189-27 rfb - booster pump installation at handy park

8
L- BOOSTER PUMP UPGRADE COVER SHEET PUMP INSTALLATION 2-6-19 18134 NTS 1 LOCATION OF WORK Handy Park: 2143 East Oakmont Avenue SHEET INDEX: L-1 Cover Sheet L-2 Demolition Plan L-3 Layout Plan L-4 Pump Detail L-5 Mounting Slab Detail L-6 Master valve/flow sensor Details L-7 Backflow Details L-8 Fence Details DESCRIPTION OF WORK: This is a retrofit installation project to install irrigation booster pump at Handy Park. The scope of this work includes but not limited to, furnishing and installing new master valves and booster pump and all necessary and related equipment and supplies. All work shall be completed to City of Orange Landscape Standards and Specifications and Watertronics Product Installation Specifications. Dave Nobbs Park Maintenance Supervisor City of Orange 714-532-6468 Office 714-532-6452 - Fax [email protected] CONSTRUCTION NOTES: 1. Contractor shall schedule a pre-construction meeting with City Park staff and a representatives from Watertronics at least 21 days prior the start of construction to review the existing conditions at the park site. Contact Steven Kim at Gentile and Associates, (760) 214-5737. 2. Prior to the start of construction: -contractor shall provide the City with a complete equipment submittal. No equipment substitutions will be allowed without prior written approval by the City, -contractor is responsible to notify the City of discrepancies between the plans and the field conditions. 3. Prior to the completion and acceptance of the work, the contractor shall provide the City with written approval from Watertronics that the work was installed per Watertronics specifications and is operational. 4. Any existing park site improvements within the work area modified or damaged during construction shall be repaired to pre-construction condition and to the satisfaction of the Parks Maintenance Supervisor. 5. All new irrigation control wire installed shall be a minimum of #14AWG. 6. All wiring conduit is to be buried a minimum of 18" below grade. 7. All new valve boxes shall be Rainbird products. Plans and Specifications for: Handy Park Booster Pump Retrofit Installation CITY OF ORANGE Services/Park Maintenance 230 East Chapman Avenue Orange, CA 92866

Upload: others

Post on 23-Nov-2021

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 189-27 RFB - Booster Pump Installation at Handy Park

L-

BOOSTER PUMP UPGRADE

COVER SHEET

PUMP INSTALLATION

2-6-19

18134

NTS

1

LOCATION OF WORK

Handy Park: 2143 East Oakmont Avenue

SHEET INDEX:

L-1 Cover Sheet

L-2 Demolition Plan

L-3 Layout Plan

L-4 Pump Detail

L-5 Mounting Slab Detail

L-6 Master valve/flow sensor Details

L-7 Backflow Details

L-8 Fence Details

DESCRIPTION OF WORK:

This is a retrofit installation project to install irrigation booster pump at Handy Park. The scope of this work

includes but not limited to, furnishing and installing new master valves and booster pump and all necessary

and related equipment and supplies. All work shall be completed to City of Orange Landscape Standards and

Specifications and Watertronics Product Installation Specifications.

Dave Nobbs

Park Maintenance Supervisor

City of Orange

714-532-6468 Office

714-532-6452 - Fax

[email protected]

CONSTRUCTION NOTES:

1. Contractor shall schedule a pre-construction meeting with City Park staff and a representatives from Watertronics at

least 21 days prior the start of construction to review the existing conditions at the park site. Contact Steven Kim at

Gentile and Associates, (760) 214-5737.

2. Prior to the start of construction:

-contractor shall provide the City with a complete equipment submittal. No equipment substitutions will be allowed

without prior written approval by the City,

-contractor is responsible to notify the City of discrepancies between the plans and the field conditions.

3. Prior to the completion and acceptance of the work, the contractor shall provide the City with written approval from

Watertronics that the work was installed per Watertronics specifications and is operational.

4. Any existing park site improvements within the work area modified or damaged during construction shall be repaired to

pre-construction condition and to the satisfaction of the Parks Maintenance Supervisor.

