2 7 3 4 5 6 oteha valley to mcclymonts (ov2m) … · contains 2016 aerial imagery sourced from nz...

10
CONTAINS 2016 AERIAL IMAGERY SOURCED FROM NZ TRANSPORT AGENCY UNDER CREATIVE COMMONS 3.0 NEW ZEALAND (BY) CONTAINS 2016 AERIAL IMAGERY SOURCED FROM NZ TRANSPORT AGENCY UNDER CREATIVE COMMONS 3.0 NEW ZEALAND (BY) OTEHA VALLEY TO MCCLYMONTS (OV2M) 11600 11650 11700 11750 11800 11850 11900 11950 12000 12050 12100 12150 12200 12250 12300 12350 SH1 NORTHERN MOTORWAY OTEHA VALLEY ROAD CORNERSTONE DRIVE ELLIOT ROSE LUCAS CREEK MATCHLINE JOINS SHEET 2 KEY PLAN 1 3 4 6 5 8 9 10 2 7 1 11500 11550 11600 CLIENT DATE TITLE REVISION DETAILS DATE REV APPROVED CHECKED APPROVED PROJECT DRAWN DESIGNED PROJECT No. WP REV STAGE TYPE NUMBER DRAWING No. SCALE SIZE A1 . Filename: Plot Date: Office: C:\PW_WORK\D0315096\250310-3PRE-3DES-DRG-1451-1460.DWG 24/11/2016 2:31:55 p.m. NZAKL 0 SCALE 1:1000 10 40m 20 NORTHERN CORRIDOR IMPROVEMENTS STORMWATER CATCHMENT PLAN SHEET 1 250310 3PRE 3DES DRG 1451 B 1:1000 PRELIMINARY NOT FOR CONSTRUCTION B. LI M. YU D. MACKINSTOSH J. HIND J. HIND 17/10/16 A 17.10.16 PRELIMINARY ISSUE G. MOORE B 24.11.16 CONSENT ISSUE J. HIND LEGEND EXISTING DESIGNATION BOUNDARY ALTERATION TO EXISTING DESIGNATION BOUNDARY PROPOSED CATCHMENT EX ALPURT A1 POND 30 PROPOSED CATCHMENT OTEHA VALLEY WETLAND EAST PROPOSED CATCHMENT OTEHA VALLEY WETLAND WEST PROPOSED CATCHMENT MCCLYMONTS WETLAND PROPOSED CATCHMENT GREVILLE WETLAND PROPOSED CATCHMENT EX ALPURT A1 POND 34 PROPOSED CATCHMENT EX ALPURT A1 POND 35 PROPOSED CATCHMENT GREVILLE NORTHBOUND DRY POND PROPOSED CATCHMENT GREVILLE SOUTHBOUND DRY POND PROPOSED CATCHMENT MORO WETLAND PROPOSED CATCHMENT CARIBBEAN WETLAND PROPOSED CATCHMENT ROOK WETLAND PROPOSED CATCHMENT PROPRIETARY DEVICE SF-PM2AH-1 OV2M SUB-CATCHMENT BOUNDARY PROPOSED TREATMENT PROPOSED TREATMENT AND DETENTION PROPOSED TREATMENT, DETENTION AND 10-YEAR ATTENUATION PROPOSED TREATMENT, DETENTION AND 100-YEAR ATTENUATION PROPOSED DETENTION AND 10-YEAR ATTENUATION PROPOSED DETENTION AND 100-YEAR ATTENUATION PROPOSED SWALE HIGH POINT LOW POINT NO ADDITIONAL IMPERVIOUS AREAS DISCHARGING TO ALBANY STATION DRAINAGE SYSTEM MATCHLINE BELOW MATCHLINE ABOVE EXISTING IMPERVIOUS AREAS FROM OTEHA VALLEY ROAD DISCHARGE TO AC PIPE NETWORK NOTES 1. ALL AREAS ARE IN HECTARES UNLESS OTHERWISE SHOWN. 2. CATCHMENTS HAVE BEEN DERIVED FROM THE NCI GEOMETRIC MODEL (DATED 20 SEPTEMBER 2016) AND EXISTING SURVEY INFORMATION (TOPOGRAPHIC AND AC GIS). 3. CATCHMENT AREAS FOR EXISTING PONDS ARE NOT SHOWN ON THIS DRAWING SET. 4. CATCHMENT BOUNDARIES INCLUDE BOTH IMPERVIOUS AND PERVIOUS AREAS. HIGHLIGHTED AREAS INDICATE IMPERVIOUS AREAS PROPOSED TO BE MITIGATED. 5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE STORMWATER LAYOUT PLANS (DRG-1400 SERIES). EXISTING ALPURT A1 POND 30 (RETAINED) CATCHMENT AREA (ha) IMPERVIOUS 2.28 PERVIOUS 1.04 AREA TREATED (ha) HIGH USE ROADS PRE-DEV 2.62 HIGH USE ROADS POST-DEV 2.28 VOLUMES (m3) WATER QUALITY VOLUME 295 DETENTION VOLUME 550 TOTAL LIVE VOLUME 1670 OTEHA VALLEY EAST WETLAND CATCHMENT AREA (ha) IMPERVIOUS 1.71 PERVIOUS 0.02 AREA TREATED (ha) HIGH USE ROADS POST-DEV 0.74 VOLUMES (m3) WATER QUALITY VOLUME 480 DETENTION VOLUME 420 TOTAL LIVE VOLUME 1345 OTEHA VALLEY WEST WETLAND CATCHMENT AREA (ha) IMPERVIOUS 0.43 PERVIOUS 0.00 AREA TREATED (ha) HIGH USE ROADS POST-DEV 0.43 VOLUMES (m3) WATER QUALITY VOLUME 150 DETENTION VOLUME 105 TOTAL LIVE VOLUME 495 OTEHA VALLEY TO MCCLYMONTS (OV2M) IMPERVIOUS AREAS (ha) EXISTING HIGH USE ROAD 3.32 NEW HIGH USE ROAD 0.13 NEW BUSWAY & SHARED-USE PATH 0.98 TOTAL IMP 4.44 TREATMENT (ha) EXISTING HIGH USE ROAD 3.32 PROPOSED HIGH USE ROAD 3.45 (100% OF NEW HIGH USE ROAD TREATED) (100% OF TOTAL HIGH USE ROAD TREATED) EXISTING ALPURT A1 POND 29 (RETAINED) NOT AFFECTED BY PROPOSED WORK. NO CHANGES PROPOSED TO EXISTING WETLAND CATCHMENTS

Upload: others

Post on 02-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2 7 3 4 5 6 OTEHA VALLEY TO MCCLYMONTS (OV2M) … · contains 2016 aerial imagery sourced from nz transport agency under creative commons 3.0 new zealand (by) ... sh1 northern motorway

CONTAINS 2016 AERIAL IMAGERY SOURCED FROM NZ TRANSPORTAGENCY UNDER CREATIVE COMMONS 3.0 NEW ZEALAND (BY)

CONTAINS 2016 AERIAL IMAGERY SOURCED FROM NZ TRANSPORTAGENCY UNDER CREATIVE COMMONS 3.0 NEW ZEALAND (BY)

OTEHA VALLEY TOMCCLYMONTS (OV2M)

11600

11650

11700

11750

11800

11850

11900

11950

12000

12050

12100

12150 12200 12250 12300 12350

SH1 NORTHERN MOTORWAY

OTEH

A VA

LLEY

ROA

D

CORNERSTONE DRIVE ELLIO

T ROS

E AVE

NUELUCAS CREEK

MATCHLINE JOINS SHEET 2

KEY PLAN

13 4 65

8

9

10

2 71

11500

11550

11600

CLIENT

DATE TITLE

REVISION DETAILSDATEREV APPROVED

CHECKED

APPROVED

PROJECT

DRAWN

DESIGNED

PROJECT No. WP REVSTAGE TYPE NUMBER DRAWING No.

SCALE SIZEA1

.

Filen

ame:

Plot

Date:

Offic

e:C:

\PW

_WOR

K\D0

3150

96\25

0310

-3PR

E-3D

ES-D

RG-1

451-

1460

.DW

G24

/11/20

16 2:

31:55

p.m.

