ELECTRICAL SAFETY-
STATUTES, MANUALS
& PROCEDURES
A presentation by
C.P.Geor e
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 2/72
ELECTRICAL SAFETY- STATUTES,
MANUALS & PROCEDUR ES
1. Indian Electricity Act 2003
2. IndianEl
ectricity Rules
3. Safety Systems & procedures
4. Accident prevention methods
5. Safety codes and practices and lack thereof
6. Safety Gadgets
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 3/72
IE Act 2003
Section 53 of the Act provides that ³TheCentral Electricity Authority may in
consultation with the State Government
specify suitable measures for:-
(a) Protecting the public (including the
persons engaged in the generation,
transmission, distribution or trading) from
dangers arising from the generation,transmission, distribution or trading or use of
electricity supplied or installation,
maintenance or use of any electric line or
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 4/72
53 (b) Eliminating or reducing the risksof personal injury to any person, or
damage to property of any person or
interference with use of such property.
(c) Prohibiting the supply or
transmission of electricity except bymeans of a system which conforms to
the specifications as may be specified.
IE Act 2003- Contd.
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 5/72
53 (d) Giving notice in the specified form tothe Appropriate Commission and Electrical
Inspector, of accidents and failures of
supplies or transmissions of electricity. (e) Specifying action to be taken in relation
to any electric line or electrical plant, or any
electrical appliance under the control of aconsumer for the purpose of eliminating or
reducing the risk of personal injury, or
damage to the property or interference with
IE Act 2003- Contd.
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 6/72
Section 73(c) relates to CEA specifying thesafety requirements for construction, operation
and maintenance electric plants and electric
lines.
Section 161 relates to reporting of accidents
and inquiry of accident. Section 162 deals with appointment of Chief
Electrical Inspector and Electrical Inspector.
IE Act 2003- Contd.
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 7/72
Section 185(1) is regarding repeal of the IndianElectricity Act, 1910, the Electricity (Supply)
Act, 1948 and the Electricity Regulatory
Commissions Act, 1998.
Section 185(2) (C) states that Indian Electricity
Rules, 1956 made under Section 37 of theIndian Electricity Act, 1910 as it stood before
such repeal shall continue to be in force till the
regulations under Section 53 of this Act are
IE Act 2003- Contd.
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 8/72
In exercise of powers, conferred Section 37
of Indian Electricity Act 1910, Electricity
Rules were made by Central ElectricityBoard.
These Rules have been saved in the
Electricity Act, 2003 Section 185 and shall
continue to be enforced till regulations/rules
under Section 53 of the Electricity Act 2003
IE Rule 1956
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 9/72
IE Rules
1. Preliminary
Covering Definitions &
Authorizations
2. InspectorsCovering the Authority &
related aspects of Electrical
Inspectors
3. License
Covering the procedure
of Obtaining the License
for Supply of Electricity
4. General SafetyRequirements
Covering the safety aspects
pertaining to Electric
Supply Lines & Apparatus
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 10/72
IE Rules5. General Conditions
relating to Supply & Use
of Energy
Covering the Power Supply
aspects related to
Consumers
6. Electric Supply Lines,
Systems & Apparatus for
Low & Medium Voltages
Covering Earthing Systems
& Testing
7. Electric Supply Lines,
Systems & Apparatus for
High & Extra High
Voltages
Covering the Approvals.
O&M, Testing, Earthing &
other aspects
8. Overhead Lines
Covering the Statutory
Requirements forOverhead Lines of all
voltag e levels
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 11/72
IE Rules
10. Additional Precautions tobe adopted in Mines & Oil
Fields
Covering the Electrical
installations / services in Mines
& Coal Fields11. Miscellaneous
Covering the penalties,
Relaxation provisions,
Standard forms & training
9. Electrical TractionCovering the Electric
Traction System
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 12/72
General Safety Requirement20 rules from Nos. ² 29 to 46
Rule
No.Description Coverage
29
Construction,
installation, protection,
operation &
maintenance of
electric supply lines& apparatus
All electric Supply lines
& apparatus to be of sufficient rating for power,
insulation, fault current &
mechanical strength
Should conform to BISspecifications
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 13/72
30 Service Lines
& apparatus on
Consumer's
premises
The Electrical lines / apparatus in
consumer¶s premises under
supplier¶s control to be safe
Service Lines to be insulated &secured under all conditions
The same applies to the
consumer¶s part as well
31 Cut-out onconsumer¶s
premises
Supplier to provide the suitablecut-out to each conductor other
than the earthed neutral or earthed
conductor & so is the owner
General Safety Requirement
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 14/72
General Safety Requirement20 rules from Nos. ² 29 to 46
RuleNo.
