20 sites ippm active apr6 to apr7
TRANSCRIPT
-
8/17/2019 20 Sites IPPM Active Apr6 to Apr7
1/16
AT&T NETWORK
20 sites IPPM active
Prepared by: LIYANLONG ate: !"#"20$!
Revie%ed by: ate:
Apprved by: ate: "
-
8/17/2019 20 Sites IPPM Active Apr6 to Apr7
2/16
Implementation Solution for Change
'ONTENT
1 Description of Change 4
1.1 Description of Sites.................................................................................................4
1.2 Purpose....................................................................................................................4
1.3 Description of Change and Change Influence........................................................4
1.4 License should be apply before a wee..................................................................!
1." #ersion infor$ation................................................................................................!
1.! I$pact on the Syste$ During the %d&ust$ent........................................................!
1.' ()uip$ent *unning Chec.....................................................................................!
2 Preparations for Change '
2.1 During ++,++ -th to 23,++ -th Sep we need to as custo$er stop any operation
with this two */Cs.....................................................................................................................'
2.2 Change Period.........................................................................................................'
2.3 Co$position of Change 0ea$ and *esponsibility of 0ea$ e$bers...................'
2.2.1 Change Team of Huawei Company..............................................................................7
2.2.2 Huawei On-site Monitoring Team................................................................................7
2.2.3 Huawei Support & Guarantee Team............................................................................7
2.4 Change *iss and Counter$easures.......................................................................-
2." Chec efore Change.............................................................................................-
3 Procedure 11
3.1 peration Steps for Change..................................................................................11
3.2 ac up.................................................................................................................12
3.3 Change Period.......................................................................................................1"
3.4 Change step and operation....................................................................................1"
4 #erifying the operation 1'
4.1 Chec the */C C/ script hae already configured successfully..................1'
4.2 Chec %lar$s after ad&ust$ent and ensure no related alar$s to this actiity......1-
4.3 onitor 5PIs........................................................................................................1-
" *ollbac 16
".1 *ollbac *esponsibility........................................................................................16
".2 erall Description of rollbac............................................................................16
".3 *ollbac Procedure...............................................................................................16
".4 Definition of change failure..................................................................................2+
Technical support website:http://support.huawei.com
Page 2 of 16
-
8/17/2019 20 Sites IPPM Active Apr6 to Apr7
3/16
Implementation Solution for Change
"." Infor$ation Collection efore rollbac...............................................................2+
".! Change bac steps.................................................................................................2+
".' 0ests after Change bac........................................................................................22
".'.1 %fter roll bac chec */C and /D( cells status nor$al or not...................22
".'.2 Chec if any new alar$s co$e out.......................................................................24
".'.3 Chec the serice on site for */C users runs well..............................................24
".'.4 onitor 5PIs........................................................................................................24
".- Change bac *is analysis...................................................................................24
! *esources 2"
Technical support website:http://support.huawei.com
Page 3 of 16
-
8/17/2019 20 Sites IPPM Active Apr6 to Apr7
4/16
Implementation Solution for Change
$ escripti( ) '*a(+e
1.1Description of Sites
e!ico cit" 2# sites nee$ acti%e IPP to chec& the transmission;
1.2 Purpose
'cti%ate IPP of 2# sites to chec& the transmission.
1.3 Description of Change and Change Influence
This acti%ation of IPP is to chec& the transmission (ualit" between )*C an$ *+,-
0hen acti%e we will use the information of +S
, so if the +S configuration on the T
is $ifferent with )*C*+,-
, there will has alarms
, an$ we nee$ tr" to fi! it
together with transmission team.
1.4 5icense .
This operation not relate$ to license.
1. 7ersion information
Current #ersion,
*/C, #6++*+1!C++SPC!!+
/D(, #1++*++6C++SPC23+
72+++, #2++*+14C++SPC22+
0he current ersion supports to i$ple$ent these ad&ust$ents.
1.! I$pact on the Syste$ during the %d&ust$ent
*o affect for the ser%ice.
1.' ()uip$ent *unning Chec
efore operation8 ma&e sure no T problems of this site,an$ all cells are normal.
Technical support website:http://support.huawei.com
Page 4 of 16
-
8/17/2019 20 Sites IPPM Active Apr6 to Apr7
5/16
Implementation Solution for Change
2 Preparati(s )r '*a(+e
2.1 During ++,++ !th to +",++ !th %pr. we need to as custo$er stop any operation
with this */C and sites.
2.2 Change Period
de_B_M2000 Tracker
Date
8ID96+21:+!3+:0ulancingo:II 8ID96+21 ++,++;+",++ %pr '
8ID96+26:+!33::0ulancingo ++,++;+",++ %pr '
C*629+++!%:++66:C%(:0ulancingo ++,++;+",++ %pr '
C*629
++"4%:+3!4:Calle:Sinaloa:0ulancingo:I
++,++;+",++ %pr '
C*629++12%:+141:(letra:0ulancingo ++,++;+",++ %pr '
8ID96++6:+!31:0ulancingo ++,++;+",++ %pr '
2.3 Co$position of Change 0ea$ and *esponsibility of 0ea$ e$bers
-Wireless Team 'cti%it" e!ecution
-RF Team: Performance anal"sis
2.2.1 Change 0ea$ of 8uawei Co$pany
/a$e *esponsibility 0elephone /o.