NZAK

L

0

SCALE 1:1000

10 40m20

NORTHERN CORRIDOR IMPROVEMENTS

STORMWATER CATCHMENT PLANSHEET 1

250310 3PRE 3DES DRG 1451 B

1:1000PRELIMINARY

NOT FOR CONSTRUCTION

B. LI

M. YU

D. MACKINSTOSH J. HIND

J. HIND17/10/16

A 17.10.16 PRELIMINARY ISSUE G. MOOREB 24.11.16 CONSENT ISSUE J. HIND

LEGENDEXISTING DESIGNATION BOUNDARY

ALTERATION TO EXISTINGDESIGNATION BOUNDARY

PROPOSED CATCHMENTEX ALPURT A1 POND 30

PROPOSED CATCHMENTOTEHA VALLEY WETLAND EAST

PROPOSED CATCHMENTOTEHA VALLEY WETLAND WEST

PROPOSED CATCHMENTMCCLYMONTS WETLAND

PROPOSED CATCHMENTGREVILLE WETLAND

PROPOSED CATCHMENTEX ALPURT A1 POND 34

PROPOSED CATCHMENTEX ALPURT A1 POND 35

PROPOSED CATCHMENT GREVILLENORTHBOUND DRY POND

PROPOSED CATCHMENT GREVILLESOUTHBOUND DRY POND

PROPOSED CATCHMENTMORO WETLAND

PROPOSED CATCHMENTCARIBBEAN WETLAND

PROPOSED CATCHMENTROOK WETLAND

PROPOSED CATCHMENTPROPRIETARY DEVICE SF-PM2AH-1

OV2MSUB-CATCHMENT BOUNDARY

PROPOSED TREATMENT

PROPOSED TREATMENT ANDDETENTION

PROPOSED TREATMENT, DETENTIONAND 10-YEAR ATTENUATION

PROPOSED TREATMENT, DETENTIONAND 100-YEAR ATTENUATION

PROPOSED DETENTION AND10-YEAR ATTENUATION

PROPOSED DETENTION AND100-YEAR ATTENUATION

PROPOSED SWALE

HIGH POINT

LOW POINT

NO ADDITIONAL IMPERVIOUS AREASDISCHARGING TO ALBANY STATIONDRAINAGE SYSTEM

MATC

HLIN

E BE

LOW

MATCHLINE ABOVE

EXISTING IMPERVIOUS AREAS FROMOTEHA VALLEY ROAD DISCHARGE TOAC PIPE NETWORK

NOTES1. ALL AREAS ARE IN HECTARES UNLESS OTHERWISE SHOWN.2. CATCHMENTS HAVE BEEN DERIVED FROM THE NCI GEOMETRIC MODEL (DATED 20

SEPTEMBER 2016) AND EXISTING SURVEY INFORMATION (TOPOGRAPHIC AND AC GIS).3. CATCHMENT AREAS FOR EXISTING PONDS ARE NOT SHOWN ON THIS DRAWING SET.4. CATCHMENT BOUNDARIES INCLUDE BOTH IMPERVIOUS AND PERVIOUS AREAS.

HIGHLIGHTED AREAS INDICATE IMPERVIOUS AREAS PROPOSED TO BE MITIGATED.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE STORMWATER LAYOUT

PLANS (DRG-1400 SERIES).

EXISTING ALPURT A1 POND 30 (RETAINED)

CATCHMENT AREA (ha)

IMPERVIOUS 2.28PERVIOUS 1.04AREA TREATED (ha)

HIGH USE ROADS PRE-DEV 2.62HIGH USE ROADS POST-DEV 2.28VOLUMES (m3)

WATER QUALITY VOLUME 295DETENTION VOLUME 550TOTAL LIVE VOLUME 1670

OTEHA VALLEY EAST WETLANDCATCHMENT AREA (ha)

IMPERVIOUS 1.71PERVIOUS 0.02AREA TREATED (ha)

HIGH USE ROADS POST-DEV 0.74VOLUMES (m3)

WATER QUALITY VOLUME 480DETENTION VOLUME 420TOTAL LIVE VOLUME 1345

OTEHA VALLEY WEST WETLANDCATCHMENT AREA (ha)

IMPERVIOUS 0.43PERVIOUS 0.00AREA TREATED (ha)

HIGH USE ROADS POST-DEV 0.43VOLUMES (m3)

WATER QUALITY VOLUME 150DETENTION VOLUME 105TOTAL LIVE VOLUME 495

OTEHA VALLEY TO MCCLYMONTS (OV2M)

IMPERVIOUS AREAS (ha)

EXISTING HIGH USE ROAD 3.32NEW HIGH USE ROAD 0.13NEW BUSWAY & SHARED-USE PATH 0.98TOTAL IMP 4.44TREATMENT (ha)

EXISTING HIGH USE ROAD 3.32PROPOSED HIGH USE ROAD 3.45(100% OF NEW HIGH USE ROAD TREATED)(100% OF TOTAL HIGH USE ROAD TREATED)

EXISTING ALPURT A1 POND 29 (RETAINED)NOT AFFECTED BY PROPOSED WORK. NOCHANGES PROPOSED TO EXISTINGWETLAND CATCHMENTS

Page 2: 2 7 3 4 5 6 OTEHA VALLEY TO MCCLYMONTS (OV2M) … · contains 2016 aerial imagery sourced from nz transport agency under creative commons 3.0 new zealand (by) ... sh1 northern motorway

CONTAINS 2016 AERIAL IMAGERY SOURCED FROM NZ TRANSPORTAGENCY UNDER CREATIVE COMMONS 3.0 NEW ZEALAND (BY)

CONTAINS 2016 AERIAL IMAGERY SOURCED FROM NZ TRANSPORTAGENCY UNDER CREATIVE COMMONS 3.0 NEW ZEALAND (BY)

RWRW RWRW

RW

RW

RW

RW

RW

RW

MCCLYMONTS TOSPENCER (M2S)

OTEHA VALLEY TOMCCLYMONTS (OV2M)

SPENCER TOROSEDALE (S2R)

12350 12400 12450 12500

12550

12600

12650

12700

12750

12800

12850

12900

12950

13000

13050

13100

13150EL

LIOT R

OSE A

VENU

E

SH1 NORTHERN MOTORWAY

DON MCKINNON DRIVE

ELLIOT ROSE AVENUE

DON MCKINNON DRIVE

MCCLYMONTS ROAD

MEDALLION DRIVE

SPENCER ROAD

CIVIC CRES

McCLYMONTS ROAD

COXTON LANE

KEY PLAN

13 4 65

8

9

10

2 7MA

TCHL

INE

JOIN

S SH

EET

12

MATCHLINE JOINS SHEET 3

CLIENT

DATE TITLE

REVISION DETAILSDATEREV APPROVED

CHECKED

APPROVED

PROJECT

DRAWN

DESIGNED

PROJECT No. WP REVSTAGE TYPE NUMBER DRAWING No.

SCALE SIZEA1

.

Filen

ame:

Plot

Date:

Offic

e:C:

\PW

_WOR

K\D0

3150

96\25

0310

-3PR

E-3D

ES-D

RG-1

451-

1460

.DW

G24

/11/20

16 2:

32:05

p.m.

NZAK

L

0

SCALE 1:1000

10 40m20

NORTHERN CORRIDOR IMPROVEMENTS

STORMWATER CATCHMENT PLANSHEET 2

250310 3PRE 3DES DRG 1452 B

1:1000PRELIMINARY

NOT FOR CONSTRUCTION

B. LI

M. YU

D. MACKINSTOSH J. HIND

J. HIND17/10/16

A 17.10.16 PRELIMINARY ISSUE G. MOOREB 24.11.16 CONSENT ISSUE J. HIND

LEGENDEXISTING DESIGNATION BOUNDARY

ALTERATION TO EXISTINGDESIGNATION BOUNDARY

PROPOSED CATCHMENTEX ALPURT A1 POND 30

PROPOSED CATCHMENTOTEHA VALLEY WETLAND EAST

PROPOSED CATCHMENTOTEHA VALLEY WETLAND WEST

PROPOSED CATCHMENTMCCLYMONTS WETLAND

PROPOSED CATCHMENTGREVILLE WETLAND

PROPOSED CATCHMENTEX ALPURT A1 POND 34

PROPOSED CATCHMENTEX ALPURT A1 POND 35

PROPOSED CATCHMENT GREVILLENORTHBOUND DRY POND

PROPOSED CATCHMENT GREVILLESOUTHBOUND DRY POND

PROPOSED CATCHMENTMORO WETLAND

PROPOSED CATCHMENTCARIBBEAN WETLAND

PROPOSED CATCHMENTROOK WETLAND

PROPOSED CATCHMENTPROPRIETARY DEVICE SF-PM2AH-1

OV2MSUB-CATCHMENT BOUNDARY

PROPOSED TREATMENT

PROPOSED TREATMENT ANDDETENTION

PROPOSED TREATMENT, DETENTIONAND 10-YEAR ATTENUATION

PROPOSED TREATMENT, DETENTIONAND 100-YEAR ATTENUATION

PROPOSED DETENTION AND10-YEAR ATTENUATION

PROPOSED DETENTION AND100-YEAR ATTENUATION

PROPOSED SWALE

HIGH POINT

LOW POINT

STORMWATER RUNOFF FROMMcCLYMONTS BRIDGE TODISCHARGE TO McCLYMONTSWETLAND

SPENCER ROAD FOOTBRIDGE OVER SH1,BUSWAY AND SHARED USE PATH.OUTSIDE PROJECT SCOPE, SHOWN FORINFORMATION ONLY

EXISTING ALPURT A1 POND 31 (REMOVED)

