DESCRIPTION
1961. Corrugated Metal Pipe Institute is formed President – E.L. Campbell President of Armco Drainage & Metal Products of Canada Ltd. Primary Responsibility: Preparation of Case Study & Technical Information. 1964 – Executive Committee makes its first change. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: 1961](https://reader035.vdocument.in/reader035/viewer/2022062409/56814eef550346895dbc7efc/html5/thumbnails/1.jpg)
![Page 2: 1961](https://reader035.vdocument.in/reader035/viewer/2022062409/56814eef550346895dbc7efc/html5/thumbnails/2.jpg)
19611961
Corrugated Metal Pipe Institute is formed
President – E.L. Campbell President of Armco Drainage & Metal Products of Canada Ltd.
Primary Responsibility: Preparation of Case Study & Technical Information
Corrugated Metal Pipe Institute is formed
President – E.L. Campbell President of Armco Drainage & Metal Products of Canada Ltd.
Primary Responsibility: Preparation of Case Study & Technical Information
![Page 3: 1961](https://reader035.vdocument.in/reader035/viewer/2022062409/56814eef550346895dbc7efc/html5/thumbnails/3.jpg)
1964 – Executive Committee makes its first change 1964 – Executive Committee makes its first change
P. F. Fowle, president of Westeel Products Ltd. elected to president of the CMPI
A. Buell, executive vice-president Rosco Metal Products, elected as vice president
A. D. Curran, vice-president Robert Steel, elected as secretary-treasurer
P. F. Fowle, president of Westeel Products Ltd. elected to president of the CMPI
A. Buell, executive vice-president Rosco Metal Products, elected as vice president
A. D. Curran, vice-president Robert Steel, elected as secretary-treasurer
![Page 4: 1961](https://reader035.vdocument.in/reader035/viewer/2022062409/56814eef550346895dbc7efc/html5/thumbnails/4.jpg)
1964 – The year of Proof and Information1964 – The year of Proof and Information
Technical Manual: Solving Drainage Problems with Steel
Printed and mailed to over 5,000 highway consultants and municipalengineers across Canada
Technical Manual: Solving Drainage Problems with Steel
Printed and mailed to over 5,000 highway consultants and municipalengineers across Canada
![Page 5: 1961](https://reader035.vdocument.in/reader035/viewer/2022062409/56814eef550346895dbc7efc/html5/thumbnails/5.jpg)
1965 – Information now available in French1965 – Information now available in French
First Technical Bulletin Translated and published in French
COMMENT RESOURCE les PROBLEMEMS de DRAINAGE avec L’ACIER
First Technical Bulletin Translated and published in French
COMMENT RESOURCE les PROBLEMEMS de DRAINAGE avec L’ACIER
![Page 6: 1961](https://reader035.vdocument.in/reader035/viewer/2022062409/56814eef550346895dbc7efc/html5/thumbnails/6.jpg)
1967 – From Culvert to CSP – new product identification1967 – From Culvert to CSP – new product identification
The CMPI changes the product name from:
Steel Culvert to CSP Corrugated Steel Pipe
The CMPI changes the product name from:
Steel Culvert to CSP Corrugated Steel Pipe
![Page 7: 1961](https://reader035.vdocument.in/reader035/viewer/2022062409/56814eef550346895dbc7efc/html5/thumbnails/7.jpg)
1968 – New executive announced 1968 – New executive announced
Corrugated Metal Pipe Institute officially changes its name to Corrugated Steel Pipe Institute
D.L.G. Turvey became its first President
J. W. Wilson named to the executive board
Corrugated Metal Pipe Institute officially changes its name to Corrugated Steel Pipe Institute
D.L.G. Turvey became its first President
J. W. Wilson named to the executive board
![Page 8: 1961](https://reader035.vdocument.in/reader035/viewer/2022062409/56814eef550346895dbc7efc/html5/thumbnails/8.jpg)
1968 – From Metal to Steel – a new name for the institute1968 – From Metal to Steel – a new name for the institute
