2-sections i to x (25 - 132)
TRANSCRIPT
-
7/30/2019 2-Sections I to X (25 - 132)
1/99
Sl.No Description of Building Drg.No Unit Rate per unit in figures
& words
No. of
units
required
Amount
(Rs)
1 2 3 4 5 6 7
1 Completion of Balance works and rectificatioinof defects as required for Construction of
block no.1 of 4 Dewlling Units for "Officers"
at Gopalpur, in double storeyed construction
(ground + 01 storey), including covered
garages, covered staircase (Staircasel),
entrance verandahs, rear verandahs, dry out
verandahs, balconies, dry out balconies,
ramps, covered passages, platforms, servantquarters (one for each DU) each comprising of
servant room, its wash & WC, staircase for
servant rooms (Staircase-II), plinth protection
around the block, steps etc. complete all as
specified and shown on drawings.
Refer List
of
drawings
for all
items of
this
schedule
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________only).
1 Rs. _____________________
2 Completion of Balance works and rectificatioinof defects as required for Construction of
block no.2 of 4 Dewlling Units for "Officers"
at Gopalpur, in double storeyed construction(ground + 01 storey), including covered
garages, covered staircase (Staircasel),
entrance verandahs, rear verandahs, dry out
verandahs, balconies, dry out balconies,
ramps, covered passages, platforms, servant
quarters (one for each DU) each comprising of
servant room, its wash & WC, staircase for
servant rooms (Staircase-II), plinth protection
around the block, steps etc. complete all as
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. _____________________
C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13
SCHEDULE 'A' SECTION-I
(LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
-
7/30/2019 2-Sections I to X (25 - 132)
2/99
around the block, steps etc. complete all as
1 2 3 4 5 6 7
3 Completion of Balance works and
rectificatioin of defects as required for
Construction ofblock no.3 of 4 Dewlling
Units for "Officers" at Gopalpur, in double
storeyed construction (ground + 01
storey), including covered garages,
covered staircase (Staircasel), entrance
verandahs, rear verandahs, dry outverandahs, balconies, dry out balconies,
ramps, covered passages, platforms,
servant quarters (one for each DU) each
comprising of servant room, its wash &
WC, staircase for servant rooms
(Staircase-II), plinth protection around
the block, steps etc. complete all as
specified and shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
____________________________________
only).
1 Rs. ______________________
4 Completion of Balance works and
rectificatioin of defects as required for
Construction ofblock no.4 of 4 Dewlling
Units for "Officers" at Gopalpur, in double
storeyed construction (ground + 01
storey), including covered garages,
covered staircase (Staircasel), entrance
verandahs, rear verandahs, dry out
verandahs, balconies, dry out balconies,
ramps, covered passages, platforms,
servant quarters (one for each DU) each
comprising of servant room, its wash &WC, staircase for servant rooms
(Staircase-II), plinth protection around
the block, steps etc. complete all as
specified and shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
Rs. ______________________
C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13
SCHEDULE 'A' SECTION-I (CONTD../-)
(LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 69
-
7/30/2019 2-Sections I to X (25 - 132)
3/99
1 2 3 4 5 6 7
5 Completion of Balance works and
rectificatioin of defects as required for
Construction ofblock no.5 of 4 Dewlling
Units for "Officers" at Gopalpur, in double
storeyed construction (ground + 01
storey), including covered garages,
covered staircase (Staircasel), entrance
verandahs, rear verandahs, dry outverandahs, balconies, dry out balconies,
ramps, covered passages, platforms,
servant quarters (one for each DU) each
comprising of servant room, its wash &
WC, staircase for servant rooms
(Staircase-II), plinth protection around
the block, steps etc. complete all as
specified and shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
____________________________________
only).
1 Rs. ______________________
6 Completion of Balance works and
rectificatioin of defects as required for
Construction ofblock no.6 of 4 Dewlling
Units for "Officers" at Gopalpur, in double
storeyed construction (ground + 01
storey), including covered garages,
covered staircase (Staircasel), entrance
verandahs, rear verandahs, dry out
verandahs, balconies, dry out balconies,
ramps, covered passages, platforms,
servant quarters (one for each DU) each
comprising of servant room, its wash &WC, staircase for servant rooms
(Staircase-II), plinth protection around
the block, steps etc. complete all as
specified and shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
Rs. ______________________
C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13
SCHEDULE 'A' SECTION-I (CONTD../-)
(LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 69
-
7/30/2019 2-Sections I to X (25 - 132)
4/99
1 2 3 4 5 6 7
7 Completion of Balance works and
rectificatioin of defects as required for
Construction ofblock no.7 of 4 Dewlling
Units for "Officers" at Gopalpur, in double
storeyed construction (ground + 01
storey), including covered garages,
covered staircase (Staircasel), entrance
verandahs, rear verandahs, dry outverandahs, balconies, dry out balconies,
ramps, covered passages, platforms,
servant quarters (one for each DU) each
comprising of servant room, its wash &
WC, staircase for servant rooms
(Staircase-II), plinth protection around
the block, steps etc. complete all as
specified and shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
____________________________________
only).
