20 minute c-11, 10 minute n-13 and 2 minute o-15 gas emissions from blip collider-accelerator...
TRANSCRIPT
![Page 1: 20 Minute C-11, 10 Minute N-13 and 2 Minute O-15 Gas Emissions from BLIP Collider-Accelerator Department 4-13-2010 Take 5 for Safety](https://reader030.vdocument.in/reader030/viewer/2022032708/56649e895503460f94b8e953/html5/thumbnails/1.jpg)
20 Minute C-11, 10 Minute N-13 and 2 Minute O-15 Gas Emissions from BLIP
Collider-Accelerator Department4-13-2010
Take 5 for SafetyTake 5 for Safety
![Page 2: 20 Minute C-11, 10 Minute N-13 and 2 Minute O-15 Gas Emissions from BLIP Collider-Accelerator Department 4-13-2010 Take 5 for Safety](https://reader030.vdocument.in/reader030/viewer/2022032708/56649e895503460f94b8e953/html5/thumbnails/2.jpg)
Textbook Cone-Shaped Plume
2
![Page 3: 20 Minute C-11, 10 Minute N-13 and 2 Minute O-15 Gas Emissions from BLIP Collider-Accelerator Department 4-13-2010 Take 5 for Safety](https://reader030.vdocument.in/reader030/viewer/2022032708/56649e895503460f94b8e953/html5/thumbnails/3.jpg)
Short Stack and Lower Nearby Buildings – Wind Tunnel Simulation
Wake Effect from Building or Cone-shaped Hill
Cavity Zone
Heat from ground produces recirculation inside the cavity zone
3
![Page 4: 20 Minute C-11, 10 Minute N-13 and 2 Minute O-15 Gas Emissions from BLIP Collider-Accelerator Department 4-13-2010 Take 5 for Safety](https://reader030.vdocument.in/reader030/viewer/2022032708/56649e895503460f94b8e953/html5/thumbnails/4.jpg)
BLIP Building Looking North
4
![Page 5: 20 Minute C-11, 10 Minute N-13 and 2 Minute O-15 Gas Emissions from BLIP Collider-Accelerator Department 4-13-2010 Take 5 for Safety](https://reader030.vdocument.in/reader030/viewer/2022032708/56649e895503460f94b8e953/html5/thumbnails/5.jpg)
Inside BLIP
5
![Page 6: 20 Minute C-11, 10 Minute N-13 and 2 Minute O-15 Gas Emissions from BLIP Collider-Accelerator Department 4-13-2010 Take 5 for Safety](https://reader030.vdocument.in/reader030/viewer/2022032708/56649e895503460f94b8e953/html5/thumbnails/6.jpg)
Looking West From BLIP
6
![Page 7: 20 Minute C-11, 10 Minute N-13 and 2 Minute O-15 Gas Emissions from BLIP Collider-Accelerator Department 4-13-2010 Take 5 for Safety](https://reader030.vdocument.in/reader030/viewer/2022032708/56649e895503460f94b8e953/html5/thumbnails/7.jpg)
Looking South From BLIP
7
![Page 8: 20 Minute C-11, 10 Minute N-13 and 2 Minute O-15 Gas Emissions from BLIP Collider-Accelerator Department 4-13-2010 Take 5 for Safety](https://reader030.vdocument.in/reader030/viewer/2022032708/56649e895503460f94b8e953/html5/thumbnails/8.jpg)
North Side of BLIP Building
8
![Page 9: 20 Minute C-11, 10 Minute N-13 and 2 Minute O-15 Gas Emissions from BLIP Collider-Accelerator Department 4-13-2010 Take 5 for Safety](https://reader030.vdocument.in/reader030/viewer/2022032708/56649e895503460f94b8e953/html5/thumbnails/9.jpg)
North Side of BLIP Building Looking from “NSRL Valley”
9
![Page 10: 20 Minute C-11, 10 Minute N-13 and 2 Minute O-15 Gas Emissions from BLIP Collider-Accelerator Department 4-13-2010 Take 5 for Safety](https://reader030.vdocument.in/reader030/viewer/2022032708/56649e895503460f94b8e953/html5/thumbnails/10.jpg)