5. All new irrigation control wire installed shall be a minimum of #14AWG.

6. All wiring conduit is to be buried a minimum of 18" below grade.

7. All new valve boxes shall be Rainbird products.

Plans and Specifications for:

Handy Park Booster Pump Retrofit Installation

CITY OF ORANGE

Services/Park Maintenance

230 East Chapman Avenue

Orange, CA 92866

AutoCAD SHX Text
92506
AutoCAD SHX Text
6800 INDIANA AVE
AutoCAD SHX Text
RIVERSIDE, CALIFORNIA
AutoCAD SHX Text
LIC. #2799
AutoCAD SHX Text
FAX (951) 686-8091
AutoCAD SHX Text
PH. (951) 781-1930
AutoCAD SHX Text
Sheet Title
AutoCAD SHX Text
Project Name
AutoCAD SHX Text
Sheet No
AutoCAD SHX Text
Scale
AutoCAD SHX Text
Addendum No.
AutoCAD SHX Text
RHA Project No.
AutoCAD SHX Text
Date
AutoCAD SHX Text
SUITE 245
nfavela
Typewritten text
Booster Pump Installation RFB 6
nfavela
Typewritten text
EXHIBIT A
Page 2: 189-27 RFB - Booster Pump Installation at Handy Park

-ALL EXPOSED IRRIGATION WIRING SHALL BE ENCLOSED IN WEATHERPROOF ELECTRICAL CONDUIT. ALL WIRE SPLICES SHALL BE PROTECTED IN A JUNCTION

BOX OR VALVE BOX. ALL SPLICES SHALL BE SEALED WITH 3M SCOTCHLOK NO. 3570-G-N CONNECTOR SEALING PACK. DO NOT DIRECT BURY ANY WIRE SPLICES.

-THE MASTER VALVES AND FLOW SENSORS WILL BE CONNECTED DIRECTLY TO THE CALSENSE CONTROLLER VIA #14AWG IRRIGATION WIRE.

-INSTALL A 12"x18"x12" CONCRETE THRUST BLOCK UNDER THE 3" BACKFLOW.

-REMOVE RUST, PRIME AND REPAINT ALL THE EXPOSED PIPING AND EQUIPMENT, INCLUDING THE NEW WORK, MATCH COLOR TO THE EXISTING LIGHT BLUE.

XXXXXX

XX

XX

XX

X X X X X X X X X X

XX

XX

XX

X

X

X

ELECTRICAL ENCLOSURE.

PROTECT IN PLACE.

(2) 1-1/2" WATER METERS.

PROTECT IN PLACE.

REMOVE EXISTING PUMP.

RETURN PUMP TO CITY.

REMOVE THE CHAIN LINK ENCLOSURE FENCE

REMOVE ELECTRICAL PANEL.

RELOCATE THE 480 V.A.C. ELECTRICAL

SUPPLY TO THE NEW PUMP ASSEMBLY.

CUT WATER LINE THAT SUPPLIES

THE RESTROOM BUILDING. INSTALL

TEMPORARY CAP.

CUT WATER LINE THAT SUPPLIES

THE IRRIGATION SYSTEM.

INSTALL A TEMPORARY CAP.

REMOVE EXISTING 3" PRESSURE

REDUCING/FLOW CONTROL VALVE.

RETURN VALVE TO CITY.

REMOVE BYPASS VALVE .

RETURN VALVE TO CITY.

EXISTING 3" BACKFLOW

TO BE REINSTALLED.

CUT WATER LINE DOWNSTREAM

OF WATER METER.

REMOVE MASTER VALVES/FLOW SENSORS.

SAVE FLOW SENSORS FOR REINSTALLATION.

PROTECT THE EXISTING MASTER VALVE/

FLOW SENSOR WIRES AND CONDUIT.

WIRES TO BE REROUTED PER NEW LAYOUT.