Description Coverage
32
Identification of
earthed & earthedneutral conductors
& position of
switches & cut-
outs there-in
Indication of a permanent nature to be
provided by the owner of the earthed or
earthed conductor
No cut-out other then a linked switch
should operate simultaneously other than
testing or if the switch is used to control a
generator / transformer
33
Earthed Terminal
on Consumer¶s
premises
Supplier to maintain the accessible
earthed terminal at consumer¶s premises
Consumer should take precautions torotect the same
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 15/72
34 Accessibility
to bareconductors
The owner of the conductor to ensure
that there are no bare live conductors
Live part of the conductors to be
exposed only to the switches that can
render them dead
General Safety RequirementRule
No.
Description Coverage
35 Danger Notices
Danger Notice to be provided for all theapparatus at the conspicuous places so
that it is easily visible to all the
personnel
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 16/72
36 Handling of
electric
Supply Lines
& apparatus
Before handling a line precautions of earthing
or other to be taken to discharge it electrically
& to avoid the accidental charging. All persons
should have adequate tools & all safety gadgets
No person should work on live lines
All telecommunication line on supports
carrying HV or EHV lines to be deemed as HV
Line
37 Supply to
vehicles,
cranes etc.
The owner of such apparatus using external
source should provide adequate cut-out
switches
RuleNo.
Description Coverage
General Safety Requirement
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 17/72
General Safety Requirement20 rules from Nos. ² 29 to 46
RuleNo.
Description Coverage
38Cables for portable or
transportable
apparatus
Heavily insulated & with adequate mech.
Strength cables to be provided for transportable
apparatus Metallic covering to be provided wherever
applicable & for 1-ph & 3- ph wiring on LT
should have 3 / 4 cores with one easily
identifiable earth wire
39
Cable
protected by
bituminous
material
Other types of pipes (if metallic is not
available) to be used for the cables
Should be tested periodically & the test results
duly recorded by the supplier / owner
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 18/72
General Safety Requirement
Rule No.
Description Coverage
40 Street Boxes Street Boxes should be gas / water proof
Distinct sources in street boxes to be made
easily identifiable & adequate safe supports
for HV/EHV systems
Periodic checking should be done & the
street boxes should have proper gas passing
system for any fire/f lash-overs & should have proper covers etc
41 Distinction of
different
circuits
Permanent indication for the distinct circuits
should be their for the apparatus
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 19/72
General Safety Requirement20 rules from Nos. ² 29 to 46
Rule No. Description Coverage
41 A
Distinction of
theinstallation
having more
than one feed
The installation with more then one fedshould be given a permanent indication for
easy distinction
42Accidental
Charge
The circuits should be arranged in such a
manner that no accidental charging can be
done
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 20/72
General Safety Requirement
Rule No. Description Coverage
43
Provisions
applicable to
protectiveequipment
Fire Buckets, Fire extinguishers should
be conspicuously placed & tested
First Aid boxes & other things proper ly
marked & equipped
Gas mask for Gen. Stn > 5 MW & for
Transformer > 5 MVA
44
Instruction
for
restoration of
persons
suffering
from shock
Instructions in Eng./Hindi to be placed
conspicuously & distributed to all personnel& made them acquainted about
the same
Artificial respirator for every manned
substation
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 21/72
General Safety Requirement
Rule
No.Description Coverage
44 AIntimation of
Accident
The person not below JE to send the
telegraphic report of accident to the
Inspector within 24 hrs and a written
report within 48 hrs of occurrence
45
Precautions to be
adopted by the
consumers,
owners, electrical contractors,
electrical
workmen &
suppliers
Licensed electrical contractor should
execute the installation / change in
network / circuit
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 22/72
General Safety Requirement
Rule
No.Description Coverage
46
Periodical
inspection &
Testing of installation
Any installation should be inspected
within every five years
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 23/72
PERMIT TO WORK
70 mm
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 24/72
Responsibilities
Permit holder is responsible for Contacting the Area Control (SS/CR) to report
on the applicable permit
Co-coordinating equipment conditions & work activities with all job site supervisors
Communicating the conditions of circuits or equipment to all crews/Job site supervisors
Informing the Area Control of any permittransfers to other authorized personal
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 25/72
Notifying the Area Control if there is a changein the scope of work or job conditions
Contacting the Area Control to report clear of
the applicable permit as soon as the work is
completed
Advising the Area Control of any special
circumstances as a result of the work performed
that may affect the operation of the system
Responsibilities
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 26/72
Ensuring that it is safe for the
circuit/equipment to be re-energized
Returning all switching devices &
equipment back to the configurationsfound when accepting the permit
Responsibilities
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 27/72
Reviewing & answering that all
applicable work practices are followed
Responsible for the safety of all
personnel at the work location & for
the overall coordination & supervisionof the job
Responsibilities
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 28/72
Area Control is responsible for
Ensuring that the person requesting the
permit is authorized to receive the permit
Authorizing permits
Responsibilities
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 29/72
T he Departments that utilize the permit & tagging
system are responsible for
Ensuring that revisions/updates to the authorized
personnel list are completed
Ensuring that initial training & annual refresher
training of permit & tagging procedure are
completed Ensuring that personal they have authorized are
trained & qualified as permit holders
Responsibilities
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 30/72
Authorized Personnel List
Proper & safe operations on the electric systemare the qualifications of the people who areresponsible for performance of the work.
