Page 1: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Page 1

2009  –2014

LUTHARDT Group 2009-2014

Page 2: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated
Page 3: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Last year LUTHARDT celebrated its fifth anni-versary since its inception in 2008. Reporting on the fiscal year of 2013, we would there-fore like to seize the opportunity to also look back on the first five years of our company’s existence.

If a young company such as ours wants to be successful, it above all needs trust and confi-dence. And, thankfully, trust and confidence were extended to us – by you, our customers and business partners. We in our turn pledge to honour your investment by continuing to forge ahead with predictability and sound entrepreneurial judgment.

During the first five years of operation, LUTHARDT enjoyed economic success in a fragile economic environment. Today, our sales amount to just under fifteen million euros and our organization is not indebted. Conscious of these cornerstones of our stabi-lity, we have made a confident start into the new fiscal year of 2014.

We now employ a total of more than 90 employees – at our headquarters in Berlin, the capital of Germany, at our location in Bremen, Germany, and at our international branch offi-ces in Iraq, Libya, Serbia, and the United Arab Emirates. On our projects abroad we almost always make the experience that German engineering is very highly valued. We there-

fore believe that our team with all its enginee-ring competency and knowledge will remain our most important asset and resource in the future.

As far as its shareholdings are concerned, our organization is clearly structured. Hanseatische Energietechnik HET in Bremen, Germany, is a regional engineering service provider which offers solutions for the assembly and installa-tion, start-up, and servicing of high-voltage, medium-voltage and low-voltage switch-gears, of protection systems as well as of complex converter systems.

Our branch office in Abu Dhabi takes care of our commercial interests in the United Arab Emirates and the other Gulf States as well as in East Africa. In Serbia, LUTHARDT Belgrade is a competent contact point for the planning, supply and delivery of automation and electri-cal engineering equipment. It focuses on the markets in South Eastern Europe. In Erbil, we have a team which supports all our projects in Iraq.

In the recent fiscal year, we once again have been able to demonstrate our talent and excellence as an independent service pro-vider for products „Made in Germany“. We continue on our path to become a gene-ral EPC contractor. Together with renowned manufacturers, among them many impres-

sive names of the German industry, we deve-lop solutions for decentralized power supply systems. Through this, we want to make a contribution to further develop the infrastruc-tures in the emerging markets as well as to help re-build and strengthen those in crisis-ridden countries.

Today, we can base ourselves on a global net-work of engineers and manufacturers which enables us to forge customized alliances, thus pooling the best available competences locally and on-site. We rely on long-term partner-ships and can therefore guarantee our cus-tomers perfect project handling and execu-tion at any place around the world. In short, sound expert knowledge and many years of project experience are the decisive assets of our team.

Our objectives also include to expand our die-sel and gas generator business in Libya and in Iraq, as well as to establish maintenance and servicing centers for heavy duty gas turbines.

As you can see, our objectives for the future are as ambitious as they are demanding. We are determined to stay on the road to success and are confident to do so, if we continue to merit your support and confidence in the future. To us the co-operative partnership with you is both an incentive and an obligation. It is the essence of our motivation.

 Letter of the Managing Partners

Sven Luthardt Bjoern Luthardt Managing Partner Managing Partner

Dear Ladies and Gentlemen,

Page 4: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated
Page 5: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Page 5

2009  –2014

Letter of the Managing Partners 3

Contents 5

Facts and Figures 6

Advisory Board 8

Managing Board 9

Service Provider 10

General Contractor 12

Sales Partner 14

Highlights 2009 – 2014 16

Projects 2009 – 2014 24

Current Projects 46

Company Structure 52

Team 53

Memberships 54

Contacts 55

Certificates 56

Profit and Loss Statement 57

Balance Sheet 58

Auditor‘s Report 60

Imprint 62

 Contents

Contents

Page 6: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Neckarswestheim

Moorburg

Kassel

Frankfurt                                   

Page 6

Luthardt Group

ReferencesHeadquarters Affiliates Offices Workshop*

HamburgEemshaven

Innsbruck

BerlinBremen

Frankfurt

MeiramaTbilisi

Benghazi

Derna

Tobruk

Accra

Jeddah

Abu Dhabi

Basra

SuleymaniyahErbil

Fuzhou

Isle of Skye

Belgrade

Tripoli

Dohuk

Baghdad

Musayib

Vlora

Antalya

Tanga

Pancevo^

*Belfast

Cork

Ellon

Cumbria

Giubiaso

Santiago de Compostella

Aker Yards

Brande

Shanghai

Ras Laffan

Fahud

MashadIzmir

Amman

Aktobe

Port Harcourt

Porto

Jakarta

Baku

Milazzo

Istanbul

Mina Abdullah

Luanda

Mpumalanga

Mumbai

Kairo

Kajaki

Shiroro

Sarir

Taluka

Maasvlakte

Hull

Baiji

DhakaBharuch

Mariel

Lübeck

Neumünster

Norderstedt

Hamburg

Moorburg

Wedel

Stade

Bremerhaven

Varel

Nordenham

Wilhelmshaven

Emden

Leer

Oldenburg

Hespenbusch

Bremen

Mittelsbüren

Verden

Datteln

Gelsenkirchen

Düsseldorf

Hannover

Peine

Kassel

Wolkramshausen

Frankfurt

Berlin

Karlsruhe

Doberlug

Heilbronn

Neckarwestheim

Hof

Karlsfeld

Luthardt worldwide

Page 7: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Page 7

2009  –2014

Foundation: 2008

Board of directors: Sven Luthardt, Bjoern Luthardt

Advisory board: Juergen Luthardt (Chairman), Bernd Janker, Daniel Walther

Personnel: 93 (LUTHARDT Group)

