The DILG in FY 2016: Intensifying the campaign against criminality
and illegal drugs and Sustaining Good Governance
(A Year-ender Report)
I. Introduction
The DILG CAR is one with the Department in the attainment of
national goals and objectives. This is the driving force that pushes DILG CAR to work with dedication and utmost commitment in obtaining and
sustaining excellent results and service delivery guided by fully capacitated
personnel.
This year, initial challenges and setbacks were identified but were used as an opportunity to assess and plan actions to mitigate the situation.
Applying the 3M brand of “Matino, Mahusay and Maasahan”, the objectives
on sustaining drive for good local governance and strengthening
organizational capacity were efficiently and effectively realized.
II. Significant Accomplishments
A. LOCAL GOVERNMENT SECTOR
1) Sustained the Drive for LGU Transparency, Accountability and
Performance in providing capacity development to local officials
a. Full Disclosure Policy (FDP)
The Full Disclosure Policy has been seriously observed by all levels
of local governments in the Cordillera. As of December 31, 2016, the region has recorded 90.36% compliance rate for FULLY complying provinces,
cities and municipalities combined.
The table below shows the statistics of fully complying and complying LGUs.
b. Seal of Good Local Governance (SGLG)
The regional assessment was conducted within the month of
March 2016. Highlights of the assessment are shown through the
following photos.
LGU FULLY COMPLYING
COMPLYING
Province 5 6
City 2 2
Municipality 63 75
Barangay 995 (84.61%) 181 (15.39%)
4:
There was a remarkably 275% increase of SGLG passers for
this year compared to last year of 8 passers only. This year’s 22 awardees for Cordillera Region are the following:
1. Provinces
a. Benguet
b. Kalinga
c. Mt. Province
2. Cities
a. Baguio City
b. Tabuk City
3. Municipalities
a. Bucay, Abra
b. Dolores, Abra
c. La Paz, Abra
d. Peñarrubia, Abra
e. San Juan, Abra
f. Tayum, Abra
g. Luna, Apayao
h. Pudtol, Apayao
i. Sta. Marcela, Apayao
j. Itogon, Benguet
k. Kapangan, Benguet
l. La Trinidad, Benguet
m. Tublay, Benguet
n. Banaue, Ifugao
o. Lamut, Ifugao
p. Balbalan, Kalinga
q. Paracelis, Mt. Province
c. Performance Challenge Fund (PCF)
1. FY 2013
There are a total of 46 CY 2013 PCF Projects. 44 projects
were successfully completed in 2015. As of this 3rd Quarter, the two (2) remaining projects were completed. In total, ALL 46 FY
2013 PCF Projects were completed.
2. FY 2014
For this year, this region has yet to complete four (4)
remaining CY 2014 PCF projects. All or four (4) of the on-going
projects last year were completed as of November 30, 2016. In total 100% of the seven (7) 2014 PCF projects were
accomplished. Project details are shown in the table below:
Province LGU Project
1 Baguio City Improvement of Bakakeng Main
Road-Phase III
2 Apayao Calanasan Rehabilitation of Controlled Disposal
Facility (Sanitary Landfill)
3 Apayao Kabugao Improvement of Municipal Street
4 Benguet Itogon Improvement of Sayo Barangay Road
5 Benguet Mankayan Construction of Tourism Center within
Plaza Gym
6 Benguet Tuba Improvement Along Codeodag-Baracbac-Pimiggan Road
7 Kalinga Pinukpuk Construction of Pong-ad Drainage
System
5:
3. FY 2015
A total of 8 LGUs qualified for PCF 2015 consists of 3
provinces, 4 municipalities, and 1 city. 3 LGUs were targeted for completion this year but as of reporting date, a total of 4 projects
were completed. The table below shows the status of the
implementation:
Province LGU Project Status
1 Baguio
City
Construction of North
Bound Bus Terminal at Slaughter House/ Transport
Terminal
On-going
2 Abra Province Construction of Dialysis
Center
COMPLETED
Q3-2016
3 Abra San Juan Multi-Purpose Bldg. and
Tourism Facility
90% On-
going
4 Apayao Calanasan Construction of Mandaya
Isnag Village Replica
10% On-
going
5 Benguet Province Construction of Multi-
Purpose Bldg. (Evac./
Training Center)
75% On-
going
6 Benguet Tublay Completion of the 3-storey
Building for Marketing and
Processing Center with Training Facility for Farmers
COMPLETED
7 Ifugao Lamut Construction of Public Market Building 4 (First
Floor for Vegetable Section)
COMPLETED Q3-2016
8 Kalinga Province Improvement/Concreting of
Bulanao-Laya-Balong
Provincial Road
COMPLETED
Q1-2016
d. Conduct of Orientation to Newly Elected Officials (NEO)
4 Provinces, 2 Cities, and 66 Municipalities have successfully
organized their respective transition teams
DILG CAR conducted the Basic Orientation for Local Chief Executives
both for re-elected and newly-elected municipal mayors of the
Cordillera Administrative Region on August 18-19, 2016 in which 59
out of the 75 municipalities were represented. Participation was expanded to include re-elected officials because of the thrust of the
present administration.
Participants from 59 municipalities take notes as they listen intently while speakers discussed
topics about RA 6713 or the Ethical Standards for Public Official, Common Pitfalls in Local
Governance, Responsibilities of the LCE’s, DILG Programs, and DRRM.
6:
e. LUPONG TAGAPAMAYAPA INCENTIVE AND AWARDS (LTIA)
As a result of the Regional Assessment conducted on March 22,
2016, the following have been identified as LTIA Regional Winners:
Categories Regional Winners National Winners
HUC Brgy. Imelda Village,
Baguio City
CC Brgy. Dagupan
Centro, Tabuk City
2nd Runner-Up
1st – 3rd Class
Mun.
Brgy. Tuding, Itogon,
Benguet
1st Runner-up
4th – 6th Class
Mun.
Brgy. Ambassador,
Tublay, Benguet
2nd Runner-up
f. Conduct of Barangay Assembly
100% or 1,1175 barangays have successfully conducted the
Barangay Assembly for the 1st Semester 2016.
g. OTHER ACCOMPLISHMENTS ON MAJOR PROGRAMS
Katarungang Pambarangay (KP) – Barangay Captains and
Secretaries from targeted 20 barangays of Baguio City were trained
on KP laws and procedures on November 9-11, 2016
Citizens Satisfaction Index System (CSIS) - The pilot-testing
for the CSIS to municipalities have commenced. Target-
municipalities in CAR are Tublay, Benguet, and San Juan, Abra.
The pilot testing entails the conduct of survey by the University of Cordilleras in Tublay, Benguet and the Abra State Institute of
Sciences and Technology in San Juan, Abra. 150 respondents shall
be randomly selected by the LRIs. Regional and Provincial Focal
Persons have attended the program briefing in Manila last May 18-19, 2016.
Child-Friendly Local Government Assessment (CFLGA) –
Assessment to all 75 municipalities and 2 cities, as well as the
Provincial Table Validation, were already conducted.
RD Marlo L. Iringan welcomes the participants while ARD Jonathan Paul M. Leusen, Jr. with the
Provincial Directors introduce their respective mayors.
7:
Ugnayan ng Barangay at Simbahan (UBAS) – 100% of all
barangays have organized the Barangay Action Teams
LGU Performance Scorecard – all aggregation forms of PCMs are
100% uploaded at Google Drive 100% data-entry at LGPMS
Website. On the other hand, 100% of barangay profile were successfully uploaded at Google Drive.
Public Financial Management (PFM) – TOT on the CDP Review
Guide successfully conducted to the target-LGU (Tublay, Benguet).
This program ended on June 29, 2016. Community-Based Monitoring System –
o 100% of the requesting municipalities were provided with
technical assistance on Modules I, II, III and IV. Status of
implementation is shown on the tables below:
8:
h. REGIONAL INITIATIVES
1. Monitoring of compliance to RA 9994 – 100% of Cities and
Municipalities have been monitored on the Compliance to the said law.
2. Promoting Volunteerism in Local Governance – the region
participated in the Search for Outstanding Volunteers for CY 2015.
The Municipality of Kabayan, Benguet is the regional nominee of the CAR.
