WP 3 - Pilot Project PresentationWP 3 - Pilot Project PresentationMunicipality of Cervia – PP1Municipality of Cervia – PP1
Javni razpis št. 02/2009: SALTWORKS - Ekolosko trajnostno vrednotenje solin med Italijo inJavni razpis št. 02/2009: SALTWORKS - Ekolosko trajnostno vrednotenje solin med Italijo inSlovenijoSlovenijoBando pubblico n. 02/2009: SALTWORKS - Valorizzazione ecosostenibile delle saline traBando pubblico n. 02/2009: SALTWORKS - Valorizzazione ecosostenibile delle saline traItalia e SloveniaItalia e Slovenia
Cervia, Pilot Project – External renovation
In Cervia Saltpans, the pilot project had as purpose the restoration and the internal preparation of the ancient Hexagonal Aqueduct Tower to be used as a starting point for a cultural itinerary in the Saltpans.
The Tower, not used in the last years, has a good location near the Saltpans’ Visitor Center.Thanks to the up-coming inside multimedia equipment, it will be possible to introduce new historical and scientific contents increasing the cultural and didactical Saltpan offert.
2nd Intermediate MeetingPortorose 14-15/03/2013
WP3 Pilot Project presentation
Cervia, Pilot Project – External renovation
The Cervia’s Pilot Project has been recently changed because the planned Mooring Area, has not been authorized by State Forester Corps.
Therefore the Municipality has decided to redevelop the outstanding Tower area that aims at reclaiming it from pollutant materials too (as “eternit”).
2nd Intermediate MeetingPortorose 14-15/03/2013
WP3 Pilot Project presentation
Cervia, Pilot Project Location
New town
Old town
2nd Intermediate MeetingPortorose 14-15/03/2013
WP3 Pilot Project presentation
WP 3 Work Team
Referee Project Role
Venturi Gianna – Responsabile del Servizio Attività economiche e del Servizio Parco della salina
Team Manager
Gasperoni Roberta Management and project reporting
Di Martino Elisabetta – Responsabile Ufficio Europa
Administrative activities and reporting management
Bottari Stefano – Servizio Progettazione
Management of the Pilot Action (wp3)
2nd Intermediate MeetingPortorose 14-15/03/2013
WP3 Pilot Project presentation
Pilot Project actions – External renovation
• The Restoration of the hexagonal Aqueduct Tower
• The Design of a multimedia information point for the discovery of Cervia’ s Old Town
2nd Intermediate MeetingPortorose 14-15/03/2013
WP3 Pilot Project presentation
Pilot Project actions – External renovation
• Renovate the walls
• Cornices and string courses consolidation, tank cover waterproofing
• New flooring
• New outside pavement area
• Environmental redevelopment of a new external area
2nd Intermediate MeetingPortorose 14-15/03/2013
WP3 Pilot Project presentation
Pilot Project actions– Internal preparation
Interior design:
• Interactive floor, multimedia panels;
• Virtual map tours, that illustrate the Cervia’s territory evolution ( 6 languages)
2nd Intermediate MeetingPortorose 14-15/03/2013
WP3 Pilot Project presentation
Cervia, Pilot Project: Phases & State of the art
• Feasibility study – approved on 24.04.2012
• On 29.05.2012 Approval of the preliminary draft and the beginning of the final phase design
• On 30.08.2012 Final draft has obtains a positive opinion from the Private Building Service
• On 04.09.2012 positive opinion from the Quality Architectural and Landscape Commission
2nd Intermediate MeetingPortorose 14-15/03/2013
WP3 Pilot Project presentation
Cervia, Pilot Project: Phases & State of the art
• On 24.09.2012 the State Property Agency, gave a positive opinion to preliminary draft
• On 28.09.2012, the Architectural Heritage and Cultural Activities Authority , authorized the implementation of the project
2nd Intermediate MeetingPortorose 14-15/03/2013
WP3 Pilot Project presentation
Cervia, Pilot Project: Phases & State of the art
• On 24.09.2012 The State Forester Corps, Territorial Office of Biodiversity, gave:
- a positive opinion on the Tower project to recover the surrounding areas;
- a negative opinion for a new docking point for boats to ensure an environmental and wildlife protection.
2nd Intermediate MeetingPortorose 14-15/03/2013
WP3 Pilot Project presentation
Cervia, Pilot Project: Phases & State of the art
Following the denied opinion, it was decided to proceed with
a new project that includes the Tower surrounding area:
- Demolition of the building nearby the Tower that looks dilapidated and build with poor materials
- Remove the asbestos- cement cover;
- The renovation of the area2nd Intermediate MeetingPortorose 14-15/03/2013
WP3 Pilot Project presentation
Cervia, Pilot Project: State of the art
• The final design was approved the last 18 December.
• Currently the work team is concluding the final design.
• The work completion is expected to the end of October
2nd Intermediate MeetingPortorose 14-15/03/2013
WP3 Pilot Project presentation
Grazie per l’attenzione!Grazie per l’attenzione!Hvala za vašo pozornost!Hvala za vašo pozornost!
Roberta [email protected]
Progetto finanziato nell'ambito del Programma per la Cooperazione TransfrontalieraItalia-Slovenia 2007-2013, dal Fondo europeo di sviluppo regionale e dai fondi nazionali Projekt sofinanciran v okviru Programa čezmejnega sodelovanja Slovenija-Italija 2007-2013 iz sredstev Evropskega sklada za regionalni razvoj in nacionalnih sredstev
Ministero dell'Economia e delle Finanze