1 Rs. ______________________
8 Completion of Balance works and
rectificatioin of defects as required for
Construction ofblock no.8 of 4 Dewlling
Units for "Officers" at Gopalpur, in double
storeyed construction (ground + 01
storey), including covered garages,
covered staircase (Staircasel), entrance
verandahs, rear verandahs, dry out
verandahs, balconies, dry out balconies,
ramps, covered passages, platforms,
servant quarters (one for each DU) each
comprising of servant room, its wash &WC, staircase for servant rooms
(Staircase-II), plinth protection around
the block, steps etc. complete all as
specified and shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
Rs. ______________________
C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13
SCHEDULE 'A' SECTION-I (CONTD../-)
(LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 69
-
7/30/2019 2-Sections I to X (25 - 132)
5/99
1 2 3 4 5 6 7
9 Completion of Balance works and
rectificatioin of defects as required for
Construction ofblock no.9 of 4 Dewlling
Units for "Officers" at Gopalpur, in double
storeyed construction (ground + 01
storey), including covered garages,
covered staircase (Staircasel), entrance
verandahs, rear verandahs, dry outverandahs, balconies, dry out balconies,
ramps, covered passages, platforms,
servant quarters (one for each DU) each
comprising of servant room, its wash &
WC, staircase for servant rooms
(Staircase-II), plinth protection around
the block, steps etc. complete all as
specified and shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
____________________________________
only).
1 Rs. ______________________
10 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no.10 of 4
Dewlling Units for "Officers" at Gopalpur,
in double storeyed construction (ground +
01 storey), including covered garages,
covered staircase (Staircasel), entrance
verandahs, rear verandahs, dry out
verandahs, balconies, dry out balconies,
ramps, covered passages, platforms,
servant quarters (one for each DU) each
comprising of servant room, its wash &WC, staircase for servant rooms
(Staircase-II), plinth protection around
the block, steps etc. complete all as
specified and shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
Rs. ______________________
C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13
SCHEDULE 'A' SECTION-I (CONTD../-)
(LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 69
-
7/30/2019 2-Sections I to X (25 - 132)
6/99
1 2 3 4 5 6 7
11 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no.11 of 4
Dewlling Units for "Officers" at Gopalpur,
in double storeyed construction (ground +
01 storey), including covered garages,
covered staircase (Staircasel), entrance
verandahs, rear verandahs, dry outverandahs, balconies, dry out balconies,
ramps, covered passages, platforms,
servant quarters (one for each DU) each
comprising of servant room, its wash &
WC, staircase for servant rooms
(Staircase-II), plinth protection around
the block, steps etc. complete all as
specified and shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
____________________________________
only).
1 Rs. ______________________
12 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no.12 of 4
Dewlling Units for "Officers" at Gopalpur,
in double storeyed construction (ground +
01 storey), including covered garages,
covered staircase (Staircasel), entrance
verandahs, rear verandahs, dry out
verandahs, balconies, dry out balconies,
ramps, covered passages, platforms,
servant quarters (one for each DU) each
comprising of servant room, its wash &WC, staircase for servant rooms
(Staircase-II), plinth protection around
the block, steps etc. complete all as
specified and shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
Rs. ______________________
C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13
SCHEDULE 'A' SECTION-I (CONTD../-)
(LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 69
-
7/30/2019 2-Sections I to X (25 - 132)
7/99
1 2 3 4 5 6 7
13 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no.13 of 4
Dewlling Units for "Officers" at Gopalpur,
in double storeyed construction (ground +
01 storey), including covered garages,
covered staircase (Staircasel), entrance
verandahs, rear verandahs, dry out
verandahs, balconies, dry out balconies,
ramps, covered passages, platforms,
servant quarters (one for each DU) each
comprising of servant room, its wash &
WC, staircase for servant rooms
(Staircase-II), plinth protection around
the block, steps etc. complete all as
specified and shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
14 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no.14 of 4
Dewlling Units for "Officers" at Gopalpur,
in double storeyed construction (ground +
01 storey), including covered garages,
covered staircase (Staircasel), entrance
verandahs, rear verandahs, dry out
verandahs, balconies, dry out balconies,
ramps, covered passages, platforms,
servant quarters (one for each DU) each
comprising of servant room, its wash &WC, staircase for servant rooms
(Staircase-II), plinth protection around
the block, steps etc. complete all as
specified and shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
Rs. ______________________
C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13
SCHEDULE 'A' SECTION-I (CONTD../-)
(LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 69
-
7/30/2019 2-Sections I to X (25 - 132)
8/99
1 2 3 4 5 6 7
15 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no.15 of 4
Dewlling Units for "Officers" at Gopalpur,
in double storeyed construction (ground +
01 storey), including covered garages,
covered staircase (Staircasel), entrance
verandahs, rear verandahs, dry out
verandahs, balconies, dry out balconies,
ramps, covered passages, platforms,
servant quarters (one for each DU) each
comprising of servant room, its wash &
WC, staircase for servant rooms
(Staircase-II), plinth protection around
the block, steps etc. complete all as
specified and shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
16 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no.16 of 4
Dewlling Units for "Officers" at Gopalpur,
in double storeyed construction (ground +
01 storey), including covered garages,
covered staircase (Staircasel), entrance
verandahs, rear verandahs, dry out
verandahs, balconies, dry out balconies,
ramps, covered passages, platforms,
servant quarters (one for each DU) each
comprising of servant room, its wash &WC, staircase for servant rooms
(Staircase-II), plinth protection around
the block, steps etc. complete all as
specified and shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
Rs. ______________________
C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13
SCHEDULE 'A' SECTION-I (CONTD../-)
(LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 69
-
7/30/2019 2-Sections I to X (25 - 132)
9/99
1 2 3 4 5 6 7
17 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no.17 of 4
Dewlling Units for "Officers" at Gopalpur,
in double storeyed construction (ground +
01 storey), including covered garages,
covered staircase (Staircasel), entrance
verandahs, rear verandahs, dry out
verandahs, balconies, dry out balconies,
ramps, covered passages, platforms,
servant quarters (one for each DU) each
comprising of servant room, its wash &
WC, staircase for servant rooms
(Staircase-II), plinth protection around
the block, steps etc. complete all as
specified and shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
18 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no.18 of 4
Dewlling Units for "Officers" at Gopalpur,
in double storeyed construction (ground +
01 storey), including covered garages,
covered staircase (Staircasel), entrance
verandahs, rear verandahs, dry out
verandahs, balconies, dry out balconies,
ramps, covered passages, platforms,
servant quarters (one for each DU) each
comprising of servant room, its wash &WC, staircase for servant rooms
(Staircase-II), plinth protection around
the block, steps etc. complete all as
specified and shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
Rs. ______________________
C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13
SCHEDULE 'A' SECTION-I (CONTD../-)
(LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 70
-
7/30/2019 2-Sections I to X (25 - 132)
10/99
1 2 3 4 5 6 7
19 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no.19 of 4
Dewlling Units for "Officers" at Gopalpur,
in double storeyed construction (ground +
01 storey), including covered garages,
covered staircase (Staircasel), entrance
verandahs, rear verandahs, dry out
verandahs, balconies, dry out balconies,
ramps, covered passages, platforms,
servant quarters (one for each DU) each
comprising of servant room, its wash &
WC, staircase for servant rooms
(Staircase-II), plinth protection around
the block, steps etc. complete all as
specified and shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
20 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no.20 of 4
Dewlling Units for "Officers" at Gopalpur,
in double storeyed construction (ground +
01 storey), including covered garages,
covered staircase (Staircasel), entrance
verandahs, rear verandahs, dry out
verandahs, balconies, dry out balconies,
ramps, covered passages, platforms,
servant quarters (one for each DU) each
comprising of servant room, its wash &WC, staircase for servant rooms
(Staircase-II), plinth protection around
the block, steps etc. complete all as
specified and shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
Rs. ______________________
C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13
SCHEDULE 'A' SECTION-I (CONTD../-)
(LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 70
-
7/30/2019 2-Sections I to X (25 - 132)
11/99
1 2 3 4 5 6 7
21 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no.21 of 4
Dewlling Units for "Officers" at Gopalpur,
in double storeyed construction (ground +
01 storey), including covered garages,
covered staircase (Staircasel), entrance
verandahs, rear verandahs, dry out
verandahs, balconies, dry out balconies,
ramps, covered passages, platforms,
servant quarters (one for each DU) each
comprising of servant room, its wash &
WC, staircase for servant rooms
(Staircase-II), plinth protection around
the block, steps etc. complete all as
specified and shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
22 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no.22 of 4
Dewlling Units for "Officers" at Gopalpur,
in double storeyed construction (ground +
01 storey), including covered garages,
covered staircase (Staircasel), entrance
verandahs, rear verandahs, dry out
verandahs, balconies, dry out balconies,
ramps, covered passages, platforms,
servant quarters (one for each DU) each
comprising of servant room, its wash &WC, staircase for servant rooms
(Staircase-II), plinth protection around
the block, steps etc. complete all as
specified and shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
Rs. ______________________
C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13
SCHEDULE 'A' SECTION-I (CONTD../-)
(LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 70
-
7/30/2019 2-Sections I to X (25 - 132)
12/99
1 2 3 4 5 6 7
23 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no.23 of 4
Dewlling Units for "Officers" at Gopalpur,
in double storeyed construction (ground +
01 storey), including covered garages,
covered staircase (Staircasel), entrance
verandahs, rear verandahs, dry out
verandahs, balconies, dry out balconies,
ramps, covered passages, platforms,
servant quarters (one for each DU) each
comprising of servant room, its wash &
WC, staircase for servant rooms
(Staircase-II), plinth protection around
the block, steps etc. complete all as
specified and shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
24 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no.24 of 4
Dewlling Units for "Officers" at Gopalpur,
in double storeyed construction (ground +
01 storey), including covered garages,
covered staircase (Staircasel), entrance
verandahs, rear verandahs, dry out
verandahs, balconies, dry out balconies,
ramps, covered passages, platforms,
servant quarters (one for each DU) each
comprising of servant room, its wash &WC, staircase for servant rooms
(Staircase-II), plinth protection around
the block, steps etc. complete all as
specified and shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
Rs. ______________________
C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13
SCHEDULE 'A' SECTION-I (CONTD../-)
(LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 70
-
7/30/2019 2-Sections I to X (25 - 132)
13/99
1 2 3 4 5 6 7
25 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no.25 of 4
Dewlling Units for "Officers" at Gopalpur,
in double storeyed construction (ground +
01 storey), including covered garages,
covered staircase (Staircasel), entrance
verandahs, rear verandahs, dry out
verandahs, balconies, dry out balconies,
ramps, covered passages, platforms,
servant quarters (one for each DU) each
comprising of servant room, its wash &
WC, staircase for servant rooms
(Staircase-II), plinth protection around
the block, steps etc. complete all as
specified and shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
26 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no.26 of 4
Dewlling Units for "Officers" at Gopalpur,
in double storeyed construction (ground +
01 storey), including covered garages,
covered staircase (Staircasel), entrance