2. Enhancement of Local Business Environment
a. Regulatory Simplification for Local Government Units
(RS4LGUs) Enhanced Business Permit and Licensing System
- Orientation Training of Regulatory Simplification attended
by 3 LGU Key Personnel from Dolores, Abra; Luna, Apayao; Itogon, Benguet; Alfonso Lista, Ifugao; Rizal, Kalinga and
Sagada Mt. Province, MLGOOs and Cluster Head/Program
Managers or BPLS Provincial Technical Action Officers of 6
Provinces of CAR was conducted on November 8-11, 2016
in Baguio City.
- La Trinidad, Benguet have undergone Coaching on RS4
LGUs.
b. LIIC Formulation Orientation
- On March 16, 2016, 27 MLGOOs and BPLOs/LEIPOs of 17
LGUs of the Province of Abra, namely: Bangued, Tayum,
Dolores, San Juan, Lagangilang, Pilar, Bucay, Manabo, La
LGOO V Rolando Gonzales of
DILG-CAR responds to queries
during the training on CBMS
Module IV of Tabuk City last
April 4-8 at Sta. Ana,
Cagayan. City Planning and
Development Coordinator
Maricel Kiley (right) assists
one of the sectoral groups
during the workshop.
9:
Paz, Pidigan have participated the said activity. This aims
to (1) capacitate LGUs in the formulation of the Local Investment and Incentive Code; and (2) Identify the laws
and policies in giving incentives and appropriate taxes to
create fiscal space and economic growth.
3. Hastened the implementation of the DILG locally-funded projects
a. Support to BUB
The BUB-RPMO remained to be active in the monitoring the implementation of BuB Projects across all participating agencies.
Project status as of reporting period is shown in the following tables:
FY 2013
AGENCY NUMBER OF PROJECTS TOTA
L
COMPLETIO
N RATE in % COMPLETED
ON-GOING
PIPELINED
PROPOSED
DAR 10 0 0 0 10 100%
DA 85 0 0 0 85 100%
DEPED 31 7 0 0 38 82%
DENR 7 0 0 0 7 100%
Participants during the workshop on the LIIC Formulation Orientation, March 16, 2017, at the Provincial Capitol, Bangued, Abra.
10:
DOH 12 0 0 0 12 100%
DOLE 3 0 0 0 3 100%
DSWD 24 0 0 0 24 100%
DILG 85 0 0 0 85 100%
NEA 14 0 0 0 14 100%
TOTAL 271 7 0 0 278 97%
FY 2014
AGENCY
NUMBER OF PROJECTS
TOTAL
COMPLETION
RATE in
%
COMPLETED
ON-GOING
PIPELINED
PROPOSED
TO BE
DETERMI
NED
DAR 10 3 0 0 0 13 77%
DA
258 23 0 0 0 281 92%
DEPED 1 0 78 133 0 212 0%
DOE 0 0 0 1 5 6 0%
DENR &
EMB 20 0 3 0 0 23 87%
DOH 55 10 0 0 0 65 85%
DOLE 6 0 0 0 0 6 100%
DSWD 141 12 7 0 0 160 88%
DILG 223 71 0 8 0 302 74%
DOT 23 1 0 0 0 24 96%
DTI 50 11 0 0 0 61 82%
NIA 10 0 0 0 0 10 100%
TESDA 45 0 0 0 0 45 100%
11:
TOTAL 842 131 88 142 5 1208 70%
FY 2015
AGENCY
NUMBER OF PROJECTS
TOTAL
COMPLETION
RATE in
% COMPLETED
ON-GOING
PIPELINED
PROPOSED
TO BE
DETERMINED
DA 25 68 4 0 0 97 26%
DENR 9 0 0 0 0 9 100%
DEPED 0 0 0 22 0 22 0%
DILG 32 29 3 0 0 64 50%
DOH 20 17 4 0 0 41 49%
DOLE 12 0 3 0 0 15 80%
DOT 3 0 0 1 0 4 75%
DSWD 19 25 14 5 0 63 30%
DTI 1 10 2 2 0 15 7%
LGSF 82 62 24 32 0 200 41%
NEA 0 0 0 1 0 1 0%
NIA 16 21 0 0 0 37 43%
TESDA 5 0 0 0 0 5 100%
TOTAL 224 232 54 63 0 573 39%
FY 2016
AGENCY
NUMBER OF PROJECTS
TOTAL
COMPLET
ION RATE in
% COMPLE
TED
ON-
GOING
PIPELIN
ED
PROP
OSED
TO BE
DETERMI
NED
BFAR 0 0 0 1 0 1 0%
DA 0 1 46 0 19 66 0%
DENR 0 0 0 0 1 1 0%
12:
DILG 0 0 0 0 22 22 0%
DOH 0 4 17 3 0 24 0%
DOLE 12 0 2 7 0 21 57%
DOT 0 1 0 0 10 11 0%
DSWD 0 0 0 0 36 36 0%
DTI 0 1 3 14 0 18 0%
LGSF 0 0 0 0 390 390 0%
NCIP 0 0 0 0 1 1 0%
NEA 0 0 0 0 1 1 0%
TESDA 0 0 0 0 14 14 0%
TOTAL 12 7 68 25 494 606 2%
CM Norberto Duran
discuss the Barangay
BuB during the CSO
Forum on April 22,
2016 at Santa Marcela,
Apayao. He
encouraged CSOs to
strongly participate in
the said program.
DILG-Abra represented by PD
Millicent B. Cariño conducted CSO
Forum at Pastoral Center Building on
April 27-29, 2016 to facilitate sharing
and reflection of partner-
beneficiaries on major community
empowerment programs such as the
BuB, 4Ps and KALAHI CIDSS. It was
also the venue to present the
potential of Barangay BuB as means
of deepening and sustaining citizen
empowerment and community
involvement in governance.
13:
b. DILG BUB Projects
1. BUB Local Access FY 2014 Projects
100% or 169 projects are already completed. Projects in
Licuan Baay, Abra, and in Kabayan, Benguet which are the remaining project for completion in the 1st Quarter of 2016 were
accomplished.
2. BUB PROVISION OF POTABLE WATER SUPPLY 2014
Total number of projects is 118. There were 92 water
projects completed in 2015. 21 Projects were completed for
FY 2016. As of reporting period, all of the 5 on-
going/remaining projects were more than 65% complete.
The 10 projects which were completed in 1st Quarter are:
1. Construction of Level III Water Supply System in
Barangay Labaan, BUCLOC, ABRA
2. Rehabilitation of Nagpaoayan Water System, L.BAAY,
ABRA
3. Construction of Mapisla Water System, L. BAAY, ABRA
4. Rehabilitation of Tumalip Water System, L.BAAY, ABRA
5. Proposed Level III Water System, LUNA, APAYAO
6. Rehabilitation of Calaba-Pasdong Proper Waterworks
System, ATOK BENG
7. Improvement of Waterworks System, MANKAYAN, BENG
8. Improvement of Tabio Potable Water works System,
MANKAYAN, BENG
9. Provision of Water System for Malelempfob - Poblacion,
AGUINALDO, IFUGAO
10. Provision of Water System for Damag, AGUINALDO, IFUGAO
The additional 9 projects completed in 2nd Quarter are:
11.Rehab. of Caguyen WS, L. BAAY, ABRA
12. Bagaan Water System, BANAUE, IFUGAO
13. Batad WS, BANAUE, IFUGAO
14. Bangbang WS, HUNGDUAN, IFUGAO
15. Hapao WS, HUNGDUAN, IFUGAO
Cluster 2 Leader/Santa Marcela Concurrent MLGOO Wilnelia M. Aceret discussed and presented
the selection criteria for Barangay BuB to barangay officials during the Barangay BuB Roll-out
at the Municipal Hall, Santa Marcela, Apayao on February 23, 2016
14:
16. Const. of Waterworks (Level III Phase 2, Kataobbogan),
PINUKPUK, KALINGA
17. Const. of Waterworks (Limos), PINUKPUK, KALINGA
18. Const. of Balicongcong Waterworks Syst., TANUDAN,
KALINGA
19. Comp. of Bontoc PWS for Brgy. Caluttit, BONTOC, MP
Two projects were completed during the 4th quarter as follows:
Municipality PROJECT_TITLE AMOUNT
Atok CONSTRUCTION OF WATERWORKS SYSTEM AT POBLACION
P 403,047.62
Atok CONSTRUCTION OF WATERWORKS SYSTEM AT CAMP 30
P 838,095.24
3. BUB PROVISION OF POTABLE WATER SUPPLY 2015
Total number of project is 91 with 22 projects completed
in FY 2015. As of reporting date, 53 projects were
completed which is higher compared to the target of 37. In total, 75 projects were accomplished with 82% completion
rate.
