2 Marks 1. What is software Engineering? Software Engineering it establishment and use of sound engineering principles in order to obtain economic software that is reliable and works efficiently on all real machines. 2. Give the importance of risk analysis? Changes will occur in customer requirements, development technologies, target environment and all other entities connected to the project. It affect timeliness and overall success of the project. Risk analysis and management are a series of steps that help a software team to understand and manage uncertainity. Risk analysis is the key element of good software process management. The risk is potential proplem. It may happen or may not happen. But it is a good idea to identify it asses its impact, and establish a contingency plan should the problem actually occurs. 3. What is the difference between “known risks” and “preditable risks”? Known Risks Predictable Risks It can be uncovered after careful evaluation project plan, business and technical environment in which the project is being developed, other reliable information resources. E.g. unrealistic delivery date, lack of software poor development environment. Predictable risks are extrapolated from past project experience. E.g. staff turnover, poor communication with the customer, dilution of staff effort as ongoing maintenance requests are serviced. 4. What is the importance of Software Project Planning? The objective of the software project planning is to provide a framework that enable the manager to make reasonable estimates of resources, cost and schedule. These estimates are made within a limited time frame at the beginning of a software project and should be updated regularly as the project progresses.

Upload: hema-mariya

Post on 02-Dec-2014

208 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: 2 Marks se

2 Marks

1. What is software Engineering?

Software Engineering it establishment and use of sound engineering principles in order to obtain economic software that is reliable and works efficiently on all real machines.

 

2. Give the importance of risk analysis?

Changes will occur in customer requirements, development technologies, target environment and all other entities connected to the project. It affect timeliness and overall success of the project. Risk analysis and management are a series of steps that help a software team to understand and manage uncertainity. Risk analysis is the key element of good software process management. The risk is potential proplem. It may happen or may not happen. But it is a good idea to identify it asses its impact, and establish a contingency plan should the problem actually occurs.

 

3. What is the difference between “known risks” and “preditable risks”?

 

Known Risks Predictable Risks

It can be uncovered after careful evaluation project plan, business and technical environment in which the project is being developed, other reliable information resources.

E.g. unrealistic delivery date, lack of software poor development environment. Predictable risks are extrapolated from past project experience.

 

 

 

E.g. staff turnover, poor communication with the customer, dilution of staff effort as ongoing maintenance requests are serviced.

 

4. What is the importance of Software Project Planning?

The objective of the software project planning is to provide a framework that enable the manager to make reasonable estimates of resources, cost and schedule.

These estimates are made within a limited time frame at the beginning of a software project and should be updated regularly as the project progresses.

 

5. State the levels of process maturity.

Five process maturity levels:

1. Level 1 - Initial

Page 2: 2 Marks se

2. Level 2 - Repeatable

3. Level 3 - Defined

4. Level 4 - Managed

5. Level 5 – Optimizing

 

6.Compare process and product.

 

S NO PRODUCT PROCESS

1 High quality software Process is the frame work for the tasks that are required to build high quality software.

2 It is the work product It is the frame work for a set of key process areas that must be established for effective delivery of software engineering technology.

3 Outcome of the process is the product If the process is week, the end product will suffer.

 

7. What are the element of a good project plan?

* Estimation of work to be done

* The resources required

* The time required

* The money required

* Degree of structure & definition

* Project size

* Project complexity.

 

8. Though we have estimation tools and planning ideas, often software projects are developed when it come to meeting deadlines. Why?

Software projects are delayed because of the improper use of tools, not understanding and following the plan & schedule, lack of training and not realizing the need to follow the guideline, plan and schedule.

 

9. What are the key element of RMMM plan with respect to risk management?

Organizing risk management steps.

Documenting all work performed as part of risk analysis & used by project manager.

Page 3: 2 Marks se

Preparing Risk Information Sheet(RIS)

 

10. What are different software prototyping methods and tools available?

For software prototyping to be effective, a prototype must be developed rapidly so that the customer may assess results and recommednd changes.

To conduct rapid prototyping, 3 generic classes of methods and tools are available.

a. Fourth generation techniques

b. Reusable software components

c. Formal specification and prototying environments.

11. What is direct metrics?

Direct metrics/ size orinted metrics:

Size oriented metrics are derived by normalizing quality and / or productivity measures by considering the size of the software that has been produced . SE process includes cost and effort applied. Software product includes LOC produced, execution speed, memory size and defects reported. A table is created as follows:

 

Project LOC Effort $(000) Pp.doc Errors Defects People

 

 

12. What is indirect metrics?

Indirect metrics(Function-oriented metrics)

Use a measure of the functionality delivered by the application as a normalization value. It uses the measure called Function Point. Metrics is derived based on direct measures of software information domain and assessment of software complexity. FP is determined by five information domain characteristics.

Function points are computed by completing the table:

 

Measurement

parameter Count Simple Average Complex Total

Number of user i/ps

Number of user o/ps

Number of user enquries

Number of files

Number of external Interface

Page 4: 2 Marks se

Count total =

 

FP = count total * [0.65 + 0.01*∑ fi]

Fi( I = 1 to 14) complexity adjustment value.It is based on 14 question asked by the developer to himself.

 

 

13 Define software engineering.

 

Software engineering is the technological and managerial discipline concerned with systematic production and maintenance of software products

That are developed and modified on time and with cost estimates.

 

14 What are the primary goals of software engineering

 

The primary goals of software engineering are

 

1. To improve the quality of software products

2. To increase the productivity and

3. Job satisfaction of software engineer

 

15 What are the fundamental principle of software engineering.

 

The fundamental principle of software engineering is to design software products that minimize the itellectula distance between problem and solution.

 

16 Define the term ‘PROGRAMMER’.

 

The term programmer’ is used to denote an individual who is concerned with the details of implementing, packaging vend modifying algorithms and data structures written in particular programming languages.

 

Page 5: 2 Marks se

17 What is the job of software engineer

 

Software engineers are concerned with issues of analysis, design, verification and testing, documentation, software maintenance and project management

 

18 Define the term of computer software

 

computer software includes the source code and all the associated documents and documentation, that constitute a software product.

 

19 What are all the components of a software product (MU:Ap-97).

Requirements document User’s manuals

Design specifications ware problem repots

Source code Soft

Test plans Training aid

Principles of operation

Quality assurance produces

 

20 What are the primary goals of software engineering?

The primary goals of software engineering are

i) To improve the quality of software products.

ii) To increase the productive and

iii) Job satisfaction of software engineers.

 

21 What is the fundamental principle of software engineering?

The fundamental principle of software engineering is to design software products that minimize the intellectual distance betwee4n problem and solution.

 

22 Define the term ‘PROGRAMMER”

The term ‘Programmer’ is used to denote an individual who is concerned with the details of implementing, packaging and modifying algorithms and data structures written in particular programming languages.

Page 6: 2 Marks se

 

23 hat is the job of software engineer?

