    Sl.No Description of Building Drg.No Unit Rate per unit in figures

    & words

    No. of

    units

    required

    Amount

    (Rs)

    1 2 3 4 5 6 7

    1 Completion of Balance works and rectificatioinof defects as required for Construction of

    block no.1 of 4 Dewlling Units for "Officers"

    at Gopalpur, in double storeyed construction

    (ground + 01 storey), including covered

    garages, covered staircase (Staircasel),

    entrance verandahs, rear verandahs, dry out

    verandahs, balconies, dry out balconies,

    ramps, covered passages, platforms, servantquarters (one for each DU) each comprising of

    servant room, its wash & WC, staircase for

    servant rooms (Staircase-II), plinth protection

    around the block, steps etc. complete all as

    specified and shown on drawings.

    Refer List

    of

    drawings

    for all

    items of

    this

    schedule

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________only).

    1 Rs. _____________________

    2 Completion of Balance works and rectificatioinof defects as required for Construction of

    block no.2 of 4 Dewlling Units for "Officers"

    at Gopalpur, in double storeyed construction(ground + 01 storey), including covered

    garages, covered staircase (Staircasel),

    entrance verandahs, rear verandahs, dry out

    verandahs, balconies, dry out balconies,

    ramps, covered passages, platforms, servant

    quarters (one for each DU) each comprising of

    servant room, its wash & WC, staircase for

    servant rooms (Staircase-II), plinth protection

    around the block, steps etc. complete all as

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. _____________________

    C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13

    SCHEDULE 'A' SECTION-I

    (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)

  • 7/30/2019 2-Sections I to X (25 - 132)

    2/99

    around the block, steps etc. complete all as

    1 2 3 4 5 6 7

    3 Completion of Balance works and

    rectificatioin of defects as required for

    Construction ofblock no.3 of 4 Dewlling

    Units for "Officers" at Gopalpur, in double

    storeyed construction (ground + 01

    storey), including covered garages,

    covered staircase (Staircasel), entrance

    verandahs, rear verandahs, dry outverandahs, balconies, dry out balconies,

    ramps, covered passages, platforms,

    servant quarters (one for each DU) each

    comprising of servant room, its wash &

    WC, staircase for servant rooms

    (Staircase-II), plinth protection around

    the block, steps etc. complete all as

    specified and shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ____________________________________

    only).

    1 Rs. ______________________

    4 Completion of Balance works and

    rectificatioin of defects as required for

    Construction ofblock no.4 of 4 Dewlling

    Units for "Officers" at Gopalpur, in double

    storeyed construction (ground + 01

    storey), including covered garages,

    covered staircase (Staircasel), entrance

    verandahs, rear verandahs, dry out

    verandahs, balconies, dry out balconies,

    ramps, covered passages, platforms,

    servant quarters (one for each DU) each

    comprising of servant room, its wash &WC, staircase for servant rooms

    (Staircase-II), plinth protection around

    the block, steps etc. complete all as

    specified and shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    Rs. ______________________

    C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13

    SCHEDULE 'A' SECTION-I (CONTD../-)

    (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)

    Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 69

  • 7/30/2019 2-Sections I to X (25 - 132)

    3/99

    1 2 3 4 5 6 7

    5 Completion of Balance works and

    rectificatioin of defects as required for

    Construction ofblock no.5 of 4 Dewlling

    Units for "Officers" at Gopalpur, in double

    storeyed construction (ground + 01

    storey), including covered garages,

    covered staircase (Staircasel), entrance

    verandahs, rear verandahs, dry outverandahs, balconies, dry out balconies,

    ramps, covered passages, platforms,

    servant quarters (one for each DU) each

    comprising of servant room, its wash &

    WC, staircase for servant rooms

    (Staircase-II), plinth protection around

    the block, steps etc. complete all as

    specified and shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ____________________________________

    only).

    1 Rs. ______________________

    6 Completion of Balance works and

    rectificatioin of defects as required for

    Construction ofblock no.6 of 4 Dewlling

    Units for "Officers" at Gopalpur, in double

    storeyed construction (ground + 01

    storey), including covered garages,

    covered staircase (Staircasel), entrance

    verandahs, rear verandahs, dry out

    verandahs, balconies, dry out balconies,

    ramps, covered passages, platforms,

    servant quarters (one for each DU) each

    comprising of servant room, its wash &WC, staircase for servant rooms

    (Staircase-II), plinth protection around

    the block, steps etc. complete all as

    specified and shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    Rs. ______________________

    C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13

    SCHEDULE 'A' SECTION-I (CONTD../-)

    (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)

    Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 69

  • 7/30/2019 2-Sections I to X (25 - 132)

    4/99

    1 2 3 4 5 6 7

    7 Completion of Balance works and

    rectificatioin of defects as required for

    Construction ofblock no.7 of 4 Dewlling

    Units for "Officers" at Gopalpur, in double

    storeyed construction (ground + 01

    storey), including covered garages,

    covered staircase (Staircasel), entrance

    verandahs, rear verandahs, dry outverandahs, balconies, dry out balconies,

    ramps, covered passages, platforms,

    servant quarters (one for each DU) each

    comprising of servant room, its wash &

    WC, staircase for servant rooms

    (Staircase-II), plinth protection around

    the block, steps etc. complete all as

    specified and shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ____________________________________

    only).