List of 75 completed projects are as follows:
Province Municipality PROJECT_TITLE AMOUNT
1 ABRA
Pilar EXPANSION/UPGRADING OF LEVEL II WATER SUPPLY SYSTEMS INCLUDING APPROPRIATE WATER TREATMENT P 2,500,000.00
2 ABRA Villaviciosa PROVISION OF POTABLE WATER SYSTEM (POBLACION) P 2,015,000.00
3 ABRA Villaviciosa PROVISION OF POTABLE WATER SYSTEM (LAPLAPOG) P 3,485,000.00
4 ABRA Dolores CONSTRUCTION OF LEVEL I WATER SYSTEM IN TAPING P 490,000.00
5 ABRA Dolores CONSTRUCTION OF LEVEL I WATER SYSTEM IN CABAROAN P 315,000.00
6 ABRA Dolores CONSTRUCTION OF LEVEL I WATER SYSTEM IN SALUCAG P 315,000.00
7 ABRA Dolores CONSTRUCTION OF LEVEL I WATER SYSTEM IN CALUMBAYA P 315,000.00
8 ABRA Dolores CONSTRUCTION OF LEVEL I WATER SYSTEM IN PACAC P 315,000.00
9 ABRA Dolores CONSTRUCTION OF LEVEL I WATER SYSTEM IN NAMIT-INGAN P 490,000.00
10 ABRA Dolores CONSTRUCTION OF LEVEL I WATER SYSTEM IN TALOGTOG P 490,000.00
RD Marlo Iringan and Mayor Bernadette Baroña cut the ribbon during the inauguration of the completed water system worth P7,505,000.00 at Bugbog, Bucay, Abra on July 28, 2016. With them are LGOO VI Jimmicio Daoaten, MLGOO Carlito Barreras, Engr. Osborne Dolaoen, and the resident beneficiaries of the water system.
15:
Province Municipality PROJECT_TITLE AMOUNT
11 ABRA Dolores CONSTRUCTION OF LEVEL I WATER SYSTEM IN MUDIIT P 315,000.00
12 ABRA Dolores CONSTRUCTION OF LEVEL I WATER SYSTEM IN LIBTEC P 315,000.00
13 ABRA Lagangilang CONSTRUCTION OF HAND PUMP DRIVEN DEEP WELL P 1,400,000.00
14 ABRA Luba REHABILITATION OF POBLACION WATER SYSTEM P 1,500,000.00
15 ABRA Tubo EXTENSION OF BATAYAN WATER SYSTEM P 1,551,671.18
16 APAYAO Luna CONSTRUCTION OF LEVEL I/II WATER SUPPLY IN 2 BARANGAYS P 6,000,000.00
17 APAYAO Pudtol PROVISION OF POTABLE WATER SUPPLY P 3,000,000.00
18 APAYAO
Conner CONSTRUCTION OF WATER WORKS SYSTEM PHASE II (PADDAOAN) P 300,000.00
19 APAYAO Conner CONSTRUCTION OF POTABLE WATER SYSTEM (MALAMA) P 500,000.00
20 APAYAO Conner CONSTRUCTION OF WATER SYSTEM (MAWIGUE) P 500,000.00
21 APAYAO Conner PHASE 1 WATER SYSTEM (RIPANG) P 500,000.00
22 APAYAO Conner CONSTRUCTION OF WATER SYSTEM PHASE II (MANAG) P 400,000.00
23 APAYAO Conner CONSTRUCTION OF SPRING DEVELOPMENT PHASE II (ILI) P 1,000,000.00
24 APAYAO Conner REHABILITATION OF WATER SYSTEM (GUINAMGAMAN) P 400,000.00
25 APAYAO Conner CONSTRUCTION OF TALIFUGO WATER SYSTEM LEVEL II P 300,000.00
26 APAYAO Kabugao PROVISION OF POTABLE WATER SUPPLY P 850,000.00
27 APAYAO Sta. Marcela CONSTRUCTION OF DEEP WELL P 525,000.00
28 BENGUET Itogon REHABILITATION OF WATERWORKS SYSTEM P 1,450,000.00
29 BENGUET Kabayan REHABILITATION OF TUAP WWS P 500,000.00
30 BENGUET Kabayan REHABILITATION OF BAAY-ABUYON WWS P 500,000.00
31 BENGUET Kabayan REHABILITATION OF BESOCOL WWS P 500,000.00
32 BENGUET Kabayan RECONSTRUCTION OF KNHS-APEJAW-UNOY WWS P 500,000.00
33 BENGUET Kabayan REHABILITATION OF BASHOY WWS P 500,000.00
34 BENGUET Kabayan REHABILITATION OF WATERWORK SYSTEM P 1,000,000.00
35 BENGUET Kabayan REHABILITATION OF PACSO PROPER WWS P 500,000.00
36 BENGUET Sablan WATERWORKS SYSTEM (SALINTUBIG) P 3,500,000.00
37 BENGUET Tuba PIMINGGAN WATER WORKS P 1,000,000.00
38 BENGUET Tuba KABUYAO WATERWORKS P 1,000,000.00
39 BENGUET Atok REHABILITATION OF BEKES AND ANGEO WATER SYSTEM P 500,000.00
40 BENGUET
Atok IMPROVEMENT OF POBLACION WATERWORKS P 500,000.00
41 BENGUET
Atok CONSTRUCTION OF WATER SUPPLY FROM MADECLAN TO SIGIB P 500,000.00
42 BENGUET Atok CONSTRUCTION OF WATER RESERVOIR AT PUAL - CADIAN P 500,000.00
43 BENGUET Buguias KADOYDOYAN-LINGADAN DOMESTIC WATER SUPPLY P 500,000.00
44 BENGUET Kapangan REHABILITATION OF TALANGEW-PAYKEK DWS P 500,000.00
45 BENGUET Kapangan REHABILITATION OF TOKOK DOMESTIC WATER SUPPLY (DWS) P 500,000.00
46 BENGUET Mankayan PROVISION OF POTABLE WATER SUPPLY (SUYOC) P 500,000.00
47 BENGUET Mankayan IMPROVEMENT OF WATER SUPPLY SYSTEM (TABIO) P 500,000.00
48 IFUGAO Hingyon SALINTUBIG P 1,250,000.00
49 IFUGAO Lagawe GUIHING-AWAO-PULAW WATER SYSTEM P 750,000.00
50 IFUGAO Lagawe BURNAY WATER SYSTEM P 500,000.00
51 IFUGAO Lagawe PONGHAL WATER SYSTEM P 1,000,000.00
52 IFUGAO Lagawe BUYABUYAN WATER SYSTEM P 700,000.00
53 IFUGAO Lagawe CUDOG WATER SYSTEM P 500,000.00
54 IFUGAO Lagawe HUYO OLILICON WATER SYSTEM P 950,000.00
55 IFUGAO Lagawe ANGADAL MONTABIONG WATER SYSTEM P 250,000.00
56 IFUGAO Lagawe JUCBONG WATER SYSTEM P 850,000.00
57 KALINGA Balbalan REHAB OF PULAY, BADUNGAN,TUKOD WATER WORK SYSTEM P 600,000.00
58 KALINGA Pasil DANGTALAN WATER WORK SYSTEM P 500,000.00
59 KALINGA Pasil BALINCIAGAO NORTE WATER WORK SYSTEM P 518,341.00
60 KALINGA Pasil GALDANG WATER WORK SYSTEM P 500,000.00
61 KALINGA Pasil DALUPA WATER WORK SYSTEM P 500,000.00
62 KALINGA Tinglayan CONSTRUCTION OF CHUPAKAN WATER SYSTEM, SUMADEL I P 1,000,000.00
63 KALINGA Tinglayan CONSTRUCTION OF OLD TINGLAYAN PWS P 1,000,000.00
16:
Province Municipality PROJECT_TITLE AMOUNT
64 KALINGA Tinglayan CONSTRUCTION OF BUTBUT PROPER POTABLE WATER SYSTEM P 1,000,000.00
65 KALINGA Tinglayan IMPROVEMENT OF TABNAC-FANGSOCAN WATER SYSTEM P 1,000,000.00
66 MT. PROVINCE Bontoc
CONSTRUCTION/IMPROVEMENT OF GUINA-ANG WATER SYSTEM P 2,500,000.00
67 MT. PROVINCE Bontoc
CONSTRUCTION/EXPANSION/REHABILITATION/MAINTENANCE OF THE BONTOC WATERWORKS P 1,250,000.00
68 MT. PROVINCE Bauko MAYAG WATERWORKS SYSTEM P 500,000.00
69 MT. PROVINCE Bauko BAGNEN PROPER WATERWORKS SYSTEM P 1,000,000.00
70 MT. PROVINCE Sabangan
