REPAIR OF CONCRETE STRUCTURES
CASE STUDIES
DR SYED EHTESHAM HUSSAIN
CONCRETE TECHNOLOGY CONSULTANTS
(CONTEC)
KHOBAR
![Page 2: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/2.jpg)
CONCRETE DURABILITY PROBLEMS
IN THE GULF REGION
1. SEVERE EXPOSURE CONDITIONS
- High concentrations of chloride & sulfate ions in soil
- High salinity in seawater
- High temperature & temperature fluctuations
- High humidity
CONTEC - EVALUATION, STRUCTURAL ASSESSMENT, REHAB DESIGN, FAILURE ANALYSIS, NDT
![Page 3: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/3.jpg)
CONCRETE DURABILITY PROBLEMS
IN THE GULF REGION
2. POOR QUALITY MATERIALS
- Absorptive & dusty aggregates
- Contamination in sand and coarse aggregates
- Poorly graded sand
- High salinity in water
![Page 4: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/4.jpg)
CONCRETE DURABILITY PROBLEMS
IN THE GULF REGION
3. USE OF OLD (INAPPROPRIATE) SPECS.
- Type V cement or OPC (No mineral admixtures)
- High water-cement ratio
- Inadequate curing/curing period
- Low cover to reinforcement
- Poor workmanship
- Fast construction & lack of proper quality control
![Page 5: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/5.jpg)
PRESENT IMPROVED SPECIFICATIONS
- Type I cement (C3A > 8%)
- Mineral admixtures (silica fume, fly ash and slag)
- Low w/c ratio (< 0.40)
- High cover (75 mm)
- Additional protection
- QC techniques for durability
RESULTED IN IMPROVED SERVICE LIFE
![Page 6: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/6.jpg)
EFFECT OF EXPOSURE CONDITIONS
AND CONCRETE QUALITY ON LIFE
LIFE (YEARS)
CON
CO
NC
RE
TE
QU
AL
ITY
INC
RE
AS
ING
SE
VE
RITY
OF
EX
PO
SU
RE
10 20 30 40 50
NORMAL
ARABIAN GULF
NORMAL
70s-80s
PRESENT
ADDITIONAL PROTECTION
![Page 7: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/7.jpg)
COMMON REINFORCEMENT CORROSION PROBLEMS
1. Marine structures
2. Strcs. in contact with soil & groundwater
3. Strcs. exposed to excessive condensation
4. Bridge decks
5. Strcs. exposed to deposition of sand/dust
6. Deterioration due to design defects
![Page 8: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/8.jpg)
MARINE STRUCTURES
![Page 9: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/9.jpg)
![Page 10: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/10.jpg)
![Page 11: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/11.jpg)
![Page 12: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/12.jpg)
STRCS. IN CONTACT WITH SOIL
& GROUNDWATER
![Page 13: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/13.jpg)
![Page 14: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/14.jpg)
![Page 15: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/15.jpg)
![Page 16: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/16.jpg)
![Page 17: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/17.jpg)
STRCS. EXPOSED TO EXCESSIVE CONDENSATION
![Page 18: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/18.jpg)
![Page 19: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/19.jpg)
![Page 20: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/20.jpg)
![Page 21: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/21.jpg)
BRIDGE DECKS
![Page 22: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/22.jpg)
![Page 23: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/23.jpg)
![Page 24: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/24.jpg)
![Page 25: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/25.jpg)
STRCS. EXPOSED TO DEPOSITION OF SAND/DUST
![Page 26: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/26.jpg)
![Page 27: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/27.jpg)
DETERIORATION DUE TO
DESIGN DEFECTS
![Page 28: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/28.jpg)