    1 Rs. ______________________

    8 Completion of Balance works and

    rectificatioin of defects as required for

    Construction ofblock no.8 of 4 Dewlling

    Units for "Officers" at Gopalpur, in double

    storeyed construction (ground + 01

    storey), including covered garages,

    covered staircase (Staircasel), entrance

    verandahs, rear verandahs, dry out

    verandahs, balconies, dry out balconies,

    ramps, covered passages, platforms,

    servant quarters (one for each DU) each

    comprising of servant room, its wash &WC, staircase for servant rooms

    (Staircase-II), plinth protection around

    the block, steps etc. complete all as

    specified and shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    Rs. ______________________

    C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13

    SCHEDULE 'A' SECTION-I (CONTD../-)

    (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)

    Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 69

  • 7/30/2019 2-Sections I to X (25 - 132)

    5/99

    1 2 3 4 5 6 7

    9 Completion of Balance works and

    rectificatioin of defects as required for

    Construction ofblock no.9 of 4 Dewlling

    Units for "Officers" at Gopalpur, in double

    storeyed construction (ground + 01

    storey), including covered garages,

    covered staircase (Staircasel), entrance

    verandahs, rear verandahs, dry outverandahs, balconies, dry out balconies,

    ramps, covered passages, platforms,

    servant quarters (one for each DU) each

    comprising of servant room, its wash &

    WC, staircase for servant rooms

    (Staircase-II), plinth protection around

    the block, steps etc. complete all as

    specified and shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ____________________________________

    only).

    1 Rs. ______________________

    10 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no.10 of 4

    Dewlling Units for "Officers" at Gopalpur,

    in double storeyed construction (ground +

    01 storey), including covered garages,

    covered staircase (Staircasel), entrance

    verandahs, rear verandahs, dry out

    verandahs, balconies, dry out balconies,

    ramps, covered passages, platforms,

    servant quarters (one for each DU) each

    comprising of servant room, its wash &WC, staircase for servant rooms

    (Staircase-II), plinth protection around

    the block, steps etc. complete all as

    specified and shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    Rs. ______________________

    C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13

    SCHEDULE 'A' SECTION-I (CONTD../-)

    (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)

    Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 69

  • 7/30/2019 2-Sections I to X (25 - 132)

    6/99

    1 2 3 4 5 6 7

    11 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no.11 of 4

    Dewlling Units for "Officers" at Gopalpur,

    in double storeyed construction (ground +

    01 storey), including covered garages,

    covered staircase (Staircasel), entrance

    verandahs, rear verandahs, dry outverandahs, balconies, dry out balconies,

    ramps, covered passages, platforms,

    servant quarters (one for each DU) each

    comprising of servant room, its wash &

    WC, staircase for servant rooms

    (Staircase-II), plinth protection around

    the block, steps etc. complete all as

    specified and shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ____________________________________

    only).

    1 Rs. ______________________

    12 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no.12 of 4

    Dewlling Units for "Officers" at Gopalpur,

    in double storeyed construction (ground +

    01 storey), including covered garages,

    covered staircase (Staircasel), entrance

    verandahs, rear verandahs, dry out

    verandahs, balconies, dry out balconies,

    ramps, covered passages, platforms,

    servant quarters (one for each DU) each

    comprising of servant room, its wash &WC, staircase for servant rooms

    (Staircase-II), plinth protection around

    the block, steps etc. complete all as

    specified and shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    Rs. ______________________

    C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13

    SCHEDULE 'A' SECTION-I (CONTD../-)

    (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)

    Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 69

  • 7/30/2019 2-Sections I to X (25 - 132)

    7/99

    1 2 3 4 5 6 7

    13 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no.13 of 4

    Dewlling Units for "Officers" at Gopalpur,

    in double storeyed construction (ground +

    01 storey), including covered garages,

    covered staircase (Staircasel), entrance

    verandahs, rear verandahs, dry out

    verandahs, balconies, dry out balconies,

    ramps, covered passages, platforms,

    servant quarters (one for each DU) each

    comprising of servant room, its wash &

    WC, staircase for servant rooms

    (Staircase-II), plinth protection around

    the block, steps etc. complete all as

    specified and shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    14 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no.14 of 4

    Dewlling Units for "Officers" at Gopalpur,

    in double storeyed construction (ground +

    01 storey), including covered garages,

    covered staircase (Staircasel), entrance

    verandahs, rear verandahs, dry out

    verandahs, balconies, dry out balconies,

    ramps, covered passages, platforms,

    servant quarters (one for each DU) each

    comprising of servant room, its wash &WC, staircase for servant rooms

    (Staircase-II), plinth protection around

    the block, steps etc. complete all as

    specified and shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    Rs. ______________________

    C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13

    SCHEDULE 'A' SECTION-I (CONTD../-)

    (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)

    Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 69

  • 7/30/2019 2-Sections I to X (25 - 132)

    8/99

    1 2 3 4 5 6 7

    15 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no.15 of 4

    Dewlling Units for "Officers" at Gopalpur,

    in double storeyed construction (ground +

    01 storey), including covered garages,

    covered staircase (Staircasel), entrance

    verandahs, rear verandahs, dry out

    verandahs, balconies, dry out balconies,

    ramps, covered passages, platforms,

    servant quarters (one for each DU) each

    comprising of servant room, its wash &

    WC, staircase for servant rooms

    (Staircase-II), plinth protection around

    the block, steps etc. complete all as

    specified and shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    16 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no.16 of 4

    Dewlling Units for "Officers" at Gopalpur,

    in double storeyed construction (ground +

    01 storey), including covered garages,

    covered staircase (Staircasel), entrance

    verandahs, rear verandahs, dry out

    verandahs, balconies, dry out balconies,

    ramps, covered passages, platforms,

    servant quarters (one for each DU) each

    comprising of servant room, its wash &WC, staircase for servant rooms

    (Staircase-II), plinth protection around

    the block, steps etc. complete all as

    specified and shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    Rs. ______________________

    C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13

    SCHEDULE 'A' SECTION-I (CONTD../-)

    (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)

    Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 69

  • 7/30/2019 2-Sections I to X (25 - 132)

    9/99

    1 2 3 4 5 6 7

    17 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no.17 of 4

    Dewlling Units for "Officers" at Gopalpur,

    in double storeyed construction (ground +

    01 storey), including covered garages,

    covered staircase (Staircasel), entrance

    verandahs, rear verandahs, dry out

    verandahs, balconies, dry out balconies,

    ramps, covered passages, platforms,

    servant quarters (one for each DU) each

    comprising of servant room, its wash &

    WC, staircase for servant rooms

    (Staircase-II), plinth protection around

    the block, steps etc. complete all as

    specified and shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    18 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no.18 of 4

