2000 Test RoadmapUpdate
Don Edenfeld
Mike Rodgers
ITRS Test TWG
December 6, 2000 2
Test TWG MembershipUS Members
Name CompanyMark Baber LucentBill Ortner LucentYi Cai LucentRichard Antley TIMarc Mydill TIAnne Gattiker IBMDon Wheater IBM Phil Nigh IBMAtul Goel AgilentPeter Maxwell AgilentTim Sheen TeradyneLee Song TeradynePaul Roddy MotorolaJay Bedsole MotorolaDon Edenfeld Intel Roger Barth IntelMichael RogersIntelRochit Rajsuman AdvantestYervant Zorian LogicVision
International Members
NameCompany
Peter MuhmenthalerInfineon
Rene Segers PhilipsKazumi Hatayama
HitachiMr. Ohta
MatsushitaMr. Satou
HitachiKang Chil Lee Hyundai
December 6, 2000 3
2000 Test Chapter Update DFT Tester Table
The DFT Tester Table debuted in the 1999 edition The 2000 update represents the trends that were described
in the 1999 edition Significant changes are intended to clarify the requirements
based on the significant industry confusion evident in 2000 This table will receive significant focus for the 2001 edition
Commodity Flash Table In 2000 minor adjustments were made to the trends that
were described in the 1999 edition Requirements for a scan vector capability were added to
address a growing trend towards integration of logic on flash devices
December 6, 2000 4
Industry Trend - CostManufacturing cost continues to be the
dominant factor in test Test represents an increasing percentage of
overall device manufacturing cost 1999 edition cost targets begin to trend cost in the
right direction Cost of Silicon Mfg and Test
0.0000001
0.000001
0.00001
0.0001
0.001
0.01
0.11
1982 1985 1988 1991 1994 1997 2000 2003 2006 2009 2012
cost: cents /transistor
Fab capital / transistor
Test capital / transistor
Based on ‘97 SIA Roadmap Data & ‘99 ITRS Roadmap
1999 Roadmap
December 6, 2000 5
Industry Trend - SoCDemand for small form factors and low power
solutions drive increased integration
Increasing levels of design integration drive new test challenges
Integration of logic, analog, RF, RAM, ROM, and/or Flash on a single chip is on the horizon
How to test highly integrated components at a cost consistent with the market for these devices?
Flash
SRAM
DSP
uController
RF An
alog
December 6, 2000 6
Industry Trend - Wireless
Dramatic growth in the consumer wireless market segment over the foreseeable future requires cost effective solutions for RF testing
2.4GHz and 5.2GHz bands are targeted for a large number of products in many applications (Bluetooth, 802.11x, …)
December 6, 2000 7
Industry Trend - HSS
High speed serial (HSS) technologies are not just for long range communication anymore Serial communication is becoming the technology
of choice for peripheral connectivity Slow parallel bus architectures are being replaced
by Firewire, Infiniband, and other HSS solutions Traditional rack and stack approach to test of high
speed ports is too expensive
December 6, 2000 8
Industry Trend – Burn-in
Shrinking fab process feature sizes and increasing transistor performance challenge device burn-in infrastructure and capability
Capability Exists
Technology Exists $$
Technology Development Required $$$$
Die Size (mils)
BI
Po
wer
(W
)
Mean Power in Burn-In Increased transistor
performance leads to increasing power and thermal demand in burn-in
Burn-in cost trend is increasing faster than other parameters as a component of overall test cost
December 6, 2000 9
Industry Trend - Power
Once an afterthought, precise power delivery is crucial for high performance designs Voltage droop during test has
a direct impact on manufacturing yield
High current power delivery requires accurate modeling and simulation of the entire power path
High precision analog circuits require very stable references
0A
IDD
VCC
Time
DUT Current Load Step
Voltage as Seen by DUT
December 6, 2000 10
Industry Trend - Diagnosis Validation and debug of complex designs require an
increased level of interactivity between design automation and test equipment Correlation must be established between a device failure
and the actual failing circuit node Automation tools are needed to shorten the process of
tracing failures to the failing circuit as a direct impact to time to market
Emerging packaging technologies compromise existing failure analysis techniques Flip-chip and multi-chip packaging require new approaches
to probing for diagnosis and failure analysis
December 6, 2000 11
Industry Challenge
The ATE business model must change to adapt to evolving market directions The high performance functional tester market
segment is declining Low performance functional tester and DFT tester
market segments are growing The industry must come together to define
common requirements for DFT tester capability
December 6, 2000 12
Manufacturing Cost Initiatives Technologies are emerging to lower equipment
capital cost and increase test module throughput The industry is driving toward DFT technology to move test
complexity onto the die and away from the test equipment Reduction in test equipment complexity should result in a
significant decrease in tester cost over the 5 year horizon
DFT will be used to enable lower performance functional testers to test high performance designs
DFT techniques that reduce device pin count requirements for test enable increased parallelism and module throughput
Wafer level burn-in and test exploits high parallelism to increase throughput and decrease unit cost
December 6, 2000 13
System-on-a-Chip
Solutions must emerge to solve Big D / Big A test challenges Today’s environment is structured for Little D / Big
A or Big D / Little A
SoC testing requires a disciplined DFT approach Fundamental research is needed to define and prove
Analog BIST and DFT techniques Extensive digital DFT techniques must be applied Embedded flash and PROM test time threatens test
module throughput
Test cost is a primary concern
December 6, 2000 14
High Speed Serial
High performance digital interfaces are approaching the analog domain for testability High speed serial digital interfaces must be
characterized and tested in the analog domain Analog compliance
testing is time consuming
Trade-off between increased tester resources, test time, and test effectiveness
December 6, 2000 15
2001 Edition Test Chapter Plans Iddq Testing High Frequency Serial Communications High Performance ASIC High Performance Microprocessor Low-end Microcontrollers Mixed Signal Commodity DRAM Commodity Flash Embedded DRAM and Embedded Flash DFT Test Equipment Design-for-Test Automation Tools System-on-a-Chip Failure Analysis ATE Software
Proposed for 2001