1.industrial training 2.mini project 3. major project(phase 1)
DESCRIPTION
1.Industrial Training 2.Mini Project 3. Major Project(Phase 1). Guide: Asst.Prof Anju S.S Presented By Josmy T Jose S3-Mtech CSE - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: 1.Industrial Training 2.Mini Project 3. Major Project(Phase 1)](https://reader031.vdocument.in/reader031/viewer/2022013103/56815e0d550346895dcc6a22/html5/thumbnails/1.jpg)
1.Industrial Training 2.Mini Project 3. Major Project(Phase 1) Guide: Asst.Prof Anju S.S Presented By
Josmy T Jose S3-Mtech CSE Roll No:09
![Page 2: 1.Industrial Training 2.Mini Project 3. Major Project(Phase 1)](https://reader031.vdocument.in/reader031/viewer/2022013103/56815e0d550346895dcc6a22/html5/thumbnails/2.jpg)
Overview of work done Industrial visit -Location: Jubilee Mission Medical College & Research Institute, Thrissur -Period: Dec 22 to Feb 22 Mini project
-As Is document -To be document - IEEE paper: Integration of ICU data into electronic medical records-Issues & solutions - Android applications: Working on it
Major Project - Problem definition -Literature Survey -Solution Strategy -Implementation
![Page 3: 1.Industrial Training 2.Mini Project 3. Major Project(Phase 1)](https://reader031.vdocument.in/reader031/viewer/2022013103/56815e0d550346895dcc6a22/html5/thumbnails/3.jpg)
Contents Industrial training @ JMMC
Mini Project : Laboratory Linkage for NICU Automation in JMMC.
IEEE conference paper “Integration of ICU data into Electronic Medical Records- Issues and Solutions”
Main Project : Server side architecture for ICU automation system
![Page 4: 1.Industrial Training 2.Mini Project 3. Major Project(Phase 1)](https://reader031.vdocument.in/reader031/viewer/2022013103/56815e0d550346895dcc6a22/html5/thumbnails/4.jpg)
INDUSTRIAL TRAINING
@ JMMC Thrissur
![Page 5: 1.Industrial Training 2.Mini Project 3. Major Project(Phase 1)](https://reader031.vdocument.in/reader031/viewer/2022013103/56815e0d550346895dcc6a22/html5/thumbnails/5.jpg)
Health Care Industry The healthcare industry is one of the world’s largest
industry and India is emerging as a major player in this industry, because of its high population.
The major inputs of health care industries HospitalsMedical insuranceMedical softwareHealth equipments
The service marketing structureCompanyCustomerProvider
![Page 6: 1.Industrial Training 2.Mini Project 3. Major Project(Phase 1)](https://reader031.vdocument.in/reader031/viewer/2022013103/56815e0d550346895dcc6a22/html5/thumbnails/6.jpg)
JMMC- Introduction JMMC, a Christian Minority Institution, established in the year 1952
makes the modern medical facilities available to common man
35 departments running successfully in the 4 blocks Golden Jubilee Block Hridayalaya St. Thomas Block Medical College Block
Super specialty departments Medical education and research. Hospital Information Management System Biomedical Department MRD Laboratories
![Page 7: 1.Industrial Training 2.Mini Project 3. Major Project(Phase 1)](https://reader031.vdocument.in/reader031/viewer/2022013103/56815e0d550346895dcc6a22/html5/thumbnails/7.jpg)
Departments.. Anesthesiology Anatomy Biochemistry Blood Bank Cardiology Cardiovascular Science Community Medicine Dentistry Maxillofacial Surgery • Ophthalmology • Orthopedics • Pediatrics
![Page 8: 1.Industrial Training 2.Mini Project 3. Major Project(Phase 1)](https://reader031.vdocument.in/reader031/viewer/2022013103/56815e0d550346895dcc6a22/html5/thumbnails/8.jpg)
Cont..• Forensic Medicine • Gastroenterology • General Surgery • Laboratory Medicine • Microbiology • Neonatology • Nephrology • Neurology • Obstetrics & Gynecology Dermatology Endocrinology ENT Head & Neck Surgery
![Page 9: 1.Industrial Training 2.Mini Project 3. Major Project(Phase 1)](https://reader031.vdocument.in/reader031/viewer/2022013103/56815e0d550346895dcc6a22/html5/thumbnails/9.jpg)
Cont.. Pathology Pharmacology Physiology Physiotherapy & Rehabilitation Psychiatry Pulmonary Medicine Radiology Urology and Vascular Surgery
![Page 10: 1.Industrial Training 2.Mini Project 3. Major Project(Phase 1)](https://reader031.vdocument.in/reader031/viewer/2022013103/56815e0d550346895dcc6a22/html5/thumbnails/10.jpg)
Working Model of JMMC
Golden Jubilee Block
Hridayalaya
St.Thomas Block Medical
College Block
Central Server
Laboratory
Intranet
Administration,
Emergency
Biomedical unit
Internet
![Page 11: 1.Industrial Training 2.Mini Project 3. Major Project(Phase 1)](https://reader031.vdocument.in/reader031/viewer/2022013103/56815e0d550346895dcc6a22/html5/thumbnails/11.jpg)
Further Details are Given in the Industrial Visit Report
![Page 12: 1.Industrial Training 2.Mini Project 3. Major Project(Phase 1)](https://reader031.vdocument.in/reader031/viewer/2022013103/56815e0d550346895dcc6a22/html5/thumbnails/12.jpg)
Mini project
Laboratory Linkage For ICU Automation in JMMC
![Page 13: 1.Industrial Training 2.Mini Project 3. Major Project(Phase 1)](https://reader031.vdocument.in/reader031/viewer/2022013103/56815e0d550346895dcc6a22/html5/thumbnails/13.jpg)
Introduction ICU patients is having need of constant monitoring and support
using specialized equipments and medication
Patients are transferred to the ICU either from a ward, casuality ,or immediately after a surgery
The interactions among doctors, nurses ,equipments and the patients constitutes the ICU workflow
Even though hospital automation is present in other departments, ICU still operates on paper and pen. JMMC is no exception.