It is important that people in charge of jobs be
knowledgeable of the hazards & means for providing safe conditions to accomplish thenecessary work.
For this reason, only authorized people will be permitted to request permits to work onsubstation premises or to perform work oncircuits requiring Circle Control involvement.
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 31/72
Each Zonal manager (Exe. Engineer) shall
determine the qualifications of the personnel
authorized as Permit Holders to hold permits
within substation premises, on circuits or onfeeders.
They shall submit to HOG (Power System
Control) all changes to the Authorized Personnel List. Each Zone shall review the list as required
but not less than once per year.
Authorized Personnel List
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 32/72
Description of tags
DO NOT OPERATE (DOP) Tag
DOP tags are associated with the outage of thecircuit/equipment for which the PTW is obtained
from the Circle Control.
DOP will have the same number as the PTW for the circuit/equipment.
DOP has to be filled by the permit holder and to
be necessarily placed at all theisolating/grounding points for the
circuits/equipments that are taken out or isolated
from the system & are not energized.
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 33/72
The Permit Holder to notify the Circle Control
about the number of DOP tags to be placed on
isolating/grounding points for the
circuits/equipments that are taken out or isolatedfrom the system & are not energized.
DOP tags are to be attached to open switches,
breakers, isolators, disconnects. Jumpers, taps,GO Switches & other means through which
known sources of electric energy may be supplied
to the lines & equipment.
Description of tags
DO NOT OPERATE (DOP) Tag
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 34/72
The DOP tag acts as a lock. Once the tag is
attached to a piece of equipment that equipment
cannot be connected to known sources of electric
energy not even for test purposes.
Switching personnel are responsible for
placement & removal of DOP tags.
Description of tags
DO NOT OPERATE (DOP) Tag
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 35/72
TAG
Front Back
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 36/72
CAUTION OR DER TAG A Caution Order tag may be used in
conjunction with the PTW
A Caution Order shall be used to providegeneral information on the status of new,abandoned, or abnormal equipment, cables,abnormal isolating features and Transformer and breaker alarms
The caution order is used to notify anyabnormal condition of the equipment.
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 37/72
PURPOSE1. Caution Order tag is used to indicate abnormal
conditions such as failure, hazards, relay
inoperative, equipment not in service, temporary
changes in operating rules etc. This tag can be
placed on either energised or de-energised
equipment. This Caution Order tag may be
issued either to a person or placed on equipmentto designate a particular operating condition.
CAUTION OR DER TAG
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 38/72
(2) DESIGNATING EQUIPMENTFAILURE/DEFECT.
Equipment failures/defects are designated by placing Caution Order tags on control switches,
valves etc. until the equipment is taken out for inspection and repairs.
(3) DESIGNATING HAZARDS,
CAUTIONING AGAINST OPERATION OFSWITCHES, DISCONNECTS, VALVES ANDPUMPS (WHICH PROHIBITS THEOPERATION OF EQUIPMENT)
CAUTION OR DER TAG
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 39/72
(4) ISSUING TO A PERSON
The Caution Order may be issued to a personwhen he/she is working near energised lines or equipment and there is a possibility that the
working personnel accidentally come in contactor foul the equipment.