MicroR/h on April 6, 6 PM, 20 mm Water Path for Beam, 485 CFM, Routine Medical Production Targets, 117 MeV Beam
Radiation survey was performed at various outdoor locations around the following buildings/facilities:· NSRL, EBIS, HITL, REF, and LINAC· No readings above background were found in these
areas
Outside wall of BLIP was 2000 microR/h near cooling water pipe
10
![Page 11: 20 Minute C-11, 10 Minute N-13 and 2 Minute O-15 Gas Emissions from BLIP Collider-Accelerator Department 4-13-2010 Take 5 for Safety](https://reader030.vdocument.in/reader030/viewer/2022032708/56649e895503460f94b8e953/html5/thumbnails/11.jpg)
MicroR/h on April 7, 11 am, BLIP Off
11
![Page 12: 20 Minute C-11, 10 Minute N-13 and 2 Minute O-15 Gas Emissions from BLIP Collider-Accelerator Department 4-13-2010 Take 5 for Safety](https://reader030.vdocument.in/reader030/viewer/2022032708/56649e895503460f94b8e953/html5/thumbnails/12.jpg)
MicroR/h on April 8, 5 AM, South Wind, 65 mm Water Path, 485 CFM, 181 MeV Beam, Simos Targets Plus Normal BLIP Targets
12
![Page 13: 20 Minute C-11, 10 Minute N-13 and 2 Minute O-15 Gas Emissions from BLIP Collider-Accelerator Department 4-13-2010 Take 5 for Safety](https://reader030.vdocument.in/reader030/viewer/2022032708/56649e895503460f94b8e953/html5/thumbnails/13.jpg)
MicroR/h on April 8, 2 PM, South Wind, Reduced Water Path to 50 mm (25%) and Reduced Ventilation to 300 CFM (38%)
BLIP outside wall reduced from 8000 microR/h to 6000 microR/h (25%)
Area exposure rates dropped to 20 to 30 microR/h along the NSRL beam line, and 8 microR/h inside the NSRL building
Factor of 3 ± 1 reduction in NSRL area exposure rates
This met BNL criteria for less than 50 microR/h in uncontrolled areas, and C-AD HP requirement for less than 13 microR/h background to release NSRL targets
13
![Page 14: 20 Minute C-11, 10 Minute N-13 and 2 Minute O-15 Gas Emissions from BLIP Collider-Accelerator Department 4-13-2010 Take 5 for Safety](https://reader030.vdocument.in/reader030/viewer/2022032708/56649e895503460f94b8e953/html5/thumbnails/14.jpg)
MicroR/h on April 10, 2 PM, West Wind, Reduced Water Path to 50 mm and Reduced Ventilation to 300 CFM
14
![Page 15: 20 Minute C-11, 10 Minute N-13 and 2 Minute O-15 Gas Emissions from BLIP Collider-Accelerator Department 4-13-2010 Take 5 for Safety](https://reader030.vdocument.in/reader030/viewer/2022032708/56649e895503460f94b8e953/html5/thumbnails/15.jpg)
MicroR/h on April 12, 12:30 AM, North Wind, 50 mm Water Path, 300 CFM, 181 MeV
15
![Page 16: 20 Minute C-11, 10 Minute N-13 and 2 Minute O-15 Gas Emissions from BLIP Collider-Accelerator Department 4-13-2010 Take 5 for Safety](https://reader030.vdocument.in/reader030/viewer/2022032708/56649e895503460f94b8e953/html5/thumbnails/16.jpg)
Next Steps
Finish FY10 BLIP program with Simos targets and 50 mm or less water path and 300 CFM
Develop system to independently review modifications to BLIP targets and stack
Options:· Increase stack height· Minimize water path to 20 mm or less