verandahs, rear verandahs, dry out
verandahs, balconies, dry out balconies,
ramps, covered passages, platforms,
servant quarters (one for each DU) each
comprising of servant room, its wash &WC, staircase for servant rooms
(Staircase-II), plinth protection around
the block, steps etc. complete all as
specified and shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
Rs. ______________________
C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13
SCHEDULE 'A' SECTION-I (CONTD../-)
(LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 70
-
7/30/2019 2-Sections I to X (25 - 132)
14/99
1 2 3 4 5 6 7
27 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no.27 of 4
Dewlling Units for "Officers" at Gopalpur,
in double storeyed construction (ground +
01 storey), including covered garages,
covered staircase (Staircasel), entrance
verandahs, rear verandahs, dry out
verandahs, balconies, dry out balconies,
ramps, covered passages, platforms,
servant quarters (one for each DU) each
comprising of servant room, its wash &
WC, staircase for servant rooms
(Staircase-II), plinth protection around
the block, steps etc. complete all as
specified and shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
28 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no.28 of 4
Dewlling Units for "Officers" at Gopalpur,
in double storeyed construction (ground +
01 storey), including covered garages,
covered staircase (Staircasel), entrance
verandahs, rear verandahs, dry out
verandahs, balconies, dry out balconies,
ramps, covered passages, platforms,
servant quarters (one for each DU) each
comprising of servant room, its wash &WC, staircase for servant rooms
(Staircase-II), plinth protection around
the block, steps etc. complete all as
specified and shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
Rs. ______________________
C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13
SCHEDULE 'A' SECTION-I (CONTD../-)
(LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 70
-
7/30/2019 2-Sections I to X (25 - 132)
15/99
1 2 3 4 5 6 7
29 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no.29 of 1
Dewlling Unit for "Officers" at Gopalpur, in
single storeyed construction including
covered garages, entrance verandah, rear
dry out verandah, platforms, ramp,
connecting platform between dwelling
unit and garage, servant quarter
comprising of servant room, its wash &
WC & platform, plinth protection around
the block, steps etc. complete all as
specified and shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
30 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no.30 of 1
Dewlling Unit for "Officers" at Gopalpur, in
single storeyed construction including
covered garages, entrance verandah, rear
dry out verandah, platforms, ramp,
connecting platform between dwelling
unit and garage, servant quarter
comprising of servant room, its wash &
WC & platform, plinth protection around
the block, steps etc. complete all as
specified and shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
31 Completion of Balance works and
rectificatioin of defects as required for
Construction ofblock no.1 of 6 Dewlling
Units for "JCOs" at Gopalpur, in triple
storeyed construction (ground + 02
storey), including covered scooter and car
garages, covered staircase, verandah
entrance verandah, lobby, balconies, dry
out balconies, dryout verandah, ramps,
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
1 Rs. ______________________
C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13
SCHEDULE 'A' SECTION-I (CONTD../-)
(LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
-
7/30/2019 2-Sections I to X (25 - 132)
16/99
1 2 3 4 5 6 7
32 Completion of Balance works and
rectificatioin of defects as required for
Construction ofblock no.2 of 6 Dewlling
Units for "JCOs" at Gopalpur, in triple
storeyed construction (ground + 02
storey), including covered scooter and car
garages, covered staircase, verandah,
entrance verandah, lobby, balconies, dry
out balconies, dryout verandah, ramps,
platforms, plinth protection around the
block, steps etc. complete all as specified
and shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
33 Completion of Balance works and
rectificatioin of defects as required for
Construction ofblock no.3 of 6 Dewlling
Units for "JCOs" at Gopalpur, in triple
storeyed construction (ground + 02
storey), including covered scooter and car
garages, covered staircase, verandah,
entrance verandah, lobby, balconies, dry
out balconies, dryout verandah, ramps,
platforms, plinth protection around the
block, steps etc. complete all as specified
and shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
34 Completion of Balance works and
rectificatioin of defects as required for
Construction ofblock no.4 of 6 DewllingUnits for "JCOs" at Gopalpur, in triple
storeyed construction (ground + 02
storey), including covered scooter and car
garages, covered staircase, verandah,
entrance verandah, lobby, balconies, dry
out balconies, dryout verandah, ramps,
platforms, plinth protection around the
block, steps etc. complete all as specified
and shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees_____________________________
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
(LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13
SCHEDULE 'A' SECTION-I (CONTD../-)
-
7/30/2019 2-Sections I to X (25 - 132)
17/99
1 2 3 4 5 6 7
35 Completion of Balance works and
rectificatioin of defects as required for
Construction ofblock no.5 of 6 Dewlling
Units for "JCOs" at Gopalpur, in triple
storeyed construction (ground + 02
storey), including covered scooter and car
garages, covered staircase, verandah,
entrance verandah, lobby, balconies, dry
out balconies, dryout verandah, ramps,
platforms, plinth protection around the
block, steps etc. complete all as specified
and shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
36 Completion of Balance works and
rectificatioin of defects as required for
Construction ofblock no.6 of 6 Dewlling
Units for "JCOs" at Gopalpur, in triple
storeyed construction (ground + 02
storey), including covered scooter and car
garages, covered staircase, verandah,
entrance verandah, lobby, balconies, dry
out balconies, dryout verandah, ramps,
platforms, plinth protection around the
block, steps etc. complete all as specified
and shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
37 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no.7 of 6 Dewlling
Units for "JCOs" at Gopalpur, in triplestoreyed construction (ground + 02
storey), including covered scooter and car
garages, covered staircase, entrance
verandah, lobby, balconies, dry out
balconies, ramps, platforms, plinth
protection around the block, steps etc.