CONSTRUCTION/INSTALLATION OF DOMESTIC WATER SYSTEM (CAMATAGAN) P 2,500,000.00
71 MT. PROVINCE Sabangan
CONSTRUCTION/INSTALLATION OF DOMESTIC WATER SYSTEM (MADEPDEPAS) P 1,000,000.00
72 MT. PROVINCE Sabangan
CONSTRUCTION/INSTALLATION OF DOMESTIC WATER SYSTEM (DATA) P 1,000,000.00
73 MT. PROVINCE Sabangan
CONSTRUCTION/INSTALLATION OF DOMESTIC WATER SYSTEM (BUSA) P 1,500,000.00
74 MT. PROVINCE Sagada CONSTRUCTION OF DAGDAG SMALL WATER SYSTEMS LEVEL II P 900,000.00
75 MT. PROVINCE Sagada CONSTRUCTION OF AMPATYAY WATER SYSTEM P 500,000.00
TOTAL P 71,555,012.18
On the other hand, hereunder is the status of the remaining projects:
Province Municipality PROJECT_TITLE AMOUNT STATUS
ABRA Danglas SALINTUBIG P 12,500,000.00 On-going (58%)
ABRA Lagayan SALINTUBIG (PHASE I) P 11,000,000.00 Procurement
ABRA San Quintin SAGANA AT LIGTAS NA TUBIG SA LAHAT( SALINTUBIG)
P 5,000,000.00 On-going (48%)
ABRA Lacub TALIPUGO POTABLE WATER SYSTEM P 1,200,000.00 Document Preparation
ABRA Malibcong CONSTRUCTION OF BAYABAS LEVEL 1 DOMESTIC WATER SYSTEM
P 1,000,000.00 On-going (90%)
ABRA Malibcong IMPROVEMENT OF PACGUED DOMESTIC WATER SYSTEM
P 1,000,000.00 On-going (90%)
ABRA Malibcong CONSTRUCTION OF ADUGAO (UMNAP) DOMESTIC WATER SYSTEM
P 1,000,000.00 On-going (90%)
ABRA Tubo CONSTRUCTION OF TABACDA WATER SYSTEM
P 1,407,640.60 On-going (47.31%)
APAYAO Sta. Marcela EXPANSION AND UPGRADING OF WATER SYSTEM (LEVEL 2 TO LEVEL 3)
P 4,475,000.00 on-going (97%)
BENGUET Atok CONSTRUCTION OF POTABLE WATER SUPPLY AT UPPER AND LOWER ENGLANDAD
P 500,000.00 On-going (12.44%)
IFUGAO Kiangan SALINTUBIG FOR KIANGAN URBAN AREA P 5,000,000.00 On-going (95%)
IFUGAO Banaue CONSTRUCTION OF POTABLE WATER SUPPLY SYSTEM (5 PROJECTS)
P 3,500,000.00 On-going (78%)
IFUGAO Hungduan DAYANDI-TINANGAAN WS P 500,000.00 On-going
KALINGA Tanudan LAY-ASAN WWS P 3,000,000.00 On-going (63.22%)
KALINGA Balbalan REHAB OF MADALAAG-BOTOD WWS P 600,000.00 Procurement
MT. PROVINCE
Sadanga COMPLETION OF DEMANG WATER SYSTEM
P 2,000,000.00 On-going
17:
4. BUB PROVISION OF POTABLE WATER SUPPLY 2016
For PWS 2016, there are 17 projects for 15 LGUs. As of December 31, 2016, there were 6 and 3 projects that were
on-going and completed respectively.
Hereunder are the details:
Province Municipality PROJECT_TITLE AMOUNT STATUS
ABRA Lagayan PROVISION OF POTABLE WATER SUPPLY P 11,000,000.00 Document Preparation
ABRA Dolores PROVISION OF POTABLE WATER SUPPLY P 5,250,000.00 Document Preparation
ABRA Tayum PROVISION OF POTABLE WATER SUPPLY P 3,000,000.00 Document Preparation
ABRA Peñarrubia PROVISION OF POTABLE WATER SUPPLY P 15,000,000.00 Document Preparation
APAYAO Calanasan PROVISION OF POTABLE WATER SUPPLY P 3,000,000.00 on-going(10%)
APAYAO Flora PROVISION OF POTABLE WATER SUPPLY P 3,000,000.00 For Procurement
APAYAO Sta. Marcela PROVISION OF POTABLE WATER SUPPLY P 3,370,000.00 For Procurement
BENGUET La Trinidad PROVISION OF POTABLE WATER SUPPLY P 3,000,000.00 Ongoing (57%)
BENGUET Sablan PROVISION OF POTABLE WATER SUPPLY P 3,500,000.00 Ongoing (60%)
IFUGAO Kiangan PROVISION OF POTABLE WATER SUPPLY P 7,000,000.00 Procurement
IFUGAO Alfonso Lista PROVISION OF POTABLE WATER SUPPLY P 10,300,000.00 On-going
IFUGAO Banaue PROVISION OF POTABLE WATER SUPPLY P 4,000,000.00 Document Review
MT. PROVINCE Natonin PROVISION OF POTABLE WATER SUPPLY (STA. ISABEL) P 2,100,000.00 Completed
MT. PROVINCE Natonin PROVISION OF POTABLE WATER SUPPLY (POBLACION) P 2,100,000.00 Completed
MT. PROVINCE Natonin PROVISION OF POTABLE WATER SUPPLY (BUTAC) P 2,100,000.00 Completed MT. PROVINCE Bauko PROVISION OF POTABLE WATER SUPPLY (ABATAN) P 4,000,000.00 On-going (50%)
MT. PROVINCE Besao PROVISION OF POTABLE WATER SUPPLY (KIN-IWAY) P 3,000,000.00 On-going (77.15%)
5. BUB OTHER INFRA – FLOOD CONTROL 2015
Total number of project counts to 50 but as of last year
20 projects were completed. All 30 projects on-going at the
start of the year were completed as of reporting date. Project details are:
Province Municipality PROJECT_TITLE AMOUNT STATUS
ABRA San Quintin FLOOD CONTROL P 4,000,000.00 Completed
ABRA Lacub TANGLEB FLOOD CONTROL/ EROSION PROTECTION
P 1,000,000.00 Completed
ABRA Malibcong CONSTRUCTION OF LAT-EY FLOOD CONTROL P 1,000,000.00 Completed
ABRA Malibcong CONSTRUCTION OF MATARAGAN-LUGSAD FLOOD CONTROL
P 1,000,000.00 Completed
ABRA Bucay FLOOD CONTROL P 1,000,000.00 Completed
ABRA Bucay IMPROVEMENT OF DRAINAGE CANAL P 1,000,000.00 Completed
ABRA Bucloc CONSTRUCTION OF DRAINAGE CANAL P 3,000,000.00 Completed
ABRA Bucloc FLOOD CONTROL P 3,000,000.00 Completed
ABRA Daguioman FLOOD CONTROL (ABLEG) P 2,125,000.00 Completed
ABRA Daguioman FLOOD CONTROL (CABARUYAN) P 2,125,000.00 Completed
ABRA Daguioman FLOOD CONTROL (TUI) P 2,125,000.00 Completed
ABRA Daguioman FLOOD CONTROL (PIKEK) P 2,125,000.00 Completed
ABRA Manabo CONSTRUCTION OF EROSION PROTECTION DIKE (RETAINING WALL)
P 4,838,000.00 Completed
APAYAO Conner CONSTRUCTION OF DRAINAGE CANAL LINING P 1,000,000.00 Completed
APAYAO Kabugao CONSTRUCTION OF FLOOD CONTROL PROJECTS P 1,900,000.00 Completed
BENGUET Bokod CONSTRUCTION OF BINGA-AN FLOOD CONTROL
P 500,000.00 Completed
BENGUET La Trinidad FLOOD CONTROL P 4,000,000.00 Completed
18:
Province Municipality PROJECT_TITLE AMOUNT STATUS
BENGUET Atok CONSTRUCTION OF FLOOD CONTROL AT BELIS P 500,000.00 Completed (Awaiting PCR)
BENGUET Atok CONSTRUCTION OF BADAYAN RETAINING WALL
P 500,000.00 Completed