While getting a caution order issued, theworking party should indicate to the operating
party the possible hazards by way of nature of caution and by way of nature of work.
Contd.
CAUTION OR DER TAG
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 40/72
Contd..
For transmission lines with auto-re-
closing facility, when a Caution Order
of this nature is issued, the re-closing
gear is to be made INOPERATIVE.
CAUTION OR DER TAG
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 41/72
It should be clear ly understood that
A CAUTION OR DER ISSUED TO A PERSON
NEITHER AUTHORISES HIM/HER TOOPERATE THE EQUIPME NT NOR DOES IT
PROTECT HIM/HER FROM OPERATION OR
E NERGISING OF THE EQUIPME NT EXCEPT
WHE N AN AUTOMATIC TRIP OUT OCCURS.
CAUTION OR DER TAG
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 42/72
CAUTION OR DER
Front Back
Ci l t l d id &
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 43/72
Check the
Status & decide
for the Outage of
the Equipment
required
Request Circle Control
for Outage, 2 days in
advance through
mail/written request
Circle control decides &
authorize for outage with
a PTW No. Circle Control
to confirm the number of
DOP tags & the no. of
points where DOP tags
are to be placed
Give the list
of outage with
the area
affected to
Corp. Comm.
For
information to
consumers
SANCHAR &
FM/PRESS
release is done to
inform the
consumers
After getting the PTW
No. the PTW holder
distribute the jobs to
labor with clear
instructions of puttingthe DOP tags at
isolation points &
Back feed the area
All material
& safety
gears to be
arranged
prior to
starting thework
Concerned
site to be
cordonedoff
FLOW CHART EXPLAINING
THE PROCEDURE TO OBTAIN
PTW & USAGE OF DO NOT
OPERATE TAGS
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 44/72
Energize the
equipment &
restore the
power supply
or normalize
the Back feed
Remove all the DOPtags from the isolating
points & un-cordon
the equipment
Inform Circle
Control after completing the
work & clear the
PTW before
energizing the
equipment
Work to be done withall the isolations done
& the relevant DOP
Tags as mentioned to
the Circle Control to
be put at the isolating
point
O i Di ib i h h
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 45/72
Outages in Distribution where the usage
of Safety Tags is warranted
1.Outage of the 11 kv Overhead Feeder (Isolationfrom Grid)
2.Outage of the 11 kv Underground (Cable) Feeder
(Isolation from Grid)3.Outage of the 11 kv Overhead Feeder Section
between Two substations
4.Outage of the 11 kv Overhead Feeder Section between Two substations when Isolations are done by removing the jumpers on the poles
5.Outage of the 11 kv Underground Cable Section
between Two substations
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 46/72
6. Outage of the 11 kv HT Switchgear of a substation7. Outage of the 11/0.433 kv Distribution
Transformer
8. Outage of the LT main feeder cable from thesubstation
9. Outage of the LT Overhead Feeder
10. Outage of the LT Overhead Feeder section where
Isolations are to be done by removing the jumperson the poles
(This is not t he exhaust ive list, and t he Safety
Taggin g & PTW s y st em is Applicable to all t he
Outages in Distribution where the usage
of Safety Tags is warranted
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 47/72
11 KV Bus at the
Grid Station 11 KV
440 V
1st Switching Station
Distribution Transformer
Outage of the 11 kv Overhead
Feeder (Isolation from Grid)
Do Not Operate
(DOP) tags to be put
on these points
PTW for the outage
of this 11 kv feeder istaken
Outage of the 11 kv
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 48/72
11 KV Bus at the
Grid Station 11 KV
440 V
1st Switching Station
Distribution Transformer
Outage of the 11 kv
Underground (Cable) Feeder
(Isolation from Grid)
Do Not Operate
(DOP) tags to be put
on these points
PTW for the
outage of this
11 kv
Underground
(Cable) feeder
is taken
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 49/72
11 KV Bus at the
Grid Station 11 KV
440 V
1st Switching Station
Distribution Transformer
Outage of the 11 kv Overhead Feeder
