environmental Statement Publicity Requirements

    Volu

    me

    7 O

    ther

    Med

    ia

    APP-1187.1 3D Model Visualisation Document

    APP-1198.1 Planning Statement

    APP-1458.1 Planning Statement Appendix 1 - Details of Other Consents and Licenses

    APP-1208.1 Summary Planning Statement

    APP-1218.1 Summary Planning Statement (Welsh)

    APP-1228.2 Strategic Optioneering Report

    Volu

    me

    6 En

    viro

    nmen

    tal I

    nfor

    mat

    ion

    Volu

    me

    8 O

    ther

    Doc

    umen

    ts

    15

  • Guide to the Application

    Documents Accepted as late submissions to Deadline 3

    Documents Submitted for Deadline 41 February 2016

    Documents Submitted for Deadline 518 February 2016

    Documents Accepted as late submissions to Deadline 5

    Documents Submitted24 February 2016

    Documents Submitted for Deadline 617 March 2016

    Documents Submitted for Deadline 731 March 2016

    REP3-0548.1A Planning Statement Appendix 1 - Details of Other Consents and Licenses

    16

  • Guide to the Application

    Volume Main Submission 29 May 2015Documents Submitted21 August 2015

    Documents Submitted25 September 2015

    Documents Submittedfor Deadline 19 November 2015

    Documents Submitted for Deadline 224 November 2015

    Documents Accepted as late submissions to Deadline 2

    Documents Submitted for Deadline 317 December 2015

    APP-1238.3 Draft Section 106 Agreement

    REP3-0388.3A Draft Section 106 Agreement

    APP-1248.4 Lifetime Costs Report

    APP-1258.5 Construction Management Strategy Part 1 of 2

    APP-1268.5 Construction Management Strategy Part 2 of 2

    APP-1278.6 Construction Environmental Management Plan

    REP3-0398.6.1 Construction Environmental Management Plan - Habitat Management Plan

    APP-1288.7 Construction Traffic Management Plan

    APP-1298.7 Construction Traffic Management Plan Figures 1.1 to 4.2

    APP-1308.7 Construction Traffic Management Plan Appendix 1 PRoW Management Strategy

    APP-1318.7 Construction Traffic Management Plan Appendix 2 Access Pro Formas

    APP-1328.8 Transport Assessment

    APP-1338.9 Outline Archaeological Written Scheme of Investigation

    APP-1348.9 Outline Archaeological Written Scheme of Investigation Figure 1.1

    APP-1358.10 DCO Documents Errata

    APP-1478.10 Volume 6.4 - Appendix 14.1 Noise Supporting Information Errata

    APP-1488.11 Sections 56 and 59 and Regulation 13 Compliance Certificates and Notice of Recipients Not Included in the Revised Book of Reference

    Volu

    me

    8 O

    ther

    Doc

    umen

    ts

    17

  • Guide to the Application

    Documents Accepted as late submissions to Deadline 3

    Documents Submitted for Deadline 41 February 2016

    Documents Submitted for Deadline 518 February 2016

    Documents Accepted as late submissions to Deadline 5

    Documents Submitted24 February 2016

    Documents Submitted for Deadline 617 March 2016

    Documents Submitted for Deadline 731 March 2016

    8.3B Draft Section 106 Agreement(unsigned)

    REP4-0268.6A Construction Environmental Management Plan

    18

  • Guide to the Application

    Volume Main Submission 29 May 2015Documents Submitted21 August 2015

    Documents Submitted25 September 2015

    Documents Submittedfor Deadline 19 November 2015

    Documents Submitted for Deadline 224 November 2015

    Documents Accepted as late submissions to Deadline 2

    Documents Submitted for Deadline 317 December 2015

    APP-1498.12 Response to ExA Procedural Decision dated 6 July 2015 and Planning Inspectorate Section 55 Application Checklist