CMPI officially becomes the CSPI
CSPI goes from 11 to 14 member companies and 3 to 6 Associate Member companies
CMPI officially becomes the CSPI
CSPI goes from 11 to 14 member companies and 3 to 6 Associate Member companies
![Page 9: 1961](https://reader035.vdocument.in/reader035/viewer/2022062409/56814eef550346895dbc7efc/html5/thumbnails/9.jpg)
1970 – Automation, Structures of Earth and Steel 1970 – Automation, Structures of Earth and Steel
CSPI Case Study now designed to do more than promote Corrugated Steel Pipe
Move to become more topical – issues of the day
CSPI Case Study now designed to do more than promote Corrugated Steel Pipe
Move to become more topical – issues of the day
![Page 10: 1961](https://reader035.vdocument.in/reader035/viewer/2022062409/56814eef550346895dbc7efc/html5/thumbnails/10.jpg)
1973 – Freshening up the look 1973 – Freshening up the look
A change in style for Case Studies and Technical Bulletins
A more contemporary look for CSP logo
The removal of the old CSPI logo design and the addition of colour
A change in style for Case Studies and Technical Bulletins
A more contemporary look for CSP logo
The removal of the old CSPI logo design and the addition of colour
![Page 11: 1961](https://reader035.vdocument.in/reader035/viewer/2022062409/56814eef550346895dbc7efc/html5/thumbnails/11.jpg)
1975 – Increasing visibility through colour1975 – Increasing visibility through colour
CSPI Literature takes on a more colourful appearance
Full colour used for inside spreads
CSPI Literature takes on a more colourful appearance
Full colour used for inside spreads
![Page 12: 1961](https://reader035.vdocument.in/reader035/viewer/2022062409/56814eef550346895dbc7efc/html5/thumbnails/12.jpg)
19751975
C.R. Mallory Smith, elected as President
John W. Wilson, elected as Vice President
Keith C. Huffman, elected as Secretary-Treasurer
C.R. Mallory Smith, elected as President
John W. Wilson, elected as Vice President
Keith C. Huffman, elected as Secretary-Treasurer
![Page 13: 1961](https://reader035.vdocument.in/reader035/viewer/2022062409/56814eef550346895dbc7efc/html5/thumbnails/13.jpg)
1977 – Strengthening CSPI perception by design1977 – Strengthening CSPI perception by design
Official introduction of the new institute design
New look that would become the current logo application
Official introduction of the new institute design
New look that would become the current logo application
![Page 14: 1961](https://reader035.vdocument.in/reader035/viewer/2022062409/56814eef550346895dbc7efc/html5/thumbnails/14.jpg)
1978 – Metrification1978 – Metrification
Metric system a new language for the CSPI and Canada
Published first Canadian Edition of Orange version of Handbook
Metric system a new language for the CSPI and Canada
Published first Canadian Edition of Orange version of Handbook
![Page 15: 1961](https://reader035.vdocument.in/reader035/viewer/2022062409/56814eef550346895dbc7efc/html5/thumbnails/15.jpg)
1983 – CSSBI Takes Over Management of CSPI1983 – CSSBI Takes Over Management of CSPI
The industry consolidates from many small companies into a few larger ones through mergers and acquisitions
Move CSPI to CSSBI offices, with several tons of orange books
Reflects economic downturn for the industry
The industry consolidates from many small companies into a few larger ones through mergers and acquisitions
Move CSPI to CSSBI offices, with several tons of orange books
Reflects economic downturn for the industry
![Page 16: 1961](https://reader035.vdocument.in/reader035/viewer/2022062409/56814eef550346895dbc7efc/html5/thumbnails/16.jpg)
1991 – A New Manager Named To The CSPI1991 – A New Manager Named To The CSPI
Steven R. Fox named as General Manager
TAC under coordination by CSPI increases production of technical information
The Green Handbook