The current system study done here brought out the necessity of automation of ICUs for PMR to EMR transition.
![Page 14: 1.Industrial Training 2.Mini Project 3. Major Project(Phase 1)](https://reader031.vdocument.in/reader031/viewer/2022013103/56815e0d550346895dcc6a22/html5/thumbnails/14.jpg)
ICU Proceedings.. New patient admission to ICU
Primary diagnosis and Test prescriptions
Lab Tests
Patient Care
Updating PMR
Discharge/Death
PMR moved to MRD
![Page 15: 1.Industrial Training 2.Mini Project 3. Major Project(Phase 1)](https://reader031.vdocument.in/reader031/viewer/2022013103/56815e0d550346895dcc6a22/html5/thumbnails/15.jpg)
Workflow –Nurse’s Perspective
![Page 16: 1.Industrial Training 2.Mini Project 3. Major Project(Phase 1)](https://reader031.vdocument.in/reader031/viewer/2022013103/56815e0d550346895dcc6a22/html5/thumbnails/16.jpg)
Workflow –Patient Perspective
![Page 17: 1.Industrial Training 2.Mini Project 3. Major Project(Phase 1)](https://reader031.vdocument.in/reader031/viewer/2022013103/56815e0d550346895dcc6a22/html5/thumbnails/17.jpg)
Laboratory- Present scenario Nurses updates Investigation laboratory record
Test request is forwarded to the laboratory with the test code and category name using system
Sample collection.
Transfer samples and request form to the lab
Results are available from the central server in the lab
A barcode indicating result is stamped in the request form and returned back to ICU
![Page 18: 1.Industrial Training 2.Mini Project 3. Major Project(Phase 1)](https://reader031.vdocument.in/reader031/viewer/2022013103/56815e0d550346895dcc6a22/html5/thumbnails/18.jpg)
Lab proceedings-Proposed Architecture
ICU SERVE
RTablet
LAB SERVE
R
Response
Request
wi-fi
Hospital LAN
![Page 19: 1.Industrial Training 2.Mini Project 3. Major Project(Phase 1)](https://reader031.vdocument.in/reader031/viewer/2022013103/56815e0d550346895dcc6a22/html5/thumbnails/19.jpg)
Proposed System Nurses can submit the request queries by selecting the patient id
The prescribed tests will be available in the selection box
The corresponding test codes are also selected and request is submitted
The laboratory of JMMC is fully automated
So the results are available in the ICU tablet
Results are notified with some notifications or alerts.
Integration of ICU and Lab databases need to be done for the proper working.