    REP1-0299.1 Response to the Examining Authority's First Written Questions

    REP1-0309.2.1 CA01 Appendix 1 Change Requests

    REP1-0319.2.2 CA12 Appendix 1 Justification for Land

    REP1-0329.2.3 CA13 Appendix 1 Organogram

    REP1-0339.2.4 CA14 Appendix 1 Annual Report and Financial Statement

    REP1-0349.2.5 CA18 Appendix 1 Land Owner Engagements

    REP1-0359.2.6.1 DLV02 Appendix 1 Figure 1 Appendix 9.5 Residential Receptors

    REP1-0369.2.6.2 DLV02 Appendix 2 Figure 1 Appendix 9.6 Footpaths

    REP1-0379.2.6.3 DLV02 Appendix 3 Figure 1 Appendix 9.7 Classified Roads

    REP1-0389.2.6.4 DLV02 Appendix 4 Figure 1 Appendix 9.8 Other Receptors

    REP1-0399.2.7 DLV03 Appendix 1 Viewpoints

    REP1-0409.2.8.1 DLV06 Appendix 1 Phillip Black - CV

    REP1-0419.2.8.2 DLV06 Appendix 2 Ellie Davies - CV

    REP1-0429.2.8.3 DLV06 Appendix 3 John Meehan - CVREP1-0439.2.9 DLV13 Appendix 1 Modified Table 9.1

    REP1-0449.2.10 DLV15 Appendix 1 Table of Receptors

    REP1-0459.2.11 DLV19 Appendix 1 Options Comparison

    Volu

    me

    9 Ex

    amin

    atio

    n Su

    bmis

    sion

    s

    19

  • Guide to the Application

    Documents Accepted as late submissions to Deadline 3

    Documents Submitted for Deadline 41 February 2016

    Documents Submitted for Deadline 518 February 2016

    Documents Accepted as late submissions to Deadline 5

    Documents Submitted24 February 2016

    Documents Submitted for Deadline 617 March 2016

    Documents Submitted for Deadline 731 March 2016

    20

  • Guide to the Application

    Volume Main Submission 29 May 2015Documents Submitted21 August 2015

    Documents Submitted25 September 2015

    Documents Submittedfor Deadline 19 November 2015

    Documents Submitted for Deadline 224 November 2015

    Documents Accepted as late submissions to Deadline 2

    Documents Submitted for Deadline 317 December 2015

    REP1-0469.2.12 DLV20 Appendix 1 Report into Underground Cables

    REP1-0479.2.13.1 DLV22 Appendix 1 Route Alignment Selection Report

    REP1-0489.2.13.2 DLV22 Appendix 2 Route Alignment Selection Report Figures

    REP1-0499.2.13.3 DLV22 Appendix 3 Route Alignment Selection Report Appendix 1.1

    REP1-0509.2.13.4.1 DLV22 Appendix 4 Route Alignment Selection Report Appendix 1.2 Part 1

    REP1-0519.2.13.4.2 DLV22 Appendix 4 Route Alignment Selection Report Appendix 1.2 Part 2

    REP1-0589.2.13.4.3 DLV22 Appendix 4 Route Alignment Selection Report Appendix 1.2 Part 3

    REP1-0599.2.13.4.4 DLV22 Appendix 4 Route Alignment Selection Report Appendix 1.2 Part 4

    REP1-0529.2.13.5 DLV22 Appendix 5 Route Alignment Selection Report Appendix 2.1

    REP1-0539.2.14.1 DLV24 Appendix 1 National Grid - Our Approach to Design and Routeing 2012

    REP1-0549.2.14.2 DLV24 Appendix 2 National Grid - Approach to Options Appraisal 2012

