I. The draft regional list
Draft regional list in the N$OG Priority Corridor
Transmission projects
:i Cluster name Name of the PCI candidates (+ TYNDP number)1 . Audorf-Döllern New 3 80 kV double circuit OHL Döllern — Hamburg Nord (251.147)
New 380 kV double circuit OHL Audorf— Hamburg Nord (251.148)2:_ Westcoast Line Westcoast Line (258.667)
3. Interco Iceland Interco Iceland UK (214.1082)UK
4. Thames Estuary 1 000 MW DC Link Richborough (UK) — Gezelle (BE) (74.443)Cluster (NEMO) New 400 kV double circuit OHL and new 400 kV substation in
Richborough (UK) (74.449)Gridlink Gridlink (285 . 1 3 83)
-i--- IFA 2 IFA 2 (25.62)
7. New Great New Great Britain - Netherlands Interconnector (260.1255)
Britain -
NetherlandsInterconnector
8. France-Alderney- France-Aldemey-Britain (1 53 .98 7)Britain
9. 2nd 2nd interconnector Belgium — UK (12 1.934)interconnectorBelgium - UK
iQ:_ Greenlink Greenlink (286. 1 3 85)1 1 . AQUIND AQUIND Interconnector (247.1381)
Interconnector12. Norway-Great Norway-Great Britain North Sea Link (NSL) (110.424)
Britain North SeaLink (NSL)Eleclink Eleclink (172.1388)
1 4. DKW-DE, New 3 80 kV cross-border line DK1 -DE (183.1018)Westcoast
1 5 . Nordlink 1400 MW HVDC Interconnector Southern Norway — NorthernGermany (37.142)Internal reinforcements Southern Norway (3 7.406)
DKW-DE, step 3 DKW-DE, step 3 (39.144)Celtic Link Celtic Link (107.8 10)
j__ NorthConnect NorthConnect (190. 1 3 82)
J2 Viking DKW-GB Viking DKW-GB (167.998)
Storage projects
Cluster name Name of the PCI candidates (+ TYNDP number)1 . HPSPP Cruachan HPSPP Cruachan II (1015)
II
2:__ CAES Lame CAES Lame (1010)
L_ CAES Cheshire CAES Cheshire (1005)CAES CAES Zuidwending (1013)
\
Brussels, 13 July 2017
Zuidwending5. HP$PP Coire HPSPP Coire Glas (1014)
Glas6. CARES CARES (1022)
II. Projects subject to further assessment by considering the qualitative criteria
Name of the PCI candidates (+ TYNDP number)iLand (1022)
‘S
Draft regional list in the NSI West Electricity Priority Corridor
I. The draft regional list
::: Cluster name Name of the PCI candidates (+ TYNDP number)1 . RE$ in north of Internal line between Pedralva and Sobrado (PT), formerly designated
Portugal Pedralva and Alfena (PT) [1.2]
2. Internal line between Vieira do Minho, Ribeira de Pena and Feira (PT),formerly designated Frades B, Ribeira de Pena and Feira (PT) [1.4,
1.474]
----—
HVDC BrunsbUttel/Wilster to GroBgartachlGrafenrheinfeld [23 5.664]4. Internal
Belgian Internal line between Horta-Mercator (BE) [236.60$]Backbone West
5 . Interconnection Portugal Spain interconnection between Portugal SpainPortugal-Spain interconnection between Beariz (ES) — fonteftIa (ES) — Ponte de
Lima (PT), including substations in Beariz (ES), FontefrIa (ES) andPonte de Lima(PT) [4.18, 4.496, 4.98, 4.499, 4.500]
6. Austria - Austria internal line between Westtirol and Zell-Ziller (AT) to increaseGermany capacity at the AustrianlGerman border [47.219]
7. 2nd 2nd interconnector Belgium — Germany [225.1107]interconnectorBelgium -
Germany8. Biscay Gulf France Spain interconnection between Aquitaine (FR) and the
Basque country (ES) [16.3$]9. North South Ireland — United Kingdom interconnection between Woodland (IE) and
Interconnector Turleenan (UK) [8 1 .462]1 0. SACOI3 New HVDC line between Italy mainland, Corsica and Sardinia
replacing the existing link SACOI2 [299. 145$]LL Belgian North Belgian North Border: Brabo II and III [297.445, 297.605]12.
