1xfohdu 6,* (yhqw 1ryhpehu - cambridge · pdf fileadopted complete aveva plant suite in 2003...
TRANSCRIPT
1
Darren Duddy
Global Business Development - Nuclear
AVEVA – The first 45 years
1976
Launched PDMS
1967
CADCentre established from Cambridge University
1979
Launched Intelligent P&ID
1999
Launched world’s 1st Engineering Information Management Solution
2002
Launch AVEVA NET
2011
Acquired LFM Software
1988
Launched AVEVA Review
2001
Launched AVEVA Global
2004
Acquired Tribon
2006
AVEVA Laser model Interface launched
2010
Acquired Logimatic MARS & ADB Systemer
2012
Acquired bocad A History of Innovation
Nuclear SIG Event 12 November 2012
www.cambridgecleantech.org.uk 1
2
Existing Nuclear Position
Copyright 2011 AVEVA Solutions Limited. All rights reserved.
Slide 8
Major AVEVA Customers in the Nuclear
Industry - EDF Group (Electricité de France)
The largest operator of nuclear plant in the world
63 GW Nuclear capacity in France – 57 units 9 GW Nuclear capacity in UK – 15 units at 8 sites
AVEVA PDMS customer since 1981
Designed entire series of N4 1450MW reactors using PDMS
Most recent reactors commissioned in France (2000) PDMS used for Thermal plants too
eg Phu My 2-2 715MW Combined Cycle - Viet Nam 2008
Using AVEVA PDMS for maintenance, modification & decommissioning on existing fleet
Designing France’s first 3rd generation reactor using PDMS Flamanville 3 construction site opened Jul 2006
2012
Hinkely Point C Planned NNB – AVEVA Tools Selected
Nuclear SIG Event 12 November 2012
www.cambridgecleantech.org.uk 2
3
Copyright 2011 AVEVA Solutions Limited. All rights reserved.
Slide 9
Current AVEVA Plant Projects :
China: Taishan
- Design & Construction of 2*1600MW EPRs Finland : Olkiluoto 3
– Design & Construction of the world’s first Gen 3+ nuclear plant (1600MW EPR with TVO) – 200+ engineers using AVEVA software across 4 locations
France: Flamanville 3 – First 3rd generation nuclear plant in France (1600 MW EPR with EDF) – Design of the new ATMEA 1 reactor in a JV with MHI in Japan
UK: Hinkley Point C
– First 3rd generation nuclear plant in UK for 25 years (2 x 1600 MW EPR with EDF NNB Genco) – Engineering tools selection and site works started
USA: – Design Certification & COL projects across multiple offices in North America
Major AVEVA Customers in the Nuclear
Industry - AREVA NP
“World’s leading designer and builder of nuclear power plants”
Adopted complete AVEVA Plant suite in 2003 Major development partner of AVEVA
Copyright 2011 AVEVA Solutions Limited. All rights reserved.
Slide 10
AVEVA Nuclear Strategy –
The Challenge
New Nuclear Build
(NNB)
Early adoption of Planning and Licencing requirements
Design for Construction, Operations and Maintenance
Design Standardisation and Reuse (Series/Fleet/Modular
Construction etc),
Construction Planning/Materials Management
Operational
Excellence
(OPEX)
Project Collaboration in commissioning and handover
Validation of Planned Construction Processes, Outages and
maintenance activities
Quality Assurance of information integrity (complete, correct and
reliable from Global Suppliers to Constructors to Operators)
Plant Life Extension
(PLEX)
Accurate Project Execution and Compliance
Project Cost and Schedule Optimisation and validation
Integration of new and legacy technologies
Decommissioning
(DECOM)
Knowledge capture and reuse for future project execution
Increase efficiency without compromise to safety and security
Validate complex decommissioning procedures prior to project
execution
Nuclear SIG Event 12 November 2012
www.cambridgecleantech.org.uk 3
4
Copyright 2011 AVEVA Solutions Limited. All rights reserved.