    Dewlling Units for "Officers" at Gopalpur,

    in double storeyed construction (ground +

    01 storey), including covered garages,

    covered staircase (Staircasel), entrance

    verandahs, rear verandahs, dry out

    verandahs, balconies, dry out balconies,

    ramps, covered passages, platforms,

    servant quarters (one for each DU) each

    comprising of servant room, its wash &WC, staircase for servant rooms

    (Staircase-II), plinth protection around

    the block, steps etc. complete all as

    specified and shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    Rs. ______________________

    C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13

    SCHEDULE 'A' SECTION-I (CONTD../-)

    (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)

    Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 70

  • 7/30/2019 2-Sections I to X (25 - 132)

    10/99

    1 2 3 4 5 6 7

    19 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no.19 of 4

    Dewlling Units for "Officers" at Gopalpur,

    in double storeyed construction (ground +

    01 storey), including covered garages,

    covered staircase (Staircasel), entrance

    verandahs, rear verandahs, dry out

    verandahs, balconies, dry out balconies,

    ramps, covered passages, platforms,

    servant quarters (one for each DU) each

    comprising of servant room, its wash &

    WC, staircase for servant rooms

    (Staircase-II), plinth protection around

    the block, steps etc. complete all as

    specified and shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    20 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no.20 of 4

    Dewlling Units for "Officers" at Gopalpur,

    in double storeyed construction (ground +

    01 storey), including covered garages,

    covered staircase (Staircasel), entrance

    verandahs, rear verandahs, dry out

    verandahs, balconies, dry out balconies,

    ramps, covered passages, platforms,

    servant quarters (one for each DU) each

    comprising of servant room, its wash &WC, staircase for servant rooms

    (Staircase-II), plinth protection around

    the block, steps etc. complete all as

    specified and shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    Rs. ______________________

    C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13

    SCHEDULE 'A' SECTION-I (CONTD../-)

    (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)

    Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 70

  • 7/30/2019 2-Sections I to X (25 - 132)

    11/99

    1 2 3 4 5 6 7

    21 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no.21 of 4

    Dewlling Units for "Officers" at Gopalpur,

    in double storeyed construction (ground +

    01 storey), including covered garages,

    covered staircase (Staircasel), entrance

    verandahs, rear verandahs, dry out

    verandahs, balconies, dry out balconies,

    ramps, covered passages, platforms,

    servant quarters (one for each DU) each

    comprising of servant room, its wash &

    WC, staircase for servant rooms

    (Staircase-II), plinth protection around

    the block, steps etc. complete all as

    specified and shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    22 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no.22 of 4

    Dewlling Units for "Officers" at Gopalpur,

    in double storeyed construction (ground +

    01 storey), including covered garages,

    covered staircase (Staircasel), entrance

    verandahs, rear verandahs, dry out

    verandahs, balconies, dry out balconies,

    ramps, covered passages, platforms,

    servant quarters (one for each DU) each

    comprising of servant room, its wash &WC, staircase for servant rooms

    (Staircase-II), plinth protection around

    the block, steps etc. complete all as

    specified and shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    Rs. ______________________

    C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13

    SCHEDULE 'A' SECTION-I (CONTD../-)

    (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)

    Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 70

  • 7/30/2019 2-Sections I to X (25 - 132)

    12/99

    1 2 3 4 5 6 7

    23 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no.23 of 4

    Dewlling Units for "Officers" at Gopalpur,

    in double storeyed construction (ground +

    01 storey), including covered garages,

    covered staircase (Staircasel), entrance

    verandahs, rear verandahs, dry out

    verandahs, balconies, dry out balconies,

    ramps, covered passages, platforms,

    servant quarters (one for each DU) each

    comprising of servant room, its wash &

    WC, staircase for servant rooms

    (Staircase-II), plinth protection around

    the block, steps etc. complete all as

    specified and shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    24 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no.24 of 4

    Dewlling Units for "Officers" at Gopalpur,

    in double storeyed construction (ground +

    01 storey), including covered garages,

    covered staircase (Staircasel), entrance

    verandahs, rear verandahs, dry out

    verandahs, balconies, dry out balconies,

    ramps, covered passages, platforms,

    servant quarters (one for each DU) each

    comprising of servant room, its wash &WC, staircase for servant rooms

    (Staircase-II), plinth protection around

    the block, steps etc. complete all as

    specified and shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    Rs. ______________________

    C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13

    SCHEDULE 'A' SECTION-I (CONTD../-)

    (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)

    Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 70

  • 7/30/2019 2-Sections I to X (25 - 132)

    13/99

    1 2 3 4 5 6 7

    25 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no.25 of 4

    Dewlling Units for "Officers" at Gopalpur,

    in double storeyed construction (ground +

    01 storey), including covered garages,

    covered staircase (Staircasel), entrance

    verandahs, rear verandahs, dry out

    verandahs, balconies, dry out balconies,

    ramps, covered passages, platforms,

    servant quarters (one for each DU) each

    comprising of servant room, its wash &

    WC, staircase for servant rooms

    (Staircase-II), plinth protection around

    the block, steps etc. complete all as

    specified and shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    26 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no.26 of 4

    Dewlling Units for "Officers" at Gopalpur,

    in double storeyed construction (ground +

    01 storey), including covered garages,

    covered staircase (Staircasel), entrance

    verandahs, rear verandahs, dry out

    verandahs, balconies, dry out balconies,

    ramps, covered passages, platforms,

    servant quarters (one for each DU) each

    comprising of servant room, its wash &WC, staircase for servant rooms

    (Staircase-II), plinth protection around

    the block, steps etc. complete all as

    specified and shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    Rs. ______________________

    C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13

    SCHEDULE 'A' SECTION-I (CONTD../-)