Section between Two substations
Do Not Operate
(DOP) tags to be put
on these points
PTW for the
outage of this 11kv Overhead
Section is taken
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 50/72
11 KV Bus at the
Grid Station 11 KV
440 V
1st Switching Station
Distribution Transformer
Outage of the 11 kv Overhead Feeder
Section between Two substations when Isolations are
done by removing the jumpers on the poles
Do Not Operate (DOP)
tags to be put on thesepoles where jumpers are
removed to isolate
PTW for the
outage of this 11kv Overhead
Section is taken
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 51/72
11 KV Bus at the
Grid Station 11 KV
440 V
1st Switching Station
Distribution Transformer
Outage of the 11 kv Underground Cable
Section between Two substations
Do Not Operate
(DOP) tags to be put
on these points
PTW for the
outage of this 11kv Overhead
Section is taken
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 52/72
11 KV Bus at the
Grid Station 11 KV
440 V
1st Switching Station
Distribution Transformer
Outage of the 11 kv HT Switchgear
of a substation
Do Not Operate
(DOP) tags to be put
on these points
PTW for the outage
of this 11 kvSwitchgear in the s/s
is taken
Backend
assembly
flashover or
others
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 53/72
11 KV Bus at the
Grid Station 11 KV
440 V
1st Switching Station
Distribution Transformer
Outage of the 11/0.433 kv
Distribution Transformer
Do Not Operate
(DOP) tags to be put
on these points
PTW for the outage
of this DT is taken
Usage of Safety Tags in Distribution (Zones)
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 54/72
11 KV Bus at the
Grid Station 11 KV
440 V
1st Switching Station
Distribution Transformer
Outage of the LT main feeder
cable from the substation
Cut Out Point at LT
PTW for the outage
of this LT O/H feeder
is taken
Do Not Operate (DOP)
tags to be put on the
ACB & the pole where
jumpers are removed to
isolate
U sage of Safety T ags in Distribution (Zones)
Usage of Safety Tags in Distribution (Zones)
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 55/72
11 KV Bus at the
Grid Station 11 KV
440 V
1st Switching Station
Distribution Transformer
Outage of the LT Overhead Feeder
Cut Out Point at LT
PTW for the outage
of this LT O/H feeder
is taken
Do Not Operate (DOP)
tags to be put on the
ACB & the pole where
jumpers are removed to
isolate
U sage of Safety T ags in Distribution (Zones)
U sage of Safety T ags in Distribution (Zones)
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 56/72
11 KV Bus at the
Grid Station 11 KV
440 V
1st Switching Station
Distribution Transformer
Outage of the LT Overhead Feeder section where
Isolations are to be done by removing the
jumpers on the poles
Cut Out Point at LT
PTW for the
outage of this LT
O/H feeder is
taken
Do Not Operate (DOP)
tags to be put on these
poles where jumpers are
removed to isolate
g f f y g ( )
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 57/72
Usage of Caution Order
Distribution Transformer
ACB ACB
Case of ACB Burning
ACB Bypassed to restore the supply
Caution Order to be put at this point
after taking the number from Circle
Control Indicating the abnormal
Condition that the ACB is bypassed but
the supply is restored & the concerned
equipment (ACB) is energized
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 58/72
Outages in Systems where the usage
of Safety Tags is warranted
1.Outage of Power Transformer (66/33 kv, 66/11
kv, 33/11 kv & 11/0.433 kv Stn. Tr.)
2.Outage of Transmission Lines3.Outage of 66/33 kv Bus Bars at the Grid
Substation
4.Outage of 66/33 kv PTs5.Outage of 66/33 kv CTs
6.Outage of HT (66/33 kv) Breaker
i h h
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 59/72
Outages in Systems where the usage
of Safety Tags is warranted
7. Outage of LT (33/11 kv) Breaker
8. Outage of GOD / Earth Switch / Isolators
9. Outage of 11 kv Bus
10. Outage of 11 kv Outgoing Feeder Breaker
11. Outage of Capacitor Banks
(This is not t he exhaust ive list, and t he Safety
Taggin g & PTW s y st em is Applicable to all t he
out ages.)
