OptiX OSN 1500/2500/3500/7500/9500 Equipment Commissioning

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page1

Objectives

l Upon completion of this course, you will be able to:

p Successfully complete hardware and software commissioning of

OptiX OSN 1500/2500/3500/7500/9500 equipment

p Interconnect all the equipment and perform system commissioning

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page2

Contents

1. Preparations before Commissioning

2. Single Station Commissioning

3. Network Commissioning

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page3

Preparations

l Requirements to Commissioning Engineers

p Be familiar with the fundamentals of SDH, PDH, Ethernet, and

ATM

p Be familiar with the OptiX OSN equipment

p Be familiar with the T2000,T2000LCT

p Skillful with test instruments

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page4

Preparations (Cont.)

l Prerequisites

p Prepare tools and instruments

n Laptop, Multi-meter, Optical power meter, Optical Attenuator, SDH Analyser,

Loop back patch fibre, DDF test cable, etc.

p Understand engineering information

n Networking, services, fiber and cable connection, clock tracing etc.

p Confirm surrounding assets

n Checking Installation of NMS

n Checking Hardware Installation

– OptiX equipment and DDF, ODF, EDF

– Power Supply and Protection Ground

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page5

Contents

1. Preparations before Commissioning

2. Single Station Commissioning

3. Network Commissioning

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page6

Single Station Commissioning

Item Sub-item

Single station

commissioning

Checking hardware

Testing power-on of the cabinet

Testing subrack functions

Configuring the commissioning data, and testing

the all buses

Testing the ALMC/RESET Button on the SCC

Testing the indices of optical/electrical interface

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page7

Single Station Commissioning (Cont.)Item Sub-item

Single station

commissioning

Testing on/off of all electrical interfaces

Testing the fiber jumper connection

Testing TPS

Testing active/standby board switching

Testing PDH channels in Series and monitoring

alarms and performance events

Testing intra-station ECC

Testing NE restarting after power failure

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page8

Checking Hardware (Cont.)

l Checking cabinet

p Installation of cabinets must comply with the requirements of the

construction drawing

p Multiple cabinets must be aligned, leveled and firmly fixed

p All cabinets must be labelled

p Power supply cables must be correctly connected (RTN+, NEG-)

p Ground cable must be correctly connected to the Ground stud

p Ground wires to the door must also be well connected

p The Orderwire phone and ESD wrist strap are in place

p No unrelated materials inside

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page9

Checking Hardware (Cont.)

l Checking sub-rack

p Power supply cables must be correctly connected to the right

connectors (PIU 1, PIU 2)

p Ground wires to the sub-rack must be well connected

p The vacant slots are installed with blank panels

p Confirm available boards

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page10

Checking Hardware (Cont.)

l Checking cables

p Ethernet cable, PDH cables

p Optical fibers, STM-1e cables

p Network clock synchronization cables

ü Cables are connected, bundled and arranged neatly

ü All cables must be correctly labeled

ü The power cables and grounding cables outside the cabinet are

arranged separately from the signal cables

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page11

Checking Hardware (Cont.)

l The AUX/EOW Board of OSN 1500

l The SEI Board of OSN 2500

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page12

Checking Hardware (Cont.)l The AUX Board of OSN 3500

CLKI1

CLKI2

CLKO1

CLKO2

CLK2

ETH

COM

EXT

LAMP1

LAMP2

ALMO1

ALMO2

ALMI1

ALMI2

ALMI3

ALMI4

CLK1

REV

F&f

PHONE

V1

V2

OAM

S1

S2

S3

S4

F1

STAT

CLK

I3CLK

O3

CLK4

REV

F&f

F1

ALMI1

ALMI2

ALMI3

ALMI4

STAT

LAMP1

LAMP2

ALMO1

ALMO2

AUX

AUX

STAT

CLK2

ETH

COM

EXT

PHONE

V1

V2

OAM

S1

S2

S3

S4

EOW

EOW

CLK

I1CLK

O1

l The AUX/EOW Board of OSN 7500

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page13

Checking Hardware (Cont.)