Software engineers are concerned with issues of analysis, design, verification and testing, documentation, software maintenance and project management.

 

24 efine the term ‘Computer software’

Computer software includes the source code and all the associated documents and documentation that constitute a software product.

 

25 What are all the components of a software product? (MU:Ap-97)

i) Requirements document vi) Quality assurance procedures

ii) Design specifications vii) Software problems reports

iii) Source code viii) User’s manuals

iv) Test plans ix) Training aids

v) Principles of operation x) Maintenance procedures’

are all components of a software product.

26 What are the fundamental quality attributes that every software Product should posses?

i) Usefulness iv) Efficiency

ii) Clarity v) Cost-effectiveness

Iii) Reliability

 

27 Define ‘Software reliability.

Software reliability is “the ability of a program to perform a required function under stated conditions for a stated period of time”

 

 

28 What are the activities involved in software maintenance?

 

i) Enhancing the capabilities of the products

ii) Adapting the products to new processing environments.

Page 7: 2 Marks se

iii) Correcting Bugs.

 

29 Give short notes on Trivial projects

 

A trivial project involves one program duration of the project is from 1 to 4 weeks. The size of the products is about 500 source lines.

 

30 Short notes on small projects.

Number of programmers involved 1

Duration of the project 1 6 months

Source code size 1 K - 2 K

Examples Scientific applications, small

Commercial applications and

Student projects.

31 Explain about medium - size projects.

Number of programmers 2 - 5

Duration of the project 1 - 2 years

Product size 5K - 50K

Example Assemblers, comliers

Inventory systems management information systems.

 

32. Write short notes on large projects.

Number of programmers 5 – 20

Duration of the project 2 – 3 years

Product size 50K – 100K

Examples Large compilers, small time

Sharing systems, data-base

Packages, graphics

Programs.

Page 8: 2 Marks se

 

33. Explain about very large projects.

Number of programmers 100 – 1000

Duration of the project 4 – 5 years

Product size 1 M

Examples Real – time processing,

Telecommunication and

Multitasking

 

34. Number of programmers 2000 – 5000

Duration of the project 5 – 10 years

Product size 1M – 10M

Examples Air traffic control, ballistic

Missile defense military

Command and control

Systems

 

35. Mention some factors that influence quality and productivity.

i) Individual ability

ii) Team communication

iii) Product complexity

iv) Appropriate notations

v) Systematic approaches

vi) Level of Technology.

 

 

36. What are the two aspects to individual ability?

i) The general competence of the individual

ii) The familiarity of the individual with the particular application area.

Page 9: 2 Marks se

 

37. state Brooks law for term communication

 

The Brooks law states that ‘Adding’ more programmers to a late project may make it later

 

38 what are the three levels of product complexity

i) Application programs

ii) Utility programs

iii) System-level programs

 

39. What are utility programs?

Utility programs include Compliers, Assemblers, Linkage Editors, and loaders.

 

 

40. System level programs include data communications packages, real time process control systems an operating systems routines, which are usually written in assembly language or a High-level language such as PL/1 or Ada.

 

41. What are the stages involved in planning a software project?

i) Defining the problem

ii) Developing a solution strategy

iii) Planning the development process.

 

42. What is the first stages in planning a project?

The first step in planning a software project is to prepare, a concise statement of the problem to be solved and the constraints that exist for its solution. The problem statement should include a description of the present situation and the goals to be achieved by the new system.

 

43. What is the second step in planning a software project?

The second step in planning a software project is to determine the appropriateness of a computer sided solution. In addition to being a cost-effective, a computerized system must be socially and politically acceptable.

 

Page 10: 2 Marks se

44. Explain about portability of a software product.

The case with which software can be transferred from one computer system or environment to another.

 

45. Explain about portability of a software product.

The extent to which software performs its intended functions with a minimum consumption of computing resources.

 

46. Explain the factor-Robustness.

The extent to which software can continue to operate correctly despite the introduction of invalid inputs.

 

47. Mentioned some factors to consider in setting project goals.

i) New capabilities to be provided

ii) Efficiency requirements.

iii) Security concerns.

iv) Likely modifications.

v) Level of user sophistication.

 

48. What are the five phases in software life cycle?

i) Analysis phase

ii) Design phase

iii) Implement phase

iv) System Test

v) Maintenance phase

 

49. What are the two sub phases in Analysis Phase?

Analysis consists of two sub phases. They are

i) Planning and

ii) Requirements definition

 

50. What are the major activities during planning?

Page 11: 2 Marks se

The Major activities include understanding the customer’s problem, performing a feasibility suty, developing a recommended solution strategy, determining the acceptance criteria and planning the development process

 

51. Define the term “Software Maintenance”

The term “Software maintenance” is used to describe the software engineering activities that occur following delivery of a software product to the customer.

 

It is the time period in which a software product performing useful work

 

52. What are the 2 products of planning?

i) System definition

ii) Project plan

 

53. Explain about system definition.

The system definition is typically expressed in English or some other natural language and may incorporate charts figures, graphs, tables and equations.

 

54. What are the contents of ‘Project Plan’?

The project plan contains the life-cycle model to be used the organizational structural for the project, the preliminary development schedule, preliminary cost and resource estimates, preliminary staffing requirements, tools and techniques to be used and standard practices to be followed.

 

55. What is requirements definition?

Requirements definition is concerned with identifying the basic functions of the software component in hardware/software/people system.

 

56. What is the product of ‘Requirements Definition’?

The product of requirements definition is a specification that describes the processing environment, the required software functions, performance constraints on the software exception handling, subsets and implementation priorities, probable changes and likely modifications and the acceptance criteria for the software.

 

57. What is the purpose of ‘Software Design’?

Design is concerned with identifying software components specifying relationship among components, specifying software structure, maintaining a record of design decisions and providing a blue print for the implementation phase.

Page 12: 2 Marks se

 

58. What are the two types of software design?

i) Architectural Design

ii) Detailed Design

 

59. Explain ‘Architectural Design’.

Architectural design involves identifying the software components, decoupling and decomposing them into processing modules and conceptual data structures, and specifying the inter connections among components.

 

60. Explain about ‘Detailed Design’

Detailed design involves adoption of existing code, modification of standard algorithms, invention of new algorithms, design of data representation and packaging of the software product.

 

61. What is the purpose of ‘Product Feasibility Review’ (PFT)?

The purpose of product feasibility review is to determine the feasibility of project continuation. The outcome of the review may be termination of the project, redirection of the project or continuation of the project.

 

62. What is the use of preparing user’s manual?

It provides a vehicle of communication between customer and developer. It is prepared using information form the system definition as well as the results of prototype studies.

 

63. What is a prototype. (MU:Ap-97)

A prototype is a make-up or model of a software product. In a contrast to a simulation model, a prototype incorporate components of the actual product.

 

64. What are the reasons for developing a prototype?

i) To illustrate input data formats, messages, reports and interactive dialogues for the customer.

ii) To explore technical issues in the proposed product.