complete all as specified and shown on
Each
Block
Rs._______________________________
__
(Rupees___________________________
___________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
Rs
SCHEDULE 'A' SECTION-I (CONTD../-)
C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13
(LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No 71
-
7/30/2019 2-Sections I to X (25 - 132)
18/99
1 2 3 4 5 6 7
38 Completion of Balance works and
rectificatioin of defects as required for
Construction ofblock no.8 of 6 Dewlling
Units for "JCOs" at Gopalpur, in triple
storeyed construction (ground + 02
storey), including covered scooter and car
garages, covered staircase, verandah,
entrance verandah, lobby, balconies, dry
out balconies, dryout verandah, ramps,
platforms, plinth protection around the
block, steps etc. complete all as specified
and shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
39 Completion of Balance works and
rectificatioin of defects as required for
Construction ofblock no.9 of 6 Dewlling
Units for "JCOs" at Gopalpur, in triple
storeyed construction (ground + 02
storey), including covered scooter and car
garages, covered staircase, verandah,
entrance verandah, lobby, balconies, dry
out balconies, dryout verandah, ramps,
platforms, plinth protection around the
block, steps etc. complete all as specified
and shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
40 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no.10 of 6Dewlling Units for "JCOs" at Gopalpur, in
triple storeyed construction (ground + 02
storey), including covered scooter and car
garages, covered staircase, verandah,
entrance verandah, lobby, balconies, dry
out balconies, dryout verandah, ramps,
platforms, plinth protection around the
block, steps etc. complete all as specified
and shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees_____________________________
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13
SCHEDULE 'A' SECTION-I (CONTD../-)
(LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
-
7/30/2019 2-Sections I to X (25 - 132)
19/99
1 2 3 4 5 6 7
41 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no.11 of 6
Dewlling Units for "JCOs" at Gopalpur, in
triple storeyed construction (ground + 02
storey), including covered scooter and car
garages, covered staircase, verandah,
entrance verandah, lobby, balconies, dry
out balconies, dryout verandah, ramps,
platforms, plinth protection around the
block, steps etc. complete all as specified
and shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
42 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no.12 of 6
Dewlling Units for "JCOs" at Gopalpur, in
triple storeyed construction (ground + 02
storey), including covered scooter and car
garages, covered staircase, verandah,
entrance verandah, lobby, balconies, dry
out balconies, dryout verandah, ramps,
platforms, plinth protection around the
block, steps etc. complete all as specified
and shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
43 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no.13 of 5
Dewlling Units for "JCOs" at Gopalpur, intriple storeyed construction (ground + 02
storey), including covered scooter and car
garages, covered staircase, verandah,
entrance verandah, lobby, balconies, dry
out balconies, dryout verandah, ramps,
platforms, plinth protection around the
block, steps etc. complete all as specified
and shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
___________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
SCHEDULE 'A' SECTION-I (CONTD../-)(LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13
-
7/30/2019 2-Sections I to X (25 - 132)
20/99
1 2 3 4 5 6 7
44 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no.14 of 6
Dewlling Units for "JCOs" at Gopalpur, in
triple storeyed construction (ground + 02
storey), including covered scooter and car
garages, covered staircase, verandah,
entrance verandah, lobby, balconies, dry
out balconies, dryout verandah, ramps,
platforms, plinth protection around the
block, steps etc. complete all as specified
and shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
45 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no.15 of 6
Dewlling Units for "JCOs" at Gopalpur, in
triple storeyed construction (ground + 02
storey), including covered scooter and car
garages, covered staircase, verandah,
entrance verandah, lobby, balconies, dry
out balconies, dryout verandah, ramps,
platforms, plinth protection around the
block, steps etc. complete all as specified
and shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
46 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no.16 of 6Dewlling Units for "JCOs" at Gopalpur, in
triple storeyed construction (ground + 02
storey), including covered scooter and car
garages, covered staircase, verandah,
entrance verandah, lobby, balconies, dry
out balconies, dryout verandah, ramps,
platforms, plinth protection around the
block, steps etc. complete all as specified
and shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees_____________________________
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13
SCHEDULE 'A' SECTION-I (CONTD../-)(LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
-
7/30/2019 2-Sections I to X (25 - 132)
21/99
1 2 3 4 5 6 7
47 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no.17 of 6
Dewlling Units for "JCOs" at Gopalpur, in
triple storeyed construction (ground + 02
storey), including covered scooter and car
garages, covered staircase, verandah,
entrance verandah, lobby, balconies, dry
out balconies, dryout verandah, ramps,
platforms, plinth protection around the
block, steps etc. complete all as specified
and shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
48 Construction of block nos.18, 19, 20,
21 & 22 of 6 Dewlling Units for "JCOs" at
Gopalpur, in triple storeyed construction
(ground + 02 storey), including covered
scooter and car garages, covered
staircase, entrance verandah, lobby,
balconies, dry out balconies, ramps,
platforms, plinth protection around the
block, steps etc. complete all as specified
and shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
5 Rs. ______________________
49 Construction ofblock nos. 1, 2, 3, 4, 5,
6, 7 & 8 of 6 Dewlling Units for "OR" at
Gopalpur, in triple storeyed construction
(ground + 02 storey), including covered
scooter sheds, covered staircase,
verandahs, entrance lobbies, balconies,dry out balconies, ramps, plinth
protection around the block, steps etc.
complete all as specified and shown on
drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
____________________________________
___
_________________________________
only).