Power module

J9

l Checking Jumper J9 Setting on the AUX

Board for OSN 3500

p Connected with a jumper cap: the main sub-

rack

p If not: an extended one

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page14

Checking Hardware (Cont.)

l Checking Jumpers Setting for Power Supply

Monitoring

p Jumpers J9, J10 on OptiX OSN 2500 SAP

n -48V: capped J9 and J10 (default)

n -60V: remove the caps from J9 and J10

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page15

Checking Hardware (Cont.)

l Checking Jumpers Setting for Power Supply Monitoring

Equipment Jumpers on

GSCC

Description

OptiX OSN

3500

J16, J17 on

N1GSCC

-48V: capped

(default)

-60V: remove the

caps from jumpers

OptiX OSN

3500/7500

J30 and J31 on

N3GSCC

OptiX OSN

7500

J30 and J31 on

N2GSCC

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page16

NEG 2(-)

INPUT

RTN2(+)RTN1(+) NEG1(-)

2 3 4 5

O N

O FF20A32A 32A 20A

O N

O FF

1 2 3 4

1 6

1 2 3 4

20A32A 32A 20A

O UTP UT O UTP UTA B

1. Grounding stud 2. PGND 3. RTN1 (+)

4. RTN2 (+) 5. NEG1 (-) 6. NEG2 (-)

7. Left output cable terminal 8. Right output cable terminal

Checking Hardware (Cont.)

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page17

l Checking Resistance Between Power Cable Posts

p No connection with the power supply equipment

ActionThe resistance between NEG1/2 (–) and

RTN1/2 (+) /PGND

All power switches

OFF∞

Subrack

power switches ON

> 20 KΩ. If <20 Ω, short circuit present and

remove the fault before continue

Checking Hardware (Cont.)

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page18

l Checking Fuse Capacity of Power Output Terminal

Equipment Subrack typeThe maximum power consumption

of a single sub-rack (W)Fuse capacity

OSN 1500ACommon 200 10

Enhanced 313 15

OSN 1500BCommon 280 10

Enhanced 400 15

OSN 2500Common 400 15

Enhanced 643 25

OSN 3500Common 600 20

Enhanced 1088 32

OSN 7500 Common 1000 32

Checking Hardware (Cont.)

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page19

l Testing method

pConnect OSN equipment to the power equipment

n Ensure that the positive and negative poles are not connected reversely

p Measure the voltage of the power supply equipment at the top of the

cabinet

n Ranging from –38.4 V to –57.6 V (-48V±20%)

n Ranging from –48 V to –72 V (-60V±20%)

Testing Power-on of the Cabinet

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page20

l Testing method

p Check the connection between sub-rack power cables and PIU boards

p Turn on the left switches, and every sub-rack can be powered on normally

p Turn off the left switches and turn on the right switches, and every

sub-rack can be powered on normally

p Turn on all switches

Testing Power-on of the Subrack

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page21

Indicator Status Description

Power indicator (green)On The cabinet is powered on.

Off The cabinet is not powered on.

Critical alarm indicator (red)On There is a critical alarm.

Off There is no critical alarm.

Major alarm indicator (orange)On There is a major alarm.

Off There is no major alarm.

Minor alarm indicator (yellow)On There is a minor alarm.

Off There is no minor alarm.

Testing Sub-rack Functions

l Testing the Fan

p The green indicator is on, and you can feel wind blowing normally

l The PWRA and PWRB indicators should be green

l Testing the indicators on the top of the cabinet

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page22

Indicator status description

Indicator Status Description

STAT (red or

green)

On, green The board works normally.

On, red The board hardware is faulty.

Flash, red The board hardware is mismatched.

Off The board is not powered on, or the service is not configured.

PROG (redor green)

On, greenUpload of board software to FLASH or the FPGA upload is normal, or the board software initialization is normal.

On for 100ms and off for 100ms alternatively, green

Board software is being uploaded to FLASH or FGPA.

On for 300ms and off for 300ms alternatively, green

The board software is initializing, and is in BIOS boot stage.

On, redThe board software in FLASH or the FPGA configuration is lost, resulting in upload and initialization failure.

Off No power supply.

