1. Citation2. Introduction – Haya Water3. Vision4. Organization & Staff 5. Governorate of Muscat Map (projects catchment-wise)
6. Planned Capital Expenditure7. Outside Muscat Governorate 8. Haya Water Strategies and Future Plans9. Challenges
Presented by: Said Al-Asmi, General Manager Projects, Haya Water (WSTA 11th Gulf Water Conference – Muscat 20-22/10/2014) 2/31
Established in December 2002.
In 2005, RD 69/2005 was issued to give HayaWater Concession to Operate Facilities inMuscat Governorate.
The Company signed a 30 years ConcessionAgreement with the Government to build andoperate wastewater collection, treatment andreuse systems in 2006.
Agreement with Muscat Municipality regardingsupply of TE water in 2006.
Agreement with Government about land use(21 different agreements for different lands).
Presented by: Said Al-Asmi, General Manager Projects, Haya Water (WSTA 11th Gulf Water Conference – Muscat 20-22/10/2014) 3/31
“Conserving water is a sacred duty for which
we will be held accountable in the future if we
do not undertake our duty towards this vital
resource”
Qaboos bin Said
Sultan of Oman
4Presented by: Said Al-Asmi, General Manager Projects, Haya Water (WSTA 11th Gulf Water Conference – Muscat 20-22/10/2014) 4/31
“To enable Muscat to become one of the
top cities in the world by building &
operating a world class Water Reuse
system that connects at least 80% of the
properties by year 2020.”
Presented by: Said Al-Asmi, General Manager Projects, Haya Water (WSTA 11th Gulf Water Conference – Muscat 20-22/10/2014) 5/31
Year Omani Non- Omani Number of Staff Percentage%
2003 8 3 11 73%
2004 22 7 29 75.86%
2005 39 10 49 79.59%
2006 129 107 236 54.66%
2007 182 139 321 57%
2008 278 144 422 65.87%
2009 283 139 422 67%
2010 341 135 476 71.64%
2011 354 134 488 72.20 %
2012 495 136 631 78.45 %
2013 579 129 708 81.78 %
*2014 584 131 712 81.46%
* Figures are up to end of September 2014
Presented by: Said Al-Asmi, General Manager Projects, Haya Water (WSTA 11th Gulf Water Conference – Muscat 20-22/10/2014) 6/31
Presented by: Said Al-Asmi, General Manager Projects, Haya Water (WSTA 11th Gulf Water Conference – Muscat 20-22/10/2014) 7/31
Network Length CapacitySewerage (km) TE (km)Seeb CatchmentC1 (STP) NA NA 60,000 3mC2 25 NA NAC3 604 36 NAC4 460 71 NAC5A 328 43 NAC5B 414 32 NABausher CatchmentB2 71 10 NAB4 111 11 NAGreater Mattrah CatchmentCoastal Darsait & Wadi Al Kabir 195 NA NANew Darsait STP NA NA 50,000Amerat CatchmentA2 215 291 NAQuraiyatHail Al Ghaf NA 6.4 NA
Presented by: Said Al-Asmi, General Manager Projects, Haya Water (WSTA 11th Gulf Water Conference – Muscat 20-22/10/2014) 8/31
SN. No. Project/Tender Description Remarks
A' Seeb Catchment1 Consultancy A'Seeb STP Expansion - Phase II Design
2 Design Consultancy for Wastewater and TE Connections to Royal Properties (6 SC+ 18 TE = 24 Nos) Design
Bausher Catchment3 Construction of Al Ansab STP - Access Road Rehabilitation Construction4 Design Consultancy Area 1 Bausher (B8) Design Amerat Catchment5 A3 Northern Area N/W EPC6 A4 Eastern Area N/W EPC7 A1 Al Amerat STP EPCGreater Muttrah Catchment8 TE Connection to 9 Muscat Municipality Parks Construction
Presented by: Said Al-Asmi, General Manager Projects, Haya Water (WSTA 11th Gulf Water Conference – Muscat 20-22/10/2014) 9/31
SN. No Project/Tender Description Remarks
Bausher Catchment1 Construction B3B EPC2 B3C - Rehab - 17/1 & 17/2 Al Khuwair (Integrated Services) EPC3 Construction B5 (MSQ) EPC4 OCEC Pump Station Construction Construction
5 Al Ansab STP Expansion & Auzaibah CPS (Phase 2) - Construction Procurement and Construction
6 New Tanker STP Construction EPC
7 Design & Supervision Consultancy Services for Azaibah South, Al Ansab, Bawshar & Ghala SC & TE Network (B7) Design