8 Rs. ______________________
Rs. ______________________Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 71
C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13
SCHEDULE 'A' SECTION-I (CONTD../-)(LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
-
7/30/2019 2-Sections I to X (25 - 132)
22/99
1 2 3 4 5 6 7
50 Completion of Balance works and
rectificatioin of defects as required for
Construction ofblock no. 9 of 5 Dewlling
Units for "OR" at Gopalpur, in triple
storeyed construction (ground + 02
storey), including covered scooter sheds,
covered staircase, verandahs, entrance
lobbies, balconies, dry out balconies,
ramps, plinth protection around the block,
steps etc. complete all as specified and
shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
51 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no. 10 of 5
Dewlling Units for "OR" at Gopalpur, in
triple storeyed construction (ground + 02
storey), including covered scooter sheds,
covered staircase, verandahs, entrance
lobbies, balconies, dry out balconies,
ramps, plinth protection around the block,
steps etc. complete all as specified and
shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
52 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no. 11 of 6
Dewlling Units for "OR" at Gopalpur, in
triple storeyed construction (ground + 02storey), including covered scooter sheds,
covered staircase, verandahs, entrance
lobbies, balconies, dry out balconies,
ramps, plinth protection around the block,
steps etc. complete all as specified and
shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
____________________________________
_________________________________
___
_________________________________
only).
1 Rs. ______________________
Rs. ______________________
C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13
SCHEDULE 'A' SECTION-I (CONTD../-)(LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 71
-
7/30/2019 2-Sections I to X (25 - 132)
23/99
1 2 3 4 5 6 7
53 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no. 12 of 6
Dewlling Units for "OR" at Gopalpur, in
triple storeyed construction (ground + 02
storey), including covered scooter sheds,
covered staircase, verandahs, entrance
lobbies, balconies, dry out balconies,
ramps, plinth protection around the block,
steps etc. complete all as specified and
shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
54 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no. 13 of 6
Dewlling Units for "OR" at Gopalpur, in
triple storeyed construction (ground + 02
storey), including covered scooter sheds,
covered staircase, verandahs, entrance
lobbies, balconies, dry out balconies,
ramps, plinth protection around the block,
steps etc. complete all as specified and
shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
55 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no. 14 of 6
Dewlling Units for "OR" at Gopalpur, in
triple storeyed construction (ground + 02
storey), including covered scooter sheds,covered staircase, verandahs, entrance
lobbies, balconies, dry out balconies,
ramps, plinth protection around the block,
steps etc. complete all as specified and
shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
____________________________________
___
_________________________________
only).
1 Rs. ______________________
Rs. ______________________
C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13
SCHEDULE 'A' SECTION-I (CONTD../-)(LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 71
-
7/30/2019 2-Sections I to X (25 - 132)
24/99
1 2 3 4 5 6 7
56 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no. 15 of 6
Dewlling Units for "OR" at Gopalpur, in
triple storeyed construction (ground + 02
storey), including covered scooter sheds,
covered staircase, verandahs, entrance
lobbies, balconies, dry out balconies,
ramps, plinth protection around the block,
steps etc. complete all as specified and
shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
57 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no. 16 of 6
Dewlling Units for "OR" at Gopalpur, in
triple storeyed construction (ground + 02
storey), including covered scooter sheds,
covered staircase, verandahs, entrance
lobbies, balconies, dry out balconies,
ramps, plinth protection around the block,
steps etc. complete all as specified and
shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
58 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no. 17 of 6
Dewlling Units for "OR" at Gopalpur, in
triple storeyed construction (ground + 02storey), including covered scooter sheds,
covered staircase, verandahs, entrance
lobbies, balconies, dry out balconies,
ramps, plinth protection around the block,
steps etc. complete all as specified and
shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
____________________________________
_________________________________
___
_________________________________
only).
1 Rs. ______________________
Rs. ______________________
C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13
SCHEDULE 'A' SECTION-I (CONTD../-)(LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 71
-
7/30/2019 2-Sections I to X (25 - 132)
25/99
1 2 3 4 5 6 7
59 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no. 18 of 6
Dewlling Units for "OR" at Gopalpur, in
triple storeyed construction (ground + 02
storey), including covered scooter sheds,
covered staircase, verandahs, entrance
lobbies, balconies, dry out balconies,
ramps, plinth protection around the block,
steps etc. complete all as specified and
shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
60 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no. 19 of 6
Dewlling Units for "OR" at Gopalpur, in
triple storeyed construction (ground + 02
storey), including covered scooter sheds,
covered staircase, verandahs, entrance
lobbies, balconies, dry out balconies,
ramps, plinth protection around the block,
steps etc. complete all as specified and
shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
61 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no. 20 of 6
Dewlling Units for "OR" at Gopalpur, in
triple storeyed construction (ground + 02
storey), including covered scooter sheds,covered staircase, verandahs, entrance
lobbies, balconies, dry out balconies,
ramps, plinth protection around the block,
steps etc. complete all as specified and
shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
____________________________________
___
_________________________________
only).
