1/8 t. kume, y. honda, and t. tauchi high energy accelerator research organization (kek) t. suehara,...

8
1/8 T. Kume, Y. Honda, and T. Tauchi High Energy Accelerator Research Organization (KEK) T. Suehara, H. Yoda, M. Oroku, T. Yamanaka and Y. Kami ya The univ. of Tokyo T. Sanuki Tohoku Univ. Mount stabilization for Shintake m onitor-6 5th ATF2 Project meeting December 20, 2007

Upload: griselda-williams

Post on 15-Jan-2016

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1/8 T. Kume, Y. Honda, and T. Tauchi High Energy Accelerator Research Organization (KEK) T. Suehara, H. Yoda, M. Oroku, T. Yamanaka and Y. Kamiya The univ

1/8

T. Kume, Y. Honda, and T. Tauchi High Energy Accelerator Research Organization (KEK)

T. Suehara, H. Yoda, M. Oroku, T. Yamanaka and Y. KamiyaThe univ. of Tokyo

T. SanukiTohoku Univ.

Mount stabilization for Shintake monitor-65th ATF2 Project meeting December 20, 2007

Page 2: 1/8 T. Kume, Y. Honda, and T. Tauchi High Energy Accelerator Research Organization (KEK) T. Suehara, H. Yoda, M. Oroku, T. Yamanaka and Y. Kamiya The univ

2/8

Specifications expected for new table support

• ~10nm of amplitude for incoherent vibration with floor

– >Use steal honeycomb core (<Al), thicker (110mm->250mm)

– >Highly ridged mount on floor without any insulator

• ±5mm of height adjustable range with accuracy of ±1mm

– >Shim between table mount and floor

• ±2.5mm of horizontal position adjustable range perpendicular to beam with accuracy of ±1mm

– >Slide sheet between vertical table and horizontal table

Page 3: 1/8 T. Kume, Y. Honda, and T. Tauchi High Energy Accelerator Research Organization (KEK) T. Suehara, H. Yoda, M. Oroku, T. Yamanaka and Y. Kamiya The univ

3/8

Position and height adjustmentby using slide sheet and shim

Vertical table for mounting interferometer optics(made of non-magnetic SUS and steel honeycomb core)

Beam

Floor

Horizontal table for mounting vertical table(made of steel honeycomb core)

Cover for preventing LASAR scattering

Slide sheet for horizontal position

adjustmentShim for height adjustment

Mou

ntin

g fa

ce

Page 4: 1/8 T. Kume, Y. Honda, and T. Tauchi High Energy Accelerator Research Organization (KEK) T. Suehara, H. Yoda, M. Oroku, T. Yamanaka and Y. Kamiya The univ

4/8

Method for ensuring face contact on floorby using filler (clay?)

Beam

Floor

Filler for ensuring face contactbetween table and floor

Mou

ntin

g fa

ce

Page 5: 1/8 T. Kume, Y. Honda, and T. Tauchi High Energy Accelerator Research Organization (KEK) T. Suehara, H. Yoda, M. Oroku, T. Yamanaka and Y. Kamiya The univ

5/8

Shintake monitor mount-side viewassuming distance between end face of CLIC table and FF magnet is 20 m

m, distance between end face of FF magnet and IP is 1000 mm

Downstream ⇔  Upstream

Page 6: 1/8 T. Kume, Y. Honda, and T. Tauchi High Energy Accelerator Research Organization (KEK) T. Suehara, H. Yoda, M. Oroku, T. Yamanaka and Y. Kamiya The univ

6/8

Shintake monitor mount-top viewassuming beam goes center of CLIC table

Page 7: 1/8 T. Kume, Y. Honda, and T. Tauchi High Energy Accelerator Research Organization (KEK) T. Suehara, H. Yoda, M. Oroku, T. Yamanaka and Y. Kamiya The univ

7/8

Plan

• Make new optical table and mount (end of Feb.,2008., by Herz co.)

• Put new table and mount on IP (end of Feb., 2008., by Herz co.)

• Align laser optics on the new table and test optics

(~Sep.?, 2008. by U.Tokyo & KEK)

• Vibration measurement and adjustment (~May?, 2008., by Herz co.)

Page 8: 1/8 T. Kume, Y. Honda, and T. Tauchi High Energy Accelerator Research Organization (KEK) T. Suehara, H. Yoda, M. Oroku, T. Yamanaka and Y. Kamiya The univ

8/8

Schedule

2007Dec Jan. Feb Mar Apr May Jun Jul Aug

Overall

Univ. ofTokyo &

KEK

HERZCo. LTD.

Make Laser optics install & test

2008

Make new optical table & table mount

Install laser optics

Optics test

☆Vibrationmeasurement

☆Install

Design & makelaser cover