    REP1-0559.2.14.3 DLV24 Appendix 3 NG UG Policy New Connections

    REP1-0569.2.14.4.1 DLV24 Appendix 4 CIGRE Guidelines Part 1

    REP1-0579.2.14.4.2 DLV24 Appendix 4 CIGRE Guidelines Part 2

    REP1-0609.2.15 DCO03 Appendix 1 Mitigation Table

    REP1-0619.2.16 DCO24 Appendix 1 Brechfa Forest West Wind Farm Approved layout

    REP1-0629.2.17 DCO33 Appendix 1 Email from Openreach

    REP1-0639.2.18.1 DCO34 Appendix 1 S37 Consent Burry Port

    Volu

    me

    9 Ex

    amin

    atio

    n Su

    bmis

    sion

    s

    21

  • Guide to the Application

    Documents Accepted as late submissions to Deadline 3

    Documents Submitted for Deadline 41 February 2016

    Documents Submitted for Deadline 518 February 2016

    Documents Accepted as late submissions to Deadline 5

    Documents Submitted24 February 2016

    Documents Submitted for Deadline 617 March 2016

    Documents Submitted for Deadline 731 March 2016

    REP4-0469.2.15A DCO03 Appendix 1 Mitigation Table

    REP5-0299.2.15B DCO03 Appendix 1 Mitigation Table

    22

  • Guide to the Application

    Volume Main Submission 29 May 2015Documents Submitted21 August 2015

    Documents Submitted25 September 2015

    Documents Submittedfor Deadline 19 November 2015

    Documents Submitted for Deadline 224 November 2015

    Documents Accepted as late submissions to Deadline 2

    Documents Submitted for Deadline 317 December 2015

    REP1-0649.2.18.2 DCO34 Appendix 2 Existing Assets Table

    REP1-0659.2.18.3 DCO34 Appendix 3 Proposed Works to Existing Assets Plans

    REP1-0669.2.19.1 EIA09 Appendix 1 Notes of NRW ecology meetings

    REP1-0679.2.19.2 EIA09 Appendix 2 Follow up Email with NRW

    REP1-0689.2.19.3 EIA09 Appendix 3 CCC Scoping Opinion to PINS

    REP1-0699.2.19.4 EIA09 Appendix 4 CCC Response on Draft ES

    REP1-0709.2.20.1 EIA13 Appendix 1 BFWWF Habitat Management Plan

    REP1-0719.2.20.2 EIA13 Appendix 2 BFWWF Completed Unilateral Undertaking

    REP1-0729.2.21 EIA17 Appendix 1 Stage 3 Consultation - NRW

    REP1-0739.2.22 EIA20 Appendix 1 Conceptual Site Model

    REP1-0749.2.23.1 EIA22 Appendix 1 Relevant Watercourses Part 1

    REP1-0759.2.23.2 EIA22 Appendix 2 Relevant WatercoursesPart 2

    REP1-0769.2.24 EIA26 Appendix 1 Outline Frac-out Contingency Plan

    REP1-0779.2.25 EIA29 Appendix 1 SIA Guidelines

    REP1-0789.2.26 EIA30 App1 Tables 20.1 & 20.2

    REP1-0799.2.27 HA11 Appendix 1 HRA Figure 2 Otter Figures

    REP1-0809.2.28 OM02 Appendix 1 Guide to the Application

    REP1-0829.3.1 Statements of Common Ground - Carmarthenshire County Council

    REP1-0839.3.2 Statements of Common Ground - Historic Environment - Dyfed Archaeological Trust and Cadw

    Volu

    me

    9 Ex

    amin

    atio

    n Su

    bmis

    sion

    s

    23

  • Guide to the Application

    Documents Accepted as late submissions to Deadline 3

    Documents Submitted for Deadline 41 February 2016

    Documents Submitted for Deadline 518 February 2016

    Documents Accepted as late submissions to Deadline 5

    Documents Submitted24 February 2016

    Documents Submitted for Deadline 617 March 2016

    Documents Submitted for Deadline 731 March 2016

    REP5-0309.2.18.2A DCO34 Appendix 2 Existing Assets Table

    REP4-0479.2.18.3A DCO34 Appendix 3 Proposed Works to Existing Assets Plans

    24

  • Guide to the Application

    Volume Main Submission 29 May 2015Documents Submitted21 August 2015

    Documents Submitted25 September 2015

    Documents Submittedfor Deadline 19 November 2015

    Documents Submitted for Deadline 224 November 2015

    Documents Accepted as late submissions to Deadline 2

    Documents Submitted for Deadline 317 December 2015

    REP2-0369.3.3 Statements of Common Ground - Natural Resources Wales

    REP2-0379.3.4 Statements of Common Ground - Landscape and Visual - Carmarthenshire County Council

    REP2-0389.3.5 Statements of Common Ground - Historic Environment - Carmarthenshire County Council

    REP2-0399.3.6 Statements of Common Ground - Landscape and Visual - Natural Resources Wales

    REP3-0479.3.7 Statements of Common Ground - Development Consent Order - Carmarthenshire County Council

    REP1-0279.4 Applicant’s Responses to Relevant Representations

    REP1-0849.5 Position with regard to Statements of Common Ground

    REP2-0309.6.1 Applicant’s Comments on Written Representations from Carmarthenshire County Council

    REP2-0319.6.2 Applicant’s Comments on Written Representations from Other Parties

    REP2-0329.7 Applicant’s Comments on Carmarthenshire County Council's Local Impact Report