Slide 12
Asset Information Lifecycle
Management
Asset Data Asset Data
Process Design knowledge base
Organization learning and knowledge sharing
Supplier management
Asset portfolio management
Owner/ Owner/ Operator Operator
Reusable design components
Strategic Sourcing
Project Management
Supplier collaboration
Document control
Engineering Engineering & &
Construction Construction Operation optimization
Equipment reliability
Maintenance management
Abandonment planning
Asset Asset Operations & Operations & Maintenance Maintenance
Equipment maintenance history
Problem analysis
Parts inventory management
Service Service Providers Providers
Design parameters
Performance analytics
As-built documentation
After-market support
Equipment Equipment Supplier Supplier
Construction Planning
Copyright 2011 AVEVA Solutions Limited. All rights reserved.
Slide 13
Managing the Complexity
Start of construction before design completion
Insufficient incorporation of regulatory requirements into design
Insufficient schedule integration and communication
Poor interface definition and management
Nuclear SIG Event 12 November 2012
www.cambridgecleantech.org.uk 4
5
Copyright 2011 AVEVA Solutions Limited. All rights reserved.
Slide 14
iALM «industrial Asset Lifecycle
Management»
“Back Office
Functionalities”
“Engineering
Functionalities”
Product Data Management
Operation Maintenance
Product Life Cycle
Management PLM
1980
1990
2000
2010
“Life Cycle Management
Functions”
“Operation &
Maintenance Functions”
ALM
PPM
PDM
CAD
EDM
ECM
PLM
EAM
iALM Best In Class
CMMS
HR Finance
Engineering Software Trends: “Life Cycle Management functions associated to Operation & Maintenance
functions”
Copyright 2011 AVEVA Solutions Limited. All rights reserved.
Slide 15 Business led, IT enabled Partnership Project
The iALM platform Key business
challenges
Issue NO SINGLE SOURCE OF TRUTH
FOR ENGINEERING INFORMATION (EI) ACROSS THE PLANT LIFECYCLE
INCONSISTENT AND DIFFERING APPROACHES TO STANDARDS, PROCESSES AND SYSTEMS IMPLEMENTATION AFFECTING EI ACROSS NPP FLEET
LATE ADOPTION OF ENGINEERING CHANGES THROUGH INEFFICIENT HANDOVER PRACTICES
PROCESSES OF LOCATING, COLLECTING, VALIDATING AND ACCESSING EI ARE RENDERED INEFFICIENT.
PROCESS OF PROVIDING ACCURATE PROJECT EXECUTION PLANNING ACTIVITIES AND REPORTING DOCUMENTATION
NON-COMPLIANCES WITH REGULATORY AUTHORITIES FOR ASSET INFORMATION INTEGRITY
PROJECT DELAYS AND PROGRAM RISKS
SUPPLIER AND CONTRACTOR PENALTIES
RISK IS NOT ADEQUATELY MANAGED – REACTIVE
INEFFECTIVE COLLABORATIVE DECISION MAKING
GLOBAL ENTERPRISE INFORMATION HUB (EIH)
SCALABLE AND ROBUST SOLUTION FOR :
SINGLE EI ACCESS COMMON, STANDARDS,
PROCESSES, PROCEDURES DATA QUALITY AND
VALIDATION
COMBINES AND REVIEW ALL SOURCES OF INFORMATION CLASSES, OBJECTS AND RELATIONSHIPS
PROVIDING A SYNCHRONOUS SOURCE OF TRUSTED AND RELIABLE ENTERPRISE ASSET INFORMATIONS
2D
3D
…
Docs
Multiple Formats
Multiple Participants
Part. A
Part. B
Part.…
Part. n
Electric
Mech.
Water
Cooling
…
Multiple Disciplines
Plant Design
Impact Solution
Nuclear SIG Event 12 November 2012
www.cambridgecleantech.org.uk 5
6
Copyright 2011 AVEVA Solutions Limited. All rights reserved.
Slide 16
iALM Overview
Issues
Solution Structure
Solution Vision
Benefits
“a single logical instance of data gathering and connecting
plant information throughout its life cycle”
Inefficient management of
Engineering Information
contributing to:
o Project Delays
o Non-Compliances
o Increased Risk
o Ineffective Decisions
o Increased Costs
“an innovative,
integrated and effective
solution for the
management of Assets
through their life cycle
… connecting people,
processes and systems
through information”
Thank you.
Nuclear SIG Event 12 November 2012
www.cambridgecleantech.org.uk 6