PIPE OPENING IN WALL
![Page 29: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/29.jpg)
CABLE DUCT
![Page 30: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/30.jpg)
COMMON REPAIR TECHNIQUES
1. DO NOTHING
2. COATINGS
3. PATCH REPAIR
4. REPLACEMENT OF CHLORIDE CONTAMINATED CONCRETE
![Page 31: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/31.jpg)
COMMON REPAIR TECHNIQUES
5. RE-SKINNING – reconstruction of cover concrete
6. RE-CONSTRUCTION
7. CATHODIC PROTECTION
8. STRENGTHENING
![Page 32: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/32.jpg)
DO NOTHING
• STRUCTURE LEFT UNREPAIRED
• LOW LEVEL OF DETERIORATION
• LEVEL OF DETERIORATION IS STRUCTURALLY ACCEPTABLE
• REMAINING SERVICE LIFE IS LIMITED
• STRUCTURE CAN OPERATE UNDER REDUCED LOADS
![Page 33: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/33.jpg)
COATINGS
• BARRIER TO INGRESS OF CHLORIDES
• PROLONG SERVICE LIFE
• NO DETERIORATION
• CHLORIDE CONMTAMINATION LEVELS ARE LOW
![Page 34: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/34.jpg)
COATINGS
COMMONLY USED COATINGS
• ACRYLIC BASED CEMENTITIOUS COATINGS
• EPOXIES
• PULYURETHANE
• PENETRANTS (SILANES & SILOXANES)
![Page 35: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/35.jpg)
PATCH REPAIR
• UNSOUND CONCRETE REPLACED WITH REPAIR CONCRETE
• REPAIRED AND ADJACENT AREAS GENERALLY COATED
• CHLORIDE CONTAMINATED CONCRETE IS NOT REMOVED
• INCIPIENT ANODE CORROSION
![Page 36: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/36.jpg)
PATCH REPAIR
• GALVANIC ANODES IN UN-REPAIRED AREAS
• LOW INITIAL COST
• NEEDS TO BE REPEATED AT REGULAR INTERVALS
• LIFE CYCLE COST MAY BE HIGH
![Page 37: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/37.jpg)
RE-SKINNING
• ENTIRE COVER IS REPLACED WITH REPAIR CONCRETE
• COATED TO PROLONG LIFE
• CHLORIDE TESTING REQUIRED
• NO INCIPIENT ANODE CORROSION
• HIGH INITIAL COST
• LONG-TERM SOLUTION
![Page 38: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/38.jpg)
REPLACEMENT
• STRUCTURE OR ITS PART RECONSTRUCTED USING DURABLE CONCRETE
• EXTENSIVE DETERIORATION
• THIN SECTIONS – SLABS AND COLUMNS
• HIGH INITIAL COST
• LONG-TERM SOLUTION
![Page 39: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/39.jpg)
CATHODIC PROTECTION
• PATCH REPAIR OF UNSOUND CONCRETE
• DIRECT CURRENT PASSED BETWEEN INSTALLED ANODE AND REBARS
• CHLORIDES MOVE AWAY FROM THE REBARS
• ALKALINITY INCREASES AROUND REBARS
![Page 40: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/40.jpg)
CATHODIC PROTECTION
• CHLORIDE REMOVAL IS NOT REQUIRED
• LONG-TERM SOLUTION – LIFE OVER 40 YEARS
• NEEDS REGULAR MONITORING
![Page 41: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/41.jpg)
SELECTION OF REPAIR STRATEGY
FACTORS
• CAUSES OF DETERIORATION
• LEVEL OF DETERIORATION
• SEVERITY OF EXPOSURE CONDITIONS
• LEVEL OF CHLORIDE CONTAMINATION
• REQUIRED SERVICE LIFE
• FUTURE MAINTENANCE REQUIREMENTS
• INITIAL AND LIFE CYCLE COST
![Page 42: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/42.jpg)
SELECTION OF REPAIR TECHNIQUES
PRACTICAL EXAMPLES
![Page 43: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/43.jpg)
CASE 1 - LOW DEGREE OF DETERIORATION & LONG SERVICE LIFE
![Page 44: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/44.jpg)
CASE 1
• NO OR LOW DEGREE DETERIORATION
• MARINE EXPOSURE – HIGH RISK OF CHLORIDE CONTAMINATION
• LOW CHLORIDE CONTAMINATION IN CONCRETE
• REQUIRED SERVICE LIFE - LONG
APPROPRIATE REPAIR
COATING
![Page 45: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/45.jpg)
CASE 2 – LOCAL DETERIORATION
![Page 46: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/46.jpg)
CASE 2
• ISOLATED DETERIORATION
• LOCAL CAUSES (CONSTRUCTION DEFECTS, LEAKAGE etc.)