    REP2-0359.7A Applicant’s Comments on Carmarthenshire County Council's Local Impact Report

    REP2-0339.8 Applicant’s Comments on Responses to Examining Authority’s First Written Questions

    REP2-0349.9 Commentary of Changes to Draft Development Consent Order 3.1

    REP3-0409.10 Commentary of Changes to Draft Development Consent Order 3.1A

    REP3-0419.11 Applicant's Response to Open Floor Hearings

    Volu

    me

    9 Ex

    amin

    atio

    n Su

    bmis

    sion

    s

    25

  • Guide to the Application

    Documents Accepted as late submissions to Deadline 3

    Documents Submitted for Deadline 41 February 2016

    Documents Submitted for Deadline 518 February 2016

    Documents Accepted as late submissions to Deadline 5

    Documents Submitted24 February 2016

    Documents Submitted for Deadline 617 March 2016

    Documents Submitted for Deadline 731 March 2016

    26

  • Guide to the Application

    Volume Main Submission 29 May 2015Documents Submitted21 August 2015

    Documents Submitted25 September 2015

    Documents Submittedfor Deadline 19 November 2015

    Documents Submitted for Deadline 224 November 2015

    Documents Accepted as late submissions to Deadline 2

    Documents Submitted for Deadline 317 December 2015

    REP3-0429.12 Applicant's Response to Compulsory Acquisition Hearing

    REP3-0439.13 Applicant's Response to Issue Specific Hearing on Environmental Matters

    REP3-0449.14 Applicant's Response to Issue Specific Hearing on the DCO

    REP3-0459.15 Responses to Examining Authority Questions asked at Hearings

    REP3-0469.16 Existing and Wire Line View Transparencies

    Volu

    me

    9 Ex

    amin

    atio

    n Su

    bmis

    sion

    s

    27

  • Guide to the Application

    Documents Accepted as late submissions to Deadline 3

    Documents Submitted for Deadline 41 February 2016

    Documents Submitted for Deadline 518 February 2016

    Documents Accepted as late submissions to Deadline 5

    Documents Submitted24 February 2016

    Documents Submitted for Deadline 617 March 2016

    Documents Submitted for Deadline 731 March 2016

    REP4-0279.17 Applicant’s Responses to Examining Authority’s Second Round of Written QuestionsREP4-0289.18.1 Updated Land Owner Engagement Table

    REP5-0319.18.1A Updated Land Owner Engagement Table

    REP6-0209.18.1B Updated Land Owner Engagement Table

    9.18.1C Updated Land Owner Engagement Table

    REP4-0379.18.2 Table of Plots with Unknown Ownership

    REP4-0389.18.3 Copy of Metropolitan Board of Works v McCarthy (1874)

    REP4-0399.18.4 Copy of Wildtree Hotels Limited v Harrow London Borough Council (2000)REP4-0409.18.5 Copy of Secretary of State's Decision and Examining Authority's Recommendation in Hinkley Point C Connection REP4-0419.18.6 Copy of Section 37 Recommendation and Secretary of State Decision for Legacy Substation to Oswestry Substation 132kV Connection

    REP4-0429.18.7 List of Documents to be Certified by the Secretary of State

    REP4-0439.18.8 Protective Provisions Table

    REP4-0449.18.9 Letter from Mainline Pipelines agreeing to Protective Provisions

    28

  • Guide to the Application

    Volume Main Submission 29 May 2015Documents Submitted21 August 2015

    Documents Submitted25 September 2015

    Documents Submittedfor Deadline 19 November 2015

    Documents Submitted for Deadline 224 November 2015

    Documents Accepted as late submissions to Deadline 2

    Documents Submitted for Deadline 317 December 2015

    Volu

    me

    9 Ex

    amin

    atio

    n Su

    bmis

    sion

    s

    29

  • Guide to the Application

    Documents Accepted as late submissions to Deadline 3

    Documents Submitted for Deadline 41 February 2016

    Documents Submitted for Deadline 518 February 2016

    Documents Accepted as late submissions to Deadline 5

    Documents Submitted24 February 2016

    Documents Submitted for Deadline 617 March 2016

    Documents Submitted for Deadline 731 March 2016

    REP4-0299.18.10 Plan Showing Location of Temporary Bridge

    REP5-0329.18.10A Plan Showing Location of Temporary Bridge

    REP4-0309.18.11 WPD Adaptation to Climate Change Reports (from June 2011 and May 2015)