    (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)

    Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 70

  • 7/30/2019 2-Sections I to X (25 - 132)

    14/99

    1 2 3 4 5 6 7

    27 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no.27 of 4

    Dewlling Units for "Officers" at Gopalpur,

    in double storeyed construction (ground +

    01 storey), including covered garages,

    covered staircase (Staircasel), entrance

    verandahs, rear verandahs, dry out

    verandahs, balconies, dry out balconies,

    ramps, covered passages, platforms,

    servant quarters (one for each DU) each

    comprising of servant room, its wash &

    WC, staircase for servant rooms

    (Staircase-II), plinth protection around

    the block, steps etc. complete all as

    specified and shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    28 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no.28 of 4

    Dewlling Units for "Officers" at Gopalpur,

    in double storeyed construction (ground +

    01 storey), including covered garages,

    covered staircase (Staircasel), entrance

    verandahs, rear verandahs, dry out

    verandahs, balconies, dry out balconies,

    ramps, covered passages, platforms,

    servant quarters (one for each DU) each

    comprising of servant room, its wash &WC, staircase for servant rooms

    (Staircase-II), plinth protection around

    the block, steps etc. complete all as

    specified and shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    Rs. ______________________

    C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13

    SCHEDULE 'A' SECTION-I (CONTD../-)

    (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)

    Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 70

  • 7/30/2019 2-Sections I to X (25 - 132)

    15/99

    1 2 3 4 5 6 7

    29 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no.29 of 1

    Dewlling Unit for "Officers" at Gopalpur, in

    single storeyed construction including

    covered garages, entrance verandah, rear

    dry out verandah, platforms, ramp,

    connecting platform between dwelling

    unit and garage, servant quarter

    comprising of servant room, its wash &

    WC & platform, plinth protection around

    the block, steps etc. complete all as

    specified and shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    30 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no.30 of 1

    Dewlling Unit for "Officers" at Gopalpur, in

    single storeyed construction including

    covered garages, entrance verandah, rear

    dry out verandah, platforms, ramp,

    connecting platform between dwelling

    unit and garage, servant quarter

    comprising of servant room, its wash &

    WC & platform, plinth protection around

    the block, steps etc. complete all as

    specified and shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    31 Completion of Balance works and

    rectificatioin of defects as required for

    Construction ofblock no.1 of 6 Dewlling

    Units for "JCOs" at Gopalpur, in triple

    storeyed construction (ground + 02

    storey), including covered scooter and car

    garages, covered staircase, verandah

    entrance verandah, lobby, balconies, dry

    out balconies, dryout verandah, ramps,

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    1 Rs. ______________________

    C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13

    SCHEDULE 'A' SECTION-I (CONTD../-)

    (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)

  • 7/30/2019 2-Sections I to X (25 - 132)

    16/99

    1 2 3 4 5 6 7

    32 Completion of Balance works and

    rectificatioin of defects as required for

    Construction ofblock no.2 of 6 Dewlling

    Units for "JCOs" at Gopalpur, in triple

    storeyed construction (ground + 02

    storey), including covered scooter and car

    garages, covered staircase, verandah,

    entrance verandah, lobby, balconies, dry

    out balconies, dryout verandah, ramps,

    platforms, plinth protection around the

    block, steps etc. complete all as specified

    and shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    33 Completion of Balance works and

    rectificatioin of defects as required for

    Construction ofblock no.3 of 6 Dewlling

    Units for "JCOs" at Gopalpur, in triple

    storeyed construction (ground + 02

    storey), including covered scooter and car

    garages, covered staircase, verandah,

    entrance verandah, lobby, balconies, dry

    out balconies, dryout verandah, ramps,

    platforms, plinth protection around the

    block, steps etc. complete all as specified

    and shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    34 Completion of Balance works and

    rectificatioin of defects as required for

    Construction ofblock no.4 of 6 DewllingUnits for "JCOs" at Gopalpur, in triple

    storeyed construction (ground + 02

    storey), including covered scooter and car

    garages, covered staircase, verandah,

    entrance verandah, lobby, balconies, dry

    out balconies, dryout verandah, ramps,

    platforms, plinth protection around the

    block, steps etc. complete all as specified

    and shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees_____________________________

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)

    C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13

    SCHEDULE 'A' SECTION-I (CONTD../-)

  • 7/30/2019 2-Sections I to X (25 - 132)

    17/99

    1 2 3 4 5 6 7

    35 Completion of Balance works and

    rectificatioin of defects as required for

    Construction ofblock no.5 of 6 Dewlling

    Units for "JCOs" at Gopalpur, in triple

    storeyed construction (ground + 02

    storey), including covered scooter and car

    garages, covered staircase, verandah,

    entrance verandah, lobby, balconies, dry

    out balconies, dryout verandah, ramps,

    platforms, plinth protection around the

    block, steps etc. complete all as specified

    and shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    36 Completion of Balance works and

    rectificatioin of defects as required for

    Construction ofblock no.6 of 6 Dewlling

    Units for "JCOs" at Gopalpur, in triple

    storeyed construction (ground + 02

    storey), including covered scooter and car

    garages, covered staircase, verandah,

    entrance verandah, lobby, balconies, dry

    out balconies, dryout verandah, ramps,

    platforms, plinth protection around the

    block, steps etc. complete all as specified

    and shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    37 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no.7 of 6 Dewlling

    Units for "JCOs" at Gopalpur, in triplestoreyed construction (ground + 02

    storey), including covered scooter and car

    garages, covered staircase, entrance

    verandah, lobby, balconies, dry out

    balconies, ramps, platforms, plinth

    protection around the block, steps etc.

    complete all as specified and shown on

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    ___________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    Rs

    SCHEDULE 'A' SECTION-I (CONTD../-)

    C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13

    (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)

    Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No 71

  • 7/30/2019 2-Sections I to X (25 - 132)