Head office: Berlin

International offices: Germany, U.A.E, Serbia, Iraq, Libya, Jordan

Banks: Deutsche Bank AG, Commerzbank AG

Luthardt  2013* 2012* 2011 2010

Sales revenue: € 16.3 million € 10.3 million € 5.9 million € 4.9 million

Turnover: € 14.5 million € 10.9 million € 6.3 million € 5.3 million

Export share: 96 % 95 % 96 % 86 %

Total assets: € 4.0 million € 5.2 million € 1.9 million € 1.5 million

Equity ratio: 44 % 21 % 46 % 37 %

EBIT: € 1.0 million € 0.5 million € 0.5 million € 0.3 million

EBIT margin: 7 % 5 % 9 % 5 %

* consolidated

 Facts and Figures

Facts and Figures

mill

ion

Eur

o

EBIT

15

14

13

12

11

10

9

8

7

6

5

4

3

2

1

0

0.258

0.532

6.3

0.511

1.0

2010 2011 2012 2013 2010 2011 2012

5.3

6.3

10.9

2013Turn Over

14.5

Page 8: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Page 8

Luthardt Group

The shareholders of LUTHARDT decided to implement an advisory board. It is, however, not a supervisory board according to § 52 GmbH law. The advisory board will consult the management for the benefit of the company. Furthermore, it will arbitrate over the resolutions passed at the company‘s general meeting. The consultancy-specific focuses cover the sectors entrepreneurship, finance and public affairs.

       daniel Walther Juergen Luthardt  Bernd Janker Member of the Advisory Board Chairman of the Advisory Board Member of the Advisory Board

 advisory Board

advisory Board

Page 9: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Page 9

2009  –2014

The management of LUTHARDT pursues a company policy that focuses on long-term partnerships. It is ready to explore and accept new challenges while remaining loyal to corporate values of flexibility, commit-ment, and willingness to take well-calculated risks in order to guarantee an outstanding quality in handling projects worldwide. The long-term experience of all employees forms the basis of the company’s success.

          Volker Kenschke  Sven Luthardt   Gerhard Kessler  Bjoern Luthardt     Head of Operations Managing Partner Head of Procurement Managing Partner

 Managing Board

Managing Board

Page 10: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Page 10

Luthardt Group

Customer

Service PortfolioAs an independent service provider LUTHARDT assists EPC-Contractors and original equipment suppliers of the power industry in implementing their projects worldwide. LUTHARDT offers comprehensive services covering the whole range of relevant work of a project life cycle from engineering over site management to commissioning as well as operation. With their well-trained and internationally experienced engineers LUTHARDT manages complex power generation and distribution projects adherent to cost budgets, time schedules and quality directives.

 Service Provider

Service Provider

Maintanance & repair

Operationmanagement

Rehabilitation

Inspection

Repair

Damageanalysis

Customertraining

Warrantycontrol

Contract management

Tenderingsupport

Offerpreparation&analysis

Technicalcontractmanagement

Claimmanagement

Engineering

Sitesurveys

Specification

Designrewiev

Electricalengineering

As-built

Documentation

Commissioning

Loopcheck

Commissioning

Finalinspection

Site management

Sitesupervision

Qualityassurance&control

Operationalsafety

Documentationcontrol

Project management

Projectco-ordination

Projectsupervision

Humanresources

Expediting

Qualityassurance&control

Permitprocedures

Page 11: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Page 11

2009  –2014

Field of ExpertiseLUTHARDT closely co-operates with leading original equipment suppliers of the international power industry to participate in their complex training programs. Thus LUTHARDT employees keep the highest level of qualification in state-of-the-art technologies within the power generation, distribution and trans-mission sector.

Service Provider

Generator CB

dCS

hV & MV Switchgear

transformer

dC, Battery and uPS

Grounding & Lighting Protection

Cables/ Busbars & trays

Protection, Synchron- ization & Fast C/O

LV Switchgear

Excitation System

Generator  Busduct

Startup Frequency Converter

Lighting & small Power

diesel Generator

Frequency Converter  for drives

Communcation &  Fire alarm

Page 12: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Page 12

Luthardt Group

Our BusinessBased on long-term co-operation with several of the leading original equipment suppliers LUTHARDT tailors customer-orientated solutions for power generation, distribution and transmission facilities. As General Contractor LUTHARDT offers the entire value chain of a project from the initiation phase to commissioning and hand-over to the customer. LUTHARDT is an efficient and reliable partner for utilities, operators and public institutions of the power, oil and gas market to construct, refurbish or modernise power plants and substations.

 General Contractor

General Contractor

Power distributionPower Generation

Air-insulatedsubstations

Gas-insulatedsubstations

Frequencyconverterstations

LVRTandHVRTtestunits

Staticsynchronousconverters

Hydropowerplants

Pumpstoragepowerplants

Steampowerplantsconventional

Steampowerplantsmultistagefordistrictheatingordesalination

Gasturbineopencyclepowerplants

Gasturbinecombinedcyclepowerplants

Dieselpowerplants

Windparkpowerplants

Solarpowerplants

Hybrid(wind–solar–diesel)powerplants

Page 13: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Page 13

2009  –2014

Our CompetenceLUTHARDT provides turnkey engineering, design, procurement, construction management as well as com-missioning, testing and start-up. Besides constructing new facilities, LUTHARDT also offers up-grade, life-time extension and rehabilitation measures on a part or full-turnkey basis.

Project  development

Project Financing

Project &  technical Concept

Operation & Maintenance

Operation &  Maintenance

EPC-Contracting

training &  Commissioning

Civil &  Erection

Procurement Equip./ Bulk

Engineering Basic/detail

General Contractor

Page 14: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Page 14

Luthardt Group

respresenting German ProductsEmerging economies offer new export potential for products “Made in Germany”, especially in the energy sector. Although many governments in Africa, the Middle East and Central Asia manage their economies quite successfully and therefore offer interesting terms and conditions for a market entry, only a very small number of German manufacturers in the energy industry actually do seize this opportunity. The main rea-son for German manufacturers to not do business in these economies is a lack of access to the markets themselves combined with a lack of experience in them, sometimes also accompanied by a limited appe-tite for entrepreneurial risk. In the past, LUTHARDT, however, has acquired extensive project experience and developed tightly knit business networks in many of these emerging markets. Hence Luthardt is able to offer pioneering services for German manufacturers in these markets, acting like a connecting link bet-ween the two. Luthardt thus gives German manufacturers in the energy industry the possibility to fully participate in the economic development of these markets, too.