AREA TREATED (ha)

HIGH USE ROADS PRE-DEV 0.70VOLUMES (m3)

WATER QUALITY VOLUME 410DETENTION VOLUME 240TOTAL LIVE VOLUME 545

EXISTING ALPURT A1 POND 32 (REMOVED)

AREA TREATED (ha)

HIGH USE ROADS PRE-DEV 1.48VOLUMES (m3)

WATER QUALITY VOLUME 325DETENTION VOLUME 300TOTAL LIVE VOLUME 480

MCCLYMONTS WETLANDCATCHMENT AREA (ha)

IMPERVIOUS 2.21PERVIOUS 0.27AREA TREATED (ha)

HIGH USE ROADS POST-DEV 1.59VOLUMES (m3)

WATER QUALITY VOLUME 405DETENTION VOLUME 450TOTAL LIVE VOLUME 1225

MCCLYMONTS TO SPENCER (M2S)

IMPERVIOUS AREAS (ha)

EXISTING HIGH USE ROAD 1.60NEW HIGH USE ROAD -0.01NEW BUSWAY & SHARED-USE PATH 0.62TOTAL IMP 2.21TREATMENT (ha)

EXISTING HIGH USE ROAD 1.48PROPOSED HIGH USE ROAD 1.59NO NEW HUR AREA(100% OF TOTAL HUR TREATED)

NOTES1. ALL AREAS ARE IN HECTARES UNLESS OTHERWISE SHOWN.2. CATCHMENTS HAVE BEEN DERIVED FROM THE NCI GEOMETRIC MODEL (DATED 20

SEPTEMBER 2016) AND EXISTING SURVEY INFORMATION (TOPOGRAPHIC AND AC GIS).3. CATCHMENT AREAS FOR EXISTING PONDS ARE NOT SHOWN ON THIS DRAWING SET.4. CATCHMENT BOUNDARIES INCLUDE BOTH IMPERVIOUS AND PERVIOUS AREAS.

HIGHLIGHTED AREAS INDICATE IMPERVIOUS AREAS PROPOSED TO BE MITIGATED.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE STORMWATER LAYOUT

PLANS (DRG-1400 SERIES).

Page 3: 2 7 3 4 5 6 OTEHA VALLEY TO MCCLYMONTS (OV2M) … · contains 2016 aerial imagery sourced from nz transport agency under creative commons 3.0 new zealand (by) ... sh1 northern motorway

CONTAINS 2016 AERIAL IMAGERY SOURCED FROM NZ TRANSPORTAGENCY UNDER CREATIVE COMMONS 3.0 NEW ZEALAND (BY)

CONTAINS 2016 AERIAL IMAGERY SOURCED FROM NZ TRANSPORTAGENCY UNDER CREATIVE COMMONS 3.0 NEW ZEALAND (BY)

SPENCER TO

ROSEDALE (S2R)

13200

13250

13300 13350 13400 13450 13500

13550

13600

13650

13700

13750

13800

13850

13900

13950

SH1 NORTHERN MOTORWAY

ALBANY EXPRESSWAY

GREVILLE ROAD

TAWA DRIVE

RATH

MULL

EN P

LACE

COLLISTON RISE

COLLISTON RISE

CORINTHIAN

GREVILLE ROAD

KEY PLAN

13 4 65

8

9

10

2 7MATCHLINE JOINS SHEET 4

3MA

TCHL

INE

JOIN

S SH

EET

2

CLIENT

DATE TITLE

REVISION DETAILSDATEREV APPROVED

CHECKED

APPROVED

PROJECT

DRAWN

DESIGNED

PROJECT No. WP REVSTAGE TYPE NUMBER DRAWING No.

SCALE SIZEA1

.

Filen

ame:

Plot

Date:

Offic

e:C:

\PW

_WOR

K\D0

3150

96\25

0310

-3PR

E-3D

ES-D

RG-1

451-

1460

.DW

G24

/11/20

16 2:

32:16

p.m.

NZAK

L

0

SCALE 1:1000

10 40m20

NORTHERN CORRIDOR IMPROVEMENTS

STORMWATER CATCHMENT PLANSHEET 3

250310 3PRE 3DES DRG 1453 B

1:1000PRELIMINARY

NOT FOR CONSTRUCTION

B. LI

M. YU

D. MACKINSTOSH J. HIND

J. HIND17/10/16

A 17.10.16 PRELIMINARY ISSUE G. MOOREB 24.11.16 CONSENT ISSUE J. HIND

LEGENDEXISTING DESIGNATION BOUNDARY

ALTERATION TO EXISTINGDESIGNATION BOUNDARY

PROPOSED CATCHMENTEX ALPURT A1 POND 30

PROPOSED CATCHMENTOTEHA VALLEY WETLAND EAST

PROPOSED CATCHMENTOTEHA VALLEY WETLAND WEST

PROPOSED CATCHMENTMCCLYMONTS WETLAND

PROPOSED CATCHMENTGREVILLE WETLAND

PROPOSED CATCHMENTEX ALPURT A1 POND 34

PROPOSED CATCHMENTEX ALPURT A1 POND 35

PROPOSED CATCHMENT GREVILLENORTHBOUND DRY POND

PROPOSED CATCHMENT GREVILLESOUTHBOUND DRY POND

PROPOSED CATCHMENTMORO WETLAND

PROPOSED CATCHMENTCARIBBEAN WETLAND

PROPOSED CATCHMENTROOK WETLAND

PROPOSED CATCHMENTPROPRIETARY DEVICE SF-PM2AH-1

OV2MSUB-CATCHMENT BOUNDARY

PROPOSED TREATMENT

PROPOSED TREATMENT ANDDETENTION

PROPOSED TREATMENT, DETENTIONAND 10-YEAR ATTENUATION

PROPOSED TREATMENT, DETENTIONAND 100-YEAR ATTENUATION

PROPOSED DETENTION AND10-YEAR ATTENUATION

PROPOSED DETENTION AND100-YEAR ATTENUATION

PROPOSED SWALE

HIGH POINT

LOW POINT

NOTES1. ALL AREAS ARE IN HECTARES UNLESS OTHERWISE SHOWN.2. CATCHMENTS HAVE BEEN DERIVED FROM THE NCI GEOMETRIC MODEL (DATED 20

SEPTEMBER 2016) AND EXISTING SURVEY INFORMATION (TOPOGRAPHIC AND AC GIS).3. CATCHMENT AREAS FOR EXISTING PONDS ARE NOT SHOWN ON THIS DRAWING SET.4. CATCHMENT BOUNDARIES INCLUDE BOTH IMPERVIOUS AND PERVIOUS AREAS.

HIGHLIGHTED AREAS INDICATE IMPERVIOUS AREAS PROPOSED TO BE MITIGATED.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE STORMWATER LAYOUT

PLANS (DRG-1400 SERIES).