Testing the indicators on boards

l The indicators on boards should be in the right status

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page23

l The location of Ethernet Ports

p OSN 1500/ 3500: AUX Board

p OSN 2500: SAP Board

p OSN 7500: EOW Board

l Testing method

p NM port (ETH): 129.9.0.X

p Usually, the cross-over network cable are applicable.

p Check LED status on the ETH port

Testing Ethernet Ports

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page24

Indicator Status Description

LINK1

(green)

On The link between the first GE port and the opposite equipment is established.

OffThe link between the first GE port and the opposite equipment is not

established.

ACT1

(orange)

FlashingThere are data being exchanged between the first GE port and the opposite

equipment.

OffThere is no data being exchanged between the first GE port and the opposite

equipment.

Testing Ethernet Ports (Cont.)

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page25

l Setting NE ID

l Setting NE IP address and gateway IP, if need

p Note: SCC will reboot automatically

l Delivering Commissioning Data

p Make configured services run through all boards and buses

n All ports of all tributary boards

n All buses of each line board

Configuring Commissioning Data

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page26

l Distribution of average services

Service level Service source Service sink

VC12 2-PQ1-1–2 7-SL16-1-1-1–2

VC12 7-SL16-1-1-1–2 2-PQ1-1–2

VC12 …… ……

VC12 2-PQ1-31–32 7-SL16-1-16-1–2

VC12 7-SL16-1-16-1–2 2-PQ1-31–32

VC12 2-PQ1-33–34 12-SL16-1-1-1–2

VC12 12-SL16-1-1-1–2 2-PQ1-33–34

VC12 …… ……

VC12 2-PQ1-63 12-SL16-1-16-1

VC12 12-SL16-1-16-1 2-PQ1-63

Configuring Commissioning Data (Cont.)

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page27

Testing the ALMC Button on the SCC

l Testing method

p Remove the input fiber jumper, then the buzzer is triggered

p Cut off the alarm sound temporarily

n Press it in a short time, then the alarm sound disappeared.

p Cut off the alarm sound permanently

n Press it for more than 3 seconds

n The ALMC indicator turns yellow

n Reconnect the fiber jumper, then remove it again

n The buzzer will not beep

n Cancel the permanent cut-off status after the test

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page28

l Testing method

p Press the RESET button to reset the SCC board.

p The SCC will reset after two minutes.

p The NE can be logged in and is in the running state again.

Testing the RESET Button on SCC

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page29

l Testing method

p Check the cable and connection for the alarm output cable.

p Remove the input fiber jumper, the buzzer will beep.

p The centralized alarm processing device will give corresponding

audible and visual indications.

Testing the Centralized Alarm System

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page30

l Testing method

p Connect BER tester on DDF

n Outloop: normal service

n Inloop: interrupted service

Testing On/Off of All Electrical Interfaces

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page31

l Testing method

p On ODF, test the transmitting fiber

n Connect the fiber jumper: normal

n Remove the fiber jumper: loss

p Loopback the optical port on ODF

n Close the laser, R-LOS occurs

n Open the laser, R-LOS ends

p Check the fiber label

Testing the Fiber Jumper Distribution

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page32

Test item Description

Mean launched power Mandatory

Actual received optical power Mandatory

Receiver sensitivity Optional

Allowable input frequency deviation at the optical interface Optional

Input jitter tolerance at the optical interface Optional

Output jitter at the optical interface Optional

Allowable input frequency deviation at the electrical interface Optional

Input jitter tolerance at the electrical interface Optional

Output jitter at the electrical interface Optional

Testedoptical

interface

Opticalinterfaceboard

IN

OUT

Fiberjumper

-

Opticalpower meter

Testing Optical/Electrical Interface Indices

Opticalinterface

board Testedoptical

interface

IN

OUT

Fiberjumper

- ODF ODF

Fiberjumper

Adjacent stationLocal station

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page33

Step Action

1Configure TPS protection. Suppose that the PQ1 board in slot 1 protects the PQ1 board in slots 2 (with low priority) and 3

(with high priority).

2 Check the status of TPS protection and the ACT indicators on PQ1 boards.

3 Self-loop the optical interface with a 5 dB attenuator.

4 Connect BER tester to E1 port of the D75S board. The BER tester gives no alarm.

5 Remove the PQ1 in slot 2. Services are interrupted transiently and resumed immediately.

6 Check TPS protection switching status and the ACT indicator.

Testing TPS Function

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page34

Step Action

7 Remove the PQ1 in slot 3. The BER tester generates an alarm.

8 Connect the BER tester to protected service interface. The BER tester will be normal.

9 Insert the working board in slot 3 back to test restoration. Check TPS protection switching status and ACT indicator.

10 Verify that the switching state of the protected board is WTR.

11After the WTR time, the PQ1 board in slot 3 should work. And the PQ1 board in slot 1 should also work to protect the PQ1

in slot 2.