Consulting

LUTHARDTactsasconsultantassistingtheoriginalequipmentsupplierduringhissalesactivitiesbutalso

intheexecutionphaseonaprojectbasis.Suchservicesmayrangefrommarketingstudiesand

salesstrategiestoliaisonactivities.

distributing

LUTHARDTactsasanintermediaryinbusinessbysellingadefinedrangeofproductsofanequipmentsupplier.ThisgivesLUTHARDTspecialrightstoactin

hisnameinacertainregion.Inadditiontothat,LUTHARDTalsooffersafter-sales

andmaintenanceservices.

 Sales Partner

Products

HighSpeedDieselGeneratorsIAeroderivativeGasTurbinesIElectricalNoblePartsIEtc.

Sales Partner

Page 15: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Page 15

2009  –2014

Page 16: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

01 02 03 04 01 01

Page 16

Luthardt Group highlights

February 2009:  Luthardt meets German For-eign Minister, Mr Frank-Walter Steinmeier in Erbil

Mr Sven Luthardt, General Mana-ging Partner of LUTHARDT, participated in the reception of the German delegation, lead by the German Foreign Minister Frank-Walter Steinmeier in Erbil.

The German politician made a landmark visit to Erbil to mark the inauguration of Germany‘s Con-sulate General in the Kurdistan Region in Iraq.

Germany is one of 13 nations with diplomatic representations in the Kurdistan Region, four of which now have full Consulates General.

January 2010:  New Year‘s reception of Luthardt takes place in the representation of EWE aG in  Berlin

The Managing Partners Sven and Bjoern Luthardt invited to the first New Year‘s Reception in the represen-tation of the EWE AG in Berlin.

Sven Luthardt opened the recep-tion and reported on the company‘s successful first business year in his speech. Furthermore, he prognostica-ted a very positive development in the year 2010. The patron of the event, Mr Philipp Missfelder, spokesman for foreign affairs of the CDU/CSU frac-tion of the German Bundestag, spoke about the political course in foreign affairs of the new German Govern-ment in 2010.

March 2009:  Masud Barzani, President of the autonomous Kurdistan region in Iraq, was received by Chancellor angela Merkel in Berlin

Invited by the German Minister of Economic Affairs, Mr zu Guttenberg, the President of the Autonomous Kurdistan Region in Iraq, Masud Barzani, visited Berlin. Besides the newly appoin-ted Minister for Economic Affairs, he also met Dr Angela Merkel in the Federal Chancellery and had several conversations in the Ministry of Foreign Affairs and the Ministry of the Interior.

After the political meetings, President Barzani granted our Managing Partner Sven Luthardt an audience in his presidential suite. They exchanged their opinions regarding the economic relation-ship between their countries and talked about up-coming projects. At the end, Mr Luthardt presen-ted a personal gift to President Barzani in memory of his visit to Germany.

2009  highlights 2010

Page 17: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Page 17

2009  –2014

december 2010:   Luthardt accompanies German Foreign Minister on  

his flying visit to Baghdad

As member of a small and exclusive business delegation, Mr Sven Luthardt, Managing Partner of LUTHARDT, accompanied the German

Foreign Minister, Mr Guido Westerwelle, on his flying visit to Baghdad. Under strict safety measures they met high ranking government

representatives.

Mr Westerwelle was the first Western Foreign Minister who visited Baghdad after the parliamentary election in March 2010. Together with the Iraqi Minister of Industry, Mr Al-Hariri, he signed an agreement on

the protection of German investments in Iraq. This was an important action to improve the general economic and legal conditions for

German companies in Iraq.

april 2010:  Establishment of Luthardt & Experts in abu dhabi

LUTHARDT and its partner, Mr Murshed Bin Eissa AL Shamsi, proudly announce the ope-ning of their new company in Abu Dhabi. Luthardt & Experts plans to focus on the growing need for manpower services in the power generation field in the United Arab Emi-rates. Luthardt & Experts was pleased to wel-come as speakers at the reception in the Abu Dhabi Hilton the German Ambassador, H. E. Klaus Peter Brandes, and Mr Philipp Mißfelder, Member of the German Parliament.

04 05 11 12

During a trip through the capi-tals of Serbia, Macedonia and Albania, the Managing Direc-tors of LUTHARDT met leading political and business figures. In Belgrade, they followed the personal invitation of President Boris Tadic and discussed the current project development within the energy and railway sector.

In the Macedonian capital Skopje, Mr Bjoern Luthardt gathered information about power plant investments from the Macedonian Power Generation Company ELEM, the Deputy Minister for the Economy, Dr Hadzi-Vaskov, as well as the Minister for Foreign Affairs, Mr Milošoski. Besides a new combined-cycle heat and power station, the government is planning to build various hydro-power plants.

In Tirana, the Economic Advisor of the Prime Minis-ter, Dr Guxholli, disclosed that the situation of the Albanian energy sector shall be enhan-ced especially by new power generation capacities. Cur-rently, there are one thermal power plant and different small scale hydro power plants under discussion.

april 2010:  Luthardt investigates new markets in Balkan region

highlights

Page 18: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

0701 02 03 04

2011

05 06

Page 18

Luthardt Group

July 2011:  Sven Luthardt accompanies German business 

delegation to afghanistan

Sven Luthardt accompanied a German business delegation to Afghanistan and met the Minister of

Mines, Wahidullah Shahrani.