REMOVE PIPING

1. REMOVE THE EXISTING CHAIN LINK ENCLOSURE AND ALL IRRIGATION

EQUIPMENT LOCATED WITHIN. THE FOLLOWING EQUIPMENT NEEDS TO BE

STORED BY THE CONTRACTOR AND REINSTALLED: Calsense FLOW

SENSORS, AND Apollo BACKFLOW. TURNOVER MASTER VALVES AND PUMP

EQUIPMENT TO CITY STAFF.

2. COORDINATE WITH The Southern California Gas Company TO HAVE THE

NATURAL GAS METER REMOVED AND SERVICE LINE CAPPED.

3. REMOVE ALL THE IRRIGATION PIPING AND EQUIPMENT WITHIN THE

FENCED ENCLOSURE, STARTING DOWNSTREAM OF THE WATER METERS.

4. PRIOR TO BEGINNING INSTALLATION, STAKE THE PROPOSED LAYOUT OF

THE PUMP ENCLOSURE AND BACKFLOW ASSEMBLIES FOR APPROVAL BY

CITY PARK STAFF. ADJUST FINAL LAYOUT TO AVOID CONFLICTS WITH THE

SURROUNDING UTILITIES.

5. PROVIDE A 1-1/2" SUPPLY LINE FROM THE METER MANIFOLD TO PROVIDE

DOMESTIC WATER SERVICE TO THE RESTROOM BUILDING. INSTALL A

1-1/2" ISOLATION VALVE AT THE OUTLET AND INSTALL A NEW 1-1/2"

BACKFLOW DEVICE PER LEGEND AND DETAILS. FINAL LOCATION TO BE

APPROVED BY CITY PARK STAFF. EXTEND A COPPER LINE TO THE

EXISTING WATER LINE THAT SUPPLIES THE RESTROOM BUILDING.

6. INSTALL NEW 3" DUCTILE IRON PIPE FROM THE WATER METER MANIFOLD

TO THE 3" BACKFLOW AND THE DROP PIPE ON THE NEW BOOSTER PUMP.

7. CONSTRUCT CONCRETE SLAB AND INSTALL PUMP ASSEMBLY. REFER TO

DETAIL FOR DIMENSIONS. ORIENT THE ASSEMBLY AS SHOWN ON PLAN.

8. A LICENSED ELECTRICAL CONTRACTOR SHALL REROUTE THE EXISTING

480VAC PUMP ELECTRICAL SUPPLY TO THE NEW PUMP LOCATION AND

INSTALL THE REQUIRED GROUNDING PROTECTION.

9. CONSTRUCT A LOW FLOW BYPASS MANIFOLD PER CALSENSE DESIGN

GUIDELINES. USE BRASS OR COPPER PIPE TO THE MANIFOLD. INSTALL

THE MASTER VALVES AND FLOW METERS BELOW GRADE AND WITHIN

RAINBIRD PLASTIC VALVE BOXES.

10. INSTALL A 1" PVC CONDUIT BETWEEN THE VALVE BOXES OF THE MASTER

VALVE AND FLOW SENSOR.

11. INSTALL VINYL PRIVACY SLATES IN THE NEW CHAIN LINK FABRIC, COLOR

TO BE GREEN.

12. PROTECT IN PLACE ALL THE EXISTING CONTROL/COMMUNICATION WIRES.

13. REPAIR ALL SURROUNDING LANDSCAPE AND HARDSCAPE AREAS TO A

PRE-CONSTRUCTION CONDITION.

COORDINATE WITH The Southern California Gas Company

TO HAVE THE NATURAL GAS METER REMOVED AND

SERVICE LINE CAPPED.

CONCRETE ELECTRICAL SPLICE BOX.

PROTECT IN PLACE.

BACK EDGE OF

SIDEWALK.