L’O II +Belgian North Border: Brabo and [297.604]
----i- ALEGrO Interconnection between Lixhe (BE) and Oberzier (DE) [92.146]14. Italy-France Interconnection between Grande Ile (FR) and Piossasco (IT) (Savoie
Piemont) [21.55]1 5 . Ultranet Germany internal line between Osterath and Philippsburg (DE) to
increase capacity at Western borders [254.660]1 6. RIDP I Ireland United Kingdom Interconnection between Srananagh (IE)
and Turleenan (UK) [82.463, 82.896, 82.897]1 7. Greenconnector Italy Switzerland interconnection between Thusis/Sils (CII) and
Verderio Inferiore (IT) [174.1014]18. FR-fSproject
Aragón- FR-ES project -Aragón-Atlantic Pyrenees [270.1211, 270.1212,Atlantic 270.1214, 270.1215]Pyrenees
19. FR-ES project -
FR-ES project -Navarra-Landes [276.1206, 276.1207, 276.1208,Navarra-276.1210]Landes
-i -HPSPPMont-Negre[1O11]
Brussels, 13 July 2017
21. - P-PHESNavaleo [1012]22. - Kaunertal extension [1001]23. - HPSPP Girones & Ralmats [1019]
II. Projects subject to further assessment by considering the qualitative criteria
Name of the PCI candidates (+ TYNDP number)Italy-Switzerland [3 1 .642J
S\
Draft regional list in the NSI East Electricity Priority Corridor
I. The draft regional list
---
Cluster name Name of the PCI candidates (+ TYNDP number)1) Internal line between Krajnik and Baczyna PL, - mv. item353;
. 2) Internal line between Mikulowa and wiebodzice (PL)- mv.Ger-Pol Power Bridge‘23O
item 355;‘ ) 3) Internal line Baczyna (PL)-Plewiska(PL) ; mv. items
12,321,035
1— 1) Interconnection between Resita (RO) and Pancevo (RS)- mv.item 2382) Internal line between Portile de Fier and Resita (RU)- mv.
. . item 269;Mid Continental East . . .
. 3) Internal line between Resita and Timisoara/Sacalaz (RU)-corridor (144) .
mv. item 270;4) Internal line between Arad and Timisoara/Sacalaz (RU)- mv.item 701, 705
-ELMED Italy-Tunisia interconnector 29 (635)
4. 1) Internal line between Dobrudja and Burgas (BG)- mv. item. 800; 2) Internal line between Cemavoda and Stalpu (RU)- mv.Black Sea Corridor (138) . .
item 273 , 7 1 5 ; 3)Internal line between Gutmas and Smardan
(RU) - mv. item 275
---— -
Wurmlach (AT) - Somplago (IT) Interconnection 210 (1380)6.
1) Interconnection between Hadera (IL) and Kofinou (CY)- mv.item 1410;
EuroAsia Interconnector 2) Interconnection between Kofinou (CY) and Korakia, Crete(219) (EL)- mv. item 1049;
3) Internal line between Korakia, Crete and Attica region (EL)-mv. item 1407;
7. 1) Interconnection between St. Peter (AT) and Isar (DE) — mv.
Cluster Austria — item 212;Germany between St. 2) Internal line between St. Peter and Tauern (AT)- mv. itemPeter and Isar (47) 216
8 . 1) Internal line between Vernerov and Vitkov (CZ)) mv. item306, 307,308;2) Internal line between Vitkov and Prestice (CZ)- mv. item309;3) Internal line between Prestice and Kocin (CZ)- mv. item 3 15,CZ Northwest-South3 11
corridor(200+35) ‘ . . . .4) Internal line between Kocrn and Mirovka (CZ)- mv. item313 (35); 200 (312);5) Internal line between Mirovka and Cebin (CZ)- mv. item316; 200 (314)
Brussels, 13 July 2017
---- Interconnection between Gabikovo (SK) Gonyü (HU) andNew $K-HU intercon. — Vel’k Dur (SK)- mv. item 214;phasel (48) PCI Hungary Slovakia interconnection between Sajóvánka
(RU) and Rimavská Sobota (SK) —mv. item 695, 696, 6971 0. Cluster Austria Italy between Lienz and Veneto region:
Cluster Austria — Italy 1) Internal line between Lienz and Obersielach (AT)- mv. item(26) 218
iT 1) Interconnection between Maritsa East 1 (BG) and N. Santa
C$E 4 2nd BG GRmv. item 256;
. ‘ 2) Internal line between Maritsa East 1 and Plovdiv (BG)-inv.rnterconnector and South . . .