 

65. What are the three types of programming team structure?

i) Democratic Teams

ii) Chief programmer Teams

Page 13: 2 Marks se

iii) Hierarchical team structure.

.

66. What are the major factors that influence software cost (MU:Ap-97)

i) Programmer ability

ii) Product complexity

iii) Product size

iv) Available Time

v) Required reliability

vi) Level of technology.

 

67. What are the various cost estimation techniques?

i) Expert Judgment

ii) Delhi cost estimation

iii) Work Breakdown structures

iv) Algorithmic cost models.

 

68. Discuss briefly about Top-down estimation.

Top-down estimation Top-down estimation. first focuses on system level costs, such as the computing resources and personnel required to develop the system, as well as the costs of configuration management, quality assurance, system integration, training and publications.

 

69. Give short note on Bottom-up estimation.

Bottom-up cost estimation first estimates the of develop each module or subsystem. Those costs are combined to arrive at an overall estimate.60. What are the four possible life-cycle models?

i) The phased model

ii) The cost model

iii) The prototype model

iv) The successive versions model

 

16 Marks

Page 14: 2 Marks se

1. (i) Explain win-win spiral model and evolutionary models of software life cycles. Compare with object oriented life cycles. *

(ii) Whar are software development problems? Describe. *

2. (i) Explain in detail Boehm’s spiral model for software life cycle and discuss various activities in each phase. *

3. Describe a software life cycle model and compare with software production. *

4. Explain the system engineering concepts and briefly describe on product engineering.*

5. Explain iterative waterfall and spiral model for software life cycle and discuss various activities in each phase. *

6. (i) Explain the advantages of adhering to life cycle model for software development. *

(ii) Describe waterfall and spiral models of life cycle *

(iii) How do you classify softwares based on cost, application and development time? Explain. *

7. Explain in detail about RAD Model.

8. Write in detail about the various phases of software engineering.

9. (i) Which is more important – the product or process? Justify your answer

(ii) Identify the umbrella activities in software engineering process.

(iii) With suitable illustration explain about Spiral model evolutionary software development. *

10. Explain the concept of verification and validation with respect to software with an example. *

11. Explain in detail the spiral model and compare this model with incremental model in detail. *

12. Explain system engineering in detail with example.

13. Explain the computer based system in detail.

14. Explain the object oriented model of life cycle process.

15. Explain the development process in software engineering.

 

unit 2

2 Marks

1. What are Computer-Based System Elements?

Software,Hardware, People,Database, Documentation,Procedures.

 

2. Explain System Engineering Hierarchy?

Page 15: 2 Marks se

World view

Domain view

Element view

Detailed view

 

3. What do you meant by System Modeling?

 

Definte the processes that serve the needs of the view under consideration

Represent the process behavior and the assumptions on which the behavior is modeled

Explicitly define the exogenous (links between constituents) and endogenous (links between constituent components) input to the model.

Represent all linkages (including outputs) required to understand the view.

 

4. Mention the Business Process Engineering Hierarchy?

Information Strategy Planning (world view)

Business Area Analysis(domain view)

Business System Design(Element view – software engineers)

Construction and Integration (detailed view- software engineers)

 

5. Write about Product Engineering Hierarchy

 

Requirements engineering (world view)

Component engineering (domain view)

Analysis and Design modeling (element view – software engineers)

Construction and Integration (detailed view – software engineers)

 

6. What do you mean by Business Process Engineering Architectures?

Data Architecture – provides framework for information needs of a business or business function.

Applications architecture – those system elements that transform objects within the data architecture for some business purpose.

Page 16: 2 Marks se

Technology infrastructure – provides foundation for the data and application architectures.

 

 

 

7. Explain the various Requirements Engineering Tasks

Inception

Elicitation

Elaboration

Negotiation

Specification

Requirements validation

 

8. Describe about Traceability Tables

• Features traceability table(shows how requirements relate to customer observable feature)

• Source traceability table(indicate relations among requirements)

• Subsystem traceability table (requirements categorized by subsystem)

• Interface traceability table (shows requirement relations to internal and external interfaces)

 

9. What do you meant by Quality function deployment (QFD)?

Identifies three types of requirements (normal, expected, exciting)

In customer meetings function deployment is used to determine the value of each function that is required for the system.

Information deployment identifies both data objects and events that the system must consume or produce(these are linked to functions)

Task deployment examines the system behavior in the context of its environment

Value analysis is conducted to determine relative priority of each requirement generated by the deployment activities.

 

10. Describe about User-scenarios

Also known as use-cases, describe how the system will be used.

Developers and users create a set of usage threads for the system to be constructed.

Page 17: 2 Marks se

 

11. What are the Analysis Model Objectives?

Describe what the customer requires. Establish a basis for the creation of a software design.Devise a set of requirements that can be validated once the software is built.

 

12. Write short notes on UML Activity Diagrams?

Supplements use-case by providing graphical representation of the interaction flow within a specific scenario.

Similar to flow chart

Rounded rectangles used to represent functions

Diamonds used to represent decision points.

Labeled arrows represent decision alternatives.

Solid horizontal lines indicate parallel activities.

 

13. What are UML Swimlane Diagrams?

Variation of activity diagrams used show flow of activities in use case as well as indicating which actor has responsibility for activity rectangle actions.’

Responsibilities are represented by parallel line segments that divide the diagram vertically headed by the responsible actor.

 

14. What do you meant by Class-Responsibility – Collaborator (CRC) Modeling?

Develop a set of index cards that represent the system classes.

One class per card

Cards are divide into three sections (class name, class responsibilities, class collaborators)

Once a complete CRC card set is developed it is reviewed examining the usage scenarios

 

15. Describe about Associations and Dependencies

Association – present any time two classes are related to one another in some fashion.

Association multiplicity or cardinality can be indicated in a UML class diagram(e.g, 0..1, 1..1,0.., 1..)

Dependency – client/server relationship between two classes

Dependency relationships are indicated in class diagrams using stereotype names surrounded by angle brackets (e.g., stereotypes)

Page 18: 2 Marks se

 

16.Object – Behavior Model Construction

Evaluate all use-cases to understand the sequence of interaction within the system.

Identify events that drive the interaction sequence and how events relate to specific object.

Create an envent – trace for each use-case.

Build a state diagram for the system.

Build a sequence diagram for the system.

Review the object behavior model to verify accuracy and consistency.