L-

BOOSTER PUMP UPGRADE

HANDY PARK

DEMOLITION PLAN

2-6-19

18134

NTS

2

AutoCAD SHX Text
BF
AutoCAD SHX Text
PV
AutoCAD SHX Text
MV
AutoCAD SHX Text
FS
AutoCAD SHX Text
BP
AutoCAD SHX Text
MV2
AutoCAD SHX Text
FS2
AutoCAD SHX Text
G
AutoCAD SHX Text
P
AutoCAD SHX Text
M
AutoCAD SHX Text
M
AutoCAD SHX Text
92506
AutoCAD SHX Text
6800 INDIANA AVE
AutoCAD SHX Text
RIVERSIDE, CALIFORNIA
AutoCAD SHX Text
LIC. #2799
AutoCAD SHX Text
FAX (951) 686-8091
AutoCAD SHX Text
PH. (951) 781-1930
AutoCAD SHX Text
Sheet Title
AutoCAD SHX Text
Project Name
AutoCAD SHX Text
Sheet No
AutoCAD SHX Text
Scale
AutoCAD SHX Text
Addendum No.
AutoCAD SHX Text
RHA Project No.
AutoCAD SHX Text
Date
AutoCAD SHX Text
SUITE 245
nfavela
Typewritten text
Booster Pump Installation RFB 7
Page 3: 189-27 RFB - Booster Pump Installation at Handy Park

X

XX

X

XXXXXX

XX

X

X

X

X

NEW 1-1/2" BACKFLOW

FOR DOMESTIC WATER

PO

WE

R

DIS

CO

NN

EC

T

EN

CLO

SU

RE

ELECTRICAL ENCLOSURE

PROTECT IN PLACE

(2) 1-1/2" WATER METERS

REINSTALL 3" BACKFLOW

FOR IRRIGATION

RECONNECT TO EXISTING WATER SUPPLY

LINE TO RESTROOM BUILDING.

RECONNECT TO EXISTING

3" IRRIGATION MAINLINE

KEEP

48"

CLEAR

1-1/2"

COPPER

MAKE TRANSITION FROM 1-1/2" COPPER TO

3" DUCTILE IRON WITH DIELECTRIC FLANGE KIT.

MASTER VALVE ASSEMBLY

INSTALLED BELOW GRADE

SLOPE

ENCLOSURE FENCE

20" min

10" min

10" min

5" min

1-1/2"

COPPER

LEGEND

2" NORMALLY CLOSED BRONZE MASTER VALVE -

GRISWOLD MODEL 2030LE

1" NORMALLY OPEN MASTER VALVE GRISWOLD

MODEL 2160HE (LOW FLOW BYPASS)

2" FLOW METER - CALSENSE MODEL FM-2B

1" FLOW METER - CALSENSE MODEL FM-1B

3" REDUCED PRESSURE ASSEMBLY-

APOLLO VALVES MODEL RPLF4AN

WATERTRONICS BOOSTER PUMP,

WMBV-5000-2-7.5-460-3-140-90

CONTACT STEVEN KIM (760-214-5734)

1-1/2" BRASS BALL VALVE -

NIBCO MODEL T-585-66-LF

REFER TO DETAIL 'C' ON SHEET L-7

1-1/2" REDUCED PRESSURE ASSEMBLY-

FEBCO MODEL LF825Y

REFER TO DETAIL 'B' ON SHEET L-7

RE

IN

ST

ALL T

HE

FO

LLO

WIN

G

EQ

UIP

ME

NT

:

TEE FITTING

TRANSITION BACK TO

3" MAINLINE PIPE SIZE.

10'

19' 8'

BACK EDGE OF

SIDEWALK.

REINSTALL THE

3" BACKFLOW

FOR IRRIGATION

XX

X

XX

X

DEEPEN

CONCRETE

FOOTING

ENCLOSURE FENCE

INSTALL NEW PUMP ENCLOSURE

10'

XX

X

XX

X

1-1/2" WATER METERS

INSTALL NEW ENCLOSURE FENCE

WITH GREEN VINYAL PRIVACY SLATES.

DETAIL 'D' ON SHEET L-8

0.67'

0.50'

EXISTING

GRADE

HEIGHT AS

DETERMINED

IN FIELD

CROSS SECTION

SECTION VIEW

TWO 5' SWING GATES.

DETAIL 'E' ON SHEET L-8

INLET PIPE

DISCHARGE PIPE

CONCRETE

ELECTRICAL BOX

INSTALL NEW ENCLOSURE FENCE

WITH GREEN VINYL SLATES.