SPENCER TO ROSEDALE (S2R)

IMPERVIOUS AREAS (ha)

EXISTING HIGH USE ROAD 7.69NEW HIGH USE ROAD 1.73NEW BUSWAY & SHARED-USE PATH 2.71TOTAL IMP 12.13TREATMENT (ha)

EXISTING HIGH USE ROAD 3.52PROPOSED HIGH USE ROAD 9.42(342% OF NEW HUR TREATED)(100% OF TOTAL HUR TREATED)

EXISTING ALPURT A1 POND 33 (REMOVED)

AREA TREATED (ha)

HIGH USE ROADS PRE-DEV 0.80VOLUMES (m3)

WATER QUALITY VOLUME 115DETENTION VOLUME 95TOTAL LIVE VOLUME 325

GREVILLE WETLANDCATCHMENT AREA (ha)

IMPERVIOUS 2.86PERVIOUS 0.70AREA TREATED (ha)

HIGH USE ROADS POST-DEV 2.12VOLUMES (m3)

WATER QUALITY VOLUME 525DETENTION VOLUME 335TOTAL LIVE VOLUME 4420

EXISTING ALPURT A1 POND 34 (MODIFIED)

CATCHMENT AREA (ha)

IMPERVIOUS 2.33PERVIOUS 2.09AREA TREATED (ha)

HIGH USE ROADS PRE-DEV 2.72HIGH USE ROADS POST-DEV 2.26VOLUMES (m3)

WATER QUALITY VOLUME 300DETENTION VOLUME 370TOTAL LIVE VOLUME 2520

GREVILLE SOUTHBOUND DRY PONDCATCHMENT AREA (ha)

IMPERVIOUS 0.25PERVIOUS 0.07AREA TREATED (ha)

HIGH USE ROADS POST-DEV 0.00VOLUMES (m3)

WATER QUALITY VOLUME 0DETENTION VOLUME 70TOTAL LIVE VOLUME 320

Page 4: 2 7 3 4 5 6 OTEHA VALLEY TO MCCLYMONTS (OV2M) … · contains 2016 aerial imagery sourced from nz transport agency under creative commons 3.0 new zealand (by) ... sh1 northern motorway

CONTAINS 2016 AERIAL IMAGERY SOURCED FROM NZ TRANSPORTAGENCY UNDER CREATIVE COMMONS 3.0 NEW ZEALAND (BY)

CONTAINS 2016 AERIAL IMAGERY SOURCED FROM NZ TRANSPORTAGENCY UNDER CREATIVE COMMONS 3.0 NEW ZEALAND (BY)

MATCHLINE JOINS SHEET 5MA

TCHL

INE

JOIN

S SH

EET

3

SPENCER TOROSEDALE (S2R)

13950

14000

14050

14100

14150 14200 14250 14300 14350 14400 14450

14500

14550 14600 14650 14700 14750

TAWA DRIVE

SH1 NORTHERN MOTORWAY

TAWA DRIVE

MIRO

PLA

CE

TITO

KI P

LACE

ROSE

DALE

ROA

D

TAWA DRIVE COWLEY PLACE

COWLEY PLACE

ROSEDALE ROAD

ARRENWAY DRIVE

TRITON DRIVE

DALL

AN P

LACE

COWLEY PLACE

OTEH

A VA

LLEY

STR

EAM

KEY PLAN

13 4 65

8

9

10

2 74

CLIENT

DATE TITLE

REVISION DETAILSDATEREV APPROVED

CHECKED

APPROVED

PROJECT

DRAWN

DESIGNED

PROJECT No. WP REVSTAGE TYPE NUMBER DRAWING No.

SCALE SIZEA1

.

Filen

ame:

Plot

Date:

Offic

e:C:

\PW

_WOR

K\D0

3150

96\25

0310

-3PR

E-3D

ES-D

RG-1

451-

1460

.DW

G24

/11/20

16 2:

32:26

p.m.

NZAK

L

0

SCALE 1:1000

10 40m20

NORTHERN CORRIDOR IMPROVEMENTS

STORMWATER CATCHMENT PLANSHEET 4

250310 3PRE 3DES DRG 1454 B

1:1000PRELIMINARY

NOT FOR CONSTRUCTION

B. LI

M. YU

D. MACKINSTOSH J. HIND

J. HIND17/10/16

A 17.10.16 PRELIMINARY ISSUE G. MOOREB 24.11.16 CONSENT ISSUE J. HIND

LEGENDEXISTING DESIGNATION BOUNDARY

ALTERATION TO EXISTINGDESIGNATION BOUNDARY

PROPOSED CATCHMENTEX ALPURT A1 POND 30

PROPOSED CATCHMENTOTEHA VALLEY WETLAND EAST

PROPOSED CATCHMENTOTEHA VALLEY WETLAND WEST

PROPOSED CATCHMENTMCCLYMONTS WETLAND

PROPOSED CATCHMENTGREVILLE WETLAND

PROPOSED CATCHMENTEX ALPURT A1 POND 34

PROPOSED CATCHMENTEX ALPURT A1 POND 35

PROPOSED CATCHMENT GREVILLENORTHBOUND DRY POND

PROPOSED CATCHMENT GREVILLESOUTHBOUND DRY POND

PROPOSED CATCHMENTMORO WETLAND

PROPOSED CATCHMENTCARIBBEAN WETLAND

PROPOSED CATCHMENTROOK WETLAND

PROPOSED CATCHMENTPROPRIETARY DEVICE SF-PM2AH-1

OV2MSUB-CATCHMENT BOUNDARY

PROPOSED TREATMENT

PROPOSED TREATMENT ANDDETENTION

PROPOSED TREATMENT, DETENTIONAND 10-YEAR ATTENUATION

PROPOSED TREATMENT, DETENTIONAND 100-YEAR ATTENUATION

PROPOSED DETENTION AND10-YEAR ATTENUATION

PROPOSED DETENTION AND100-YEAR ATTENUATION

PROPOSED SWALE

HIGH POINT

LOW POINT

SUB-CATCHMENT TREATED BY SWALE SW-S2R-1AND SF-S2R-1. DETENTION AND ATTENUATIONPROVIDED BY GREVILLE NORTHBOUND BASIN.

NO INCREASED IMPERVIOUS AREASDISCHARGING TO ROSEDALE ROAD

NOTES1. ALL AREAS ARE IN HECTARES UNLESS OTHERWISE SHOWN.2. CATCHMENTS HAVE BEEN DERIVED FROM THE NCI GEOMETRIC MODEL (DATED 20

SEPTEMBER 2016) AND EXISTING SURVEY INFORMATION (TOPOGRAPHIC AND AC GIS).3. CATCHMENT AREAS FOR EXISTING PONDS ARE NOT SHOWN ON THIS DRAWING SET.4. CATCHMENT BOUNDARIES INCLUDE BOTH IMPERVIOUS AND PERVIOUS AREAS.

HIGHLIGHTED AREAS INDICATE IMPERVIOUS AREAS PROPOSED TO BE MITIGATED.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE STORMWATER LAYOUT

PLANS (DRG-1400 SERIES).

EXISTING HIGH AND LOW POINT ON ROSEDALE ROAD UNCHANGED

EXISTING ALPURT A1 POND 35 (MODIFIED)

CATCHMENT AREA (ha)

IMPERVIOUS 4.61PERVIOUS 1.78AREA TREATED (ha)

HIGH USE ROADS PRE-DEV 0.00HIGH USE ROADS POST-DEV 0.00VOLUMES (m3)

WATER QUALITY VOLUME 230DETENTION VOLUME 595TOTAL LIVE VOLUME 2800

GREVILLE NORTHBOUND DRY PONDCATCHMENT AREA (ha)

IMPERVIOUS 2.07PERVIOUS 0.02AREA TREATED (ha)

HIGH USE ROADS POST-DEV 0.00VOLUMES (m3)

WATER QUALITY VOLUME 0DETENTION VOLUME 195TOTAL LIVE VOLUME 420

SPENCER TO ROSEDALE (S2R)

IMPERVIOUS AREAS (ha)

EXISTING HIGH USE ROAD 7.69NEW HIGH USE ROAD 1.73NEW BUSWAY & SHARED-USE PATH 2.71TOTAL IMP 12.13TREATMENT (ha)

EXISTING HIGH USE ROAD 3.52PROPOSED HIGH USE ROAD 9.42(342% OF NEW HUR TREATED)(100% OF TOTAL HUR TREATED)

TREATMENT SWALE SW-S2R-1AREA TREATED (ha)

TREATMENT - IMP 1.02

PROPOSED PROPRIETARY DEVICE TO PROVIDE WATERQUALITY TREATMENT PRIOR TO DISCHARGING TO EXISTINGALPURT A1 POND 35 FOR WATER QUANTITY MANAGEMENT

PROPRIETARY DEVICE SF-S2R-1CATCHMENT AREA (ha)

IMPERVIOUS 5.21PERVIOUS 2.26AREA TREATED (ha)

HIGH USE ROADS PRE-DEV 0.00HIGH USE ROADS POST-DEV 4.02

Page 5: 2 7 3 4 5 6 OTEHA VALLEY TO MCCLYMONTS (OV2M) … · contains 2016 aerial imagery sourced from nz transport agency under creative commons 3.0 new zealand (by) ... sh1 northern motorway

CONTAINS 2016 AERIAL IMAGERY SOURCED FROM NZ TRANSPORTAGENCY UNDER CREATIVE COMMONS 3.0 NEW ZEALAND (BY)

CONTAINS 2016 AERIAL IMAGERY SOURCED FROM NZ TRANSPORTAGENCY UNDER CREATIVE COMMONS 3.0 NEW ZEALAND (BY)

WSL POND 2

WSL POND 1

ROSEDALE TOCONSTELLATION (R2C)

SPENCER TOROSEDALE (S2R)

00

50

100

150 200 250 300 350

400

14700 14750 14800

14850

14900

14950

15000

15050

15100

15150

15200

15250

15300

15350

15400

15450

15500DA

LLAN

PLA

CE

COWLEY PLACE

ARRENWAY DRIVE

CIVI

L PLA

CE

ARRE

NWAY

DRI

VE

SH1 NORTHERN MOTORWAY

KEY PLAN

13 4 65

8

9

10

2 7

MATCHLINE JOINS SHEET 6

5MA

TCHL

INE

JOIN

S SH

EET

4

CLIENT

DATE TITLE

REVISION DETAILSDATEREV APPROVED

CHECKED

APPROVED

PROJECT

DRAWN

DESIGNED

PROJECT No. WP REVSTAGE TYPE NUMBER DRAWING No.