• MILD EXPOSURE CONDITIONS – LOW RISK OF CHLORIDE CONTAMINATION
• LOW CHLORIDE CONTAMINATION IN CONCRETE
APPROPRIATE REPAIR
PATCH REPAIR
![Page 47: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/47.jpg)
CASE 3 – EXTENSIVE DETERIORATION & LONG SERVICE LIFE
![Page 48: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/48.jpg)
CASE 3
• EXTENSIVE DETERIORATION
• SEVERE EXPOSURE CONDITIONS – HIGH RISK OF CHLORIDE CONTAMINATION
• HIGH CHLORIDE CONTAMINATION IN CONCRETE
• REQUIRED SERVICE LIFE - LONG
APPROPRIATE REPAIR
RE-SKINNING PLUS COATING
![Page 49: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/49.jpg)
CASE 4 – SEVERE EXPOSURE & LONG LIFE
![Page 50: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/50.jpg)
CASE 4
• LOW TO MODERATE DETERIORATION
• SEVERE EXPOSURE CONDITIONS – HIGH RISK OF CHLORIDE CONTAMINATION
• HIGH CHLORIDE CONTAMINATION IN CONCRETE
• REQUIRED SERVICE LIFE - LONG
APPROPRIATE REPAIR
CATHODIC PROTECTION
![Page 51: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/51.jpg)
CASE 5 – EXTENSIVE DETERIORATION& SHORT SERVICE LIFE
![Page 52: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/52.jpg)
CASE 5
• LOW TO MODERATE DETERIORATION
• SEVERE EXPOSURE CONDITIONS – HIGH RISK OF CHLORIDE CONTAMINATION
• HIGH CHLORIDE CONTAMINATION IN CONCRETE
• REQUIRED SERVICE LIFE - SHORT
APPROPRIATE REPAIR
PATCH REPAIR
![Page 53: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/53.jpg)
CASE 6 – SMALL SECTIONS
![Page 54: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/54.jpg)
CASE 6
• EXTENSIVE DETERIORATION
• THIN SECTIONS – SLABS, COLUMNS
• SEVERE EXPOSURE CONDITIONS – HIGH RISK OF CHLORIDE CONTAMINATION
• HIGH CHLORIDE CONTAMINATION IN CONCRETE
APPROPRIATE REPAIR
REPLACEMENT
![Page 55: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/55.jpg)
CONCLUDING REMARKS
![Page 56: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/56.jpg)
1. PREMATURE CONCRETE DETERIORATION
OBSERVED DUE TO
- AGGRESSIVE EXPOSURE CONDITIONS
- POOR QUALITY MATERIALS
- USE OF INAPPROPRIATE SPECIFICATIONS
![Page 57: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/57.jpg)
2. IMPROVEMENT IN SPECIFICATIONS IN
RECENT YEARS HAS IMPROVED THE SERVICE
LIFE OF STRUCTURES
![Page 58: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/58.jpg)
3. STRUCTURES SUSCEPTIBLE TO REINFORCEMENT CORROSION
INCLUDE
- Marine Strcs
- Strcs. In Contact With Soil/GW
- Strcs. Exposed To Condensation
- Strcs. With Accumulation of Dust
- Other Structures Exposed to Aggressive Conditions
![Page 59: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/59.jpg)
4. FACTORS TO BE CONSIDERED TO SELECT A
REPAIR STRATEGY
• Causes and Extent of Deterioration
• Severity of Exposure Conditions
• Level of Chloride Contamination
• Required Service Life
• Future Maintenance Requirements
• Initial and Life Cycle Cost
![Page 60: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/60.jpg)
5. PATCH REPAIR
• Provides Short Term Solution at Low Initial Cost
• Needs Repair at Regular Intervals
• Life Cycle Cost may be High
![Page 61: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/61.jpg)
6. RE-SKINNING
• Provides Long Term Solution
• High Initial Cost
• Suitable Where Deterioration is Extensive
![Page 62: (2) repair of concrete_structures_case_studies](https://reader030.vdocument.in/reader030/viewer/2022032611/55a89bd71a28ab9e188b45a9/html5/thumbnails/62.jpg)
7. CATHODIC PROTECTION
• Provides Long Term Solution
• High Initial Cost
• Suitable Where Deterioration is Low, Chloride
Contamination is High and Exposure Conditions are
Severe