DETAIL 'D' ON SHEET L-8

L-

BOOSTER PUMP UPGRADE

HANDY PARK

LAYOUT PLAN

2-6-19

18134

NTS

3

AutoCAD SHX Text
MV
AutoCAD SHX Text
FS
AutoCAD SHX Text
"
AutoCAD SHX Text
1
AutoCAD SHX Text
"
AutoCAD SHX Text
1
AutoCAD SHX Text
MV2
AutoCAD SHX Text
FS2
AutoCAD SHX Text
"
AutoCAD SHX Text
1
AutoCAD SHX Text
"
AutoCAD SHX Text
2
AutoCAD SHX Text
MV
AutoCAD SHX Text
FS
AutoCAD SHX Text
MV2
AutoCAD SHX Text
FS2
AutoCAD SHX Text
BP
AutoCAD SHX Text
RP
AutoCAD SHX Text
BF
AutoCAD SHX Text
"
AutoCAD SHX Text
2
AutoCAD SHX Text
92506
AutoCAD SHX Text
6800 INDIANA AVE
AutoCAD SHX Text
RIVERSIDE, CALIFORNIA
AutoCAD SHX Text
LIC. #2799
AutoCAD SHX Text
FAX (951) 686-8091
AutoCAD SHX Text
PH. (951) 781-1930
AutoCAD SHX Text
Sheet Title
AutoCAD SHX Text
Project Name
AutoCAD SHX Text
Sheet No
AutoCAD SHX Text
Scale
AutoCAD SHX Text
Addendum No.
AutoCAD SHX Text
RHA Project No.
AutoCAD SHX Text
Date
AutoCAD SHX Text
SUITE 245
nfavela
Typewritten text
Booster Pump Installation RFB 8
Page 4: 189-27 RFB - Booster Pump Installation at Handy Park

L-4

1

DA

TE

NO

.

4 3 27 56

DE

SC

RIP

TIO

NB

Y

TH

IS

D

RA

WIN

G A

ND

D

ES

IG

N, IS

T

HE

PR

OP

ER

TY

O

F W

AT

ER

TR

ON

IC

S A

ND

IS

NO

T T

O B

E R

EP

RO

DU

CE

D IN

W

HO

LE

O

R

PA

RT

, N

OR

E

MP

LO

YE

D F

OR

A

NY

P

UR

PO

SE

OT

HE

R T

HA

N S

PE

CIF

IC

AL

LY

P

ER

MIT

TE

D IN

WR

IT

IN

G B

Y W

AT

ER

TR

ON

IC

S.

TH

IS

D

RA

WIN

G L

OA

NE

D A

ND

S

UB

JE

CT

TO

R

ET

UR

N O

N D

EM

AN

DJO

B N

O.:

NT

SS

CA

LE

:

DR

AW

N B

Y:

OF

DR

AW

IN

G N

O.

DA

TE

:

SH

EE

TS

HE

ET

S

TIT

LE

:

WA

TE

RT

RO

NIC

S

AP

PR

OV

ED

A

S S

UB

MIT

TE

D

AP

PR

OV

ED

A

S N

OT

ED

RE

VIS

E A

ND

R

ES

UB

MIT

SIG

NA

TU

RE

: ____________________

___

CH

EC

KE

D B

Y:

DA

TE

: _______

____

NA

ME

: ________________________

____

DA

TE

:

HA

ND

Y P

AR

K

IR

RIG

AT

IO

N P

UM

P S

TA

TIO

N

PR

ST

13

63

4

11

.