BENGUET Atok CONSTRUCTION OF BAHONG RETAINING WALL P 500,000.00 Completed
BENGUET Kapangan CONSTRUCTION OF POSPOSOK PROPER CENTRAL FLOOD CONTROL (FC)
P 500,000.00 Completed
BENGUET Kibungan CONSTRUCTION OF FLOOD CONTROL AT MARKET SIDE, POBLACION
P 1,000,000.00 Completed
BENGUET Mankayan CONSTRUCTION OF TUMPACAO DRAINAGE CANAL
P 500,000.00 Completed
BENGUET Mankayan CONCRETE DRAINAGE CANAL P 500,000.00 Completed
BENGUET Mankayan EROSION CONTROL (RIPRAPPING) OF CAEW E/S GROUND
P 500,000.00 Completed
BENGUET Mankayan IMPROVEMENT OF MAIN DRAINAGE CANAL P 500,000.00 Completed
BENGUET Mankayan EROSION CONTROL/ DRAINAGE CANAL ALONG CASUBIGAN CREEK & BELOW AURORA PHASE I
P 750,000.00 Completed
BENGUET Mankayan EROSION CONTROL ALONG SLAUGHTER HOUSE CREEK (PHASE I)
P 750,000.00 Completed
BENGUET Mankayan EROSION CONTROL (RIPRAPPING) OF BALILI NHS GROUND
P 500,000.00 Completed
IFUGAO Lagawe JUNCTION TO MUNICIPAL HALL CONSTRUCTION OF CANAL
P 500,000.00 Completed
IFUGAO Lagawe CULLATOP FLOOD CONTROL P 500,000.00 Completed
IFUGAO Lagawe KITIKIT_DULLAGAN CONSTRUCTION OF CANAL P 750,000.00 Completed
IFUGAO Lagawe LOBONG FLOOD CONTROL P 750,000.00 Completed
IFUGAO Lamut CONSTR'N OF COMPREHENSIVE DRAINAGE CANAL @ THE MARKET & MUN. GROUNDS
P 1,500,000.00 Completed
IFUGAO Banaue CONSTRUCTION OF RICE TERRACES RIVER CONTROL
P 500,000.00 Completed
KALINGA City of Tabuk
FLOOD CONTROL P 10,000,000.00 Completed
KALINGA Balbalan CONCRETING OF DRAINAGE CANAL P 1,000,000.00 Completed
KALINGA Balbalan CONSTRUCTION OF BOLO DRAINAGE CANAL P 500,000.00 Completed
KALINGA Balbalan CONSTRUCTION OF FLOOD CONTROL P 1,200,000.00 Completed
KALINGA Lubuagan CONSTRUCTION OF DANGOY DRAINAGE SYSTEM
P 1,500,000.00 Completed
KALINGA Lubuagan CONSTRUCTION OF MABILONG DRAINAGE SYSTEM
P 1,500,000.00 Completed
KALINGA Lubuagan CONSTRUCTION OF POBLACION DRAINAGE SYSTEM
P 3,000,000.00 Completed
KALINGA Tinglayan CONSTRUCTION OF LUPLUPA FLOOD CONTROL P 1,000,000.00 Completed
MT. PROVINCE Barlig REHABILITATION OF BOUMAN'S TRAIL AND DRAINAGE
P 2,750,000.00 Completed
MT. PROVINCE Natonin CONSTRUCTION OF EROSION CONTROL P 3,500,000.00 Completed
MT. PROVINCE Paracelis CONSTRUCTION OF BAYONGYONG FLOOD CONTROL
P 1,500,000.00 Completed
MT. PROVINCE Bauko BANAO DRAINAGE P 500,000.00 Completed
MT. PROVINCE Sagada REHABILITATION OF DAGDAG DRAINAGE SYSTEM (LETANG/DAOANGAN)
P 1,000,000.00 Completed
MT. PROVINCE Sagada REHABILITATION OF PAK-ET FLOOD CONTROL P 1,200,000.00 Completed
MT. PROVINCE
Sagada REHABILITATION OF TABIYO FLOOD CONTROL P 1,000,000.00 Completed
19:
Improvement of Main Drainage Canal at Poblacion, Mankayan, Benguet. Completed in January 2016. The project is worth PhP575,000 (DILG BuB P500,000.00 and LGUP75,000.00) and will directly benefit at least 60 households.- BUB OTHERS 2015
Erosion Control/ Drainage Canal along Casubigan Creek (below) and Aurora Phase 1 (above). Completed in January 2016. The project is worth PhP862, 500 (DILG BuB P750,000.00 and LGUP112,500.00) and will directly benefit at least 330 households.
Flood Control Project in San Quintin, Abra. Turned-over last Feb. 19, 2016. The project is worth PhP5, 195,306.88 and will directly benefit at least 167 households.
20:
Lobong Flood Control, Lagawe, Ifugao. Completed in January 2016. The project is worth PhP750, 000
Inauguration and turn-over of the flood control project in Tabuk City, Kalinga worth P 14.8M. DILG-BuB downloaded P 10M and Tabuk City Government allocating P 4.8 M as its counterpart. The project directly benefits 1,300 residents of Barangay Calanan.
Blessing and turnover of newly constructed P 8.5 M flood control funder over BUB-Infra 2015 located at Ableg, Tui, Pikek and Cabaruyan, Daguioman, Abra on July 28, 2016.
21:
6. BUB OTHER INFRA – RESCUE EQUIPMENT 2015
Total number of project is 5, however 3 remains to be for
completion this year. Out of the 3, 2 were completed to wit:
Completed in 1st Semester:
1. Rescue Equipment Set, TUBA, BENGUET
Completed in 3rd Quarter:
2. Provision of Rescue Equipment, SAGADA, MT.
PROVINCE
7. BUB OTHER INFRA – EVACUATION CENTER 2015
Of the four (4) total projects, 1 project was completed last year. On-going projects beginning of this year counts to 3
but 2 were accomplished during the year as follows:
Completed in 1st Semester:
1. Construction of Evac. Center, Buguias, Benguet
Completed in 3rd Quarter:
2. Construction of Evacuation Center, Lenneng, Kabugao
8. BUB OTHER INFRA – ROADS AND BRIDGES 2015
100% or ALL of the total 5 projects were completed as
of reporting date.
Completed in 1st Semester:
1. Improvement of Busan Community Road, MANKAYAN,
BENG
Completed in 3rd Quarter:
1. Widening of Sap-Al To Talipugo Access, Lacub, Abra
2. Lagawe Tupad Project, Lagawe, Ifugao
3. Construction of Minanga-Pagga Footbridge, Paracelis, Mt. Province
Completed in November 2016:
1. Phase II of Bubog-Buneg Footbridge, ConnerApayao
9. SALINTUBIG- REGULAR FY 2013
Total project for SALINTUBIG-Regular FY 2013 is 8 however, 6 projects were completed as of FY 2015. The region
is left with 2 projects for completion until end of the 1st
Semester. For the 3rd Quarter, the Construction of Ga-ang
Water System in Balbalan, Kalinga was completed. The only
remaining on-going project, which is the Construction of Pantikian Water System in Balbalan, Kalinga is 86% complete
however, some portion of the installed pipeline were destroyed
by typhoon Lawin.