SCALE SIZEA1

.

Filen

ame:

Plot

Date:

Offic

e:C:

\PW

_WOR

K\D0

3150

96\25

0310

-3PR

E-3D

ES-D

RG-1

451-

1460

.DW

G24

/11/20

16 2:

32:36

p.m.

NZAK

L

0

SCALE 1:1000

10 40m20

NORTHERN CORRIDOR IMPROVEMENTS

STORMWATER CATCHMENT PLANSHEET 5

250310 3PRE 3DES DRG 1455 B

1:1000PRELIMINARY

NOT FOR CONSTRUCTION

B. LI

M. YU

D. MACKINSTOSH J. HIND

J. HIND17/10/16

A 17.10.16 PRELIMINARY ISSUE G. MOOREB 24.11.16 CONSENT ISSUE J. HIND

LEGENDEXISTING DESIGNATION BOUNDARY

ALTERATION TO EXISTINGDESIGNATION BOUNDARY

PROPOSED CATCHMENTEX ALPURT A1 POND 30

PROPOSED CATCHMENTOTEHA VALLEY WETLAND EAST

PROPOSED CATCHMENTOTEHA VALLEY WETLAND WEST

PROPOSED CATCHMENTMCCLYMONTS WETLAND

PROPOSED CATCHMENTGREVILLE WETLAND

PROPOSED CATCHMENTEX ALPURT A1 POND 34

PROPOSED CATCHMENTEX ALPURT A1 POND 35

PROPOSED CATCHMENT GREVILLENORTHBOUND DRY POND

PROPOSED CATCHMENT GREVILLESOUTHBOUND DRY POND

PROPOSED CATCHMENTMORO WETLAND

PROPOSED CATCHMENTCARIBBEAN WETLAND

PROPOSED CATCHMENTROOK WETLAND

PROPOSED CATCHMENTPROPRIETARY DEVICE SF-PM2AH-1

OV2MSUB-CATCHMENT BOUNDARY

PROPOSED TREATMENT

PROPOSED TREATMENT ANDDETENTION

PROPOSED TREATMENT, DETENTIONAND 10-YEAR ATTENUATION

PROPOSED TREATMENT, DETENTIONAND 100-YEAR ATTENUATION

PROPOSED DETENTION AND10-YEAR ATTENUATION

PROPOSED DETENTION AND100-YEAR ATTENUATION

PROPOSED SWALE

HIGH POINT

LOW POINT

NOTES1. ALL AREAS ARE IN HECTARES UNLESS OTHERWISE SHOWN.2. CATCHMENTS HAVE BEEN DERIVED FROM THE NCI GEOMETRIC MODEL (DATED 20

SEPTEMBER 2016) AND EXISTING SURVEY INFORMATION (TOPOGRAPHIC AND AC GIS).3. CATCHMENT AREAS FOR EXISTING PONDS ARE NOT SHOWN ON THIS DRAWING SET.4. CATCHMENT BOUNDARIES INCLUDE BOTH IMPERVIOUS AND PERVIOUS AREAS.

HIGHLIGHTED AREAS INDICATE IMPERVIOUS AREAS PROPOSED TO BE MITIGATED.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE STORMWATER LAYOUT

PLANS (DRG-1400 SERIES).

PROPOSED ARC REFUSE WET POND TOREPLACE TREATMENT FUNCTION OFEXISTING ARC REFUSE POND

EXISTING MORO POND - AC (REMOVED)

VOLUMES (m3)

WATER QUALITY VOLUME 0TOTAL LIVE VOLUME 50

MORO WETLANDCATCHMENT AREA (ha)

IMPERVIOUS 8.43PERVIOUS 4.56AREA TREATED (ha)

HIGH USE ROADS POST-DEV 6.54VOLUMES (m3)

WATER QUALITY VOLUME 1195DETENTION VOLUME 1030TOTAL LIVE VOLUME 4095

ROSEDALE TO CONSTELLATION (R2C)

IMPERVIOUS AREAS (ha)

EXISTING HIGH USE ROAD 3.70NEW HIGH USE ROAD 2.84NEW BUSWAY & SHARED-USE PATH 1.89TOTAL IMP 8.43TREATMENT (ha)

EXISTING HIGH USE ROAD 1.89PROPOSED HIGH USE ROAD 6.54(164% OF NEW HUR TREATED)(100% OF TOTAL HUR TREATED)

EXISTING ARC REFUSE POND - AC (REMOVED)

VOLUMES (m3)

WATER QUALITY VOLUME 1600TOTAL LIVE VOLUME 3400

ARC REFUSE POND REPLACEMENT - ACVOLUMES (m3)

WATER QUALITY VOLUME 1800

Page 6: 2 7 3 4 5 6 OTEHA VALLEY TO MCCLYMONTS (OV2M) … · contains 2016 aerial imagery sourced from nz transport agency under creative commons 3.0 new zealand (by) ... sh1 northern motorway

CONTAINS 2016 AERIAL IMAGERY SOURCED FROM NZ TRANSPORTAGENCY UNDER CREATIVE COMMONS 3.0 NEW ZEALAND (BY)

CONSTELLATION TOPAUL MATTHEW

S (C2PM)

ROSEDALE TO

CONSTELLATION (R2C)

PAUL MATTHEWS TO

ALBANY HIGHWAY (PM2AH)

350

400

450

500

550

600

15450

15500

15550

15600

15650

15700

15750

15800

15850

15900

15950

16000

16050

16100

16150

16200

16250

CONS

TELL

ATIO

N DR

IVE

EXISTING SH18 UPPER HARBOUR HIGHWAY

SH1 NORTHERN MOTORWAY

SUNSET ROAD

MATC

HLIN

E JO

INS

SHEE

T 5

MATCHLINE JOINS SHEET 8

KEY PLAN

13 4 65

8

9

10

2 76MATCHLINE JOINS SHEET 7

CLIENT

DATE TITLE

REVISION DETAILSDATEREV APPROVED

CHECKED

APPROVED

PROJECT

DRAWN

DESIGNED

PROJECT No. WP REVSTAGE TYPE NUMBER DRAWING No.

SCALE SIZEA1

.

Filen

ame:

Plot

Date:

Offic

e:C:

\PW

_WOR

K\D0

3150

96\25

0310

-3PR

E-3D

ES-D

RG-1

451-

1460

.DW

G24

/11/20

16 2:

32:46

p.m.