    18/99

    1 2 3 4 5 6 7

    38 Completion of Balance works and

    rectificatioin of defects as required for

    Construction ofblock no.8 of 6 Dewlling

    Units for "JCOs" at Gopalpur, in triple

    storeyed construction (ground + 02

    storey), including covered scooter and car

    garages, covered staircase, verandah,

    entrance verandah, lobby, balconies, dry

    out balconies, dryout verandah, ramps,

    platforms, plinth protection around the

    block, steps etc. complete all as specified

    and shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    39 Completion of Balance works and

    rectificatioin of defects as required for

    Construction ofblock no.9 of 6 Dewlling

    Units for "JCOs" at Gopalpur, in triple

    storeyed construction (ground + 02

    storey), including covered scooter and car

    garages, covered staircase, verandah,

    entrance verandah, lobby, balconies, dry

    out balconies, dryout verandah, ramps,

    platforms, plinth protection around the

    block, steps etc. complete all as specified

    and shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    40 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no.10 of 6Dewlling Units for "JCOs" at Gopalpur, in

    triple storeyed construction (ground + 02

    storey), including covered scooter and car

    garages, covered staircase, verandah,

    entrance verandah, lobby, balconies, dry

    out balconies, dryout verandah, ramps,

    platforms, plinth protection around the

    block, steps etc. complete all as specified

    and shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees_____________________________

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13

    SCHEDULE 'A' SECTION-I (CONTD../-)

    (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)

  • 7/30/2019 2-Sections I to X (25 - 132)

    19/99

    1 2 3 4 5 6 7

    41 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no.11 of 6

    Dewlling Units for "JCOs" at Gopalpur, in

    triple storeyed construction (ground + 02

    storey), including covered scooter and car

    garages, covered staircase, verandah,

    entrance verandah, lobby, balconies, dry

    out balconies, dryout verandah, ramps,

    platforms, plinth protection around the

    block, steps etc. complete all as specified

    and shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    42 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no.12 of 6

    Dewlling Units for "JCOs" at Gopalpur, in

    triple storeyed construction (ground + 02

    storey), including covered scooter and car

    garages, covered staircase, verandah,

    entrance verandah, lobby, balconies, dry

    out balconies, dryout verandah, ramps,

    platforms, plinth protection around the

    block, steps etc. complete all as specified

    and shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    43 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no.13 of 5

    Dewlling Units for "JCOs" at Gopalpur, intriple storeyed construction (ground + 02

    storey), including covered scooter and car

    garages, covered staircase, verandah,

    entrance verandah, lobby, balconies, dry

    out balconies, dryout verandah, ramps,

    platforms, plinth protection around the

    block, steps etc. complete all as specified

    and shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    ___________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    SCHEDULE 'A' SECTION-I (CONTD../-)(LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)

    C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13

  • 7/30/2019 2-Sections I to X (25 - 132)

    20/99

    1 2 3 4 5 6 7

    44 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no.14 of 6

    Dewlling Units for "JCOs" at Gopalpur, in

    triple storeyed construction (ground + 02

    storey), including covered scooter and car

    garages, covered staircase, verandah,

    entrance verandah, lobby, balconies, dry

    out balconies, dryout verandah, ramps,

    platforms, plinth protection around the

    block, steps etc. complete all as specified

    and shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    45 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no.15 of 6

    Dewlling Units for "JCOs" at Gopalpur, in

    triple storeyed construction (ground + 02

    storey), including covered scooter and car

    garages, covered staircase, verandah,

    entrance verandah, lobby, balconies, dry

    out balconies, dryout verandah, ramps,

    platforms, plinth protection around the

    block, steps etc. complete all as specified

    and shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    46 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no.16 of 6Dewlling Units for "JCOs" at Gopalpur, in

    triple storeyed construction (ground + 02

    storey), including covered scooter and car

    garages, covered staircase, verandah,

    entrance verandah, lobby, balconies, dry

    out balconies, dryout verandah, ramps,

    platforms, plinth protection around the

    block, steps etc. complete all as specified

    and shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees_____________________________

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13

    SCHEDULE 'A' SECTION-I (CONTD../-)(LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)

  • 7/30/2019 2-Sections I to X (25 - 132)

    21/99

    1 2 3 4 5 6 7

    47 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no.17 of 6

    Dewlling Units for "JCOs" at Gopalpur, in

    triple storeyed construction (ground + 02

    storey), including covered scooter and car

    garages, covered staircase, verandah,

    entrance verandah, lobby, balconies, dry

    out balconies, dryout verandah, ramps,

    platforms, plinth protection around the

    block, steps etc. complete all as specified

    and shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    48 Construction of block nos.18, 19, 20,

    21 & 22 of 6 Dewlling Units for "JCOs" at

    Gopalpur, in triple storeyed construction

    (ground + 02 storey), including covered

    scooter and car garages, covered

    staircase, entrance verandah, lobby,

    balconies, dry out balconies, ramps,

    platforms, plinth protection around the

    block, steps etc. complete all as specified

    and shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    5 Rs. ______________________

    49 Construction ofblock nos. 1, 2, 3, 4, 5,

    6, 7 & 8 of 6 Dewlling Units for "OR" at

    Gopalpur, in triple storeyed construction

    (ground + 02 storey), including covered

    scooter sheds, covered staircase,

    verandahs, entrance lobbies, balconies,dry out balconies, ramps, plinth

    protection around the block, steps etc.

    complete all as specified and shown on

    drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ____________________________________

    ___

    _________________________________

    only).