10

/0

9/2

01

8P

JB

F

R

O

N

T

O

F

E

N

C

L

O

S

U

R

E

DE

TA

IL "A

"

CO

NC

RE

TE

A

NC

HO

R

TY

PIC

AL (4) LO

CA

TIO

NS

EN

CLO

SU

RE

IS

OM

ET

RIC

V

IE

W

VF

D

OU

TE

R

DIS

CO

NN

EC

T

10

4

62

SLA

B

48

1 2

32

1 2

46

SLA

B

PO

WE

R

PE

NE

TR

AT

IO

N

AN

CH

OR

P

OIN

T

SE

E D

ET

AIL

BA

SE

&

S

LA

B D

ET

AIL

HIG

H V

OLT

AG

E

PO

WE

R C

ON

DU

IT

HIG

H V

OLT

AG

E

PO

WE

R C

ON

DU

IT

BA

CK

O

F E

NC

LO

SU

RE

ST

AT

IO

N C

OM

PO

NE

NT

S:

A P

UM

P A

ND

M

OT

OR

B C

HE

CK

V

AL

VE

C P

RE

SS

UR

E T

RA

NS

DU

CE

R W

IT

H G

AU

GE

D B

YP

AS

S V

AL

VE

(B

OO

ST

ER

O

NL

Y)

E F

LO

W S

EN

SO

R

F T

EM

P S

EN

SO

R

G S

TA

TIO

N F

AN

H

OO

D M

OU

NT

ED

H P

UM

P IN

TA

KE

IS

OL

AT

IO

N V

AL

VE

I M

AR

IN

E G

RA

DE

A

LU

MIN

UM

E

NC

LO

SU

RE

(U

NP

AIN

TE

D)

J V

FD

W

IT

H P

UM

P C

ON

TR

OL

LE

R

K S

TA

IN

LE

SS

S

TE

EL

B

AS

E (U

NP

AIN

TE

D)

L P

UM

P D

IS

CH

AR

GE

IS

OL

AT

IO

N V

AL

VE

M S

TA

TIO

N D

IS

CH

AR

GE

IS

OL

AT

IO

N V

AL

VE

N IN

TA

KE

D

RO

P P

IP

E W

/ 3

" F

LG

. C

ON

NE

CT

IO

N

O D

IS

CH

AR

GE

D

RO

P P

IP

E W

/ 3

" F

LG

. C

ON

NE

CT

IO

N

A

B

C

E

M

L

B

F

G

J

D

K

L

M

H

I

PO

WE

R

DIS

CO

NN

EC

T

EN

CLO

SU

RE

0

PS

I

20

0

WA

TE

RT

RO

NIC

S

A LI

ND

SAY

CO

MPA

NY

50

BA

SE

NE

C C

LE

AR

AN

CE

SE

E LO

CA

L C

OD

ES

34

BA

SE

IN

LE

T

DIS

CH

AR

GE

SE

E D

ET

AIL

A

3"

3"

3"

3"

24"

PU

MP

S

TA

TIO

N S

PE

CIF

IC

AT

IO

NS

:

NA

ME

: H

AN

DY

P

AR

K

ST

AT

IO

N M

OD

EL: W

MB

V-5000-2-7.5-460-3-140-90

ST

AT

IO

N T

OT

AL P

ER

FO

RM

AN

CE

: 140 G

PM

@

90 P

SI

DY

NA

MIC

IN

LE

T P

RE

SS

UR

E: 60 P

SI

BO

OS

T P

RE

SS

UR

E: 30 P

SI

RE

GU

LA

TE

D D

IS

CH

AR

GE

P

RE

SS

UR

E: 90 P

SI

PU

MP

H

OR

SE

PO

WE

R:

PU

MP

N

O.1: 7.5H

P (3600R

PM

)

CH

EC

K V

ALV

E S

IZ

ES

:

PU

MP

N

O.1 3"

IS

OLA

TIO

N V

ALV

E S

IZ

ES

:

DIS

CH

AR

GE

IS

OLA

TIO

N V

ALV

E S

IZ

E: 3"

DIS

CH

AR

GE

M

AN

IF

OLD

S

IZ

E: 3"

PO

WE

R R

EQ

UIR

EM

EN

TS

: 460V

, 60 H

Z, 3P

HZ

, 19F

LA

(E

ST

.)