The trip was organised by the Ministry of Economic Affairs and Technology (BMWi) and the Ministry for

Economic Co-operation and Development (BMZ), under the auspices of Mr Wendling and Mrs

Köhler, respectively. From 8 to 15 July, they travelled to Kabul und Masar i Scharif together, enjoying the support of the German Association for International

Cooperation and were welcomed there by the Minister of Mines, Wahidullah Shahrani.

The aim of the trip was to explore perspectives and the general framework for economic cooperation for

German companies.

During the stay, there was an opportunity to talk with local representatives of the German Embassy,

the German Development Bank (KfW), the Asso-ciation for International Co-operation, the German

Armed Forces and several international companies.

March 2011:  Luthardt accompanies German Minister for Economic Cooperation and development, dirk Niebel, on his trip to Iraq

The German Minister for Economic Cooperation and Development, Dirk Niebel, has made a three-day trip to Iraq to pay a visit to the President, the Prime Minister, as well as the President of Autonomous Kurdistan Region of Iraq. “The interest to cooperate with Germany is extremely elevated in all areas, be that in education, academia, the economy or in the field of economic cooperation”, Mr Niebel was quo-ted by the German Press Agency during his trip.

While most companies are still preparing for a market entry in Iraq, LUTHADRT Group can already look back to a long list of successfully completed projects all over the country. Because of the exper-tise LUTHARDT has acquired in the area of energy production and distribution in Iraq, the voice of Sven Luthardt was sought and appreciated throughout the trip.

January 2011:  New Year´s reception of Luthardt takes place in the KaISErSaaL at  the Sony Center

This year again, numerous political and business leaders, as well as German and foreign business partners followed the invitation to our New Year’s reception. This time, it took place in a very time honoured backdrop – the Kaisersaal –, dating from the Empire of William II as one of the famous ceremonial rooms of the former Grand Hotel Esplanade.

In their introduction, the managing direc-tors, Bjoern and Sven Luthardt, reported on the company‘s successful business year 2010 and, furthermore, gave a very positive forecast for the year 2011. The patron of the event, Mrs Katharina Reiche, Secretary of State of the Federal Ministry for Environment, Nature Conservation and Nuclear Safety as well as a Member of the German Bundestag, completed the eve-ning with an overview about sustainable energy policy for a secure energy supply.

highlights

Page 19: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

08 09 10 11 12

Page 19

2009  –2014

November 2011:  Luthardt on a flash visit to Iraq

Together with a business delegation of thirty, Sven Luthardt, Executive Manager of LUTHARDT, accompanied the German Economics Minister and Vice-Chancellor, Dr Philipp Roesler, in a flash visit to Bagdad.

After talks with the Deputy Minister for Econo-mics, the Minister for Industry and the Head of the National Investment Commission, a reception took place in the guest house of the Iraqi Government on the first evening of the stay. Representatives of the LUTHARDT subsidiaries in Erbil and Bagdad took part in this reception as well as, on invitation of LUTHARDT, important members of the Iraqi Ministry of Electricity.

The second day of the visit was dedicated to the German Day of the Bagdad International Fair (BIF) which was opened by Minister Roesler in the mor-ning. After a tour of the fair, Minister Roesler met the Prime Minister Nuri Al-Maliki as well as several of his ministers. The German Government is keen on helping the Iraqi Government in the re-built and supports the idea of the construction of a German City.

October 2011:  Luthardt accompanies business delegation to tripoli, Libya

The German Economics Minister and Vice Chancellor, Dr Philipp Roesler, travelled to the capital of Libya for a two-days-stay together with a big business delegation. LUTHARDT was also a part of this delegation,

represented by its Managing Partner Sven Luthardt.

During the visit, the delegation not only met leading members of the Libyan National Transitional Council, like Mr Mahmoud Jibril and Mr Mustafa Jalil, but also the Finance and Oil Minister, Mr Ali Al-Tarhuni, as well as

the Libyan Economics Minister, Dr Abdullah Shamia. Of course, this visit had a humanitarian purpose too. So Dr Roesler handed over about 5 tons of German aid goods to the Libyan Health Minister Mr Naji Barakat.

In the course of a gala dinner on the first evening of the trip, arranged by the German Ministry of Economics, the members of the business delegation had the opportunity to invite a Libyan business partner to it.

Sven Luthardt was accompanied by Mr Ramadan Abdelsamad, the General Manager of GESCO, a fully-owned subsidiary of the national energy carrier GECOL.

September 2011:  Luthardt sets record at the 9th German 

Foreign trade Forum

Under the slogan of “60 Years of Foreign Trade and Export Business Promotion“, State Secre-

tary Mr Homann opened the award ceremony of the prize of the German foreign trade and export

business in the historic council chamber of the Hanseatic city of Bremen, Germany. Together with the agency of the German Foreign Trade

Prize, the German Federal Ministry of the Eco-nomy and other German trade associations, Mr

Kentzler, the President of the German Confedera-tion of Skilled Crafts, presented Bjoern Luthardt, Executive Partner of the company, with the certi-

ficate for the third place.

It took merely two years of candidacy for the Berlin based company, established in 2008, to

convince the jury of its significance for the Ger-man export sector. This demonstrates, yet again,

that also small-scale enterprises can do busi-ness abroad successfully, and that they can thus create new jobs. Furthermore it emphasizes how well the management of LUTHARDT is geared to

sustainability in the export business.

highlightshighlights

Page 20: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

02 03 04

2012

0605 07

Page 20

Luthardt Group

June 2012:  Sven Luthardt accompanies dr Philipp roesler to Saudi-arabia

Sven Luthardt accompanied the Federal Minister of Economy and

Technology, Dr Philipp Roesler, and his business delegation to the 18th meeting of the German-Saudi eco-

nomy commission to Riad, Saudi Arabia.