8 Interim Expansion of Al Ansab STP Construction9 Design Consultancy services of Al Ansab STP Phase III Expansion Design
A'Seeb Catchment10 Construction of A'Seeb Package 1 (Zone 1 & 6) EPC11 Construction of A'Seeb Package II (Zone 2,3,5,7 & 8) EPC12 A'Seeb Extension Areas - Package 3 (Zone 4A & B) Under Review13 Construction of Airport Heights 42 connections Construction14 Design Consultancy services of A'Seeb STP Phase III Expansion Design
Al Amerat Catchment15 A1 Al Amerat STP site Clearance EPC
Presented by: Said Al-Asmi, General Manager Projects, Haya Water (WSTA 11th Gulf Water Conference – Muscat 20-22/10/2014) 10/31
SN. No Project/Tender Description Remarks
Greater Muttrah Catchment16 Construction of Sea Outfall for Darsait STP and Azaiba CPS EPC
17 Redevelopment Muttrah Plan (RMP) Infrastructure & Town Planning - Design Consultancy Design
18 Consultancy Services for G2 Al Bustan, Sidab & Muscat Sewer Collection, Treated Effluent System, Sewerage Treatment Plant and Sea Outfall Design
Other Projects19 Al Ansab Wetland 1 Visitor Facilities- Construction and Landscaping (Phase I) Construction20 Consultancy Services for Al Ansab Wetland Phase II Design21 Construction of Al Ansab and Al Seeb STP Landscaping Construction22 TE Connection for Committed customers (Bausher and Greater Muttrah) EPC23 TE Al-Bustan - Construction Design 24 Staff Office (Including Lab), Archive Building and Recreation Centre - Construction Design 25 Construction of Al Shakhakheet Farm TE Supply Construction
26 Framework Agreement (Call-off) for Construction of Wastewater & TE Networks (3 to 5 years) Construction
27 Design Consultancy Services (Framework Agreement) for future needs (3-5 years) Design
28 Consultancy Services for Treated Effluent (TE) System Integration & Rationalization for Muscat Governorate Construction
29 Supply of Construction Supervision Manpower - Call-off Contract Manpower
Presented by: Said Al-Asmi, General Manager Projects, Haya Water (WSTA 11th Gulf Water Conference – Muscat 20-22/10/2014) 11/31
Presented by: Said Al-Asmi, General Manager Projects, Haya Water (WSTA 11th Gulf Water Conference – Muscat 20-22/10/2014) 12/31
Presented by: Said Al-Asmi, General Manager Projects, Haya Water (WSTA 11th Gulf Water Conference – Muscat 20-22/10/2014) 13/31
Presented by: Said Al-Asmi, General Manager Projects, Haya Water (WSTA 11th Gulf Water Conference – Muscat 20-22/10/2014) 14/31
In Progress Not req. for Sewage -In Completed
Presented by: Said Al-Asmi, General Manager Projects, Haya Water (WSTA 11th Gulf Water Conference – Muscat 20-22/10/2014) 15/31
5
MPS1 – FMC-AD- SBR
Presented by: Said Al-Asmi, General Manager Projects, Haya Water (WSTA 11th Gulf Water Conference – Muscat 20-22/10/2014) 16/31
5
Ventilation – OCU –Chemical Systems
Presented by: Said Al-Asmi, General Manager Projects, Haya Water (WSTA 11th Gulf Water Conference – Muscat 20-22/10/2014) 17/31
5
UF System - OHSG
Presented by: Said Al-Asmi, General Manager Projects, Haya Water (WSTA 11th Gulf Water Conference – Muscat 20-22/10/2014) 18/31
5
Peak Flow Test
Presented by: Said Al-Asmi, General Manager Projects, Haya Water (WSTA 11th Gulf Water Conference – Muscat 20-22/10/2014) 19/31
Presented by: Said Al-Asmi, General Manager Projects, Haya Water (WSTA 11th Gulf Water Conference – Muscat 20-22/10/2014) 20/31
Presented by: Said Al-Asmi, General Manager Projects, Haya Water (WSTA 11th Gulf Water Conference – Muscat 20-22/10/2014) 21/31
2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Integrated - Total TE Supply 83,593 137,375 157,033 159,700 176,274 186,255 222,492 247,902 258,106 261,676 262,633 263,960 265,508
Total TE Balance - High Season 18,445 28,892 29,228 16,241 11,498 7,453 (3,150) 4,138 (116) 838 (626) (1,850) (3,150)
Total TE Balance - Mid Season 34,732 56,013 61,179 52,106 52,692 52,154 53,261 65,079 64,439 66,047 65,189 64,603 64,015