    8 Rs. ______________________

    Rs. ______________________Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 71

    C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13

    SCHEDULE 'A' SECTION-I (CONTD../-)(LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)

  • 7/30/2019 2-Sections I to X (25 - 132)

    22/99

    1 2 3 4 5 6 7

    50 Completion of Balance works and

    rectificatioin of defects as required for

    Construction ofblock no. 9 of 5 Dewlling

    Units for "OR" at Gopalpur, in triple

    storeyed construction (ground + 02

    storey), including covered scooter sheds,

    covered staircase, verandahs, entrance

    lobbies, balconies, dry out balconies,

    ramps, plinth protection around the block,

    steps etc. complete all as specified and

    shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    51 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no. 10 of 5

    Dewlling Units for "OR" at Gopalpur, in

    triple storeyed construction (ground + 02

    storey), including covered scooter sheds,

    covered staircase, verandahs, entrance

    lobbies, balconies, dry out balconies,

    ramps, plinth protection around the block,

    steps etc. complete all as specified and

    shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    52 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no. 11 of 6

    Dewlling Units for "OR" at Gopalpur, in

    triple storeyed construction (ground + 02storey), including covered scooter sheds,

    covered staircase, verandahs, entrance

    lobbies, balconies, dry out balconies,

    ramps, plinth protection around the block,

    steps etc. complete all as specified and

    shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    ____________________________________

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    Rs. ______________________

    C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13

    SCHEDULE 'A' SECTION-I (CONTD../-)(LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)

    Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 71

  • 7/30/2019 2-Sections I to X (25 - 132)

    23/99

    1 2 3 4 5 6 7

    53 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no. 12 of 6

    Dewlling Units for "OR" at Gopalpur, in

    triple storeyed construction (ground + 02

    storey), including covered scooter sheds,

    covered staircase, verandahs, entrance

    lobbies, balconies, dry out balconies,

    ramps, plinth protection around the block,

    steps etc. complete all as specified and

    shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    54 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no. 13 of 6

    Dewlling Units for "OR" at Gopalpur, in

    triple storeyed construction (ground + 02

    storey), including covered scooter sheds,

    covered staircase, verandahs, entrance

    lobbies, balconies, dry out balconies,

    ramps, plinth protection around the block,

    steps etc. complete all as specified and

    shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    55 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no. 14 of 6

    Dewlling Units for "OR" at Gopalpur, in

    triple storeyed construction (ground + 02

    storey), including covered scooter sheds,covered staircase, verandahs, entrance

    lobbies, balconies, dry out balconies,

    ramps, plinth protection around the block,

    steps etc. complete all as specified and

    shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ____________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    Rs. ______________________

    C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13

    SCHEDULE 'A' SECTION-I (CONTD../-)(LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)

    Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 71

  • 7/30/2019 2-Sections I to X (25 - 132)

    24/99

    1 2 3 4 5 6 7

    56 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no. 15 of 6

    Dewlling Units for "OR" at Gopalpur, in

    triple storeyed construction (ground + 02

    storey), including covered scooter sheds,

    covered staircase, verandahs, entrance

    lobbies, balconies, dry out balconies,

    ramps, plinth protection around the block,

    steps etc. complete all as specified and

    shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    57 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no. 16 of 6

    Dewlling Units for "OR" at Gopalpur, in

    triple storeyed construction (ground + 02

    storey), including covered scooter sheds,

    covered staircase, verandahs, entrance

    lobbies, balconies, dry out balconies,

    ramps, plinth protection around the block,

    steps etc. complete all as specified and

    shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    58 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no. 17 of 6

    Dewlling Units for "OR" at Gopalpur, in

    triple storeyed construction (ground + 02storey), including covered scooter sheds,

    covered staircase, verandahs, entrance

    lobbies, balconies, dry out balconies,

    ramps, plinth protection around the block,

    steps etc. complete all as specified and

    shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    ____________________________________

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    Rs. ______________________

    C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13

    SCHEDULE 'A' SECTION-I (CONTD../-)(LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)

    Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 71

  • 7/30/2019 2-Sections I to X (25 - 132)

    25/99

    1 2 3 4 5 6 7

    59 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no. 18 of 6

    Dewlling Units for "OR" at Gopalpur, in

    triple storeyed construction (ground + 02

    storey), including covered scooter sheds,

    covered staircase, verandahs, entrance

    lobbies, balconies, dry out balconies,

    ramps, plinth protection around the block,

    steps etc. complete all as specified and

    shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    60 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no. 19 of 6

    Dewlling Units for "OR" at Gopalpur, in

    triple storeyed construction (ground + 02

    storey), including covered scooter sheds,

    covered staircase, verandahs, entrance

    lobbies, balconies, dry out balconies,

    ramps, plinth protection around the block,

    steps etc. complete all as specified and

    shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    61 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no. 20 of 6

    Dewlling Units for "OR" at Gopalpur, in

    triple storeyed construction (ground + 02

    storey), including covered scooter sheds,covered staircase, verandahs, entrance

    lobbies, balconies, dry out balconies,

    ramps, plinth protection around the block,

    steps etc. complete all as specified and

    shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ____________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    Rs. ______________________

    C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13

    SCHEDULE 'A' SECTION-I (CONTD../-)(LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)

    Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 72

  • 7/30/2019 2-Sections I to X (25 - 132)

    26/99

    1 2 3 4 5 6 7

    62 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no. 21 of 6

    Dewlling Units for "OR" at Gopalpur, in

    triple storeyed construction (ground + 02

    storey), including covered scooter sheds,

    covered staircase, verandahs, entrance

    lobbies, balconies, dry out balconies,

    ramps, plinth protection around the block,

    steps etc. complete all as specified and

    shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    63 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no. 22 of 6

    Dewlling Units for "OR" at Gopalpur, in

    triple storeyed construction (ground + 02

    storey), including covered scooter sheds,

    covered staircase, verandahs, entrance

    lobbies, balconies, dry out balconies,

    ramps, plinth protection around the block,

    steps etc. complete all as specified and

    shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    64 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no. 23 of 6

    Dewlling Units for "OR" at Gopalpur, in

    triple storeyed construction (ground + 02

    storey), including covered scooter sheds,

    covered staircase, verandahs, entrance

    lobbies, balconies, dry out balconies,

    ramps, plinth protection around the block,

    steps etc. complete all as specified and

    shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    Rs. ______________________Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 72

    C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13

    SCHEDULE 'A' SECTION-I (CONTD../-)(LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)

  • 7/30/2019 2-Sections I to X (25 - 132)

    27/99

    1 2 3 4 5 6 7

    65 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no. 24 of 6

    Dewlling Units for "OR" at Gopalpur, in

    triple storeyed construction (ground + 02

    storey), including covered scooter sheds,

    covered staircase, verandahs, entrance

    lobbies, balconies, dry out balconies,

    ramps, plinth protection around the block,steps etc. complete all as specified and

    shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________only).