Focus of the discussions was the expansion of economic relations

between Germany and Saudi- Arabia and feasible future

co-operation.

april 2012:  Sven Luthardt meets Prime Minister Nechirvan Barzani

During his visit to Erbil in Kurdis-tan, Iraq, Mr Sven Luthardt met Mr Nechirvan Barzani who was appointed Prime Minister of the Kurdistan Regional Government (KRG) on 7 March 2012. The grand-son of the founder of Kurdistan Democratic Party (KDP), Mustafa Barzani, holds the office for the third time after two premierships from 1999-2009.

January 2012:  New Year´s reception of Luthardt takes place at the China Club Berlin

More than 90 guests from politics and economics attended the traditio-nal New Year´s Reception of LUTHARDT on the 19 January 2012 in the China Club Berlin.

After a short opening speech by Mr Bjoern Luthardt, the other mana-ging director, Sven Luthardt, reported on the company‘s successful business year 2011 and gave a forecast for the projects and milestones in 2012. Guest speaker of this year’s reception was Mr Hans-Juergen Beerfeltz, parliamentary state secretary in the Federal Ministry for Economic Co-operation and Development (BMZ). In his speech, he especially pointed out the fertile co-operation of the BMZ with German small and medium-sized companies, which is one of the reasons for the positive development of the German export share during the last years and hence also for the success of LUTHARDT.

highlights

Page 21: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

08 09 10 11 12

Page 21

2009  –2014

October 2012:  Sven Luthardt participated in the  “deutsch-landtag” of Junge union as guest of honor

Sven Luthardt took part in the Deutschlandtag of Junge Union from 5 until 7 October in Rostock. During the party conference of Germanys largest political youth organization, Mr Luthardt met the Chancellor Dr Angela Merkel who travelled to Rostock in order to discuss the latest political developments with the participants. Next to other high ranking political representatives also Federal Environment Minister, Dr Peter Altmaier, gave a speech during the conference. Mr Sven Luthardt was accompanied by his Libyan Partner, Mr Mustafa Dribika.

august 2012:  Sven and Bjoern Luthardt traveled to tirana, 

albania with delegation

From 20 until 22 August, Sven and Bjoern Luthardt travelled to Tirana, Albania, with a business dele-gation. During meetings with the Albanian Prime

Minister, Prof Dr Sali Berisha, and the Minister for Economy, Trade and Energy,

Mr Edmond Haxhinasto, they had talks about the economic situation in the Albanian energy sector

and discussed possibilities for further co-operation. Additionally, Sven and Bjoern Luthardt met the

mayor of Tirana, Mr Lulzim Basha, and the Speaker of the Albanian Parliament,

Mrs Jozefina Coba Topalli.

highlights

Page 22: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

01 02 03 04 05 06 07

april 2013: Luthardt meets Energy and  Petroleum Minister from angola

From 7 to 10 April 2013, the 7th German-African Energy Forum took place in Hamburg.

LUTHARDT was represented there, sharing an exhibition booth with MTU Onsite Energy.

As a special event, LUTHARDT in- vited to a business lunch under the patronage of Dr Stefan Liebing, Chairman of the Afrika-Verein. Amongst the guests were the Energy Minister, as well as the Petroleum Minister of Angola, Mr João Baptista Borges and Mr José Maria Botelho de Vasconcelos, were attending.

april 2013: Sven Luthardt participates in the 3rd resources Congress in Berlin

Resource security is not only impor-tant for Germany, but also for other

industrial nations. Against this back-ground, the 3rd Resources Congress

under the patronage of the CDU/CSU parliamentary group took place on

20 March 2013 in Berlin. As this mat-ter is very important for LUTHARDT

too, Mr Sven Luthardt participated in the congress as well in a small din-ner afterwards with such honorable

guests as the former Federal Minister Prof h.c. Hans-Dietrich Genscher and Mr Guenther Oettinger, former Prime Minister of Baden-Württemberg and

currently EU Commissioner for Energy.

January 2013: New Year´s reception of Luthardt takes place at 

the China Club Berlin

As in recent years, LUTHARDT invited to the traditi-onal New Year´s Reception at the China Club Berlin.

Numerous guests from politics and the economy were present. Guest of honor and keynote speaker of this

evening was the German Federal Minister for the Environment, Nature Conservation and Nuclear Safety,

Mr Peter Altmaier.

At first, Mr Bjoern Luthardt received the attendees, among them many guests from abroad. Afterwards

Mr Sven Luthardt emphasized in his speech that LUTHARDT showed enormous strength in the last year in spite of the difficult world economic circumstances

and is strategically very well prepared for 2013 too.

In his following keynote speech, the Federal Minister Peter Altmaier delineated the challenges of the next

years with regard to the consolidation of the renewable energy sector. In this context, he also

mentioned LUTHARDT´s commitment for developing a mobile test equipment for wind power plants.

2013

Events 2009 – 2014

Page 22

Luthardt Group highlights

Page 23: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

11 06 07

2014

February 2014: Eu commissioner Guenther 

Oettinger as guest speaker on the 5th New Year´s reception 

of Luthardt

More than 100 guests from poli-tics, the economy and society took up the personal invitation

from Sven and Bjoern Luthardt to the 5th New Year´s Reception of

LUTHARDT. In its anniversary year too, the managing board was able

to announce an above average growth and profit.

This year´s guest speaker was the EU commissioner Guenther Oettinger. As a central theme of

his speech Mr Oettinger depicted the opportunities and risks of the energy transition in Germany as

well as the relevance of emerging markets for the future growth of

the German export.

November 2013:  Luthardt welcomes delegation from the Iraqi Ministry for Electricity

The Iraqi Minister for Electricity, S.E. Karim Aftan Al-Jumaili, visited Germany with his 10 member delegation for one week. Occasion of the visit was an invitation of the German Federal Ministry of Economics and Technology in order to hold talks with German companies about the expansion of the relationship between Germany and the Iraqi Republic.