 

17.Object – Oriented Analysis Model Elements

Scenario-based – depict how the user interacts with the system(use-case diagram) and the sequence of activities that occur during software use (activity diagrams and swim land diagrams)

Class-base – model the system objects, operations, class relationships(class diagram(

Behavioral – depict how external events change the state of the system or the system classes (state diagram and sequence diagrams)

Flow – oriented- represents the system as an information transform and depict how data objects are transformed as they flow through system function (dataflow diagram)

 

 

 

 

 

18.Describe the Analysis Pattern Template

Name

Intent

Motivation

Forces and Content

Solution

Consequences

Design

Page 19: 2 Marks se

Know use examples

Related patterns

 

 

19. What are the various representation used to depict the analysis model?

Man different representation can be used to depict the anlalysis mode

Use-case diagram

Activity diagram

Class diagrams

State diagram

Data flow diagram(DFD)

 

 

20. Define DFD

Data flow diagram(DFD) – provides an indication of how data are transformed as they move through the system; also depicts functions that transform the data flow(a function is represented in a DFD using a process specification or PSPTEC).

 

21 What are the languages which are designed to express software requirements? (MU:Ap97)

 

i) Problem statement language (PSL)

ii) Requirements statement language (RSL)

iii) SADT language (Structured Analysis & Design Technique)

iv) SSA uses graphical language.

 

22 What is the goal of software requirements definition?

The goal of software requirements definition is to completely and consistently specify the technical requirements for the software product in a concise and unambiguous manner, using formal notations as appropriate.

 

23 White the first and second section in format of a software requirements specification.

Section 1 : Product overview and summary

Page 20: 2 Marks se

Section 2 : Development, Operating and Maintenance Environment.

 

24 Discuss about section 3 of the format of a software requirements specifications.

Section 3 specifies the externally observable characteristics of the software product. Items in section 3 include user displays and report formats, a summary of user commands and report options, data flow diagrams and a data dictionary.

 

25 Define Data store.

A data store is a conceptual data structure, in the sense that physical implementation details are suppressed, only the logical characteristics of data are emphasized on a data flow diagram.

 

26 What are the entries in data dictionary?

Entries in a data dictionary include the name of the data item, and attributes such as the data flow diagrams where it is used, its purpose, where it is used, its purpose, where it is derived from, its sub items and any notes that may be appropriate.

 

27 List some perfor4mance characteristics

 

Response time for various activities.

Processing time for various processes.

Throughput .

Primary and secondary memory constraints.

Required telecommunication bandwidth.

 

16 Marks

1. Explain the state oriented approaches for representing behavioural specification of a software. *

2. Narrate the importance of software specification of requirements.Explain a typical SRS structure and its parts. *

3. Draw the basic structure of analysis model and explain each entity in detail. *

4. Explain the ways and means for collecting the software requirements and how are they organized and represented. *

5. Describe the various prototyping techniques and discuss on analysis and modeling. *

6. Explain the feasibility studies. What are the outcomes? Does it have either explicit or implicit effects on software requirement collection. *

7. What is a prototyping technique? How prototype models are prepared foe a software process? Discuss. *

Page 21: 2 Marks se

8. Describe how software requirements are documented? State the importance of documentation.

9. Explain in detail about the Mechanics of Structured Analysis.

10. Write in detail about the Analysis Principles?

11. Write in detail about requirement elicitation?

12. Explain the concept of software prototyping. What are the strengths and weakness of it. *

13. Discuss in detail the FAST method of

(i) Requirement elicitation with an example.

(ii) What is software specification? *

14. (i) Compare functional and behavioural models.

(ii) With suitable diagram explain the elements of the analysis model.

(iii) With an example explain about DFD. *

15. (i) Explain the extension of DFD for real time systems.

(ii) Discuss the features of state transition diagram and its application.

16. Explain the functional and non- functional user requirements.

17. Explain the steps used for validation and management of a software.

18. What are the rapid prototyping techniques.

19. What is software requirements? What are the various methods of gathering software requirements? Explain. *

20. Discuss the importance of requirement analysis in detail. Explain how analysis model is organized. *

21. Discuss the basic structure of analysis model and explain each entity in detail. *

 

unit 3

2 Marks

1. Define: Architectural design

Architectural design represents the structure of data and program components that are required to build a computer based system. It considers the architectural style that the system will take, the structure and properties of the components that constitute the system, and the interrelationship that occur among all architectural components of a system.

 

2. What is Data Design?

High level model depicting user’s view of the data or information.

Page 22: 2 Marks se

Design of data structures and operators is essential to creation of high-quality applications.

Translation of data model into database is critical to achieving system business objectives.

Reorganizing databases into data warehouse enables data mining or knowledge discovery that can impact success of business itself

 

3. Define the term in software designing: Modularity.

The software is divided into separately named and addressable components, often called modules that are integrated to satisfy problem requirements.

Modularity is the single attribute of software that allows a program to be intellectually manageable.

 

4. How will you ensure for effective modular design?

Effective modular design reduces complexity, facilitates change, & easier implementation by encouraging parallel development of different parts of a system.

Developing modules with single minded function is said to be functional independence. Functional independence – modules have high cohesion and low coupling Functional Independence. Functional independence – modules have high cohesion and low coupling Functional Independence is measured using two qualitative criteria: Cohesion and coupling. Cohesion – qualitative indication of the degree to which a module focuses on just one thing

Coupling – qualitative indication of the degree to which a module is connected to other modules and to the outside world.

 

5.What is the difference between cardinality and modality.

Cardinality-in data modeling, Cardinality specifies how the number of occurrences of one object are related to the number of occurrences of another object(1:1,1:N,M:N)

 

Modality-Zero(0) for an optional object relationship and one(1) for a mandatory relationship.

 

6.Discuss about Data Flow Diagrams.

DFD is a graphical representation that depicts information flow and the transforms that applied as data move from input to output. DFD may be used to represent a system at any level of abstraction .DFD allows us to picture a system as a network of functional processes ,connected to another by “Pipelines” and “Holding tanks” of data. DFD is function – oriented. You can also call it as Bubble Chart, Bubble Diagram, process model, workflow diagram.

 

7.What is JSD ?Mention the various steps.

JSD is the technique for mapping the structure of a problem into a program structure.

Mapping Steps:

Page 23: 2 Marks se

1. Specify the input and output Data Structures using Structured Diagram.

2. Convert the above structure into program structure. It will identify the points

correspondence between nodes in the input and output.

3. Expand it to detailed design(contains the operations needed to solve the problem)

3.1. Develop list of operations.

3.2. Associate operations with the program structure.

3.3. Program structure & operation are expressed in schematic logic(pseudo code)specifies the control flow for selection & iteration.

 

8. Explain State Transition Diagrams.

State transition diagram(STD) indicates how the system behaves as a consequence external events, states are used to represent behavior modes. Arcs are labeled with the event triggering the transitions from one state to another(Control information is contained in couple of specification or CSPEC).STD represent the system states and events that trigger state transitions.

 

1. Describe about Interface Design.

Interface is a set of operations that describes the externally observable behavior of a class and provides access to its operations.

Important elements:

->User interface(UI),External interfaces to other systems, Internal interfaces between various design components, Modeled using UMI, collaboration diagrams.

 

10.Define component level design.

Describes the internal detail of each software component.

Defines:

• Data structures for all local data objects.