Total TE Balance - Low Season 51,019 83,134 93,130 87,971 93,886 96,854 109,671 126,020 128,995 131,257 131,004 131,055 131,179
Total TE Demand - High Season 65,148 103,737 123,059 138,713 160,031 174,056 191,247 192,465 197,375 198,793 200,993 203,193 204,369
Total TE Demand - Mid Season 48,861 77,802 92,294 104,034 120,023 130,542 143,435 144,348 148,031 149,094 150,744 152,394 153,276
Annual Total TE Demand - Low Season 32,574 51,868 61,529 69,356 80,015 87,028 95,623 96,232 98,687 99,396 100,496 101,596 102,184
Palm Trees Demand 0 4,746 4,746 4,746 4,746 4,746 34,396 51,299 60,847 62,046 62,267 62,618 64,290
(10,000)
10,000
30,000
50,000
70,000
90,000
110,000
130,000
150,000
170,000
190,000
210,000
230,000
250,000
270,000
290,000
310,000
330,000
350,000
Qua
ntity
(m3
/ D
ay)
Total TE Supply, Seasonal Demand and Balance in Muscat Governorate)
Presented by: Said Al-Asmi, General Manager Projects, Haya Water (WSTA 11th Gulf Water Conference – Muscat 20-22/10/2014) 22/31
Current Applications:
Irrigation of public parks
and landscaped areas
Irrigation of golf courses
Dust control
Future Applications:
Managed Aquifer Recharge
Agriculture – Farms
Industrial - Cooling
Construction
Presented by: Said Al-Asmi, General Manager Projects, Haya Water (WSTA 11th Gulf Water Conference – Muscat 20-22/10/2014) 23/31
By Type
Total : RO 2,172.67 Mln.
22%
78%
Treatment : RO 425.64 Mln.
Network : RO 1319.39 Mln.
Presented by: Said Al-Asmi, General Manager Projects, Haya Water (WSTA 11th Gulf Water Conference – Muscat 20-22/10/2014) 24/31
Completed Projects
Ongoing Projects Completed Works
Ongoing Projects Remaining Works
Initiated Projects
Future Planned Projects
Total CAPEX (Infrastructure Projects) : OMR 2,172.67 mln.
Presented by: Said Al-Asmi, General Manager Projects, Haya Water (WSTA 11th Gulf Water Conference – Muscat 20-22/10/2014) 25/31
Haya Water has been given the green light to develop, operate, & maintain of sewage infrastructures and projects. Agreement is being finalized.
Presented by: Said Al-Asmi, General Manager Projects, Haya Water (WSTA 11th Gulf Water Conference – Muscat 20-22/10/2014) 26/31
Presented by: Said Al-Asmi, General Manager Projects, Haya Water (WSTA 11th Gulf Water Conference – Muscat 20-22/10/2014) 27/31
Description Details
Total Existing STPs 52
Total capacity of STPs 64,000 m3
Total length of network 1000 kms
Daily produced TE 45,000 m3
Total daily use of TE for irrigation 16,000 m3
No. of ongoing projects 6
Awarded projects and will start execution soon 2
Projects to be awarded soon 2
Projects expected be floated next year 2015 6
Allocated budget for the 9th Five-Year-Plan (2016-2020) 1,132,000,000
Presented by: Said Al-Asmi, General Manager Projects, Haya Water (WSTA 11th Gulf Water Conference – Muscat 20-22/10/2014) 28/31
1. Integrated Approach to provide services.
2. Supply TE to the one million palm trees Project.
3. Supply TE for agriculture purposes.
4. Staff Development and Training.
5. Growth
6. Reduce Capital Cost
7. New Technologies.
8. Operational Excellence
9. Staff Optimization
Presented by: Said Al-Asmi, General Manager Projects, Haya Water (WSTA 11th Gulf Water Conference – Muscat 20-22/10/2014) 29/31
• Geographical nature of Muscat• Limited availability of accurate data
covering existing services.• Multiple NOC bodies.• Limited availability of service
corridors.• Public safety and inconvenience.• Availability of contractors with state-
of-the-art experience.• Re - Design some areas.• Managing the public and the press.
Presented by: Said Al-Asmi, General Manager Projects, Haya Water (WSTA 11th Gulf Water Conference – Muscat 20-22/10/2014) 30/31
Presented by: Said Al-Asmi, General Manager Projects, Haya Water (WSTA 11th Gulf Water Conference – Muscat 20-22/10/2014) 31/31