EX

HA

US

T F

AN

R

EQ

UIR

EM

EN

TS

: 240C

FM

N

O

3"

30"

AutoCAD SHX Text
Sheet No
nfavela
Typewritten text
Booster Pump Installation RFB 9
Page 5: 189-27 RFB - Booster Pump Installation at Handy Park

L-5

AutoCAD SHX Text
Sheet No
nfavela
Typewritten text
Booster Pump Installation RFB 10
Page 6: 189-27 RFB - Booster Pump Installation at Handy Park

L-6

MA

STE

R V

ALV

E/F

LOW

SE

NS

OR

AS

SE

MB

LY B

ELO

W G

RA

DE

PIP

E S

IZ

E S

AM

E A

S F

LO

W S

EN

SO

R

FIN

IS

HE

D G

RA

DE

.

FLO

W

TO

V

ALV

ES

.

EX

IS

TIN

G M

AIN

LIN

E

RE

DU

CE

R A

S R

EQ

UIR

ED

.

VA

LV

E A

S S

PE

CIF

IE

D.

MA

ST

ER

C

ON

TR

OL

AT

B

OT

TO

M O

F E

AC

H B

OX

:

ON

E E

AC

H S

ID

E (T

WO

P

ER

B

OX

).

UP

S

ID

ES

, O

VE

R 6X

2X

16 C

ON

C. B

LO

CK

C

AP

S,

1/2" W

IR

E C

LO

TH

G

OP

HE

R S

CR

EE

N, W

RA

P

FR

OM

B

AC

KF

LO

W.

MA

IN

LIN

E

A

1" P

VC

C

ON

DU

IT

W

IT

H #14 A

WG

W

IR

ES

T

O T

HE

NE

TA

FIM

S

EN

SO

R D

EC

OD

ER

T

HA

T W

ILL B

E

IN

ST

ALLE

D A

T N

EA

RE

ST

R

EM

OT

E C

ON

TR

OL V

ALV

E

WIR

E C

ON

NE

CT

OR

S S

EA

LE

D W

IT

H 3M

S

CO

TC

HLO

K N

O.

3570 O

N 18" LO

OP

ED

W

IR

ES

, A

S M

FG

. R

EC

OM

ME

ND

.

PIP

E S

IZ

E S

AM

E A

S

VA

LV

E IN

LE

T S

IZ

E.

10X

15 R

EC

TA

NG

ULA

R B

OX

ES

W

IT

H 6' E

XT

EN

SIO

NS

A

S IN

DIC

AT

ED

.

US

E JU

MB

O S

IZ

E B

OX

F

OR

4" M

AS

TE

R V

ALV

ES

.

FLO

W S

EN

SO

R A

S S

PE

CIF

IE

D. (A

LS

O R

EF

ER

T

O C

ALS

EN

SE

FM

BX

IN

ST

ALLA

TIO

N D

ET

AIL F

OR

S

AD

DLE

M

OU

NT

IN

G IN

3"

& 4" P

IP

E)

WIR

E C

ON

NE

CT

OR

S S

EA

LE

D W

IT

H 3M

SC

OT

CH

LO

K N

O. 3570 O

N 30" LO

OP

ED

WIR

ES

.

1" P

VC

C

ON

DU

IT

W

IT

H

#14 A

WG

W

IR

ES

T

O

TH

E N

ET

AF

IM

LIN

E D

EC

OD

ER

CO

NT

AC

T M

AR

K H

UN

TZ

IN

GE

R (760) 580-1827 O

R G

O

TO

C

ALS

EN

SE

.C

OM

F

OR

T

HE

C

ALS

EN

SE

D

ES

IG

N

GU

ID

ELIN

ES

.

AutoCAD SHX Text
Sheet No
AutoCAD SHX Text
FIVE PIPE DIAMETERS
AutoCAD SHX Text
TEN PIPE DIAMETERS
AutoCAD SHX Text
NO VALVES, REDUCERS, OR ELBOWS IN THIS AREA.
nfavela
Typewritten text
Booster Pump Installation RFB 8
nfavela
Typewritten text
Booster Pump Installation RFB 11
Page 7: 189-27 RFB - Booster Pump Installation at Handy Park

L-7

THRUST BLOCK (TYP.)

