ATECO TANK TECHNOLOGIES ENG CO.LTD. Yazlik Yeni Mah. Basogretmen Cad. No:46 41650
41200 Golcuk KOCAELI TURKEY Tel : +90.262.3351598 Fax : +90.262.3351567
E-Mail : [email protected] Web : www.atecotank.com
Form No Rev.No Date Prepared By
EXTERNAL SHELL SETTLEMENT INSPECTION DATASHEET Client Tank No Contact Person Tank Location Region Tank Diameter Inspected By Tank Height Inspection Date Job No
Ref. API Standard 653 Section 10.3 , 10.5.1.2, and Appendix B1,B2,B3 1. At least 8 Settlement Point Should Be Equally Spaced With Arc
Length (L) Being Less Than Or Equal To 30 feet ( 9 mt)
Point No Rod Reading Point No Rod Reading Point No Rod Reading Point No Rod Reading Point No Rod Reading 0 16 32 48 64 1 17 33 49 65 2 18 34 50 66 3 19 35 51 67 4 20 36 52 68 5 21 37 53 69 6 22 38 54 70 7 23 39 55 71 8 24 40 56 72 9 25 41 57 73
10 26 42 58 74 11 27 43 59 75 12 28 44 60 76 13 29 45 61 77 14 30 46 62 78 15 31 47 63 79