18 asualties - napit · fire exit frie rcd-off i-oni ... 2 elling tion 3 ify this is held 4 e of...

2
419 Casualties 18 Fatalities

Upload: others

Post on 09-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 18 asualties - NAPIT · FIRE EXIT FRIE RCD-OFF I-ONI ... 2 elling tion 3 ify this is held 4 e of last EICR t EICR Routine Visual and Operational Check of the Electrical Installation

419

Casualties

18

Fatalities

Page 2: 18 asualties - NAPIT · FIRE EXIT FRIE RCD-OFF I-ONI ... 2 elling tion 3 ify this is held 4 e of last EICR t EICR Routine Visual and Operational Check of the Electrical Installation

FIRE EXIT

FR

AG

I LE

FR

AG

I LE

FR

AG

I LE

RCDO-OFF

I-ON I-ON I-ONI-ON

RCDO-OFF

I-ON I-ON

I-ON I-ON I-ON

I-ON

1

2

3

4

Item

Yes/No/NA

1 a Property, (rented), has an EICR, dated within the last 5 years

b Property, (non-rented), has an EICR dated within the last 10 years

c New property or complete re-wire with a dated EIC of less than 5 years for rented, or

10 years for private dwelling2 All observation codes C1, C2 and FI have been repaired to a satisfactory outcome and appropriate certifi cation

to verify this is held3 Date of last EICR4 Recommended date of next EICR

Routine Visual and Operational Check of the Electrical Installation

Guidance Document

WARNING!Interference With This

Installation Is Illegal And Could Cause

Death or Injury

RCD

O-OFF

O-OFF

I-ON I-ON I-ON

a

1 Electrical Intake Position

Guidance to assist with the completion of the Routine Visual and Operational Checklist

1