10. SALINTUBIG- REGULAR FY 2014
Total project for SALINTUBIG-Regular 2014 is 10 across
6 LGUs. As of 1st Semester, only one (1) project was completed i.e. Improvement of Waterworks Facility at Sitio Lubnac,
Brgy Camp 1, TUBA, BENGUET.
22:
Additional 6 projects were completed for the 3rd Quarter,
as follows:
1. Sta. Rosa Shallow Well Project (5 Wells), Bangued, Abra
2. Cabuloan Shallow Well Project (5 Wells), Bangued, Abra
3. Construction of Bokod Waterworks, Bokod, Benguet
4. Improvement of Bawek Waterworks Facility, Taloy Sur,
Tuba, Benguet
5. Improvement of Agaki Water Source, Mankayan, Benguet
6. Construction of Manggid-Bontoc Potable Water System
(Caluttit), Bontoc, Mt. Province
In total, 3 projects are still on-going.
11. SALINTUBIG- REGULAR FY 2015
There are 29 projects for SALINTUBIG 2015 for
implementation this year. 3 completed projects were reported
as of date.
Projects Status as of December 31, 2016 are as follows:
Abra
Municipality PROJECT_TITLE AMOUNT STATUS
Bangued Construction Of Potable Water
Supply System At Calot And Malita
5,000,000.00 Document
Preparation
Bucay Construction Of Potable Water
Supply System At Madalipay/Layugan
2,000,000.00 Procurement
La Paz Construction Of Potable Water Supply System (Canan)
1,000,000.00 Document Preparation
La Paz Construction Of Potable Water Supply System At Benben
2,000,000.00 Document Preparation
Pidigan Construction Of Potable Water Supply System (Immuli)
1,000,000.00 Document Preparation
Pidigan Construction Of Potable Water Supply System (Arab)
1,000,000.00 Document Preparation
Pidigan Construction Of Potable Water Supply System (San Diego)
1,000,000.00 Document Preparation
Villaviciosa Construction Of Tamac Level Ii Water System
2,000,000.00 Procurement
Apayao
Municipality PROJECT_TITLE AMOUNT STATUS
Conner Improvement And Extension Of
Water System (Guinamgaman)
1,000,000.00 On-going
Conner Construction Of Sacpil Water
System
1,000,000.00 Completed
Conner Construction Of Malama Water
System Phase II
1,000,000.00 Completed
Conner Improvement Of Water System
(Daga)
1,000,000.00 On-going
Conner Construction Of Water System
Phase Ii (Allangigan)
1,000,000.00 On-going
Conner Construction Of Water System
(Ripang)
1,000,000.00 On-going
Conner Improvement Of Water System
(Calafug)
1,000,000.00 On-going
Conner Construction Of Karikitan Water
System
1,000,000.00 On-going
Conner Construction Of Water System
Phase II (Manag)
1,000,000.00 Completed
Conner Construction Of Caglayan Water
System
3,000,000.00 On-going
Flora Construction Of Water Supply
System Level 2 (Malayugan, Balluyan)
12,000,000.00 On-going
23:
D ILG -C A R P ro je ct M o n ito rin g Te am h e ad e d b y En gr. Jo h n n y M au tin g to ge th e r w ith M LG O O K ris A lv are z te st th e w ate r f ro m th e in stalle d fau ce ts o f S A LIN TU B IG P ro je ct at S itio A n agd o n g, D ib agat, P o b lacio n , K ab u gao , A p ay aoo n A p ril 27, 2016. A t th e sam e tim e , th e te am in sp e cte d th e R e se rv o ir ( le f t) an d th e so u rce o f th e w ate r sy ste m
( righ t) .
Kabugao Rehabilitation And Upgrading Of
Level 2 Water System
12,000,000.00 On-going
Luna Water Distribution System (Turod) 2,000,000.00 Procurement
Luna Spring Development And Water
Distribution (Cagandungan)
2,000,000.00 On-going
Luna Spring Development And Water
Distribtion System (Calabigan)
3,000,000.00 On-going
Luna Water Distribution System (Luyon) 1,000,000.00 Procurement
Luna Water Distribution System (San
Isidro Norte)
1,000,000.00 Procurement
Benguet
Municipality PROJECT_TITLE AMOUNT STATUS
Kibungan REHABILITATION OF NAPSONG
WATER SYSTEM (MADAYMEN)
1,000,000.00 On-going
Ifugao
Municipality PROJECT_TITLE AMOUNT STATUS
Banaue Banao Water System 2,000,000.00 Procurement
Kalinga
Municipality PROJECT_TITLE AMOUNT STATUS
Lubuagan Construction Of Antonio Canao Waterworks System
1,000,000.00 Document Preparation
Pinukpuk Construction Of Pakawit Waterworks System
2,000,000.00 Procurement
12. SALINTUBIG- REGULAR FY 2016
One (1) out of 3 projects were completed. Hereunder is the detailed status:
Municipality PROJECT_TITLE AMOUNT STATUS
La Paz, Abra
Construction Of Potable Water
Supply System At Malabbaga
2,000,000.00 Document
Preparation
Tineg, Abra
Construction Of Potable Water Supply System
12,000,000.00 Document Preparation
Bauko, Mt. Province
Provision Of Mt. Data Potable Water Supply
2,000,000.00 Completed
24:
February 24, 2015. SALINTUBIG MOA Signing between DILG CAR represented by PD Millicent B. Cariño and LGU Bucay under the leadership of Hon. Victorino B. Baroña, Jr., witnessed by MLGOO Carlito T. Barreras, ME Romeo Trinidad and MPDC Anatoly Flores. Amounting to Php2M construction of potable water supply system in Madalipay, Bucay, Abra.
February 23, 2015. SALINTUBIG MOA Signing between DILG CAR represented by PD Millicent B. Cariño and LGU Pidigan headed by the town mayor, Hon. Jannsen P. Buemio. Witnessing the forging of engagement are Vice Mayor Arnulfo Bisares, MLGOO Antonio B. Balderama and Mun. Assessor Ruben Felicitas. The project is entitled "Construction of Potable Water Supply System (Brgys. Arab, Immuli and San Diego) amounting to Php3M.
Mayor Anthony D. Wooden receives a check worth P4.8M for Kayan West and Lubon Water Systems in Tadian, Mt. Province from RD Marlo L. Iringan and PD Anthony I. Ballug last July 23, 2016 during the Unity Gong Relay in Bontoc, Mt. Province
25:
13. PAMANA-PILLAR 3 FY 2015
Total number of PAMANA FY 2015 Projects is 12. 5
projects were completed last year however, four (4) out of the 7 remaining projects were completed as of reporting date.
Details are as follows:
PROVINCE MUNICIPALITY PROJECT_TITLE AMOUNT STATUS
ABRA Licuan-Baay CONCRETING OF APPROACHES OF KASALALAN BRIDGE
P 6,000,000.00 Completed
BENGUET Province CONCRETING OF DANGADANGAN-COPCOPIT ROAD (BAKUN)
P 32,000,000.00 On-going (30%)
BENGUET Province TOKBO BAILEY BRIDGE (KIBUNGAN) P 5,000,000.00 Completed (Awaiting PCR)
IFUGAO Province CONSTRUCTION OF CARAGASAN TRIBAL CENTER (PHASE II)
P 1,000,000.00 for contract termination
KALINGA Tinglayan IMPROVEMENT OF NAADCHIL CIS P 1,500,000.00 Completed
KALINGA Tinglayan IMPROVEMENT OF BUGNAY CIS P 1,000,000.00 Completed
KALINGA Tinglayan REHABILITATION OF CEMENTED FOOTBRIDGE
P 1,000,000.00 Completed
KALINGA Tinglayan CONSTRUCTION OF MASWA BASAO POTABLE WATER SYSTEM
P 1,000,000.00 Completed
KALINGA Tinglayan IMPROVEMENT OF PATUNGNGAY CIS P 1,500,000.00 Completed
KALINGA Tinglayan IMPROVEMENT OF ARONG CIS P 1,000,000.00 Completed
KALINGA Tinglayan CONCRETING OF BUGNAY-BUTBUT ROAD P 48,000,000.00 On-going (14%)
MT. PROVINCE
Bontoc FUBUYAN-FANGORAO ROAD CONCRETING WITH RIPRAPPING
P 25,000,000.00 Completed
BUB-PWS Level II Water system projects in Conner, Apayao- Residents enjoy the water distributed through the tapstand at Paddaoan (left). Reservoir located at Ripang (right). SALINTUBIG 2015
Completed Tokbo Bailey Bridge in
Madaymen, Kibungan Benguet has
the following works; Structure
Excavation, Embankment, Pipe
Culverts, Catch Basin, Grouted Riprap,
Construction of RC Flume and
Construction of 19.45LM length
Fabricated Bailey Bridge under
PAMANA 2015.