    REP4-0319.18.12 Due Diligence LetterREP4-0329.18.13 Consultation responses from the Ministry of DefenceREP4-0339.18.14 Consultation responses from the Civil Aviation AuthorityREP4-0349.18.15 WPD Company Directive on Pollution Prevention

    REP4-0359.18.16 Special Report - The State of Environmental Impact Assessment Practice in the UK - IEMA (2011)

    REP4-0369.18.17 The Energy Networks Association – Engineering Technical Report 136 (June 2007)

    REP4-0459.19 Table of Proposed Amendments to Book of Reference

    REP4-0489.20 Applicant’s Comments on Submissions made by Interested Parties at Deadline 3REP4-0499.21 Commentary of Changes to Draft Development Consent Order 3.1C

    REP5-0339.22 Applicant’s Written Submissions following the Compulsory Acquisition Hearing held on Wednesday 10 February 2016

    REP5-0359.22.1 Applicant’s Written Submissions following the Compulsory Acquisition Hearing held on Wednesday 10 February 2016 - Appendices

    REP5-0349.23 Applicant's Written Submissions following the Issue Specific Hearing on the DCO held on Thursday 11 February 2016

    REP5-0369.23.1 Applicant's Written Submissions following the Issue Specific Hearing on the DCO held on Thursday 11 February 2016 - Appendices

    REP5-0259.24 Commentary of Changes to Draft Development Consent Order 3.1D

    REP5-0379.25 HRA NSER Addendum: Location within DCO where mitigation is secured

    30

  • Guide to the Application

    Volume Main Submission 29 May 2015Documents Submitted21 August 2015

    Documents Submitted25 September 2015

    Documents Submittedfor Deadline 19 November 2015

    Documents Submitted for Deadline 224 November 2015

    Documents Accepted as late submissions to Deadline 2

    Documents Submitted for Deadline 317 December 2015

    Volu

    me

    9 Ex

    amin

    atio

    n Su

    bmis

    sion

    s

    31

  • Guide to the Application

    Documents Accepted as late submissions to Deadline 3

    Documents Submitted for Deadline 41 February 2016

    Documents Submitted for Deadline 518 February 2016

    Documents Accepted as late submissions to Deadline 5

    Documents Submitted24 February 2016

    Documents Submitted for Deadline 617 March 2016

    Documents Submitted for Deadline 731 March 2016

    REP5-0389.26.1 Outline Tree Inventory Showing Trees Potentially Affected, Maps 1-9

    REP5-0399.26.2 Outline Tree Inventory Showing Trees Potentially Affected, Maps 10-18REP5-0409.26.3 Outline Tree Inventory Showing Trees Potentially Affected, Maps 19-27REP5-0419.26.4 Outline Tree Inventory Showing Trees Potentially Affected, Maps 28-36REP5-0429.26.5 Outline Tree Inventory Showing Trees Potentially Affected, Maps 37-45REP5-0439.26.6 Outline Tree Inventory Showing Trees Potentially Affected, Maps 46-55

    REP5-0289.27 Book of Reference Change Commentary 4.3B to 4.3C

    CR-0029.28 Statement of Applicant Alternative Undergrounding Option in the Towy Valley

    CR-0039.29 Addendum to the Environmental Statement - Potential undergrounding of an additional part of the Brechfa Connection

    CR-0049.29.1 Addendum to the Environmental Statement FiguresPart 1: Figure 2.1 to 9.4CR-0059.29.2 Addendum to the Environmental Statement FiguresPart 2: Figure 9.5 VP09 to VP15CR-0069.29.3 Addendum to the Environmental Statement FiguresPart 3: Figure 9.5 AVP1CR-0079.29.4 Addendum to the Environmental Statement FiguresPart 4: Figure 9.5 AVP2CR-0089.29.5 Addendum to the Environmental Statement FiguresPart 5: Figure 9.5 AVP3CR-0099.29.6 Addendum to the Environmental Statement FiguresPart 6: Figure 9.5 AVP4CR-0109.30 HRA NSER Screening of Alternative Undergrounding Option in the Towy ValleyCR-0119.31 Draft Development Consent OrderCR-0129.31 Draft Development Consent Order (Tracked Change)