. item 257; 3) Internal line between Maritsa East 1 and MaritsaBG corridor) (142) . . .
East 3 (BG)- mv. item 258; 4) Internal line between MantsaEast 1 and Burgas (BG)- mv. item 262
J2: -Italy-Montenegro interconnector 28 (70)
1 3 . Internal line in Germany between Wolmirstedt and Bavaria to- increase internal North-South transmission capacity 1 30 (695)
-Hydro-pumped storage in Bulgaria — Yadenitsa 1003
-Hydro-pumped storage in Greece Amfilochia 1006
II. Projects subject to further assessment by considering the qualitative criteria
Name of the PCI candidates (+ TYNDP number)Italy — Slovenia interconnection between Salgareda (IT) and Divaèa - Bericevo region (SI) 150(616)
Slovenia —Hungary cluster : PCI candidates: 1411 ) Interconnection between Zerjavenec (HR)/Héviz (HU) and Cirkovce (SI) (mv. item 223);2) Internal line between Divaëa and Beri&vo (SI) (mv. item 225);3) Internal line between Beri&vo and Podlog (SI) (mv. item 225);4) Internal line between Podlog and Cirkovce (SI) (mv. item 225)
ril1°7°17
Draft regional list in the BEMIP Electricity Priority Corridor
I. The draft regional list
::: Cluster Name Name of the PCI candidates (+ TYNDP number)1 . Cluster Finland — Interconnection between Finland North (Fl) - Sweden bidding area
Sweden third SE1/SE2 [1 1 1 .3 96]interconnection Internal line between Keminmaa and Pyhänselkä [96.801]
3 . Kriegers Flak Denmark Germany interconnection between Tolstrup GaardeCombined Grid (DK) and Bentwisch (DE) via offshore wind parks Kriegers FlakSolution (DK) and Baltic 1 and 2 (DE) [currently known as “Kriegers Flak
Combined Grid Solution”] [36.14 1]4. Baltic Synchronisation Interconnection between Tartu (EE) and Valmiera (LV)
(Cluster Estonia- [170.1010]Latvia and internal Internal line between Balti and Tartu (EE) [170.1012]
--—
reinforcements in Interconnection Tsirguliina (EE) and Valmiera (LV) [170.101117. Lithuania) Internal line between Eesti and Tsirguliina (EE), including
upgrades in the Eesti substation [1 70. 1 01 3, 1 70. 1 1 18]8. Internal line between substation in Lithuania and state border (LT)
[170. 1034]
-i— Internal line between Paide and Sindi (EE) [170.1004]Internal line between Vilnius and Neris (LT) [170.3 82]
1 1. *Varjous aspects ofthe integration ofthe Baltic States’ electricitynetwork into the continental European network, including theirsynchronous operation [generic project]
12. Cluster Lithuania —
Poland between Alytus(LT) and Elk (PL)jLiPol Link phase 2J Internal line between Stanislawów and Ostrolçka (PL) [123.373]
1 3 . Cluster Estonia — Interconnection between Kilingi-Nomme (EE) and Riga CHP2Latvia between substation (LV) [62.386]Kilingi-Nomme and Internal line between Harku and Sindi (EE) [62.735]
1 5 . Riga jcurrently knownas 3rdinterconnectioni Internal line between Riga CHP2 and Riga HPP (LV) [62.1062]
16. NordBalt project
—
phase 2 Internal line between Ventspils, Tume and Imanta (LV) [124.3 85]1 7. - Capacity increase of hydro-pumped storage in Lithuania —
Kruonis [1009]
-Hydro-pumped storage in Estonia — Muuga [1004]
II. Projects subject to further assessment by considering the qualitative criteria
Name of the PCI candidates (+ TYNDP number)Internal line between Ekhyddan and Nybro/Hemsjo (SE) - Nordbalt phase 2 [124.7331
\