26:
14. PAMANA-PILLAR 3 FY 2016
Total number of project is 25 spread across 20 LGUs.
100% of all LGU-beneficiaries have successfully forged MOA, 7 projects are under Procurement, 11 projects are on-going, and
4 projects were completed as of reporting period. Completed
projects are the following:
1. Improvement of Caneo Waiting Shed, BONTOC, MT.
PROVINCE
2. Road Opening from Poblacion, Dilong, Abra to Besao,
Mt. Province, TUBO, ABRA
3. Warehouse and Multi-Purpose Pavement, TANUDAN, KALINGA
4.Opening of Eva-Cadaclan, Calanasan, Apayao
TUBO AND SAN ISIDRO, ABRA. FY 2016 PAMANA MOA signing and awarding of cheque held Jan. 25, 2016. The cheque was awarded to Governor Eustaquio P. Bersamin and SP member Antonio Dayag for Tubo Project amounting to 53M and for San Isidro Project amounting to 48M with the presence of PAMANA Abra Coordinator Fr. Adonis Bringas, DILG RD John Castaneda, DILG-Abra PD Millicent Carino, Phil Army, and Provincial Engineer Tanseco.
27:
The OPDS and Regional Office in coordination with the OPAPP conducted project-site visit
on 14-18 November 2016 in Apayao on the CY 2016 PAMANA DILG projects.
Completed project: Opening of 8 kms. long Eva-Cadaclan road in Calanasan, Apayao amounting to Php 24, 000,000.00 under PAMANA 2016 project.
The Improvement of Caneo Waiting Shed project in Bontoc, Mt. Province is a two-storey waiting shed and is now being used by the community.The project needs to be fully completed by the LGU, for the fence at the side of the stairs going to the 2nd floor. The shed was designed, ready for another storey which will be funded later by the LGU.
The Improvement of Liwon Amduntong Asipulo-Indalmogan Kiangan Access Project in Asipulo, Ifugao is intermittent concreting of road sections of 1 portion and also double lane. A road opening from Amduntong to Kiangan National Road. It is 71% complete.
28:
4. Readied LGUs in the transition towards Federalism
Various activities/ trainings were conducted in CAR to support the massive
information drive that our Department is spearheading.
Hereunder is the list of the activities attended by ARD Jonathan Paul M.
Leusen, Jr. where he served as the speaker on Federalism:
Orientation on Federalism conducted during the Executive
Legislative Agenda (ELA) of the six (6) municipalities of Ifugao
Province on various dates during the 2nd and 3rd Quarter of this year.
Federalism Seminar of the Vice Mayor’s League of the Philippines –
Cordillera conducted last December 1, 2016
Federalism Forum conducted for the Philippine Councilor’s League
of Abra last October 13, 2016 at Venus Park Hotel, Baguio City
Conducted training/lecture on Federalism with DILG Benguet
Fieldmen on Novemebr 24, 2016 at Calajo Restaurant, La Trinidad,
Benguet
IEC/Orientation during the Provincial Launching of MASA MASID and
POPs Planning of DILG Kalinga attended by personalities form all LGUs of Kalinga Province
Activities scheduled for the month of December 2016 are as follows:
Federalism Forum for the Barangay Congress of Abra Province to be
attended by Punong Barangay, 2 Kagawads i.e. Chief of Peace and
Order and Chief of BADAC, Barangay Secretary and Treasurer.
Scheduled date is on December 15, 2016 at Venus Park View Hotel, Baguio City
Autonomy and Federalism Orientation for the Barangays of Paracelis, Mt. Province to be held on December 22, 2016
In support to the advocacy, employees of DILG CAR attended the 1st Northern Luzon Forum on Federalism last August, 19, 2016 at Teachers Camp,
Baguio City. In addition, RD Marlo L. Iringan, ARD Jonathan Paul M. Leusen,
Jr and LGOOV Carol Gano participated in the Training of Trainors on Federalism
at Cebu on November 12-13, 2016.
Also, Federalism 101 was included as one of the topics discussed during
the DILG CAR year-end PRA attended by 228 participants.
5. MASA MASID: Utilizing Communities against illegal drugs and corruption
The Regional Launching of MASA MASID was successfully conducted
last October 25, 2016 at New Town Plaza Hotel, Baguio City. Local Chief Executives, Chief of Police, Municipal Health Officers, Municipal Local
Government Operations Officers, Municipal Social Welfare Officers and
representatives from various CSOs signed the Pledge of Commitment to
support the program.
Also, Provincial Launching were conducted in the Provinces of Abra,
Apayao, Benguet, Ifugao, Kalinga, and Mt. Provinces. Baguio City conducted
their own program launching as well.
Details are as follows:
Province/City No. of Mun.
Conducted Launching
No. of LGUs
with MASA MASID TEAMS
No. LGUs
with CRN
Abra 13 3 6
Apayao 7 7 5
Baguio City 1 99 1
29:
Benguet 11 13 1
Ifugao 11 3 1
Kalinga 4 116 1
Mt. Province 10 10 10
As of reporting date, the organization of various MASA MASID teams
and CRN in all municipalities is still on-going and is given utmost priority. As
of reporting date, 10, 427 surrendered from Cordillera and 1,194 and 26 of the surrenderers are enrolled under community rehabilitation and
rehabilitation centers respectively.
6. Strengthened the capacities of LGUs on disaster preparedness and
mitigation; and continued the rehabilitation of disaster stricken areas
a. Establishment of Regional Operations Center
To ensure continuous and functional operations of the department during disaster and calamities, the DILG CAR OPCEN
was established.
b. Enhancing LGU Capacity on CCA/DRR 1. For Abra Province, 27 or ALL LGUs attended the Training
on the Formulation of Local Climate Change Action Plan
(LCCAP) for LGUs 5th and 6th Batch on December 1-2,
2016 and the training on CDRA and CCET held last
November 7-12, 2016. 6 Municipalities and 1 City of Kalinga were trained on LCCAP formulation.
2. ALL or a total of 21 municipalities of Kalinga and Benguet
Province were trained on LCCAP for LGUs and were
provided with Technical Assistance on CDRA 3. Baguio City was provided with Technical Assistance in
CDRRM Training
4. Other Significant Accomplishment
a. Conduct of Earthquake Drill
The DILG-CAR Regional Office personnel demonstrated the duck,
cover and hold position as they joined the Baguio Shake Drill last March
31, 2016. At 10:30AM, the sound of the city hall siren signaled an emergency situation, the occurrence of a magnitude 7.2 earthquake in
Baguio City. This also signified the start of the earthquake drill. The alarm
lasted for one minute.
The drill aims to create a muscle memory of alertness and
preparedness among the people for the eventuality of a powerful earthquake. It also aims to instill the duck-cover-hold earthquake response
and assess the evacuation plans
and procedures of various sectors.
Through the drill, gaps will be noted and will be addressed.
The Baguio Shake Drill is
part of the Nationwide
Simultaneous Earthquake Drill (NSED). All Cordillera RDRRMC
member agencies were directed to
conduct an earthquake drill in their
respective offices.