• Algorithmic Detail for all component processing functions.

• Interface that allows access to all component operations.

• Modeled using UML component diagrams, UML activity diagrams, and pseudocode(PDL).

 

11. What do you meant by ADL?

Architectural Description Language (ADL)

Page 24: 2 Marks se

• Provides syntax and semantics for describing software architecture.

• Provides designers with ability to decomposee components, combine components, and define interfaces.

 

12. Write the steps in transform mapping.

Transform Mapping

1. Review fundamental system model

2. Review and redefine data flow diagrams for the software.

3. Determine whether the DFD has transform or transaction characteristics

4. Isolate the transform center by specifying incoming and outgoing flow boundaries

5. Perform first level factoring

6. Perform second level factoring.

7. Refine the first iteration architecture using design heuristics for improved software quality.

 

13. Explain Object-Oriented Component Design

Object-Oriented Component Design

 

• Focuses on the elaboration of domain specific analysis classes and the definition of infrastructure classes

• Detailed description of class attributes, operation, and interfaces is required prior to beginning construction activities

 

14. Mention some of the cohesion types.

Cohension

Utility Cohesion

Temporal Cohesion

Procedural Cohesion

Communication Cohesion.

Sequential Cohesion

Layer Cohesion

Functional Cohesion.

 

Page 25: 2 Marks se

15. Mention various coupling types.

Coupling:

• Data Coupling.

• Stamp Coupling.

• Control Coupling.

• External Coupling.

• Common Coupling.

• Content Coupling.

• Routine Call Coupling.

• Type use Coupling.

• Inclusion or Import.

 

16. What is Distributed System.

A Distributed system consists of more processors operating in parallel with shared memory and also their own memory and communicates through a network. Real time systems that distributed systems are used in process control and other mission critical applications.

 

17. What do you meant by FURPS?

FURPS Quality Factors

• Functionality

• Usability

• Reliability

• Performance

• Supportability

 

18. Explain about OCL.

Object Constraint Language (OCL).

• Complements UML by allowing a software engineer to use formal grammar and syntax to construct unambiguous statements about design model element

• Parts of OCL language Statements

Page 26: 2 Marks se

1. A Context that denotes the limited situation in which the statements is Valid.

2. A Property representing some characteristics of the context.

3. An operation that manipulates or Qualifies a property.

4. Keywords used to specify conditional expressions

 

19. Describe about Interface Design.

Interface Design:

• Use the information Developed during interface analysis to define interface objects and actions(Operations)

• Define events that will cause the state of the user interface to change and model this behavior.

• Depict each interface state as it will appear to the end-user.

• Indicate how the user interprets the state of the system from information provided through the interface.

 

20. What are the golden rules while performing user interface design.

The Golden Rules:

• Place the user in control

• Reduce the user’s memory load

• Make the Interface Consistent

 

16 Marks

1. Describes decomposition levels of abstraction and modularity concepts in software design. *

2. What are the characteristics of good design? Describe different types of coupling and cohesion. How design evaluation is performed. *

3. What are the different architectural styles for software design and explain in detail each style. *

4. Discuss in detail about the design process in software development process. Justify : “ Design is not coding and coding is not design”. *

5. Describe the architectural design of a software. *

6. Explain the information presentation procedures and the techniques for the evaluation of interface. *

7. Describe the impact of cohesion, coupling, fan-in, fan-out and factoring in design phase. *

8. Explain the real time software design and discuss the same for a data acquisition system. *

Page 27: 2 Marks se

9. Explain data, architectural and procedural design for a software. Explain. And describe the design procedure for a data acquisition system.

10. Explain the importance of user interface design for the sale of a software. *

11. Discuss the Human-computer interaction. Explain different heuristrics design procedure used for this.

12. Write a short note on SCM process.

13. What is transform mapping? Explain the process with an illustration. What is the strength and weakness. *

14. Explain the various design concepts considered during design *

15. What do you understand by software architecture? Discuss in detail about various model. *

16. What is software design? Who does this? What are the steps in the design activity? What is the outcome of design activity ? Explain *

17. Give the design heuristics.

18. Explain effective modular design.

19. Explain data design and architectural design.

unit 4

1. What is cyclomatic complexity?

It is as software metric that provides a quantitative measure of the logical complexity of a program. It defines the number of independent paths. Provides an upper bound for the number of test. Complexity is computed in one of the 3 ways.

 

1. V(G) =R+1 denotes number of regions in the flow graph.

2. V(G) = E-N+2 E-> Number of edges, N-> Number of nodes.

3. V(G) =P+1 P-> Number of predicate nodes.

 

2. What is system testing?

System Testing- To test the entire computer based system.

• Recovery testing – checks the system’s ability to recover from failures

• Security testing – verifies that system protection mechanism prevent improper penetration or data alteration

• Stress testing –program is checked to see how well it deals with abnormal resource demands(i.e., quantity, frequency, or volume)

• Performance testing – designed to test the run-time performance of software, especially real-time software.

Page 28: 2 Marks se

 

3. List any four principles of testing.

Testing principles

• All test should be traceable to customer requirements

• Tests should be planned long before testing begins.

• Testing should begin in small and progress towards testing in large.

• Exhaustive testing is not possible.

• Testing should be conducted by an independent third party.

 

4. What do you meant by white-box testing?

White box testing is also called structural testing or glass box testing.

• The internal program logic is checked

• Logical paths through the software are tested

• Status of program is examined

• All independent paths within a module is tested

• It tests the code

• It is applied in the early stage of testing process. It uses the control structure of the procedural design to derive test cases.

 

 

 

5. Define Black box testing/behavioral testing?

It exercises all the functional requirements of the software.

It does not know the internal working of the product.

It specifies the functions of the software.

It demonstrates that software functions are operational, ie whether i/p is accepted as output is correctly produced, and that the integrity of external information (database) is maintained.

It does not check the logical errors present in the application.

 

Page 29: 2 Marks se

6. What is a graph matrix? Discuss.

Graph matrix is a structure. It is used to develop s/w tool for testing. It is a square matrix of order n, where n is the number of nodes. It is tabular representation of flow graph. But row and column corresponds to an identified node and matrix entries correspond to connection between nodes. By adding a link weight to each matrix entry, the graph matrix can become powerful tool for evaluating program control structure during testing. If there is connection, weight is 1 or 0. The link weight provides additional information about control flow. It is a called connection matrix. Each row with two or more entries represent predicate node.

 

7. Define verification, Validation

Verification refers to the set of activities that ensure that software correctly implements a special function.

Validation refers to a different set of activities that ensure that the software that has been built traceable to customer requirements.

 

8. Explain the activities of Verification and validation.

Verification and validation encompasses a wide array of software quality assurance activities that include formal technical reviews, quality configuration audits, performance monitoring, simulation, feasibility study, documentation review, database review, qualification testing and installation testing.