12 Insert the working board in slot 2 back to test restoration. Check TPS protection switching status and ACT indicator.

13Verify that the switching state of the protected board is WTR. After the WTR time, the PQ1 board in slot 2 should restore

to work.

Testing TPS Function (Cont.)

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page35

l Testing method

p Configure boards and services

p Self-loop the optical port on DDF, and connect BER tester

p Switch testn Implement XCS switch (3 methods)

– Issuing switch command by T2000

– Hard reset active board by T2000

– Pull out active board (jiggle switch)

n ACT indicator

n 1+1 XCS protection status

n VC4 services and clock should be good,VC12/VC3 services are momentarily interrupted.

Test Active/Standby XCS

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page36

p Restore testn Restore the 1+1 XCS protection through T2000

n ACT indicator

n 1+1 XCS protection status

n VC4 services and clock should be good,VC12/VC3 services are momentarily interrupted.

Test Active/Standby XCS (Cont.)

Notes The interval of active/standby switch should be done after at least 1 min.

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page37

l Test method

p Configure boards and services

p Connect BER tester

p Switch test

n Implement GSCC switch (3 methods):

– Issuing switch command by T2000

– Hard reset active board by T2000

– Pull out active board (jiggle switch)

n Services should be normal

n NE can be logged in again

n The consistent configuration on the GSCC and T2000

Testing Active/Standby GSCC

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page38

p Restore test

n Restore the 1+1 GSCC protection through T2000

n ACT indicator

n 1+1 GSCC protection status

n Services should be normal

n NE can be logged in again

n The consistent configuration on the GSCC and T2000

Testing Active/Standby GSCC (Cont.)

Notes The interval of active/standby switch should be done after at least 1 min.

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page39

l Attention to CXL1/4/16 switch

p CXL1/4/16 = SCC + Cross Connection + Clock + LU

p SCC Unit and Cross Connection Unit switch together

Testing Active/Standby CXL1/4/16

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page40

l Testing method

p At the ODF side, selfloop the optical ports.

p Connect the test meter to service ports.

p Test 15 minutes, and no any alarm and bit error

Testing PDH Channels in Series

RX TX

TXRX

BER testerDDF

1234....

63626160

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page41

l Final Work to Do

p Test the Intra-Station ECC

p Single station power off test (for 10 minutes)

p What else?

n ALMCUT is correctly set.

n Order wire handset switch is “ON”, "TALK" button is off.

n All hardware and software loop backs are removed.

Ending NE Commissioning

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page42

Contents

1. Preparations before Commissioning

2. Single Station Commissioning

3. Network Commissioning

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page43

Item Sub-item

Network

commissioning

Checking actual received optical power and network-wide fiber connection

Configuration network

Testing ECC

Testing service channel availability

Testing self-healing protection switching

Testing clock protection switching

Testing the Orderwire

Testing network-wide BER

Testing other indices

Verifying the NMS functions

Network Commissioning

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page44

l Testing the Actual Received Optical Power

p Check if the received optical power has been tested in the single

station commissioning.

p Receiver sensitivity +3dB <Received power <Overload power –5dB

Testing the Received Optical Power

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page45

l Checking Fiber Jumper Connection and Labeling

p According to topology, check fiber connection

p Checking fibre jumper labelling

Checking Network-Wide Fiber Connection

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page46

l Two types of connection

p Direct connection

p Connection through a LAN

l The indicator status

p The green LINK indicator must stay lit.

p The orange ACT indicator must flash.