In the course of the visit, LUTHARDT joined the delegation from Baghdad on a factory tour of MTU AERO in Ludwigsfelde, follo-wed by a visit of the Iraqi Ministry of Elec-tricity at the LUTHARDT premises in the Reinhardtstraße in Berlin.

The managing partners presented energy projects of the last 5 years and possibilities for the enhancement of the business rela-tionship with the Ministry of Electricity.

June 2014:  Bjoern Luthardt speaks at the 

Iraq Power Conference in London

On 16 June 2014, Bjoern Luthardt took part as distinguished speaker at the panel discussion of the Iraq

Power Conference in London.

The aim of the Conference was to bring together leaders of the Iraqi power industry, the Iraqi Govern-

ment, key private companies, regu-latory bodies and the Iraqi Ministry

of Electricity to promote interna-tional investment in Iraq’s power

sector.

Discussions were focused on the Iraqi government’s plan to develop a sustainable power supply in Iraq, recognising the need for building a

modern electricity system to support the country’s economic and social

development.

June 2014:  Sven Luthardt accompanies dr. ramsauer with a business dele-gation to tehran

From 28 to 30 May, Sven Luthardt accompanied Dr Peter Ramsauer, Chairman of the Parliamentary Com-mittee for Economic Affairs and Energy, to Tehran together with a small business delegation.

In the course of this trip, LUTHARDT was able to introduce itself to the Iranian Oil- and Gas Ministry, repre-sented by the Vice Minister H.E. Mr Roknodin Javadi, as well as to other relevant representatives of the Iranian ministry such as M. Reza Ne‘matzadeh, Minister of Industry, Mining and Trade and Mr Bismark, Director General for Multilateral Eco-nomy.

A meeting with representatives of local German and Iranian companies took place on the second day.

0112 02

Events 2009 – 2014

Page 23

2009  –2014highlights

Page 24: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Page 24

Luthardt Group Projects 2009 – 2014

 Projects 2009 – 2014rehabilitation of dokan and derbandikhan  hydropower Station in the Kurdistan region of Iraq

Background 

Already decrepit under the regime of Saddam Hus-sein, the Iraqi energy infrastructure was damaged further during the US-led invasion into Iraq and the unstable political situation that followed. Sabotage, rising energy demands and a shortage of power generation did the rest. In order to prevent the total collapse of the power grid, the Government of Iraq, among other initiatives, resolved to undertake emergency repairs of the Dokan and Derbandikhan hydropower plant, the largest power stations in the Kurdistan Regional Governorate.

These rehabilitation works – funded by the World Bank – were realised by LUTHARDT. While new power plants are in the process of being built and planned, the rehabilitation repair of existing ones assures the most direct and quickest impact on the renewal of the country‘s energy infrastructure.

Today, the Dokan and Derbandikhan power stations once again produce electrical power on a reliable basis, while simultaneously providing agricultural irrigation for the region.

Order description: Refurbishment of Derbandikhan HPP switchyard and Dokan HPP

gas-insulated substation

Client: Kurdistan Regional Government,

Ministry of Electricity

Period: 2009 – 2013

BRANISLAV BRCIC Technical Director

Dokan

Derbandikhan

Page 25: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Page 25

2009  –2014

Scope of Work: 

hPP dokan

b Detailed inspection and elabor- ation of a shortfall spare part list to assure the completion of the rehabilitation works

b Replacement of all damaged and/ or missing parts and other over- haul works in accordance with the technical specifications

b Supply of testing equipment, special tools and consumable materials necessary for inspection and rehabilitation works in accordance with the technical specifications

b Supply of all shortfall spare parts and consumable materials

b Training at site (on-the-job training)

b Training abroad for employer‘s personnel

b Training abroad for the employ- er‘s personnel on protection system

b Testing and commissioning at site of all rehabilitated equipment

b Supply of recommended spare parts and consumable material for ten (10) years maintenance

Project description

In 2009, the Ministry of Electricity of the Kurdistan Regional Government contracted the rehabilitation of the 145 kV gas insulated switch gear (Siemens type 8D.6) in Dokan to LUTHARDT. This included the detailed inspection of the whole switchgear, upon which the missing spare part list was elabo-rated. All missing or damaged spare parts were supplied and replaced. Furthermore, Dokan Power Plant engineers received intensive training on the GIS and its protection system in Germany as well as an intensive hands-on training on site. The over-haul of all 19 GIS bays was completed in May 2010. After testing and commissioning, the rehabilitated switchyard was handed back to the Dokan Hydro Electrical Power Station.

Building on the successful rehabilitation of the gas insulated switchgear (GIS) substation at the nearby Dokan hydropower plant, LUTHARDT was also contracted to overhaul the GIS substation at the Derbandikhan power station. The work involved the design, manufacture, installation, and commis-sioning of most of the GIS substation. The exis-ting medium voltage switchgear was replaced, as well as the AC low voltage and DC distribution panels including redundant batteries and chargers. Furthermore, a new smoke detection system was installed in the complete substation, replacing the existing one. In order to maximize the power trans-former safety, a complete new deluge system was installed on all three transformers. Moreover, civil works for the rehabilitation of the substation buil-ding were required. It included the replacement of the ceiling, covering the walls properly, and air con-ditioning repair.