    1 Rs. ______________________

    66 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no. 25 of 6

    Dewlling Units for "OR" at Gopalpur, in

    triple storeyed construction (ground + 02

    storey), including covered scooter sheds,

    covered staircase, verandahs, entrance

    lobbies, balconies, dry out balconies,

    ramps, plinth protection around the block,

    steps etc. complete all as specified and

    shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    Rs. ______________________

    C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13

    SCHEDULE 'A' SECTION-I (CONTD../-)(LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)

    Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 72

  • 7/30/2019 2-Sections I to X (25 - 132)

    28/99

    1 2 3 4 5 6 7

    67 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no. 26 of 6

    Dewlling Units for "OR" at Gopalpur, in

    triple storeyed construction (ground + 02

    storey), including covered scooter sheds,

    covered staircase, verandahs, entrance

    lobbies, balconies, dry out balconies,

    ramps, plinth protection around the block,

    steps etc. complete all as specified and

    shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    68 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no. 27 of 6

    Dewlling Units for "OR" at Gopalpur, in

    triple storeyed construction (ground + 02

    storey), including covered scooter sheds,

    covered staircase, verandahs, entrance

    lobbies, balconies, dry out balconies,

    ramps, plinth protection around the block,

    steps etc. complete all as specified and

    shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    69 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no. 28 of 6

    Dewlling Units for "OR" at Gopalpur, in

    triple storeyed construction (ground + 02

    storey), including covered scooter sheds,

    covered staircase, verandahs, entrance

    lobbies, balconies, dry out balconies,

    ramps, plinth protection around the block,

    steps etc. complete all as specified and

    shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    Rs. ______________________

    C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13

    SCHEDULE 'A' SECTION-I (CONTD../-)(LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)

    Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 72

  • 7/30/2019 2-Sections I to X (25 - 132)

    29/99

    1 2 3 4 5 6 7

    70 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no. 29 of 6

    Dewlling Units for "OR" at Gopalpur, in

    triple storeyed construction (ground + 02

    storey), including covered scooter sheds,

    covered staircase, verandahs, entrance

    lobbies, balconies, dry out balconies,

    ramps, plinth protection around the block,

    steps etc. complete all as specified and

    shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    71 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no. 30 of 6

    Dewlling Units for "OR" at Gopalpur, in

    triple storeyed construction (ground + 02

    storey), including covered scooter sheds,

    covered staircase, verandahs, entrance

    lobbies, balconies, dry out balconies,

    ramps, plinth protection around the block,

    steps etc. complete all as specified and

    shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    72 Construction of block no. 31 of 6

    Dewlling Units for "OR" at Gopalpur, in

    triple storeyed construction (ground + 02

    storey), including covered scooter sheds,

    covered staircase, verandahs, entrance

    lobbies, balconies, dry out balconies,

    ramps, plinth protection around the block,

    steps etc. complete all as specified and

    shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    1 Rs. ______________________

    Rs. ______________________

    SCHEDULE 'A' SECTION-I (CONTD../-)

    C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13

    (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)

    Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 72

  • 7/30/2019 2-Sections I to X (25 - 132)

    30/99

    1 2 3 4 5 6 7

    73 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no. 32 of 6

    Dewlling Units for "OR" at Gopalpur, in

    triple storeyed construction (ground + 02

    storey), including covered scooter sheds,

    covered staircase, verandahs, entrance

    lobbies, balconies, dry out balconies,ramps, plinth protection around the block,

    steps etc. complete all as specified and

    shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ____________________________________

    only).

    1 Rs. ______________________

    74 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no. 33 of 6

    Dewlling Units for "OR" at Gopalpur, in

    triple storeyed construction (ground + 02

    storey), including covered scooter sheds,

    covered staircase, verandahs, entrance

    lobbies, balconies, dry out balconies,

    ramps, plinth protection around the block,

    steps etc. complete all as specified and

    shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    75 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no. 34 of 6

    Dewlling Units for "OR" at Gopalpur, in

    triple storeyed construction (ground + 02

    storey), including covered scooter sheds,

    covered staircase, verandahs, entrance

    lobbies, balconies, dry out balconies,

    ramps, plinth protection around the block,

    steps etc. complete all as specified and

    shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    Rs. ______________________Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 72

    SCHEDULE 'A' SECTION-I (CONTD../-)(LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)

    C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13

  • 7/30/2019 2-Sections I to X (25 - 132)

    31/99

    1 2 3 4 5 6 7

    76 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no. 35 of 6

    Dewlling Units for "OR" at Gopalpur, in

    triple storeyed construction (ground + 02

    storey), including covered scooter sheds,

    covered staircase, verandahs, entrance

    lobbies, balconies, dry out balconies,

    ramps, plinth protection around the block,

    steps etc. complete all as specified and

    shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    77 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no. 36 of 6

    Dewlling Units for "OR" at Gopalpur, in

    triple storeyed construction (ground + 02

    storey), including covered scooter sheds,

    covered staircase, verandahs, entrance

    lobbies, balconies, dry out balconies,

    ramps, plinth protection around the block,

    steps etc. complete all as specified and

    shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    78 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no. 37 of 6

    Dewlling Units for "OR" at Gopalpur, in

    triple storeyed construction (ground + 02

    storey), including covered scooter sheds,

    covered staircase, verandahs, entrance

    lobbies, balconies, dry out balconies,

    ramps, plinth protection around the block,

    steps etc. complete all as specified and

    shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    Rs. ______________________

    C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13

    SCHEDULE 'A' SECTION-I (CONTD../-)(LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)

    Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 72

  • 7/30/2019 2-Sections I to X (25 - 132)

    32/99

    1 2 3 4 5 6 7

    79 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no. 38 of 6

    Dewlling Units for "OR" at Gopalpur, in

    triple storeyed construction (ground + 02

    storey), including covered scooter sheds,

    covered staircase, verandahs, entrance

    lobbies, balconies, dry out balconies,ramps, plinth protection around the block,

    steps etc. complete all as specified and

    shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ____________________________________

    only).