Technical support website:http://support.huawei.com
Page of 16
-
8/17/2019 20 Sites IPPM Active Apr6 to Apr7
6/16
Implementation Solution for Change
raulio >ireless Depart$ent 9#49#99
2.2.2 8uawei n9site onitoring 0ea$
/a$e *esponsibility 0elephone /o.
5uis -$win >ireless Depart$ent 1##9#;41
*? Depart$ent
2.2.3 8uawei Support @
-
8/17/2019 20 Sites IPPM Active Apr6 to Apr7
7/16
Implementation Solution for Change
'CT IPP on
)*C*+,- si$e
+pen =2###,run
comman$
8an$ cop" the script into
this. then run the
comman$.
raulio
-nri(ue
12:##
Chec& the alarms Chec& the alarmsraulio
-nri(ue
1:##
4Chec& the IPP >PI Chec& the >PI of IPP
raulio
-nri(ue
2:##
)ollbac& ?if change
operation failure @
'cti%e the bac&up CA<
Aile an$ connect the
original ))= an$
antennas bac&.
raulio
-nri(ue
before
4:3#
3.2 ac& up Query Alarms
btain the current alar$ list and sae. In the ain 0opology clic right button
on the */C select Euery %lar$F(ent and then choose %lar$ List.
Backup license;
RNC CFGMML and backup files
7se 2+++ bacup function to select related */C and bacup.
Technical support website:http://support.huawei.com
Page 9 of 16
-
8/17/2019 20 Sites IPPM Active Apr6 to Apr7
8/16
Implementation Solution for Change
%nd eport the configuration open target */C L0 run co$$and ,(AP C?
-
8/17/2019 20 Sites IPPM Active Apr6 to Apr7
9/16
Implementation Solution for Change
acup C?
-
8/17/2019 20 Sites IPPM Active Apr6 to Apr7
10/16
Implementation Solution for Change
3.3 Change Perio$
The change perio$ is from ##:## to 1:##.
3.4 Change step an$ operation
A. Open the LMT of related RNC:Select the target )*C an$ clic& right button on mouse8 then select the aintenance Client8
"ou will open the 5T .
B. Run the ACT IM s!ripts on RNC:
Technical support website:http://support.huawei.com
Page 1# of 16
-
8/17/2019 20 Sites IPPM Active Apr6 to Apr7
11/16
Implementation Solution for Change
ACT IPPM.txt
C. Run the A"" IM#$##ION s!ripts on NO"$B:
ADD
IPPMSESSION.txt
Technical support website:http://support.huawei.com
Page 11 of 16
-
8/17/2019 20 Sites IPPM Active Apr6 to Apr7
12/16
Implementation Solution for Change
# .eri)yi(+ t*e perati(
4.1 Chec& the )*C +C* script ha%e alrea$" configure$ successfull".
=se the comman$s to chec& the configurations are all normal:
)*C si$e:
=se comman$:,SP IPP to chec& if the IPP status is =P or not;
*+,- si$e:
=se comman$ ,SP IPPS-SSI+* to chec& the IPP status is =P or not;
4.2 Chec& 'larms after a$Bustment an$ ensure no relate$ alarms to this acti%it".
4.3 onitor >PIs
GIf the %erification results are normal8 the operation is successful.
If a fault occurs $uring the %erification an$ cannot be rectifie$8 perform the rollbac&.
Technical support website:http://support.huawei.com
Page 12 of 16
-
8/17/2019 20 Sites IPPM Active Apr6 to Apr7
13/16
Implementation Solution for Change
/ Rbac1
.1)ollbac& )esponsibilit"
/a$e *esponsibility 0elephone /o.
raulio -nri(ue >ireless Depart$ent 9#49#99
*? Depart$ent
.2 +%erall ,escription of rollbac&
Change bac& the +C* 'cti%ation on )*C
.3 )ollbac& Proce$ure
* Change Step +peration Implementat
ion Person
Time
1
1
-
8/17/2019 20 Sites IPPM Active Apr6 to Apr7
14/16
Implementation Solution for Change
A. Open the LMT for related RNC:Select the target )*C an$ clic& right button on mouse8 then select the aintenance Client8
"ou will open the 5T.
B. Fall%a!& RNC IM:
DEA IPPM.txt
C. Fall%a!& NO"$B IM
RMV
IPPMSESSION.txt
.9 Tests after Change bac&
.9.1 'fter roll bac&8 chec& whether the )*C an$ *+,- cellsE status are normal or not.
=se the comman$s to chec& the configuration are all normal:
)*C si$e:
=se comman$:,SP IPP to chec& if the IPP status is =P or not;
*+,- si$e:
Technical support website:http://support.huawei.com
Page 14 of 16
-
8/17/2019 20 Sites IPPM Active Apr6 to Apr7
15/16
Implementation Solution for Change
=se comman$ ,SP IPPS-SSI+* to chec& the IPP status is =P or not;
.9.2 Chec& if an" new alarms come out.
.9.3 Chec& the ser%ice on site for )*C users runs well
.9.4 onitor >PIs
.; Change bac& )is& anal"sis
There is no ris& when we roll bac& because it was wor&ing well on the e(uipment before.
Technical support website:http://support.huawei.com
Page 1 of 16
-
8/17/2019 20 Sites IPPM Active Apr6 to Apr7
16/16
Implementation Solution for Change
! Res-rces