O tage of Po er Transformer
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 60/72
Outage of Power Transformer
(66/33 kv, 66/11 kv, 33/11
kv)66/33 kv Bus - I
66/33 kv Bus -I I
PTW for
the outage
of this
Power
Transforme
r is taken
To 33/11 kv Bus
Do Not Operate (DOP)
tags to be put on these
points of isolation for
the Power Transformer
O f 66 33 k
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 61/72
Outage of 66 or 33 kv
Transmission Lines
PTW for the outage of this 33 or 66
kv Transmission Line is taken
Do Not Operate (DOP)
tags to be put on these
points of isolation for
the 33 or 66 kv
Transmission Line
Grid Station No - 1 Grid Station No - 2
Outage of Power Transformer
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 62/72
Outage of Power Transformer
(66/33 kv, 66/11 kv, 33/11
kv & 11/0.433 kv Stn. Tr.)66/33 kv Bus - I
66/33 kv Bus -I I
PTW for the
outage of this
Station (Local)
Transformer is
taken
Do Not Operate (DOP)
tags to be put on these
points of isolation for
the Station (Local)
Transformer
11 kv Bus 440 v Bkr
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 63/72
Outage of 66 or 33 kv Bus
Bars at the Grid Substation66/33 kv Bus - I
66/33 kv Bus -I I
PTW for the
outage of this
66 or 33 kv Busis taken
Do Not Operate (DOP)tags to be put on these
points of isolation for
the Bus No. - II
11 kv Bus 440 v Bkr
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 64/72
Outage of 66 or 33 kv Bus PT
at the Grid Substation66/33 kv Bus - I
66/33 kv Bus -I I
PTW for the
outage of this
66 or 33 kv PT
is taken
Do Not Operate (DOP)
tags to be put on thesepoints of isolation for
the PT
11 kv Bus 440 v Bkr
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 65/72
Outage of 66 or 33 kv CT at
the Grid Substation66/33 kv Bus - I
66/33 kv Bus -I I
PTW for
the outage
of this 66
or 33 kv
CT istaken
Do Not Operate (DOP)tags to be put on these
points of isolation for
the CT
11 kv Bus 440 v Bkr
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 66/72
Outage of (HT) 66 or 33 kv
Breaker Grid Substation66/33 kv Bus - I
66/33 kv Bus -I I
PTW for
the outage
of this 66
or 33 kvBreaker is
taken
Do Not Operate (DOP)tags to be put on these
points of isolation for
the 66 or 33 kv Breaker
11 kv Bus 440 v Bkr
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 67/72
Outage of (LT) 11 kv
Breaker Grid Substation66/33 kv Bus - I
66/33 kv Bus -I I
PTW for the outage
of this 11
kv
Breaker is
taken
Do Not Operate (DOP)tags to be put on these
points of isolation for
the 11 kv Breaker
11 kv Bus 440 v Bkr
O t f GOD / E th S it h
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 68/72
Outage of GOD / Earth Switch
/ Isolators66/33 kv Bus - I
66/33 kv Bus -I I
PTW for
the outage
of this
Isolator
(GOD)
taken
Do Not Operate (DOP)tags to be put on these
points of isolation for
the Isolator (GOD) that is
taken out.
NOTE :- It should be
noted that all the
Isolators as pointed by
YELLOW arrow should be in OPEN condition &
that the Bus ± II should
be in de-energized state
11 kv Bus 440 v Bkr
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 69/72
Outage of (HT) 11 kv Bus
at the Grid Substation66/33 kv Bus - I
66/33 kv Bus -I I
PTW for the outage of this 11 kv Bus is taken
Do Not
Operate
(DOP) tags tobe put on
these points
of isolation
for the 11 kv
Bus
11 kv Bus 440 v Bkr
utage o v
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 70/72
Outgoing Feeder
Breaker at the Grid
Substation66/33 kv Bus - I
66/33 kv Bus -I I
PTW for the outage of this 11 kv Outgoing
Breaker Feeder is taken
Do Not Operate
(DOP) tags to beput on these
points of isolation
for the 11 kv
Outgoing Feeder
Breaker
11 kv Bus 440 v Bkr
Outage of 33 kv Capacitor
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 71/72
Outage of 33 kv Capacitor
Bank at the Grid
Substation66 kv Bus - I
66 kv Bus -I I
PTW for the
outage of
this 33 kv
Capacitor
Bank is taken
Do Not Operate
(DOP) tags to be
put on these
points of isolation
for the 33 kv
Capacitor Bank
33 kv Capacitor
Bank
33 kv Bus -I I
33 kv Bus -I
O t f (LT) 11 k C it
8/8/2019 2. Electrical Safety Practice
http://slidepdf.com/reader/full/2-electrical-safety-practice 72/72
Outage of (LT) 11 kv Capacitor
Bank at the Grid Substation
66/33 kv Bus - I
66/33 kv Bus -I I
PTW for the outage of this 11 kv Capacitor Bank
is taken
Do Not Operate(DOP) tags to be
put on these
points of isolation
for the 11 kv
Capacitor
11 kv Bus 11 kv Capacitor
Bank