NZAK

L

NORTHERN CORRIDOR IMPROVEMENTS

STORMWATER CATCHMENT PLANSHEET 6

250310 3PRE 3DES DRG 1456 B

1:1000PRELIMINARY

NOT FOR CONSTRUCTION

B. LI

M. YU

C. McGREGOR J. HIND

J. HIND17/10/16

A 17.10.16 PRELIMINARY ISSUE G. MOOREB 24.11.16 CONSENT ISSUE J. HIND

0

SCALE 1:1000

10 40m20

LEGENDEXISTING DESIGNATION BOUNDARY

ALTERATION TO EXISTINGDESIGNATION BOUNDARY

PROPOSED CATCHMENTEX ALPURT A1 POND 30

PROPOSED CATCHMENTOTEHA VALLEY WETLAND EAST

PROPOSED CATCHMENTOTEHA VALLEY WETLAND WEST

PROPOSED CATCHMENTMCCLYMONTS WETLAND

PROPOSED CATCHMENTGREVILLE WETLAND

PROPOSED CATCHMENTEX ALPURT A1 POND 34

PROPOSED CATCHMENTEX ALPURT A1 POND 35

PROPOSED CATCHMENT GREVILLENORTHBOUND DRY POND

PROPOSED CATCHMENT GREVILLESOUTHBOUND DRY POND

PROPOSED CATCHMENTMORO WETLAND

PROPOSED CATCHMENTCARIBBEAN WETLAND

PROPOSED CATCHMENTROOK WETLAND

PROPOSED CATCHMENTPROPRIETARY DEVICE SF-PM2AH-1

OV2MSUB-CATCHMENT BOUNDARY

PROPOSED TREATMENT

PROPOSED TREATMENT ANDDETENTION

PROPOSED TREATMENT, DETENTIONAND 10-YEAR ATTENUATION

PROPOSED TREATMENT, DETENTIONAND 100-YEAR ATTENUATION

PROPOSED DETENTION AND10-YEAR ATTENUATION

PROPOSED DETENTION AND100-YEAR ATTENUATION

PROPOSED SWALE

HIGH POINT

LOW POINT

ROSEDALE TO CONSTELLATION (R2C)

IMPERVIOUS AREAS (ha)

EXISTING HIGH USE ROAD 3.70NEW HIGH USE ROAD 2.84NEW BUSWAY & SHARED-USE PATH 1.89TOTAL IMP 8.43TREATMENT (ha)

EXISTING HIGH USE ROAD 1.89PROPOSED HIGH USE ROAD 6.54(164% OF NEW HUR TREATED)(100% OF TOTAL HUR TREATED)

CONSTELLATION TO PAUL MATTHEW (C2PM)

IMPERVIOUS AREAS (ha)

EXISTING HIGH USE ROAD 2.40NEW HIGH USE ROAD 1.39NEW BUSWAY & SHARED-USE PATH 0.00TOTAL IMP 3.79TREATMENT (ha)

EXISTING HIGH USE ROAD 0.77PROPOSED HIGH USE ROAD 3.37(187% OF NEW HUR TREATED)(89% OF TOTAL HUR TREATED)

NOTES1. ALL AREAS ARE IN HECTARES UNLESS OTHERWISE SHOWN.2. CATCHMENTS HAVE BEEN DERIVED FROM THE NCI GEOMETRIC MODEL (DATED 20

SEPTEMBER 2016) AND EXISTING SURVEY INFORMATION (TOPOGRAPHIC AND AC GIS).3. CATCHMENT AREAS FOR EXISTING PONDS ARE NOT SHOWN ON THIS DRAWING SET.4. CATCHMENT BOUNDARIES INCLUDE BOTH IMPERVIOUS AND PERVIOUS AREAS.

HIGHLIGHTED AREAS INDICATE IMPERVIOUS AREAS PROPOSED TO BE MITIGATED.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE STORMWATER LAYOUT

PLANS (DRG-1400 SERIES).

EXISTING ARC REFUSE POND - AC (REMOVED)

VOLUMES (m3)

WATER QUALITY VOLUME 1600TOTAL LIVE VOLUME 3400

Page 7: 2 7 3 4 5 6 OTEHA VALLEY TO MCCLYMONTS (OV2M) … · contains 2016 aerial imagery sourced from nz transport agency under creative commons 3.0 new zealand (by) ... sh1 northern motorway

CONTAINS 2016 AERIAL IMAGERY SOURCED FROM NZ TRANSPORTAGENCY UNDER CREATIVE COMMONS 3.0 NEW ZEALAND (BY)

16200

16250

16300

16350

16400

16450

16500

16550

16600

16650

16700

16750

16800

16850

16900

16950

17000

SUNSET ROAD

MATC

HLIN

E JO

INS

SHEE

T 6

KEY PLAN

13 4 65

8

9

10

2 77

CLIENT

DATE TITLE

REVISION DETAILSDATEREV APPROVED

CHECKED

APPROVED

PROJECT

DRAWN

DESIGNED

PROJECT No. WP REVSTAGE TYPE NUMBER DRAWING No.

SCALE SIZEA1

.

Filen

ame:

Plot

Date:

Offic

e:C:

\PW

_WOR

K\D0

3150

96\25

0310

-3PR

E-3D

ES-D

RG-1

451-

1460

.DW

G24

/11/20

16 2:

32:56

p.m.

NZAK

L

0

SCALE 1:1000

10 40m20

NORTHERN CORRIDOR IMPROVEMENTS

STORMWATER CATCHMENT PLANSHEET 7

250310 3PRE 3DES DRG 1457 B

1:1000PRELIMINARY

NOT FOR CONSTRUCTION

B. LI

M. YU

D. MACKINSTOSH J. HIND

J. HIND17/10/16

A 17.10.16 PRELIMINARY ISSUE G. MOOREB 24.11.16 CONSENT ISSUE J. HIND

LEGENDEXISTING DESIGNATION BOUNDARY

ALTERATION TO EXISTINGDESIGNATION BOUNDARY

PROPOSED CATCHMENTEX ALPURT A1 POND 30

PROPOSED CATCHMENTOTEHA VALLEY WETLAND EAST

PROPOSED CATCHMENTOTEHA VALLEY WETLAND WEST

PROPOSED CATCHMENTMCCLYMONTS WETLAND

PROPOSED CATCHMENTGREVILLE WETLAND

PROPOSED CATCHMENTEX ALPURT A1 POND 34

PROPOSED CATCHMENTEX ALPURT A1 POND 35

PROPOSED CATCHMENT GREVILLENORTHBOUND DRY POND

PROPOSED CATCHMENT GREVILLESOUTHBOUND DRY POND

PROPOSED CATCHMENTMORO WETLAND

PROPOSED CATCHMENTCARIBBEAN WETLAND

PROPOSED CATCHMENTROOK WETLAND

PROPOSED CATCHMENTPROPRIETARY DEVICE SF-PM2AH-1

OV2MSUB-CATCHMENT BOUNDARY

PROPOSED TREATMENT

PROPOSED TREATMENT ANDDETENTION

PROPOSED TREATMENT, DETENTIONAND 10-YEAR ATTENUATION

PROPOSED TREATMENT, DETENTIONAND 100-YEAR ATTENUATION

PROPOSED DETENTION AND10-YEAR ATTENUATION

PROPOSED DETENTION AND100-YEAR ATTENUATION

PROPOSED SWALE

HIGH POINT

LOW POINT

NOTES1. ALL AREAS ARE IN HECTARES UNLESS OTHERWISE SHOWN.2. CATCHMENTS HAVE BEEN DERIVED FROM THE NCI GEOMETRIC MODEL (DATED 20

SEPTEMBER 2016) AND EXISTING SURVEY INFORMATION (TOPOGRAPHIC AND AC GIS).3. CATCHMENT AREAS FOR EXISTING PONDS ARE NOT SHOWN ON THIS DRAWING SET.4. CATCHMENT BOUNDARIES INCLUDE BOTH IMPERVIOUS AND PERVIOUS AREAS.

HIGHLIGHTED AREAS INDICATE IMPERVIOUS AREAS PROPOSED TO BE MITIGATED.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE STORMWATER LAYOUT

PLANS (DRG-1400 SERIES).

Page 8: 2 7 3 4 5 6 OTEHA VALLEY TO MCCLYMONTS (OV2M) … · contains 2016 aerial imagery sourced from nz transport agency under creative commons 3.0 new zealand (by) ... sh1 northern motorway

CONT

AINS

2016

AER

IAL I

MAGE

RY S

OURC

ED F

ROM

NZ T

RANS

PORT

AGEN

CY U

NDER

CRE

ATIV

E CO

MMON

S 3.0

NEW

ZEA

LAND

(BY)

CONT

AINS

2016

AER

IAL I

MAGE

RY S

OURC

ED F

ROM

NZ T

RANS

PORT

AGEN

CY U

NDER

CRE

ATIV

E CO

MMON

S 3.0

NEW

ZEA

LAND

(BY)

CONTAINS 2016 AERIAL IMAGERY SOURCED FROM NZ TRANSPORTAGENCY UNDER CREATIVE COMMONS 3.0 NEW ZEALAND (BY)

CONTAINS 2016 AERIAL IMAGERY SOURCED FROM NZ TRANSPORTAGENCY UNDER CREATIVE COMMONS 3.0 NEW ZEALAND (BY)

STOP STOP

CONSTELLATION TO PAULMATTHEWS (C2PM)

PAUL MATTHEWS TOALBANY HIGHWAY (PM2AH)

550

600

650

700

750

800

850 900 950 1000 1050 1100 1150

1200

1250

1300

1350

EXISTING SH18 UPPER HARBOUR HIGHWAY

EXISTING SH18 UPPER HARBOUR HIGHWAY

BARBADOS DRIVE

SH18 UPPER HARBOUR HIGHWAY

CARRIBEAN DRIVE

KEY PLAN

13 4 65

8

9

10

2 7

MATCHLINE JOINS SHEET 9MA

TCHL

INE

JOIN

S SH

EET

68

CLIENT

DATE TITLE

REVISION DETAILSDATEREV APPROVED

CHECKED

APPROVED

PROJECT

DRAWN

DESIGNED

PROJECT No. WP REVSTAGE TYPE NUMBER DRAWING No.

