2009-05-08 Barcelona 2
Working Plan for future Colliders
• Off-detector and transfer electronics– Module controller (UB)
• Design of this module is to be done closely with interconnection and data transfer.
– Interconnection and data transfer.• Data transfer rate from ASIC to module controller and finally
to readout and off-detector electronics can be as high as 20GB/s if occupancy is high and data sparsifying is not possible [ILC-RDR2007].
• Physical connections: optical fiber or LVDS serialization.– Objective: reduce noise, cabling and connectors.– Study of EMC and signal integrity required.
• Task is closely related to System Integration and Engineering.
ILC S
antiago 2008ILC
Santiago 2008
2009-05-08 Barcelona 3
Working Plan for future Colliders
• Off-detector and transfer electronics– DAQ:
• Design and test of a stand-alone portable setup.– Same setup for Lab and testbeam.
• FPGA-based dedicated boards connected to PC for analysis.– VHDL FPGA firmware.– Acquisition and analysis software on PC.
– Testbeam preparation:• Adaptation boards for signal format/level conversion.• Overcome limitations of available facilities.• Real-time data analysis to allow in-site test decisions to better
profit from available beam characteristics.
ILC S
antiago 2008ILC
Santiago 2008
Working Plan for future Colliders
• DHP for Belle II– SEU protection for memory cells (Hamming
correction or others…)• FPGAs -> URL• ASIC -> MPI (Andreas)
– Interface DHP-DHH and DHH-back-end electronics• To be done in close contact with KEK (URL)• Gigabit TX (physical, coding, FEC…)
– FPGAs -> URL– ASIC -> U.Bonn
2009-05-08 Barcelona 4
DH
P M
eeting UB
2008D
HP
Meeting U
B 2008
Working Plan for future Colliders
• Project Status:
DEPFET officially approved for Belle II !!!
– But geometry of beam pipe and cooling system not decided yet
• Will affect number and size of modules• …which in turn will affect data rate
– Must not make strong assumptions, find flexible solution that can be adapted to either outcome
• E.g. serializing ratio, channel coding
– Fortunately, we are in the FPGA part
2009-05-08 Barcelona 5
KE
K M
eeting 2008K
EK
Meeting 2008
Working Plan for future Colliders
• Better understanding of mechanical issues, cooling.
• But nothing fixed yet, number of pixels and readout time not decided data rate unknown.
• Must be very flexible, foresee different options.
2009-05-08 Barcelona 6
Ringberg 2009
Ringberg 2009
Current Status @URL
• System level integration on Belle II @KEK– Physics and overall
• Participation on meetings and following discussions
– Radiation dose study• Will affect FPGA family selection, code selection, etc…
• Testbeam @ CERN (July’2009 ?)– Willing to participate.
• Great opportunity to connect to DEPFET people and take a global system picture.
• But… very few manpower on our group.
2009-05-08 Barcelona 7
Current Status @URL
• Gigabit TX– First Tests on LVDS TX
• Very FPGA dependent (Stratix w/o DPA, Stratix II ok, Stratix II+ GX version may be required).
• Parameter tuning is critic: lots of things to be understood.
1 Gbps on Stratix II GX done2009-05-08 Barcelona 8
Current Status @URL
• Gigabit TX– Development board acquisition
• Transceiver Signal Integrity Development Kit, Stratix II GX Edition
– Preparing lab setup for BER test (with perturbations)– Protocols
• Serial RapidIO (up to 3.125Gbps)• Gigabit Ethernet• ...
2009-05-08 Barcelona 9
Current Status @URL
• SEU Protection & FEC codes – SEU Protection for memory cells
• Hamming correction implementation cost on FPGAs• FPGA vendor and family comparison considering
radiation dose, system performance, etc… (Altera, Actel, Xilinx…)
– Coding and FEC cost and alternatives
2009-05-08 Barcelona 10
Current Status @URL
• System integration on FPGAs– NIOS II evaluation and setup
• Useful on lab setups and
prototyping
– Firmware development• Defining collaboration with U.Giessen
2009-05-08 Barcelona 11
The End
2009-05-08 Barcelona 12
2009-05-08 Barcelona 13
Working Plan for future Colliders
• Planning
2009 2010 2011
Test setup
• Testbeam study • PCB Design• VHDL firmware• Analysis SW• Test
Interconnection and data transfer
DAQ (study, HW development, SW) • PCB Design• VHDL firmware• Signal integrity• Test
• Lab setup• EMC• Digital links
ILC S
antiago 2008ILC
Santiago 2008