30:
5. Other significant accomplishments:
a. Institutionalizing Gender Responsive In Local
Governance
Report shows that the following LGUs have the following:
SUSTAINING THE EFFECTIVENESS OF PEACE AND ORDER COUNCILS (POCs)
Secretariat services have been effectively provided to Peace and Order Councils in all levels. The Regional Peace and Order Council, however, convened last November 11, 2017. The
meeting, which was presided by PRO-COR Regional Director PCSupt Elmo Francis O. Sarona,
discussed issues on drugs, and peace and order among others. Also, the DILG CAR was tasked
to formulate criteria for the selection of CSO members to the RPOC.
LGUs with: Number
Province City Municipality
GPB 2017 4
2 64
GAD AR 2015 5 2 75
GAD Code 4 1 32
GAD Responsive CDP 0 2 4
GAD Database 6 2 75
GAD FPS 6 2 72
1st Quarter City Human Rights Justice, Peace and Order Council meeting of Baguio City Government, held at SP Hall on February 18.
31:
STRENGTHENING INTERNAL ORGANIZATIONAL CAPACITY
Enhance the Department’s Systems and Processes in Planning, Financial Management,
Human Resource Management and Development, and Information and
Communications for Productivity Improvement
a. Development of IT System
The regional office is awaiting for the invitation to the following trainings to be conducted
by ISTMS:
- Executive Information System
- On-line Calendar
- Barangay Information System
- LGUs Information System (201 Profile)
b. Regional Management Conferences
1st Quarter Regional Management Conference was conducted last March 3, 2016 held at
Tabuk City, Kalinga. A Special RMC was also held on March 28, 2016 as a venue to welcome and
orient the new DILG-CAR Director, Marlo L. Iringan. All Field Operating Units have likewise
conducted its respective City/Provincial Management Conferences.
c. Regional Planning Conference
The Annual Planning Conference was held January 26-27, 2016. The accomplishment of the region and field operating units were reviewed, as well as the Operation Plan and Budget
were finalized.
Towards the end of the Planning Conference, all workforce celebrated the hard work that led to significant accomplishments of the Region. Photos of this occasion is shown below:
d. DILG-CAR Communication and Advocacy
A total of eight (12) issues of Gongs and Drums, the official newsletter of this Office,
were published as of reporting date.
PLO III Buena (right) reports on the major accomplishments in CY 2015, workshop for the finalization of the CY 2016 Operations Plan and Budget (left) followed the next day.
With a display of all sorts of western boots and hats, everyone was jovial in their cowboy/girl attires. Each unit presented a dance number, all except one, had their own version of line dance. The guitar was a mainstay on stage and the country singers dominated the fellowship deep into the night.
32:
f. Personnel Competency Build Up
Thirteen LGOO IIs from all over CAR attended the Component 1: General Orientation
of the LGOO Training from January 5-15, 2016 at the DILG CAR Regional Office in Baguio City.
The trainees, dubbed as “the Golden Batch” for being the 50th batch of trainees, are Rose Ann A. Ballangan, Elizabeth B. Layugan, and Santos B. Trinidad from Abra; Joey Paul B
Alcantara, Joan Ana J. Dumalsin, and Edward Errol B. Ucol from Apayao; Ralph Kevin B. Brett
from Benguet; Gyda H. Namingit from Ifugao; ThyrzaShoey L. Dogui-is from Kalinga; Perry D.
Bacwaden, Trisha Marie A. Dogup, and Jennifer Licyayo from Mountain Province; and Jereille D. Gayaso from the Regional Office.
In order to improve performance, DILG CAR Regional Office went to La Union for the 1st Semester performance review cum team building last June 19-21, 2016.
33:
g. 2016 Regional Year-End Program Review and Analysis
The DILG CAR CY 2016 Program Review and Analysis and CY 2017 Action Planning
and 2016 Tribute to Outstanding Performers (TOPs) Awarding was held on December 19-21,
2016 at San Juan, La Union. In addition, a teambuilding activity was also conducted as part of
the activity to strengthen and advocate teamwork.
h. Other Regional Initiatives
1. Awardees of the CY 2015 DILG-CAR Tribute to Outstanding Performers or TOPs were conferred during the Panning Conference.
The awardees are the following:
Outstanding Provincial Office-DILG-Mt. Province (2nd year)
Outstanding Cluster-Cluster 2, DILG-Abra, with CH Jimmicio Daoaten winning the Leadership Award
2. RD Marlo L. Iringan directed all 237 regular and job order employees of DILG
Cordillera to undergo drug testing las August 22, 2016 in keeping with the present
DILG-Mt. Province (above) and Cluster 2 Abra (left) receive a plaque and cash award as most outstanding provincial team and most outstanding team respectively. PD Anthony Ballug and CH Jimmicio Daoaten get the corresponding leadership award. RD John Castañeda, ARD Jonathan PM Leusen, Jr. and Benguet Gov. Nestor Fongwan hand the awards.
The RD Marlo L. Iringan giving his opening remarks and ARD Jonathan Paul M. Leusen, Jr. discussing Federalism 101 during the 2016 Regional Year-end PRA with 226 DILG CAR officers and employees, and job-orders listening intently.
34:
administration’s anti-drug campaign. Result of the drug test for ALL personnel in
the Regional Office and all Provinces yield negative results.
3. 2016 TOPs awarding was done simultaneously with the Year-End PRA conducted
last December 19-21, 2016. The following are hereby declared regional winners:
Outstanding Provincial Office – 1st Place – DILG Mt. Province
Oustanding MLGOO – 1st Place – Normita C. Venus
2nd Place – Mary Beth A. Micu
3rd Place – Cecile C. Eugenio
Special Citation – Mediatrix R. ALino
h. Significant Events
SILG’S Exit Call - Outgoing SILG Mel Senen S. Sarmiento met with the Cordillera DILG
family for his exit call on June 2, 2016 at the Tactical Operations Group 1, Philippine Air Force at Loakan, Baguio City. This is the SILG’s first regional stop for his exit calls.
He thanked everyone for the support. He said that it was truly an honor working with
public servants at their best. He asked everybody to sustain the gains already obtained, and
with the growth rate the country is experiencing, he is hopeful that the next generation will have
a better environment to grow in, a lot better than this generation has experienced. (Reports from LGOO V Carol G. Gano)
Sec. Mel Senen S. Sarmiento took time to update, inspire, thank and bid goodbye members of the Cordillera DILG family last June 2 in Baguio City. With him onstage are (L-R) DILG-CAR RD Marlo L. Iringan, PRO-Cor RD Ulysses Abellera, BJMP-CAR ARD Roland Cael, and BFP-CAR RD Ma. Sofia B. Mendoza. Photo Courtesy of BFP-CAR
The DILG Mt. Provice Officers and staff receiving their trophy and check amounting to Php20,000.00 as winner for the Outstanding Provincial office for 2016 TOPs.
35:
RD Marlo interfaces with the DILG-CAR Field Operating Units -The new DILG-CAR Regional Director Marlo L. Iringan was able to attend all provincial/city management conferences
and in meeting most, if not all, DILG-CAR field personnel during his first month as regional
director of DILG-CAR.
DILG-CAR RD Marlo L. Iringan thanked Sec. Mel Senen S. Sarmiento for bringing the Department to greater heights during the exit call last June 2 in Baguio City.
DILG-Abra DILG-Apayao
DILG-Baguio DILG-Benguet
DILG-Ifugao DILG-Kalinga
36:
DILG welcomes the new Regional Director – On March 28, 2016, RD John Castañeda
formally turned over his command to RD Marlo L. Iringan. In his talk of acceptance, he
emphasizes on the importance of working together and moving forward amidst challenges.
SILG talks with Baguio DILG Family – SILG Mel Senen Sarmiento took time after the PMA graduation to meet with his DILG Family on March 14, 2016 at the Baguio City Police Office
Multi-purpose Hall. Present during his visit are members of the DILG family from the interior
sector – PNP, BFP, BJMP, and NAPOLCOM. The local government sector contingent is headed by
ARD Jonathan Paul M. Leusen, Jr., together with CD Evelyn B. Trinidad, LGOO VI Anabelle L. Camacho, LGOO V Johnny Maymaya, Jr. of DILG –Baguio and PD Rufina Fegcan on DILG-
Benguet.
RD Castañeda symbolically hands the key of DILG-CAR to RD Iringan (right) and employees of the region warmly welcomes the new RD (left).
DILG-Mt. Province