 

9. Discuss on software maintenance

The maintenance of existing software can account for over 60% of all effort expend by a development organization and the percentage continues to rise as more than fixing mistakes.

The four activities of software maintenance are

Corrective maintenance, adaptive maintenance or enhancement and preventive maintenance or re-engineering

 

Only about 20% of all maintenance work is spent fixing mistakes. The remaining 80% spent adapting existing systems to changes in their external environment, making enhancement requested by users.

 

 

 

 

10. What test metrics are being used?

• Error rates in design, in test execution, in operations or field use

• Error severity and distribution in different development stages

• Time/cost in test running

Page 30: 2 Marks se

• Time/cost in bug fixing

• Time/cost in inspections or reviews.

• Defect present/remaining

• Defect density

• Defect remo0val efficiency

 

11. Mention some of the white box testing techniques

1. Basic path testing

Flow graph notation

Cyclomatic complexity

Graph metrics

2. Control structure testing

a) Condition testing

i) Statement coverage, ii) Decision Coverage iii) Condition Coverage iv) Multiple condition coverage v) path coverage.

b) Data flow testing

c) Loop testing

i) Simple loop testing ii) nested loop testing iii) concatenated loop testing iv) unstructured loop testing.

 

 

12. Define alpha testing.

The alpha test is conducted at the developer’s site by a customer. The software is used in natural setting with the developer of the user and recording errors and usage problems. Alpha test are conducted in a controlled environment.

 

 

13.What is incremental testing?

Top down integration testing is an incremental approach to construction of program structure. Modules are integrated by moving downward thru the control hierarchy beginning from main control module and then the subordinate modules are incorporated in the depth first or breadth first manner.

 

14. Mention some of the approaches in debugging

Page 31: 2 Marks se

Some people are better at debugging than others.

Common approaches:

• Brute force - memory dumps and run-time traces are examined for clues to error causes

• Back Tracking – Source code is examined by looking backwards from symptom to potential causes of errors

• Cause elimination - uses binary partitioning to reduce the number of locations potential(Where errors can exist)

15. Explain Unit testing

 

Unit Testing –makes heavy use of testing techniques that exercise specific control paths to detect errors in each software components individually. The steps are

 

• Module interfaces are tested for proper information flow.

• Local data are examined to ensure that integrity is maintained.

• Boundary conditions are tested.

• Basis (independent) path are tested.

• All error handling paths should be tested.

• Drivers and/or stubs need to be developed to test incomplete software.

 

16. Define Regression testing.

Regression testing- used to check for defects propagated to other modules by changes made to existing program.

 

 

17. What is smoke testing?

Smoke testing

1. Software components already translated into code are integrated into a build.

2. A series of tests designed to expose errors that will keep the build from performing its function are created.

The build is integrated with other builds and the entire product is smoke tested daily (top or bottom integration may be used).

 

Page 32: 2 Marks se

 

18. What is Scenario-Based testing?

OO Scenario-Based Testing

• Using the user tasks described in the use-cases are building the test cases from the task and their variants

• Uncovers errors that occur when any actor interacts with the OO software

• Concentrates on what the use does, not what the product does

• You can get a higher return on your effort t by spending more time on reviewing the use-cases as they are creating, than spending more time on use-case testing.

 

 

19. Describe about comparison testing.

 

Comparison testing

• black-box testing for safety critical systems in which independently developed implementations of redundant systems are tested for conformance to specifications

• Often equivalence class partitioning is used to develop a common set of test cases for each implementation.

 

 

20.Explain Orthogonal Array testing.

Orthogonal Array Testing

• Black-box technique that enables the design of a reasonably small set of test cases that provide maximum test coverage

• Focus is on categories of faulty logic likely to be present in the software component(without examining the code)

• Priorities for assessing tests using an orthogonal array

1. Detect and isolate all single mode faults

2. Detect all double mode faults

3. Multimode faults

 

16 Marks

 

1. Describe software failures and faults. What is test coverage criteria? Discuss testing issues.

Page 33: 2 Marks se

2. Explain automated software testing tools. How test cases are generated? Discuss when to stop testing. What are performances testing? Describe.

3. Justify the importance of testing process. Discuss in detail Alpha Testing and Beta Testing.

4. What is meant by integration testing? Explain. Discuss on their out comes.

5. How do you define test cases for a software and explain how do you organize and perform various testing?

6. Explain the verification and validation techniques. How are they related to software reliability? Discuss.

7. What is black box testing? Is it necessary to perform this? Explain various test activities.

8. Explain the integration testing process and system testing processes and discuss on their outcomes.

9. Explain the testing procedures for boundary conditions.

10. Describe unit testing and integration testing. How test plans are generated?

11. Suggest software testing sequence of a 100% bug free software. Explain.

unit 5

2 Marks

1. Define the term software reliability.

Software reliability is the probability of failure-free operation of a computer program in a specified environment for a specified time. Failure is nonconformance to software requirements. Correction of one failure may introduce errors. Some failure can be corrected within second & some require weeks or months.

 

Reliability Measure: Mean-Time-Between-Failure(MTBF). MTBF=MTTF+MTTR

 

 

2. Define the terms reliability and maintainability.

 

Reliability:

It is the extent to which a program can be expected to perform its intended function with required precision.

 

Maintainability:

 

It is the effort required to locate and fix an error in an operational program.

Page 34: 2 Marks se

 

 

3.What is SQA?

The SQA group has responsibility for quality assurance planning, oversight, record keeping, analysis and reporting.

 

Role of SQA group:

• Prepares an SQA plan for a project.

• Participates in the development of the projects software process description.

• Reviews s/w engineering activities to verify compliance with the defined s/w process.

• Audits designated s/w work products.

• Records any noncompliance and report to senior management.

 

 

4.What are the MC Call’s quality factors for software metrics.

Production revision factors:

Maintainability, Flexibility, Testability

Product transition factors:

Portability, Reusability, Interoperability

Production Revision factors:

Correctness, Reliability, Usability, Integrity, Efficiency.

 

5.Differentiate FTR and SCA(Software Configuration Audit)

FTR objectives:

To uncover errors in functions, logic, implementation, representation.

To verify that s/w meets its requirements.

To achieve s/w that is developed in a uniform manner.

To make projects more manageable.

 

SCA:

Page 35: 2 Marks se

SCA is a verification of a configuration items compliance with its configuration identification.

Verifies conformance with requirements are achieved or not.

Whether the procedures are followed.

Whether the traceability is maintained?

 

6. What is SQA activities?

The SQA group has responsibility for quality assurance planning, oversight, record keeping, analysis and reporting.

 

7. Define the role of SQA group.

 

Prepares an SQA plan for project.

Participates in the development of the projects software process description.

Reviews s/w engineering activities to verify compliance with the defined s/w process.

Audits designated s/w work products.

Records any noncompliance and report to senior management.

 

8. What do you mean by s/w reviews?

It is a filter for the S.E process. Reviews are applied at various points during the development and serve to uncover errors and to remove the defects. It purifies the S.E activities.

