2 ppt sumpal compression project copy paste
DESCRIPTION
Scribd Copy and PasteTRANSCRIPT
Slide 1
ConocoPhillips Indonesia.PT WIJAYA KARYACONSTRUCTION TRADE REALTY - INDUSTRY
Sumpal Noise StudyClient:ConocoPhillips (Grissik) LtdLocation:IndonesiaThe Sumpal Gas Station is a part of the Corridor Block PSC (Production Sharing Contract), located 40 km South-West of Grissik in South Sumatra. ConocoPhillips (Grissik) Ltd. ("COPGL") is the field operator.As part of the Sumpal Compression Project, new compression facilities were installed along with associated utility systems. A noise study was required to determine how these modifications would affect noise levels around the gas station during both normal operations and emergency scenarios.
1Piping
SUMPAL COMPRESSION PROJECT
ConocoPhillips Indonesia.PT WIJAYA KARYACONSTRUCTION TRADE REALTY - INDUSTRY
Departement Industrial plantPT.WIJAYA KARYA
2
SUMPAL COMPRESSION PROJECTConocoPhillips Indonesia.PT WIJAYA KARYACONSTRUCTION TRADE REALTY - INDUSTRY
Engineering,Procurement,Construction and Testing of Piping WorkDemolished and manage material and send to GrissikVarious material consist of : Duplex Stainless Steel Stainless Steel Carbon SteelVarious Installation of piping arrangement.Pipe rackSleeperPipe support
Scope of Work3
ConocoPhillips Indonesia.PT WIJAYA KARYACONSTRUCTION TRADE REALTY - INDUSTRY
Sumpal Compression is brownfield Project.Smart 3D plant,PDMS or Cad worx 3D model shall be devolped to get optimum piping routing,Tie-ins location, and equiment layout in order to avoid clashing with the existing faciities.Detail tie-ins survey and study to be conduct to optimum shutdown duration and minimize cut and re-weld activity. 42 Tie in consist ofFlange ConnectionCut & re-weld
Area of ConcernSUMPAL COMPRESSION PROJECT4
ConocoPhillips Indonesia.PT WIJAYA KARYACONSTRUCTION TRADE REALTY - INDUSTRY
Pipe Stress Analysis. Pipe routing shall comply with standart,code and specification,avoid to re- routing in the mid of egineering phaseWork Pack For Tie-insStudy for detail Tie-in works: fixed detail pipe spool design, Material for tie-ins, construction duration for tie-in work ,etcEngineering and Procure for Long Lead Item.Procure item shall be indenpendent from PID or 3D model Extracted MTO.Custody transfer for company furished material (Duplex valve 2 and above 232 ea)
Area of Concern Early ActivitySUMPAL COMPRESSION PROJECT5
ConocoPhillips Indonesia.PT WIJAYA KARYACONSTRUCTION TRADE REALTY - INDUSTRY
SUMPAL COMPRESSION PROJECT
General Equipment Layout6