18 asualties - napit · fire exit frie rcd-off i-oni ... 2 elling tion 3 ify this is held 4 e of...
TRANSCRIPT
![Page 1: 18 asualties - NAPIT · FIRE EXIT FRIE RCD-OFF I-ONI ... 2 elling tion 3 ify this is held 4 e of last EICR t EICR Routine Visual and Operational Check of the Electrical Installation](https://reader033.vdocument.in/reader033/viewer/2022052717/5f0485427e708231d40e60f5/html5/thumbnails/1.jpg)
419
Casualties
18
Fatalities
![Page 2: 18 asualties - NAPIT · FIRE EXIT FRIE RCD-OFF I-ONI ... 2 elling tion 3 ify this is held 4 e of last EICR t EICR Routine Visual and Operational Check of the Electrical Installation](https://reader033.vdocument.in/reader033/viewer/2022052717/5f0485427e708231d40e60f5/html5/thumbnails/2.jpg)
FIRE EXIT
FR
AG
I LE
FR
AG
I LE
FR
AG
I LE
RCDO-OFF
I-ON I-ON I-ONI-ON
RCDO-OFF
I-ON I-ON
I-ON I-ON I-ON
I-ON
1
2
3
4
Item
Yes/No/NA
1 a Property, (rented), has an EICR, dated within the last 5 years
b Property, (non-rented), has an EICR dated within the last 10 years
c New property or complete re-wire with a dated EIC of less than 5 years for rented, or
10 years for private dwelling2 All observation codes C1, C2 and FI have been repaired to a satisfactory outcome and appropriate certifi cation
to verify this is held3 Date of last EICR4 Recommended date of next EICR
Routine Visual and Operational Check of the Electrical Installation
Guidance Document
WARNING!Interference With This
Installation Is Illegal And Could Cause
Death or Injury
RCD
O-OFF
O-OFF
I-ON I-ON I-ON
a
1 Electrical Intake Position
Guidance to assist with the completion of the Routine Visual and Operational Checklist
1