1 Rs. ______________________
Rs. ______________________
C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13
SCHEDULE 'A' SECTION-I (CONTD../-)(LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 72
-
7/30/2019 2-Sections I to X (25 - 132)
26/99
1 2 3 4 5 6 7
62 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no. 21 of 6
Dewlling Units for "OR" at Gopalpur, in
triple storeyed construction (ground + 02
storey), including covered scooter sheds,
covered staircase, verandahs, entrance
lobbies, balconies, dry out balconies,
ramps, plinth protection around the block,
steps etc. complete all as specified and
shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
63 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no. 22 of 6
Dewlling Units for "OR" at Gopalpur, in
triple storeyed construction (ground + 02
storey), including covered scooter sheds,
covered staircase, verandahs, entrance
lobbies, balconies, dry out balconies,
ramps, plinth protection around the block,
steps etc. complete all as specified and
shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
64 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no. 23 of 6
Dewlling Units for "OR" at Gopalpur, in
triple storeyed construction (ground + 02
storey), including covered scooter sheds,
covered staircase, verandahs, entrance
lobbies, balconies, dry out balconies,
ramps, plinth protection around the block,
steps etc. complete all as specified and
shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
Rs. ______________________Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 72
C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13
SCHEDULE 'A' SECTION-I (CONTD../-)(LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
-
7/30/2019 2-Sections I to X (25 - 132)
27/99
1 2 3 4 5 6 7
65 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no. 24 of 6
Dewlling Units for "OR" at Gopalpur, in
triple storeyed construction (ground + 02
storey), including covered scooter sheds,
covered staircase, verandahs, entrance
lobbies, balconies, dry out balconies,
ramps, plinth protection around the block,steps etc. complete all as specified and
shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________only).
1 Rs. ______________________
66 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no. 25 of 6
Dewlling Units for "OR" at Gopalpur, in
triple storeyed construction (ground + 02
storey), including covered scooter sheds,
covered staircase, verandahs, entrance
lobbies, balconies, dry out balconies,
ramps, plinth protection around the block,
steps etc. complete all as specified and
shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
Rs. ______________________
C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13
SCHEDULE 'A' SECTION-I (CONTD../-)(LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 72
-
7/30/2019 2-Sections I to X (25 - 132)
28/99
1 2 3 4 5 6 7
67 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no. 26 of 6
Dewlling Units for "OR" at Gopalpur, in
triple storeyed construction (ground + 02
storey), including covered scooter sheds,
covered staircase, verandahs, entrance
lobbies, balconies, dry out balconies,
ramps, plinth protection around the block,
steps etc. complete all as specified and
shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
68 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no. 27 of 6
Dewlling Units for "OR" at Gopalpur, in
triple storeyed construction (ground + 02
storey), including covered scooter sheds,
covered staircase, verandahs, entrance
lobbies, balconies, dry out balconies,
ramps, plinth protection around the block,
steps etc. complete all as specified and
shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
69 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no. 28 of 6
Dewlling Units for "OR" at Gopalpur, in
triple storeyed construction (ground + 02
storey), including covered scooter sheds,
covered staircase, verandahs, entrance
lobbies, balconies, dry out balconies,
ramps, plinth protection around the block,
steps etc. complete all as specified and
shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
Rs. ______________________
C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13
SCHEDULE 'A' SECTION-I (CONTD../-)(LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 72
-
7/30/2019 2-Sections I to X (25 - 132)
29/99
1 2 3 4 5 6 7
70 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no. 29 of 6
Dewlling Units for "OR" at Gopalpur, in
triple storeyed construction (ground + 02
storey), including covered scooter sheds,
covered staircase, verandahs, entrance
lobbies, balconies, dry out balconies,
ramps, plinth protection around the block,
steps etc. complete all as specified and
shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
71 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no. 30 of 6
Dewlling Units for "OR" at Gopalpur, in
triple storeyed construction (ground + 02
storey), including covered scooter sheds,
covered staircase, verandahs, entrance
lobbies, balconies, dry out balconies,
ramps, plinth protection around the block,
steps etc. complete all as specified and
shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
72 Construction of block no. 31 of 6
Dewlling Units for "OR" at Gopalpur, in
triple storeyed construction (ground + 02
storey), including covered scooter sheds,
covered staircase, verandahs, entrance
lobbies, balconies, dry out balconies,
ramps, plinth protection around the block,
steps etc. complete all as specified and
shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
1 Rs. ______________________
Rs. ______________________
SCHEDULE 'A' SECTION-I (CONTD../-)
C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13
(LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 72
-
7/30/2019 2-Sections I to X (25 - 132)
30/99
1 2 3 4 5 6 7
73 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no. 32 of 6
Dewlling Units for "OR" at Gopalpur, in
triple storeyed construction (ground + 02
storey), including covered scooter sheds,
covered staircase, verandahs, entrance
lobbies, balconies, dry out balconies,ramps, plinth protection around the block,
steps etc. complete all as specified and
shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
____________________________________
only).
1 Rs. ______________________
74 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no. 33 of 6
Dewlling Units for "OR" at Gopalpur, in
triple storeyed construction (ground + 02
storey), including covered scooter sheds,
covered staircase, verandahs, entrance
lobbies, balconies, dry out balconies,
ramps, plinth protection around the block,
steps etc. complete all as specified and
shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
75 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no. 34 of 6
Dewlling Units for "OR" at Gopalpur, in
triple storeyed construction (ground + 02
storey), including covered scooter sheds,
covered staircase, verandahs, entrance
lobbies, balconies, dry out balconies,
ramps, plinth protection around the block,
steps etc. complete all as specified and
shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
Rs. ______________________Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 72
SCHEDULE 'A' SECTION-I (CONTD../-)(LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13
-
7/30/2019 2-Sections I to X (25 - 132)
31/99
1 2 3 4 5 6 7
76 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no. 35 of 6
Dewlling Units for "OR" at Gopalpur, in
triple storeyed construction (ground + 02
storey), including covered scooter sheds,
covered staircase, verandahs, entrance
lobbies, balconies, dry out balconies,
ramps, plinth protection around the block,
steps etc. complete all as specified and
shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
77 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no. 36 of 6
Dewlling Units for "OR" at Gopalpur, in
triple storeyed construction (ground + 02
storey), including covered scooter sheds,
covered staircase, verandahs, entrance
lobbies, balconies, dry out balconies,
ramps, plinth protection around the block,
steps etc. complete all as specified and
shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
78 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no. 37 of 6
Dewlling Units for "OR" at Gopalpur, in
triple storeyed construction (ground + 02
storey), including covered scooter sheds,
covered staircase, verandahs, entrance
lobbies, balconies, dry out balconies,
ramps, plinth protection around the block,
steps etc. complete all as specified and
shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
Rs. ______________________
C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13
SCHEDULE 'A' SECTION-I (CONTD../-)(LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 72
-
7/30/2019 2-Sections I to X (25 - 132)
32/99
1 2 3 4 5 6 7
79 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no. 38 of 6
Dewlling Units for "OR" at Gopalpur, in
triple storeyed construction (ground + 02
storey), including covered scooter sheds,
covered staircase, verandahs, entrance
lobbies, balconies, dry out balconies,ramps, plinth protection around the block,
steps etc. complete all as specified and
shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
____________________________________
only).