 

9. What is the measure of reliability and availability?

A simple measure of reliability is main-time-between-failures(MTBF)

MTBF=MTTF+MTTR

Availability is the probability that a program is operating according to requirement at a given point in time & it is defined as

Availability = [MTTF /(MTTF + MTTR)]*100%

 

10. Discuss about ISO 9126 quality factors.

ISO quality standard was developed in an attempt to identify the key quality attributes for computer software. The key quality attributes are Functionality, Reliability, Usability, Efficiency, Maintainability, and portability.

 

Page 36: 2 Marks se

11. Define QFD.

QFD is quality management techniques that translate the needs of the customer into technical requirements for software. It concentrates on maximizing customer satisfaction.

 

QFD identifies three type of requirements.

1. Normal requirements.

2. Expected requirements

3. Exciting requirements.

 

12. Give an account on Defect removal efficiency.

To assess the real time quality of software, engineers use certain technical measures. Defect removal efficiency (DRE) is one such quality metric that provides benefit at the project level. It is actually a measure of filtering ability of quality assurance and control activities as they are applied throughout all process framework activities.

 

DRE=E/E+D

In addition, DRF can be used within the project to assess a team’s ability to find errors before they passed to next framework activity or software engineering task. Hence DRE can be redefined as

DRE(I)=E(I)/E(I)+E(I+I)

Where E(I) is the number of errors found during software engineering activity I and E(I_I) is the number of errors found during software engineering activity I+I that are traceable to errors that were not discovered in software engineering activity.

 

13. What is SCM?

 

S/W Configuration Management..

 

It is discipline for managing the evolution of the computer products. SCM helps coordinating software development to minimize confusion. Goal is to maximize productivity by minimizing mistakes. SCM includes a set of activities to ,

1. Identify change.

2. Control change.

3. Implement change.

4. Report change.

 

Page 37: 2 Marks se

14. What is the need configuration management?

The purpose of Software Configuration Management is to establish and maintain the integrity of the products of the software project throughout the project’s software life cycle.

 

The SCM process within the project must provide a managed update of the evolving system configuration throughtout the life cycle. SCM shall achieve the following objectives

1. SCM activities are planned.

2. Selected software work products are identified, controlled and available.

3. Changes to identified software work products are controlled.

4. Software baselines are periodically audited and effected groups or informed of the status and contents as change make necessary.

5. Control and accounting of system functional and physical characteristics are provided for across the entire life cycle.

6. SCM activities will be periodically examined by the Software quality Assurance element.

7. SCM activities are reviewed with senior management of a period basis.

 

15. What is baseline?

It is n software configuration item(CI)chat.

 

Has been formally reviewed and agreed.

Serve as the basis for further development

Changed only through formal change procedure.

It is the foundation for configuration management.

It provides the official standard on which subsequent work is based and to only authorized changes are made.

 

After an initial baseline is established and frozen, every subsequent change is recorded as until the nest baseline is set. A point at which some deliverable produced during the software engineers process is put under formal change control.

 

16. Explain Version control.

Version is an instance of a system which is functionally distinct in some way from other system instances. A baseline can only be changed by creating a new version. It is used to

Keep track of SCI version.

To mange different version of SCI

Page 38: 2 Marks se

To ensure repeatability & ability to reproduce any version of the s/w at any time.

 

17. What is version management?

Version management is,

Invent identification scheme for system version.

Plan when new system version is to be produced.

Ensure that version management tools & procedures are applied.

Plan & distribute new system releases.

 

18. Discuss Configuration change control

It involves managing & controlling changes to the SCIs, baseline & s/w releases Elements(process steps/activities)

Evaluation

Co-ordination

Approval or disapproval

Implementation of changes.

 

19. What is change management?

Changes should be

Analyzed before they are made

Recorded before they are implemented.

Verified after they are implemented

Reported to affected parties.

 

20. Mention the members of change control board

A group of people are responsible for CC activities. Members include Project Manager, User representative, Quality controller. There can be different boards for different change requests.

 

21. List the functions of Re-engineering tools.

The re-engineering tools can be subdivided into

Page 39: 2 Marks se

Reverse engineering to specification tools.

Code reconstruction and analysis tools

On-line system re-engineering tools.

 

22. What is the base line criteria in SCM?

A work product becomes a baseline only after it is reviewed and approved. A baseline is a milestone in software development that is marked by the delivery of one or more configuration items. Once a baseline is established each change request must be evaluated and verified by a formal procedure before it is processed.

 

23. Explain configuration status reporting.

Configuration status reporting( Configuration Audit) is an SCM task that answers the following questions.

What are the conformance with requirements?

What are the procedures to be followed?

What kind of traceability is maintained?

It is the verification of a configuration items compliance with its configuration identification.

Two types of audit

Functional Configuration Audit(FCA)

Physical Configuration Audit(PCA)

 

24. Define CASE tools

Computer Aided Software Engineering Tools provide the software engineer with the ability to automate manual activities and to improve engineering insight. The CASE tools ensure that the quality is designed in before the product is built.

 

25. Mention some of the CASE tools.

Risk analysis tools, Project management tools, Documentation tools, System software tools, Project planning tools, Quality assurance tools, Database assurance tools, Test management tools, Client/Server tools, Web development tools, Prototyping tools.

 

 

26 Differentiate FTR and SCA (Software Configuration Audit)

FTR objectives:

To uncover errors in functions, logic, implementation, representation.

Page 40: 2 Marks se

To verify that s/w meets its requirements.

To achieve s/w that is developed in a uniform manner.

To make projects more manageable.

 

27 SCA:

SCA is a verification of a configuration items compliance with its configuration identification. Whether the procedures are followed.Whether the traceability is maintained.

 

28 What is SQA activities?

The SQA group has responsibility for quality assurance planning, oversight, recovery keeping, analysis and reporting.

 

29 Define the role of SQA group?

Prepares an SQA plan for a project.

Participates in the development of the projects software process description.

Reviews s/w engineering activities to verify compliance with the defined s/w process.

Audits designated s/w work products.

Records any noncompliance and report to senior management.

 

30 What do you mean by s/w reviews?

It is a filter for the S.E process. Reviews are applied at various points during s/w development and serve to uncover errors and to remove the defects. It purifies the S.E activities.

 

31 What is the measure of reliability and availability?

A simple measure of reliability is mean-time- between –failures(MTBF)

MTBF=MTTF + MTTR

Availability is the probability that a program is operating according to requirement at a given point in time & it is defined as

Availability = [MTTF / (MTTF + MTTR)] * 100%

 

32 Discuss about ISO 9162 quality factors.

Page 41: 2 Marks se

ISO quality standard was developed in an attempt to identify the key quality attributes for computer softwares. The key quality attributes are Functionally, Reliability, Usability, Efficiency, Maintainability and portability.

 

33.Define QFD.