12" MIN. SQ. CONCRETE

NOTE:

FINISH GRADE

BRASS PIPE TYP.

12"MIN

TxS COPPER ELL

12" MIN

"Y" STRAINER 40 -

MESH S.S.

BACKFLOW DEVICENTS

SxT COUPLER ADAPTER

PVC SCH. 80 MALE

ADAPTER

COPPER PIPE FROM

WATER SOURCE

PVC PRESSURE

SUPPLY LINE - EXTEND

AS SHOWN ON PLAN

6" MIN

REDUCED PRESSURE

BACKFLOW PREVENTION

DEVICE

1. EQUIPMENT TO BE INSTALLED AT A MINIMUM OF 12" FROM WALLS,

BUILDINGS, ETC.

2. CONTRACTOR TO PROVIDE BACKFLOW TEST APPROVAL CERTIFICATE TO

CITY.

FOOTING

B

COPPER PIPE

C ISOLATION BALL VALVE

TO GRADE.

SET BOX FLUSH

6" EXTENSION.

10"X15" RECTANGULAR BOX WITH

ADAPTER.

AS REQUIRED.

THREADED NIPPLE

BRASS

SIZE AS MAIN LINE.

COPPER LINE.

WRAP UP SIDES.

1/2" WIRE CLOTH GOPHER SCREEN,

ONE ON EACH SIDE OF BOX.

TWO 6X2X16 CONCRETE BLOCK CAPS,

AS SPECIFIED, SAME

ISOLATION VALVE

AutoCAD SHX Text
Sheet No
nfavela
Typewritten text
Booster Pump Installation RFB 12
Page 8: 189-27 RFB - Booster Pump Installation at Handy Park

L-8

DOUBLE SWING CHAINLINK PEDESTRIAN GATENTS

INDUSTRIAL 180 DEGREE HINGE

GALV. 2-3/8" GATE FRAME

GALV. TERMINAL POST

LOCKING PIPE LATCH

5' 5'

6'

3"

24"

8"

CONC. FOOTING PER FOOTING DETAIL

SET TOP OF FOOTING FLUSH W/GRADE

3/4" X 3' GALV. STEEL ROD WITH

4" 90 DEGREE HANDLE

1" STEEL SLEEVE IN CONCRETE

FOOTING (ONE AT OPEN & CLOSE)

NOTE:

-ALL RAILS & POSTS SHALL BE SCH 40

-ALL FENCING SHALL BE HOT DIPPED GALVINIZED

-TENSION WIRE SHALL BE ATTACHED TO FABRIC @ 16" O.C. W/HOG RINGS

-INSTALL GREEN VINYL PRIVACY SLATES

STRETCHER BAR

POST CAP

FINISHED GRADE

LINE POST

BOTTOM TENSION WIRE

TERMINAL POST FENCING, STEEL TUBING

4

5

LEGEND

3

2

1

TOP RAIL

POSTS SPACED @ 8' O.C. MAX. CAPPED

COMPACTED SUBGRADE

45

109

73

6

58

2

1

2

8'

TYP.

8'

6'

18"

CHAINLINK FENCENTS

9

10

8

6

7

36"

POST FOOTING, 2,500 PSI CONCRETE

a. Line Posts: 2.375 inch O.D., 3.65 lbs./ft.

b. Corner and Swing Gate Posts: 2.875 inch O.D., 5.79 lbs./ft.

c. Top and Brace Rail: 1.900 inch O.D., 2.72 lbs./ft.

d. Gate Frame: 1.900 inch O.D., 2.72 lbs./ft.

SPECIFICATIONS FOR POST AND RAIL SIZES:

9 GAUGE 1 3/4" SQ. GALV. MESH.

SELVAGE TO BE KNUCKLED TOP & BOTTOM.

INSTALL GREEN VINYL PRIVACY SLATES.

E

D

AutoCAD SHX Text
Sheet No
nfavela
Typewritten text
Booster Pump Installation RFB 13