![Page 20: 1.Industrial Training 2.Mini Project 3. Major Project(Phase 1)](https://reader031.vdocument.in/reader031/viewer/2022013103/56815e0d550346895dcc6a22/html5/thumbnails/20.jpg)
UI Design for the lab request
![Page 21: 1.Industrial Training 2.Mini Project 3. Major Project(Phase 1)](https://reader031.vdocument.in/reader031/viewer/2022013103/56815e0d550346895dcc6a22/html5/thumbnails/21.jpg)
UI design for the lab result
![Page 22: 1.Industrial Training 2.Mini Project 3. Major Project(Phase 1)](https://reader031.vdocument.in/reader031/viewer/2022013103/56815e0d550346895dcc6a22/html5/thumbnails/22.jpg)
Advantages Avoids the bidirectional transfer of request forms
Thus avoids the barcode sticking process in the request form
Print out of the result can be directly taken from the ICU
Alerts and Notifications simplifies the process
The result will be automatically added to the EMR of patient
![Page 23: 1.Industrial Training 2.Mini Project 3. Major Project(Phase 1)](https://reader031.vdocument.in/reader031/viewer/2022013103/56815e0d550346895dcc6a22/html5/thumbnails/23.jpg)
IEEE Conference Paper: Integration of ICU data into Electronic Medical Records- Issues and Solutions Paper Submitted on : February 12 Paper get accepted on : February 27 To be presented on : April 11 or 12 Venue : Kanyakumari Category : Networks – e-health Co-ordinator : Dr.George Varkey Guide : Ast.Prof Anju S.S Authors : Dhanyaja . N, Asha Yeldose,Josmy T Jose,
![Page 24: 1.Industrial Training 2.Mini Project 3. Major Project(Phase 1)](https://reader031.vdocument.in/reader031/viewer/2022013103/56815e0d550346895dcc6a22/html5/thumbnails/24.jpg)
MAJOR PROJECT(PHASE 1)
Server Side Architecture For ICU Automation System
![Page 25: 1.Industrial Training 2.Mini Project 3. Major Project(Phase 1)](https://reader031.vdocument.in/reader031/viewer/2022013103/56815e0d550346895dcc6a22/html5/thumbnails/25.jpg)
Problem Statement Develop the Server Side Architecture most optimum for ICU
Automation System with Tablet PCs Tablet PC communication is characterised by:
Limited band widthSmall packetsUnpredictable delay between consecutive packetsExistence of alternate channels with differing priority values
Server Side Architecture Should Account for these Extension of Mini Project The system should become operational in JMMC
![Page 26: 1.Industrial Training 2.Mini Project 3. Major Project(Phase 1)](https://reader031.vdocument.in/reader031/viewer/2022013103/56815e0d550346895dcc6a22/html5/thumbnails/26.jpg)
ICU Automation System. There is a central server in the ICU ,which is responsible for all the
information flows among the tablets and the server.
The ICU sever is connected to the hospital central server
The information stored in the central server is available everywhere
Each nurse in the ICU will have a tablet PC connected to the ICU server through Wi-Fi
![Page 27: 1.Industrial Training 2.Mini Project 3. Major Project(Phase 1)](https://reader031.vdocument.in/reader031/viewer/2022013103/56815e0d550346895dcc6a22/html5/thumbnails/27.jpg)
Hardware Architecture
![Page 28: 1.Industrial Training 2.Mini Project 3. Major Project(Phase 1)](https://reader031.vdocument.in/reader031/viewer/2022013103/56815e0d550346895dcc6a22/html5/thumbnails/28.jpg)
Representative software Architecture
Tablet Platform – Android (Ginger Bread or above) Java Framework-Spring Technology-Hibernate Database – PostgreSQL Server OS-Ubuntu Server – JBoss Developing Environment –Eclipse
![Page 29: 1.Industrial Training 2.Mini Project 3. Major Project(Phase 1)](https://reader031.vdocument.in/reader031/viewer/2022013103/56815e0d550346895dcc6a22/html5/thumbnails/29.jpg)
Constraints Selection of server side architecture depends mainly on the nature
of our application requirement Architecture that supports tablet platform is the prime concern Cost of Implementation
![Page 30: 1.Industrial Training 2.Mini Project 3. Major Project(Phase 1)](https://reader031.vdocument.in/reader031/viewer/2022013103/56815e0d550346895dcc6a22/html5/thumbnails/30.jpg)
Solution Strategy Literature Survey Examination of Different architectural plans
Client-Server n-Tier SoA HTML 5
Trial Implementation Finalization of Selected architecture Final Implementation
![Page 31: 1.Industrial Training 2.Mini Project 3. Major Project(Phase 1)](https://reader031.vdocument.in/reader031/viewer/2022013103/56815e0d550346895dcc6a22/html5/thumbnails/31.jpg)
Development Process
Development
Running
![Page 32: 1.Industrial Training 2.Mini Project 3. Major Project(Phase 1)](https://reader031.vdocument.in/reader031/viewer/2022013103/56815e0d550346895dcc6a22/html5/thumbnails/32.jpg)
Test Plan Applications can be tested in the android emulator by creating an
AVD The ADT pluggin will automatically create a default run
configuration for the project The Android framework includes an integrated testing frame work Following this we will use testing systems like “Load Runner” to
decide on load performance The above will decide on the design to be used for final product
![Page 33: 1.Industrial Training 2.Mini Project 3. Major Project(Phase 1)](https://reader031.vdocument.in/reader031/viewer/2022013103/56815e0d550346895dcc6a22/html5/thumbnails/33.jpg)
Integration IssuesThe problem of connecting with the central
hospital server Modifications in Central DBMSLow signal strength of Wi-Fi Malware Staff training and system acceptanceChange Management and version control
![Page 34: 1.Industrial Training 2.Mini Project 3. Major Project(Phase 1)](https://reader031.vdocument.in/reader031/viewer/2022013103/56815e0d550346895dcc6a22/html5/thumbnails/34.jpg)
THANKYOU
![Page 35: 1.Industrial Training 2.Mini Project 3. Major Project(Phase 1)](https://reader031.vdocument.in/reader031/viewer/2022013103/56815e0d550346895dcc6a22/html5/thumbnails/35.jpg)
QUESTIONS