Modern Sewer Design (Canadian) Version
Design of Underground Detention Systemsfor Stormwater Management
Design Software
Launch of the initial CSPI website
Steven R. Fox named as General Manager
TAC under coordination by CSPI increases production of technical information
The Green Handbook
Modern Sewer Design (Canadian) Version
Design of Underground Detention Systemsfor Stormwater Management
Design Software
Launch of the initial CSPI website
![Page 17: 1961](https://reader035.vdocument.in/reader035/viewer/2022062409/56814eef550346895dbc7efc/html5/thumbnails/17.jpg)
2000 – Introduction of the CSPI Product Promotion Committee2000 – Introduction of the CSPI Product Promotion Committee
Time to reassess the industry
Determine impact of alternative pipe and concrete
Time to reassess the industry
Determine impact of alternative pipe and concrete
THE INDUSTRY IS CHANGINGTHE INDUSTRY IS CHANGING
![Page 18: 1961](https://reader035.vdocument.in/reader035/viewer/2022062409/56814eef550346895dbc7efc/html5/thumbnails/18.jpg)
2003 – David J. Penny Named as new Marketing Manager2003 – David J. Penny Named as new Marketing Manager
New position whose role would be to:
Examine and respond to decreased market share
Determine the impact being made by alternative pipe
Examine concrete – specifically it’s new focusfor a more aggressive marketing thrust
How best to move
New position whose role would be to:
Examine and respond to decreased market share
Determine the impact being made by alternative pipe
Examine concrete – specifically it’s new focusfor a more aggressive marketing thrust
How best to move
![Page 19: 1961](https://reader035.vdocument.in/reader035/viewer/2022062409/56814eef550346895dbc7efc/html5/thumbnails/19.jpg)
2004 – Increased Marketing 2004 – Increased Marketing
Increased efforts to inform the industry
Target audience exposure through print advertising
Increased efforts to inform the industry
Target audience exposure through print advertising
![Page 20: 1961](https://reader035.vdocument.in/reader035/viewer/2022062409/56814eef550346895dbc7efc/html5/thumbnails/20.jpg)
2009 – Marketing Initiatives Become Aggressive2009 – Marketing Initiatives Become Aggressive
CSPI role was to clearly convey it’s role as the authority in:Water Management Solutions PLUS
Need to communicate CSP Solutions and Applications
CSPI role was to clearly convey it’s role as the authority in:Water Management Solutions PLUS
Need to communicate CSP Solutions and Applications
WATER MANAGEMENT SOLUTIONS PLUS
![Page 21: 1961](https://reader035.vdocument.in/reader035/viewer/2022062409/56814eef550346895dbc7efc/html5/thumbnails/21.jpg)
2010 – Applications and Solutions2010 – Applications and Solutions
Fulfill the new positioning mandate through the development of website structured on addressing Solutions and Applications expectationsFulfill the new positioning mandate through the development of website structured on addressing Solutions and Applications expectations
![Page 22: 1961](https://reader035.vdocument.in/reader035/viewer/2022062409/56814eef550346895dbc7efc/html5/thumbnails/22.jpg)
2011 – Expanding the Information Base2011 – Expanding the Information Base
CSPI to increase awareness within industry
CSPI to focus on education
Educate target markets
Educate company sales personnelas to benefits of site
Use site as tool to help market CSP
CSPI to increase awareness within industry
CSPI to focus on education
Educate target markets
Educate company sales personnelas to benefits of site
Use site as tool to help market CSP
![Page 23: 1961](https://reader035.vdocument.in/reader035/viewer/2022062409/56814eef550346895dbc7efc/html5/thumbnails/23.jpg)
CSPI CSPI
Significant change in 50 years
Look of the CSPI
Role of the CSPI
Mandate
Significant change in 50 years
Look of the CSPI
Role of the CSPI
Mandate