SCALE SIZEA1

.

Filen

ame:

Plot

Date:

Offic

e:C:

\PW

_WOR

K\D0

3150

96\25

0310

-3PR

E-3D

ES-D

RG-1

451-

1460

.DW

G24

/11/20

16 2:

33:06

p.m.

NZAK

L

0

SCALE 1:1000

10 40m20

NORTHERN CORRIDOR IMPROVEMENTS

STORMWATER CATCHMENT PLANSHEET 8

250310 3PRE 3DES DRG 1458 B

1:1000PRELIMINARY

NOT FOR CONSTRUCTION

B. LI

M. YU

D. MACKINSTOSH J. HIND

J. HIND17/10/16

A 17.10.16 PRELIMINARY ISSUE G. MOOREB 24.11.16 CONSENT ISSUE J. HIND

LEGENDEXISTING DESIGNATION BOUNDARY

ALTERATION TO EXISTINGDESIGNATION BOUNDARY

PROPOSED CATCHMENTEX ALPURT A1 POND 30

PROPOSED CATCHMENTOTEHA VALLEY WETLAND EAST

PROPOSED CATCHMENTOTEHA VALLEY WETLAND WEST

PROPOSED CATCHMENTMCCLYMONTS WETLAND

PROPOSED CATCHMENTGREVILLE WETLAND

PROPOSED CATCHMENTEX ALPURT A1 POND 34

PROPOSED CATCHMENTEX ALPURT A1 POND 35

PROPOSED CATCHMENT GREVILLENORTHBOUND DRY POND

PROPOSED CATCHMENT GREVILLESOUTHBOUND DRY POND

PROPOSED CATCHMENTMORO WETLAND

PROPOSED CATCHMENTCARIBBEAN WETLAND

PROPOSED CATCHMENTROOK WETLAND

PROPOSED CATCHMENTPROPRIETARY DEVICE SF-PM2AH-1

OV2MSUB-CATCHMENT BOUNDARY

PROPOSED TREATMENT

PROPOSED TREATMENT ANDDETENTION

PROPOSED TREATMENT, DETENTIONAND 10-YEAR ATTENUATION

PROPOSED TREATMENT, DETENTIONAND 100-YEAR ATTENUATION

PROPOSED DETENTION AND10-YEAR ATTENUATION

PROPOSED DETENTION AND100-YEAR ATTENUATION

PROPOSED SWALE

HIGH POINT

LOW POINT

CONSTELLATION TO PAUL MATTHEW (C2PM)

IMPERVIOUS AREAS (ha)

EXISTING HIGH USE ROAD 2.40NEW HIGH USE ROAD 1.39NEW BUSWAY & SHARED-USE PATH 0.00TOTAL IMP 3.79TREATMENT (ha)

EXISTING HIGH USE ROAD 0.77PROPOSED HIGH USE ROAD 3.37(187% OF NEW HUR TREATED)(89% OF TOTAL HUR TREATED)

PAUL MATTHEWS TO ALBANY HIGHWAY(PM2AH)

IMPERVIOUS AREAS (ha)

EXISTING HIGH USE ROAD 2.36NEW HIGH USE ROAD 2.19NEW BUSWAY & SHARED-USE PATH 0.34TOTAL IMP 4.89TREATMENT (ha)

EXISTING HIGH USE ROAD 0.00PROPOSED HIGH USE ROAD 4.57(209% OF NEW HUR TREATED)(100% OF TOTAL HUR TREATED)

SUB-CATCHMENT TREATED BY SWALESW-C2PM-1 (NO DETENTION ANDATTENUATION)

NO INCREASED IMPERVIOUSAREAS DISCHARGING TOCARIBBEAN DRIVE

UPPER HARBOUR DRIVE TODISCHARGE TO PROPOSEDCULVERT CU-NEW-13A

NO INCREASED IMPERVIOUSAREAS DISCHARGING TOPAUL MATTHEWS ROAD

NOTES1. ALL AREAS ARE IN HECTARES UNLESS OTHERWISE SHOWN.2. CATCHMENTS HAVE BEEN DERIVED FROM THE NCI GEOMETRIC MODEL (DATED 20

SEPTEMBER 2016) AND EXISTING SURVEY INFORMATION (TOPOGRAPHIC AND AC GIS).3. CATCHMENT AREAS FOR EXISTING PONDS ARE NOT SHOWN ON THIS DRAWING SET.4. CATCHMENT BOUNDARIES INCLUDE BOTH IMPERVIOUS AND PERVIOUS AREAS.

HIGHLIGHTED AREAS INDICATE IMPERVIOUS AREAS PROPOSED TO BE MITIGATED.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE STORMWATER LAYOUT

PLANS (DRG-1400 SERIES).

PROPOSED CONSTELLATION DRYPOND TO REPLACE FLOW CONTROLFUNCTIONS OF EXISTING ACCONSTELLATION POND, ARCREFUSE POND & MORO POND

CARIBBEAN WETLANDCATCHMENT AREA (ha)

IMPERVIOUS 3.09PERVIOUS 2.16AREA TREATED (ha)

HIGH USE ROADS POST-DEV 3.09VOLUMES (m3)

WATER QUALITY VOLUME 470DETENTION VOLUME 250TOTAL LIVE VOLUME 2400

CONSTELLATION HIGH-LEVEL DRY PONDVOLUMES (m3)

TOTAL LIVE VOLUME 8500

EXISTING CONSTELLATION POND - AC(REMOVED)

VOLUMES (m3)

WATER QUALITY VOLUME 0TOTAL LIVE VOLUME 19100

TREATMENT SWALE SW-C2PM-1AREA TREATED (ha)

TREATMENT - IMP 0.28

Page 9: 2 7 3 4 5 6 OTEHA VALLEY TO MCCLYMONTS (OV2M) … · contains 2016 aerial imagery sourced from nz transport agency under creative commons 3.0 new zealand (by) ... sh1 northern motorway

CONTAINS 2016 AERIAL IMAGERY SOURCED FROM NZ TRANSPORTAGENCY UNDER CREATIVE COMMONS 3.0 NEW ZEALAND (BY)

CONTAINS 2016 AERIAL IMAGERY SOURCED FROM NZ TRANSPORTAGENCY UNDER CREATIVE COMMONS 3.0 NEW ZEALAND (BY)

PAUL MATTHEWS TOALBANY HIGHWAY (PM2AH)

1300

1350

1400

1450

1500

1550

1600

1650

1700 1750 1800 1850

1900

1950

2000

2050

2100

SH18 UPPER HARBOUR HIGHWAY

PAUL MATTHEWS ROAD

SH18 UPPER HARBOUR HIGHWAY

SATURN PLACE

OMEGA STREET

WILLIAM PICKERING DRIVE

BLUEBIRD CRES

UNSW

ORTH

DRI

VE

ALEXANDRA STREAM

KEY PLAN

13 4 65

8

9

10

2 7

MATCHLINE JOINS SHEET 10MA

TCHL

INE

JOIN

S SH

EET

8

9

CLIENT

DATE TITLE

REVISION DETAILSDATEREV APPROVED

CHECKED

APPROVED

PROJECT

DRAWN

DESIGNED

PROJECT No. WP REVSTAGE TYPE NUMBER DRAWING No.

SCALE SIZEA1

.

Filen

ame:

Plot

Date:

Offic

e:C:

\PW

_WOR

K\D0

3150

96\25

0310

-3PR

E-3D

ES-D

RG-1

451-

1460

.DW

G24

/11/20

16 2:

33:16

p.m.