Projects 2009 – 2014

Page 26: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Page 26

Luthardt Group Projects 2009 – 2014

Scope of Work:  Design, manufacturing, testing, delivery, installation and commis-sion of:

hPP derbandikhan

b 63 MVA, 132/33/11 kV power transformer;

b Complement of deficiencies in 132 kV GIS bays;

b 33 kV and 11 kV equipment;

b Auxiliary transformer and grounding transformer;

b High, medium, and low voltage cables;

b 400V AC distribution system and marshalling kiosks;

b Lighting and socket outlet systems;

b Batteries;

b Battery charges;

b DC distribution system;

b Protection system;

b Fire detecting system and fire extinguishing system for all the three 63 MVA, 132/33/11 kV power transformers;

b Air-conditioning and ventilation system (HVAC)

Outlook

Today, Iraq unfortunately still suffers from short power supplies and unstable power grid conditions. In order to address this problem, many new plants are planned or already under construction. Howe-ver, since this measure is very time consuming, an overhaul is often the best option. Therefore, reno-vation of power stations and substations in many cases not only proves to be technically feasible, but also economically profitable. Rehabilitation of existing plants is the only short-term measure to provide Iraq with the necessary power supply and a stable power grid; it is also a measure that can be effective in the mid-term.

As LUTHARDT has repeatedly proven in the past, it can offer these services by relying on its first-class know-how, its proximity to German manufacturers, parts suppliers and service providers as well as its longstanding business experience in the Iraqi mar-ket itself.

Page 27: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Page 27

2009  –2014

Page 28: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Page 28

Luthardt Group Projects 2009 – 2014

Frequency Converter for the German railway System 

Background

The German railway operator Deutsche Bahn AG is Germany’s largest power consumer with about 20,000 km of electric power lines. Due to historical reasons, they use a frequency of 16.7 Hz whereas the public grid operates on a frequency of 50 Hz. Instead of operating two different types of power plant, the rail grid can be efficiently connected by static frequency converters to the public grid, allowing efficient utilisation of the total generation capacity.

In 2007 LUTHARDT affiliate Hanseatische Energie-technik GmbH (HET) became a strategic partner of ABB Switzerland Ltd. as one of the world‘s lea-ding converter manufacturers. Since then, HET has implemented several projects in Europe together with ABB.

Project description

As strategic partner of ABB, HET implements the frequency converter stations in Germany for the German railway Deutsche Bahn AG. While ABB supplies the static frequency converters, transfor-mers and cooling systems, along with engineering, development and training for the system, HET is responsible for the site management, installation and commissioning of the equipment.

Furthermore, HET provides the service for the ins-talled converters of ABB in Germany. At its head-quarters in Bremen HET maintains spare parts and service vans equipped with special tools and tes-ting instruments.

Since 2007 HET has managed, installed, commissi-oned and maintained the following contracts:

Order description: Installation and commissioning of

frequency converters

Client: ABB Switzerland Ltd.

Period: 2008 – 2013

KLAUS TER VEER Managing Director HET

Page 29: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Page 29

2009  –2014

b Generating a construction and installation program

b Site management and supervision of ABB’s subcontractors

b Levelling, unloading and placing of heavy components

b Rigging of transformer

b Oil filling and oil processing for the transformer

b Laying of the converter earthing system

b Installation of steel works and busbars between the trans- former and frequency converter container

b Supply, installation and connect- ion of all power and signalling cable within the converter unit

b Installation and connection of 33 Hz, du/dt, 16,7 Hz and 50 Hz filter components

b Installation of cooling system

Scope of Work:  

Projects 2009 – 2014

Doberlug – Kirchhain

Lübeck

Neckarwestheim

Datteln

Bremen

Hof

1. 110 kV, 19 MVA, 2 Static frequency converters, 4 Power transformers, Doberlug – Kirchhain / Germany

2. 110 kV, 19 MVA, 2 Static frequency converters, 4 Power transformers, Lübeck / Germany

3. 400 kV, 83 MVA, 2 Static frequency converters, 4 Power transformers, Neckarwestheim / Germany

4. 110 kV, 35 MVA, 2 Static frequency converters, 4 Power transformers, Timelkam / Austria

5. 400 kV, 135 MVA, 4 Static frequency converters, 16 Power transformers, Datteln / Germany

6. 110 kV, 100 MVA, 2 Static frequency converters, 4 Power transformers, Bremen 2 / Germany

7. 110 kV, 50 MVA, 2 Static frequency converters, 2 Power transformers, Bremen 3 / Germany

8. 110 kV, 19 MVA, 2 Static frequency converters, 2 Power transformers, Hof / Germany

Page 30: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Page 30

Luthardt Group Projects 2009 – 2014

Outlook

Based on its expertise in frequency converter tech-nology, LUTHARDT intends to extend its business activities towards other applications using the same technology. This also includes static synchronous compensators (STATCOM) which are regulating devices used on alternating current electricity trans-mission networks. The continuous increase of ins-talled wind turbines during recent years has

forced the transmission system operators to tigh-ten their grid codes in order to limit the effects of power parks on network quality and stability. There-fore, commonly used wind turbine designs require medium voltage STATCOM (Static Synchronous Compensator) technology which adds the missing functionality to wind parks in order to become grid code compliant.

Page 31: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Page 31

2009  –2014

Page 32: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Page 32

Luthardt Group Projects 2009 – 2014

Low Voltage ride through test unit

Background

Due to the demanding requirements on wind tur-bines the manufacturers are committed to certify their products according to the applicable stan-dards and regulations for grid connection. Besides the mechanical stability, the behaviour of the wind turbines towards the voltage fluctuations of the grid is essential for a reliable operation. Consequently, the grid codes demand wind farms to stay connec-ted to the grid and stabilize the grid voltage in case of grid faults. Such disturbances can result from symmetrical or asymmetrical faults in the grid such as short circuits. Less severe dips can be caused by overcurrents associated with motor starting and transformer energizing.

The term Low Voltage Ride Through (LVRT) stands for the capability of electrical devices such as wind turbines to operate through periods of lower vol-tage. For the manufacturers it is important to have the LVRT test facilities to simulate a wide range of different voltage dips (faults) with regard to defined duration and residual voltage including double dip simulation and to record how a wind turbine reacts. Since the wind turbines are mostly installed in remote areas, it is important that such testing facili-ties are constructed for use on site of the manufac-turer as well as offshore at the wind park. The test units therefore have to meet the requirements for an easy transportation and provisions for housing the equipment even under challenging environmen-tal conditions.