    32

  • Guide to the Application

    Volume Main Submission 29 May 2015Documents Submitted21 August 2015

    Documents Submitted25 September 2015

    Documents Submittedfor Deadline 19 November 2015

    Documents Submitted for Deadline 224 November 2015

    Documents Accepted as late submissions to Deadline 2

    Documents Submitted for Deadline 317 December 2015

    Volu

    me

    9 Ex

    amin

    atio

    n Su

    bmis

    sion

    s

    33

  • Guide to the Application

    Documents Accepted as late submissions to Deadline 3

    Documents Submitted for Deadline 41 February 2016

    Documents Submitted for Deadline 518 February 2016

    Documents Accepted as late submissions to Deadline 5

    Documents Submitted24 February 2016

    Documents Submitted for Deadline 617 March 2016

    Documents Submitted for Deadline 731 March 2016

    CR-0139.32 Draft Explanatory Memorandum

    REP6-0219.32A Draft Explanatory Memorandum REP6-0229.32A Draft Explanatory Memorandum (Tracked Change)

    CR-0149.33 Statement of Reasons 9.33A Statement of Reasons

    CR-0159.33 Statement of Reasons (Tracked Change)

    9.33A Statement of Reasons (Tracked Change)

    CR-0169.34 Alternative Undergrounding Option in the Towy Valley Works Plans - Section A

    CR-0179.34 Alternative Undergrounding Option in the Towy Valley Works Plans - Section B

    CR-0189.35 Diagram Illustrating Change OHL to UCG

    CR-019Construction Traffic Management Plan Appendix 1

    CR-0209.37 132kV OHL Work No 1 Profiles - Alternative Terminal Option

    CR-0219.38 Consultation Statement

    CR-0229.39 Trees and Hedges with the Potential to be Affected Plans Section ACR-0239.39 Trees and Hedges with the Potential to be Affected Plans Section BCR-0249.40 Master Landowner Communication TableCR-0259.41 Copies of Redacted Correspondence between BJP and Bruton KnowlesCR-0269.42 Commentary of changes to DCO Vol 03.1E

    REP6-0239.43.1 Communication between the Applicant and Affected Persons who have not yet agreed Heads of Terms (Part 1 of 4)

    REP6-0249.43.2 Communication between the Applicant and Affected Persons who have not yet agreed Heads of Terms (Part 2 of 4)

    REP6-0259.43.3 Communication between the Applicant and Affected Persons who have not yet agreed Heads of Terms (Part 3 of 4)

    34

  • Guide to the Application

    Volume Main Submission 29 May 2015Documents Submitted21 August 2015

    Documents Submitted25 September 2015

    Documents Submittedfor Deadline 19 November 2015

    Documents Submitted for Deadline 224 November 2015

    Documents Accepted as late submissions to Deadline 2

    Documents Submitted for Deadline 317 December 2015

    Volu

    me

    9 Ex

    amin

    atio

    n Su

    bmis

    sion

    s

    35

  • Guide to the Application

    Documents Accepted as late submissions to Deadline 3

    Documents Submitted for Deadline 41 February 2016

    Documents Submitted for Deadline 518 February 2016

    Documents Accepted as late submissions to Deadline 5

    Documents Submitted24 February 2016

    Documents Submitted for Deadline 617 March 2016

    Documents Submitted for Deadline 731 March 2016

    REP6-0269.43.4 Communication between the Applicant and Affected Persons who have not yet agreed Heads of Terms (Part 4 of 4)

    REP6-0279.44 Applicant’s response to ExA’s questions regarding changes to the Book of Reference

    REP6-0289.45 Applicant’s response to the ExA’s procedural decision letter of 1 March 2016

    REP6-0299.46 Agreed notes from landowner meeting on Friday, 4 March 2016 to discuss alternative alignment and access options

    REP6-0199.47 Book of Reference Change Commentary 4.3C to 4.3D

    REP6-0309.48.1 Copies of correspondence with Affected Parties regarding unknown plots (Part 1 of 2)

    REP6-0319.48.2 Copies of correspondence with Affected Parties regarding unknown plots (Part 2 of 2)

    REP6-0329.49 Applicant response to RIES

    REP6-0339.50 Response to Procedural Decision 27 February, Mr and Mrs Shaw

    9.51 Heads of Terms(Tracked change)

    9.52 Review of proposals to realign a section of OHL on land at Penwaun and Llwyn Newydd

    9.53 Bruton Knowles correspondence direct with landowners

    36