Checking Connection of an NM Computer to the Equipment

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page47

Configuration Network

Step Action

1 Logging in the T2000

2 Creating and configure NEs

3 Creating boards

4 Creating fibers

5 Creating a topology subnet

6 Creating a protection subnet

7 Configuring clock

8 Creating SDH/PDH services

9 Creating Ethernet services

10 Configuring board level protection

11 Configuring the Orderwire

13 Setting performance parameters

14 Setting alarm parameters

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page48

l NE login test

p All NEs can be logged in

l ECC automatic routing test

p By default, the short ECC route is used.

l Single-route ECC test

p The single-route ECC route is available, if cut off the other fibers.

p Test another direction

l ECC pass-through test

p Pull out SCC board in ADM NE, and other NEs can be logged in.

l Extended ECC test

Testing ECC

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page49

STM-64 two-fiberbidirectional MSP Ring

STM-16non- protection chain

NE1

NE2 NE3NE4

loopback

BER tester

Testing Service Channel Availability

l Testing Electrical/Optical Interface Services

p Normal testing

n Loopback and perform bit error test for 10 minutes, and no bit errors or alarms

p Interrupted testing

n Release the loopback, and AIS alarm generates.

p Use the same method to test other channels

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page50

l Testing Ethernet Services

p Testing Through a Laptop Computer

n EPL/EPLAN

p Testing Through a Data Analyzer

n EPL/EVPL/EPLAN/EVPLAN

STM-64 two-fiberbidirectional MSP

ring

STM-16 two-fiberbidirectional non-protection chain

NE1

NE2 NE3NE4

Computer A

VCTRUNK

Computer B

Testing Service Channel Availability

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page51

l Two-fiber bidirectional MSP ring

p Query the switch status upon normal optical paths: IDLE

p Connect the tester, loopback the service port of the other end.

Testing Self-Healing Protection

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page52

l Two-fiber bidirectional MSP ring

p Test switching by removing fibers or shutting down the laser.

n Proper switch status

n Switch completion in 50ms

n Proper alarms or performance are reported

n Services can be protected

p Test restoration

p Test MSP switch for each section repeatedly

p Test MSP switch when powering OFF

p Test other external switch functions

Testing Self-Healing Protection (Cont.)

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page53

l Four-fiber bidirectional MSP ring

p Test the span switch

p Test the ring switch

l 1+1 and 1:N linear MSP

p Test switch of each section in turn

p Dual-End Switching and Single-End Switching

p Revertive and non-revertive mode

l SNCP

p Delay time = 0

p Revertive and non-revertive mode

p Test switch of each section in turn

Testing Self-Healing Protection (Cont.)

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page54

l Testing Clock Protection Switching

p Switch and restoration

l Testing Orderwire

p Testing the Addressing Call

p Testing the Conference Call

p Testing Orderwire Functions by Removing Fibers in the ring

p Testing Orderwire upon Orderwire Pass-through

p Testing Subnet Outgoing Orderwire

Testing Clock Protection and Orderwire

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page55

l Connect SDH analyzer to 2~6 E1 interfaces in series

p Testing 24-hour BER in the Active Channel

p Testing 12-hour BER in the Standby Channel

p Monitor alarms and performance events of 15m and 24h through NMS

n No abnormal alarms

n No error

n Less than 6 times pointer adjustment counts

p SDH analyzer

n Grounding

n Set with the print status

p Control the testing area

Testing Network-wide BER

NE

NE

NE

NESDH analyzer

Loop-back PDH Port

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page56

l Test other indices

p Jitter, frequency deviation …

l NM function verification

l Remote maintenance function verification

Other Testing Items

PDF created with pdfFactory Pro trial version www.pdffactory.com

Copyright © 2008 Huawei Technologies Co., Ltd. All rights reserved. Page57

l Questions

p During commissioning, which steps are important?Item Sub-item

Preparations before Commissioning

Grasp basic skill

Understand engineering information

Single station commissioning

Checking Resistance Between Power Cable Posts

Delivering Commissioning Data

Testing optical/electrical interface indices

Testing the on/off of all electrical interfaces

Testing the fiber jumper connection

Testing TPS and active/standby board switching

Testing buses in series

Network commissioning

Network-wide configuration

Checking network-wide fiber connection and actual received optical power

Testing ECC, service make/break and protection switching

Testing network-wide BER

Network Commissioning (Cont.)

PDF created with pdfFactory Pro trial version www.pdffactory.com

Thank youwww.huawei.com

PDF created with pdfFactory Pro trial version www.pdffactory.com