    1 Rs. ______________________

    80 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no. 39 of 6

    Dewlling Units for "OR" at Gopalpur, in

    triple storeyed construction (ground + 02

    storey), including covered scooter sheds,

    covered staircase, verandahs, entrance

    lobbies, balconies, dry out balconies,

    ramps, plinth protection around the block,

    steps etc. complete all as specified and

    shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    81 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no. 40 of 6

    Dewlling Units for "OR" at Gopalpur, in

    triple storeyed construction (ground + 02

    storey), including covered scooter sheds,

    covered staircase, verandahs, entrance

    lobbies, balconies, dry out balconies,

    ramps, plinth protection around the block,

    steps etc. complete all as specified and

    shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    Rs. ______________________

    SCHEDULE 'A' SECTION-I (CONTD../-)

    C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13

    (LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)

    Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 72

  • 7/30/2019 2-Sections I to X (25 - 132)

    33/99

    1 2 3 4 5 6 7

    82 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no. 41 of 6

    Dewlling Units for "OR" at Gopalpur, in

    triple storeyed construction (ground + 02

    storey), including covered scooter sheds,

    covered staircase, verandahs, entrance

    lobbies, balconies, dry out balconies,

    ramps, plinth protection around the block,steps etc. complete all as specified and

    shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________only).

    1 Rs. ______________________

    83 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no. 42 of 6

    Dewlling Units for "OR" at Gopalpur, in

    triple storeyed construction (ground + 02

    storey), including covered scooter sheds,

    covered staircase, verandahs, entrance

    lobbies, balconies, dry out balconies,

    ramps, plinth protection around the block,

    steps etc. complete all as specified and

    shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    84 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no. 43 of 6

    Dewlling Units for "OR" at Gopalpur, in

    triple storeyed construction (ground + 02

    storey), including covered scooter sheds,

    covered staircase, verandahs, entrance

    lobbies, balconies, dry out balconies,

    ramps, plinth protection around the block,

    steps etc. complete all as specified and

    shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    Rs. ______________________Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 73

    C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13

    SCHEDULE 'A' SECTION-I (CONTD../-)(LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)

  • 7/30/2019 2-Sections I to X (25 - 132)

    34/99

    1 2 3 4 5 6 7

    85 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no. 44 of 6

    Dewlling Units for "OR" at Gopalpur, in

    triple storeyed construction (ground + 02

    storey), including covered scooter sheds,

    covered staircase, verandahs, entrance

    lobbies, balconies, dry out balconies,ramps, plinth protection around the block,

    steps etc. complete all as specified and

    shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ____________________________________

    only).

    1 Rs. ______________________

    86 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no. 45 of 6

    Dewlling Units for "OR" at Gopalpur, in

    triple storeyed construction (ground + 02

    storey), including covered scooter sheds,

    covered staircase, verandahs, entrance

    lobbies, balconies, dry out balconies,

    ramps, plinth protection around the block,

    steps etc. complete all as specified and

    shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    87 Construction ofblock nos. 46 & 47 of 6

    Dewlling Units for "OR" at Gopalpur, in

    triple storeyed construction (ground + 02

    storey), including covered scooter sheds,

    covered staircase, verandahs, entrance

    lobbies, balconies, dry out balconies,

    ramps, plinth protection around the block,

    steps etc. complete all as specified and

    shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    2 Rs. ______________________

    Rs. ______________________

    C.A. No. DG MAP/PHASE-II/GPR/PKG-14(R & C) OF 2012-13

    SCHEDULE 'A' SECTION-I (CONTD../-)(LIST OF ITEMS OF WORKS & PRICES FOR BUILDING WORKS)

    Total Carried over to Summary of Schedule 'A' Section-I on Serial Page No. 73

  • 7/30/2019 2-Sections I to X (25 - 132)

    35/99

    1 2 3 4 5 6 7

    88 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no. 48 of 6

    Dewlling Units for "OR" at Gopalpur, in

    triple storeyed construction (ground + 02

    storey), including covered scooter sheds,

    covered staircase, verandahs, entrance

    lobbies, balconies, dry out balconies,

    ramps, plinth protection around the block,steps etc. complete all as specified and

    shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________only).

    1 Rs. ______________________

    89 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no. 49 of 6

    Dewlling Units for "OR" at Gopalpur, in

    triple storeyed construction (ground + 02

    storey), including covered scooter sheds,

    covered staircase, verandahs, entrance

    lobbies, balconies, dry out balconies,

    ramps, plinth protection around the block,

    steps etc. complete all as specified and

    shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. ______________________

    90 Completion of Balance works and

    rectificatioin of defects as required for

    Construction of block no. 50 of 6

    Dewlling Units for "OR" at Gopalpur, in

    triple storeyed construction (ground + 02

    storey), including covered scooter sheds,

    covered staircase, verandahs, entrance

    lobbies, balconies, dry out balconies,

    ramps, plinth protection around the block,

    steps etc. complete all as specified and

    shown on drawings.

    Each

    Block

    Rs._______________________________

    __

    (Rupees___________________________

    __

    _________________________________

    ___

    _________________________________

    ___

    _________________________________

    only).

    1 Rs. _______________