1 Rs. ______________________
80 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no. 39 of 6
Dewlling Units for "OR" at Gopalpur, in
triple storeyed construction (ground + 02
storey), including covered scooter sheds,
covered staircase, verandahs, entrance
lobbies, balconies, dry out balconies,
ramps, plinth protection around the block,
steps etc. complete all as specified and
shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
81 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no. 40 of 6
Dewlling Units for "OR" at Gopalpur, in
triple storeyed construction (ground + 02
storey), including covered scooter sheds,
covered staircase, verandahs, entrance
lobbies, balconies, dry out balconies,
ramps, plinth protection around the block,
steps etc. complete all as specified and
shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
Rs. ______________________
SCHEDULE 'A' SECTION-I (CONTD../-)
C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13
(LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 72
-
7/30/2019 2-Sections I to X (25 - 132)
33/99
1 2 3 4 5 6 7
82 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no. 41 of 6
Dewlling Units for "OR" at Gopalpur, in
triple storeyed construction (ground + 02
storey), including covered scooter sheds,
covered staircase, verandahs, entrance
lobbies, balconies, dry out balconies,
ramps, plinth protection around the block,steps etc. complete all as specified and
shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________only).
1 Rs. ______________________
83 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no. 42 of 6
Dewlling Units for "OR" at Gopalpur, in
triple storeyed construction (ground + 02
storey), including covered scooter sheds,
covered staircase, verandahs, entrance
lobbies, balconies, dry out balconies,
ramps, plinth protection around the block,
steps etc. complete all as specified and
shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
84 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no. 43 of 6
Dewlling Units for "OR" at Gopalpur, in
triple storeyed construction (ground + 02
storey), including covered scooter sheds,
covered staircase, verandahs, entrance
lobbies, balconies, dry out balconies,
ramps, plinth protection around the block,
steps etc. complete all as specified and
shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
Rs. ______________________Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 73
C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13
SCHEDULE 'A' SECTION-I (CONTD../-)(LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
-
7/30/2019 2-Sections I to X (25 - 132)
34/99
1 2 3 4 5 6 7
85 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no. 44 of 6
Dewlling Units for "OR" at Gopalpur, in
triple storeyed construction (ground + 02
storey), including covered scooter sheds,
covered staircase, verandahs, entrance
lobbies, balconies, dry out balconies,ramps, plinth protection around the block,
steps etc. complete all as specified and
shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
____________________________________
only).
1 Rs. ______________________
86 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no. 45 of 6
Dewlling Units for "OR" at Gopalpur, in
triple storeyed construction (ground + 02
storey), including covered scooter sheds,
covered staircase, verandahs, entrance
lobbies, balconies, dry out balconies,
ramps, plinth protection around the block,
steps etc. complete all as specified and
shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
87 Construction ofblock nos. 46 & 47 of 6
Dewlling Units for "OR" at Gopalpur, in
triple storeyed construction (ground + 02
storey), including covered scooter sheds,
covered staircase, verandahs, entrance
lobbies, balconies, dry out balconies,
ramps, plinth protection around the block,
steps etc. complete all as specified and
shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
2 Rs. ______________________
Rs. ______________________
C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13
SCHEDULE 'A' SECTION-I (CONTD../-)(LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)
Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 73
-
7/30/2019 2-Sections I to X (25 - 132)
35/99
1 2 3 4 5 6 7
88 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no. 48 of 6
Dewlling Units for "OR" at Gopalpur, in
triple storeyed construction (ground + 02
storey), including covered scooter sheds,
covered staircase, verandahs, entrance
lobbies, balconies, dry out balconies,
ramps, plinth protection around the block,steps etc. complete all as specified and
shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________only).
1 Rs. ______________________
89 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no. 49 of 6
Dewlling Units for "OR" at Gopalpur, in
triple storeyed construction (ground + 02
storey), including covered scooter sheds,
covered staircase, verandahs, entrance
lobbies, balconies, dry out balconies,
ramps, plinth protection around the block,
steps etc. complete all as specified and
shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. ______________________
90 Completion of Balance works and
rectificatioin of defects as required for
Construction of block no. 50 of 6
Dewlling Units for "OR" at Gopalpur, in
triple storeyed construction (ground + 02
storey), including covered scooter sheds,
covered staircase, verandahs, entrance
lobbies, balconies, dry out balconies,
ramps, plinth protection around the block,
steps etc. complete all as specified and
shown on drawings.
Each
Block
Rs._______________________________
__
(Rupees___________________________
__
_________________________________
___
_________________________________
___
_________________________________
only).
1 Rs. _______________