QFD is quality management techniques that translate the needs of the customer into technical requirements for software. It concentrates on maximizing customer satisfaction.

 

34 QFD identifies three type of requirements.

1. Normal Requirements.

2. Expected Requirements.

3. Exciting Requirements

 

16 Marks

1. Explain the maintenance activities and the maintenance problems. How the cost of maintenance is estimated?

2. Write short notes on:

i) Cocomo estimation criteria

ii) Software metrics and

iii) Verification and validation criteria.

 

3. Explain in detail about the maintenance process.

4. Discuss in detail about software evolution.

5. Describe two metrics which are used to measure the software in detail. Discuss clearly the advantages and disadvantages of these metrics.

6. Explain the cocomo approach for estimation of cost for different kinds of software.

7. Explain the need for software measures and describe various metrics.

8. Explain various cost estimation models and compare.

9. Write briefly on

(i) CASE

(ii) Software complexity measure.

10. Write in detail about earned value analysis and error tracking.

Page 42: 2 Marks se

M.C.A DEGREE EXAMINATIONS,NOVEMBER/DECEMBER2009.THIRD SEMISTER

MC1703-SOFTWARE ENGINEERING(REGULATIONS 2007)

Time: Three hours Maximum : 100 marksAnswer ALL questions

For more question papers of MCA department CLICK HERE

PART A-(10*2=20 marks)

1.List out the four fundamental process activities.2.State the objectives of Throw-away prototyping.3.What are deliverable?Give examples.4.Use-cases are better than flow chart in understanding the user requirements-why?5.Define the term Component.6.What is Refinement?7.State what Functional testing is not concerned with,and what is concerned with?8.What is validation plan?9.What is a software test plan?Discuss.10.Relate defects and quality.

PART B-(5*16=80 marks)

11. (a) "The details of the project plan vary depending on the type of project and organization".List out and discuss the details that will be contained in almost all plans. (16) or(b) Perform a comparitive study between the Water Fall Model and Spiral Model. (16)

12.(a) Prepare a Software Requirements Specification document for a Library Management System.State the problem definition,Business Rules and any assumptions you make. (16)or(b) Develop a Use Case diagram for a Library Management Syetem.State the problem Definition,Business Rules and any assumptions you make.(16) 

13. (a) (i) With relevant examples discuss the following levels of cohesion:(1) Coincidential cohesion(2) Logical cohesion (8)(ii)Explain the following levels of cohesion with relevent example.(1)Temporal cohesion(2)Procedural cohesion. (8)or(b) (i) With relevant example discuss the following levels of coupling:(1)Content coupling(2)Control coupling (8)(ii)With a relevant example discuss the following levels of coupling:(1)Stamp coupling(2)Data coupling (8)

14. (a) Describe various White Box Testing Techniques.or(b) Discuss the following Testing Techniques:(i) Integration Testing (8)(ii) Alpha Testing (4)(iii) Beta Testing. (4)

15. (a) (i) What is Software Configuration Management?Justify the need for Software Configuration Management. (8)(ii)List and discuss the various Software Configuration items. (8)or(b) What is software quality assurance?List and discuss the various software quality assurance standards. (16)

Page 43: 2 Marks se

MC 1703 – SOFTWARE ENGINEERING

Third Semester( Regulation 2005)

Time : Three hours Maximum : 100 marksAnswer All questions.

For more question papers of MCA department CLICK HERE

PART A – ( 10 x 2 = 20 marks )

1. Write the approaches for software process assessment.2. What is the difference between systems engineering and software engineering?3. Identify the actors and use cases in a general banking problem.4. List out the requirements validation techniques.5. What is OCL? What is the use of it in Object-Oriented design?6. Enumerate the fundamental software design concepts7. How do you define cyclomatic complexity?8. Define testability?9. Name the measures for reliability in software.10. Differentiate between Errors and Defects.

PART B – (5 X 16 = 80 marks)

11. (a) Categories the iterative models for software process. Explain each of themin detail. (16)Or(b) What are the different types of agile process models? Explain thecharacteristics of each of them in detail. (16)

12. (a) (i) Explain the factors to be considered for system modeling. (8)(ii) Which of the UML diagrams are useful for system modeling. Witha suitable example explain. (8)Or(b) (i) List out the analysis modeling approaches. (2)(ii) With suitable examples and required diagrammatic representationexplain the following:1. Scenario based modeling. (7)2. Behavioral modeling. (7)

13. (a) Explain in detail about the pattern based software design. (16)Or(b) (i) Define cohesion and coupling. Explain the various types in each ofthem. (8)(ii) Elaborate the rules for good use interface design. (8)

14. (a) (i) Explain the various system testing methods. (8)(ii) Write notes on testing of real time environments. (8)Or(b) (i) Explain the variations in testing for OO environment. (8)(ii) Assume a problem and derive the test cases for it using the methodequivalence partitioning. (8)

15. (a) (i) Write notes on statistical software quality assurance. (8)(ii) Write notes on software safety. (8)Or(b) Explain in detail about the software configuration management layered activities.

M.C.A DEGREE EXAMINATION, MAY/JUNE 2007.Third Semester

MC 1703 – SOFTWARE ENGINEERING(Regulation 2005)

Page 44: 2 Marks se

Time : Three hours Maximum: 100 marksAnswer ALL questions.

For more question papers of MCA department CLICK HERE

PART A – (10x2 = 20 marks)

1. What is the main criterion for deciding whether or not to use the waterfallmodel in software development project?2. Give the model of extreme programming process.3. State the reason why software requirements elicitation is difficult.4. How does state diagram represent the behavior of a computer based system?5. Differentiate dynamic model and functional models.6. What is control coupling?7. What is alpha test and beta test?8. State the problem that are encountered when top-down integration is chosen.9. What is base line?10. What is version control?

PART B — (5 x 16 = 80 marks)

11. (a) (i) Describe the spiral model of software development. (10)(ii) State the advantage and disadvantages of the evolutionary modelof software development. (6)Or(b) Discuss the following agile process models(i) Adaptive software development and its life cycle. (6)(ii) Dynamic systems development (5)(iii) Serum. (5)

12. (a) Describe the seven distinct functions of requirements engineering task.(16)Or(b) Explain the different models used for analysis. Explain the sub modelwith an example. (16)

13. (a) Discuss the various steps involved in transform mapping and transactionmapping. (16)Or(b) Explain the various design principles that enable an interface(i) to reduce the users memory load (ii) make the interface consistent.(16)14. (a) Discuss the various tests to be conducted for system testing. (16)Or(b) Describe how unit testing and integration testing is conducted for objectoriented software. (16)

15. (a) Write short notes on :(i) Cost impact of software defect (4)(ii) defect amplification and removal (4)(iii) software reliability (4)(iv) change control. (4)Or(b) Write short notes on :(i) software configuration management (6)(ii) software quality assurance (5)(iii) quality standards. (5)