NZAK

L

0

SCALE 1:1000

10 40m20

NORTHERN CORRIDOR IMPROVEMENTS

STORMWATER CATCHMENT PLANSHEET 9

250310 3PRE 3DES DRG 1459 B

1:1000PRELIMINARY

NOT FOR CONSTRUCTION

B. LI

M. YU

D. MACKINSTOSH J. HIND

J. HIND17/10/16

A 17.10.16 PRELIMINARY ISSUE G. MOOREB 24.11.16 CONSENT ISSUE J. HIND

LEGENDEXISTING DESIGNATION BOUNDARY

ALTERATION TO EXISTINGDESIGNATION BOUNDARY

PROPOSED CATCHMENTEX ALPURT A1 POND 30

PROPOSED CATCHMENTOTEHA VALLEY WETLAND EAST

PROPOSED CATCHMENTOTEHA VALLEY WETLAND WEST

PROPOSED CATCHMENTMCCLYMONTS WETLAND

PROPOSED CATCHMENTGREVILLE WETLAND

PROPOSED CATCHMENTEX ALPURT A1 POND 34

PROPOSED CATCHMENTEX ALPURT A1 POND 35

PROPOSED CATCHMENT GREVILLENORTHBOUND DRY POND

PROPOSED CATCHMENT GREVILLESOUTHBOUND DRY POND

PROPOSED CATCHMENTMORO WETLAND

PROPOSED CATCHMENTCARIBBEAN WETLAND

PROPOSED CATCHMENTROOK WETLAND

PROPOSED CATCHMENTPROPRIETARY DEVICE SF-PM2AH-1

OV2MSUB-CATCHMENT BOUNDARY

PROPOSED TREATMENT

PROPOSED TREATMENT ANDDETENTION

PROPOSED TREATMENT, DETENTIONAND 10-YEAR ATTENUATION

PROPOSED TREATMENT, DETENTIONAND 100-YEAR ATTENUATION

PROPOSED DETENTION AND10-YEAR ATTENUATION

PROPOSED DETENTION AND100-YEAR ATTENUATION

PROPOSED SWALE

HIGH POINT

LOW POINT

PAUL MATTHEWS TO ALBANY HIGHWAY(PM2AH)

IMPERVIOUS AREAS (ha)

EXISTING HIGH USE ROAD 2.36NEW HIGH USE ROAD 2.19NEW BUSWAY & SHARED-USE PATH 0.34TOTAL IMP 4.89TREATMENT (ha)

EXISTING HIGH USE ROAD 0.00PROPOSED HIGH USE ROAD 4.57(209% OF NEW HUR TREATED)(100% OF TOTAL HUR TREATED)

NOTES1. ALL AREAS ARE IN HECTARES UNLESS OTHERWISE SHOWN.2. CATCHMENTS HAVE BEEN DERIVED FROM THE NCI GEOMETRIC MODEL (DATED 20

SEPTEMBER 2016) AND EXISTING SURVEY INFORMATION (TOPOGRAPHIC AND AC GIS).3. CATCHMENT AREAS FOR EXISTING PONDS ARE NOT SHOWN ON THIS DRAWING SET.4. CATCHMENT BOUNDARIES INCLUDE BOTH IMPERVIOUS AND PERVIOUS AREAS.

HIGHLIGHTED AREAS INDICATE IMPERVIOUS AREAS PROPOSED TO BE MITIGATED.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE STORMWATER LAYOUT

PLANS (DRG-1400 SERIES).

ROOK RESERVE

BLUEBIRD RESERVE

ROOK WETLANDCATCHMENT AREA (ha)

IMPERVIOUS 2.93PERVIOUS 1.67AREA TREATED (ha)

HIGH USE ROADS POST-DEV 2.85VOLUMES (m3)

WATER QUALITY VOLUME 355DETENTION VOLUME 480TOTAL LIVE VOLUME 2005

NO ADDITIONAL IMPERVIOUS AREADISCHARGING TO AC PIPE NETWORKON PAUL MATTHEWS ROAD

PROPRIETARY DEVICE SF-PM2AH-1CATCHMENT AREA (ha)

IMPERVIOUS 1.97PERVIOUS 0.06AREA TREATED (ha)

EXISTING HIGH USE ROAD 0.00PROPOSED HIGH USE ROAD 1.72

Page 10: 2 7 3 4 5 6 OTEHA VALLEY TO MCCLYMONTS (OV2M) … · contains 2016 aerial imagery sourced from nz transport agency under creative commons 3.0 new zealand (by) ... sh1 northern motorway

CONTAINS 2016 AERIAL IMAGERY SOURCED FROM NZ TRANSPORTAGENCY UNDER CREATIVE COMMONS 3.0 NEW ZEALAND (BY)

PAUL MATTHEWS TO

ALBANY HIGHWAY (PM2AH)

2050

2100

2127.648

WILLIAM PICKERING DRIVE

SH18 UPPER HARBOUR HIGHWAY

BUSH ROAD

ALBANY HIGHWAY

ALEXANDRA STREAM TRIBUTARY

KEY PLAN

13 4 65

8

9

10

2 7

MATC

HLIN

E JO

INS

SHEE

T 9

10

CLIENT

DATE TITLE

REVISION DETAILSDATEREV APPROVED

CHECKED

APPROVED

PROJECT

DRAWN

DESIGNED

PROJECT No. WP REVSTAGE TYPE NUMBER DRAWING No.

SCALE SIZEA1

.

Filen

ame:

Plot

Date:

Offic

e:C:

\PW

_WOR

K\D0

3150

96\25

0310

-3PR

E-3D

ES-D

RG-1

451-

1460

.DW

G24

/11/20

16 2:

33:26

p.m.

NZAK

L

0

SCALE 1:1000

10 40m20

NORTHERN CORRIDOR IMPROVEMENTS

STORMWATER CATCHMENT PLANSHEET 10

250310 3PRE 3DES DRG 1460 B

1:1000PRELIMINARY

NOT FOR CONSTRUCTION

B. LI

M. YU

D. MACKINSTOSH J. HIND

J. HIND17/10/16

A 17.10.16 PRELIMINARY ISSUE G. MOOREB 24.11.16 CONSENT ISSUE J. HIND

LEGENDEXISTING DESIGNATION BOUNDARY

ALTERATION TO EXISTINGDESIGNATION BOUNDARY

PROPOSED CATCHMENTEX ALPURT A1 POND 30

PROPOSED CATCHMENTOTEHA VALLEY WETLAND EAST

PROPOSED CATCHMENTOTEHA VALLEY WETLAND WEST

PROPOSED CATCHMENTMCCLYMONTS WETLAND

PROPOSED CATCHMENTGREVILLE WETLAND

PROPOSED CATCHMENTEX ALPURT A1 POND 34

PROPOSED CATCHMENTEX ALPURT A1 POND 35

PROPOSED CATCHMENT GREVILLENORTHBOUND DRY POND

PROPOSED CATCHMENT GREVILLESOUTHBOUND DRY POND

PROPOSED CATCHMENTMORO WETLAND

PROPOSED CATCHMENTCARIBBEAN WETLAND

PROPOSED CATCHMENTROOK WETLAND

PROPOSED CATCHMENTPROPRIETARY DEVICE SF-PM2AH-1

OV2MSUB-CATCHMENT BOUNDARY

PROPOSED TREATMENT

PROPOSED TREATMENT ANDDETENTION

PROPOSED TREATMENT, DETENTIONAND 10-YEAR ATTENUATION

PROPOSED TREATMENT, DETENTIONAND 100-YEAR ATTENUATION

PROPOSED DETENTION AND10-YEAR ATTENUATION

PROPOSED DETENTION AND100-YEAR ATTENUATION

PROPOSED SWALE

HIGH POINT

LOW POINT

PAUL MATTHEWS TO ALBANY HIGHWAY(PM2AH)

IMPERVIOUS AREAS (ha)

EXISTING HIGH USE ROAD 2.36NEW HIGH USE ROAD 2.19NEW BUSWAY & SHARED-USE PATH 0.34TOTAL IMP 4.89TREATMENT (ha)

EXISTING HIGH USE ROAD 0.00PROPOSED HIGH USE ROAD 4.57(209% OF NEW HUR TREATED)(100% OF TOTAL HUR TREATED)

NOTES1. ALL AREAS ARE IN HECTARES UNLESS OTHERWISE SHOWN.2. CATCHMENTS HAVE BEEN DERIVED FROM THE NCI GEOMETRIC MODEL (DATED 20

SEPTEMBER 2016) AND EXISTING SURVEY INFORMATION (TOPOGRAPHIC AND AC GIS).3. CATCHMENT AREAS FOR EXISTING PONDS ARE NOT SHOWN ON THIS DRAWING SET.4. CATCHMENT BOUNDARIES INCLUDE BOTH IMPERVIOUS AND PERVIOUS AREAS.

HIGHLIGHTED AREAS INDICATE IMPERVIOUS AREAS PROPOSED TO BE MITIGATED.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE STORMWATER LAYOUT

PLANS (DRG-1400 SERIES).