Order description: Design, manufacturing, testing

and commissioning

Client: Siemens Wind Power A/S

Period: 2012

VOLKER KENSCHKE Head of Operation & Service

Minimum required wind plant response to emergency low voltage

Vol

tag

e at

the

poi

nt o

f In

terc

onne

ctio

n (p

er u

nit)

12

11

1

09

08

07

06

05

04

03

02

01

0–10 0.0 0 .625 10 20 30 40 Time (seconds)

Beginning of emergency low voltage

Wind plant required to remain on-line

Wind plant not required to remain on-line

Page 33: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Page 33

2009  –2014

b Switchgear container

b Coil container

b Medium voltage switchgear

b Inductance

b Short circuit device

b Control system

b MV-cable system

b Air-insulated busbar system

b Earthing system

Scope of Work:  LVRTTU Voltage Dip Test Unit consisting of the following main components:

Projects 2009 – 2014

Page 34: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Page 34

Luthardt Group

Project description

In 2011 LUTHARDT was awarded the contract of development, production and commissioning of one LVRT test unit offering such a wide range of simulations for Siemens Wind Power A/S. The size of the device under test was limited to 10 MW.

The test unit consisted of four standard 40 feet high cube containers. One container, designed as switch gear container, was equipped with six feeders 40.5 kV metal clad SF6 gas-insulated MV switch-gear and with the overall control board. Three con-tainers were executed as coil containers, one per phase, each equipped with a set of eight coils and a copper busbar system. Highly flexible MV-cables, including connection systems, provided a relia-ble link between the electrical components inside the coil containers to the switch gear container. All containers were equipped with heating and air con-ditioning systems including monitoring devices in order to keep the temperature and humidity values within the defined limits. Two control panels were provided for control of the switching operations during the dip test procedure and for the setting of parameters. One of the control panels was integ-rated into the control board, another one supplied as a mobile panel. Both control panels provided a comfortable touch-screen visualization. The con-struction of the LVRT test units was executed in steps: after completion of the steel modifications, special coating and the interior works the contai-ners were transferred to LUTHARDT´s daughter company HET. Here, all electrical equipment was installed and tested as far as possible. The services included a comprehensive training on the switch-gear and control system and were completed by the commissioning of the LVRT test unit on site.

Outlook

The share of wind energy is further increasing in the energy mix. Efforts to improve the efficiency of wind turbines as well as to increase their power capabilities per unit are ongoing. The wind turbines design is continuously improving in order to ope-rate even at extreme weather conditions. This deve-lopment is expected to be accompanied by rising demands for testing facilities.

With the installation of wind turbines based on DC-converter technology, high voltage disturban-ces have become a major subject to research and development. Situations caused by load shedding or switching capacitor banks result in overvoltages of different magnitudes and durations that lead to a reversal of power flow in the DC-converter. Due to the current flow from the grid into the converter the DC-voltage will rise. The highly sensitive con-verter devices have to be protected by limitation of the current through the converter. The international grid code requirements differ concerning the High Voltage Ride Through (HVRT). It is therefore a must that LVRT as well as HVRT capabilities of wind tur-bines can be tested and certified according to the latest grid codes and regulations.

Based on a wide experience from previous projects, LUTHARDT, together with reputable technology partners, is able to offer both LVRT and HVRT test facilities according to the individual needs of the manufacturer of wind turbines and/or of the con-tractor of wind power stations.

Projects 2009 – 2014

Page 35: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Page 35

2009  –2014

Page 36: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Page 36

Luthardt Group Projects 2009 – 2014

Supervision and Commissioning Services for Simple Cycle Gas  Power Stations in the Kurdistan region of Iraq

Background

In 2007, ABB the leading power and automation technology group from Zurich has been awarded a contract from Mass Global Investment (MGI) Co. based in Amman to provide a turnkey solution for the balance of plant for a new 500 MW open cycle gas power station and to build a substation in the city of Erbil in the Autonomous Kurdistan Region of Iraq. Comprising four GE Frame 9E gas turbines with a capacity of 125 MW each, ABB designed, supplied and installed the balance of plant as well as provided the grid connection for the 500 MV power plant to the transmission infrastructure in Iraq.

The Erbil power plant has played such a vital role in meeting the growing power needs of Kurdistan in Iraq that Mass Global Investment Company awar-ded a second contract to ABB and GE to increase the capacity at AGPS to 1,000 MW already before its operation in late 2008.

This investment was followed by more contract awards to ABB. MGI did select ABB´s design and supply technology for the electrical balance of plant (EBoP), control system and grid connection for two new investments into open cycle gas power sta-tion projects in the cities of Dohuk and Suleimania. Both cities are located in the Autonomous Kurdis-tan Region of Iraq. With these contracts ABB has supplied key products including low and medium voltage switchgear, the auxiliary system for fuel supply and the control and automation system for 3,000 MW of power generation to MGI between 2007 and 2014.

For another customer in the region, ABB will supply a state of the art control system and a 400 kV subs-tation for the grid connection of the 1,000 MW gas power plant.

Order description: Supervision and commissioning service for the balance of plant

(BoP) and control system

Client: ABB AG

Period: 2008 – 2013

RÜDIGER WEISS Site Manager

Page 37: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Page 37

2009  –2014

Project description

Since 2008, LUTHARDT continues to mobilize site managers, supervision and commissioning engineers at the forefront of ABB´s construction sites in order to meet the demands and require-ments subject to ABB´s contractual obligation. This service agreement ensures real time sup-port on site and builds on the growing relation-ship with ABB, supporting their efforts to ena-ble a reliable supply of much needed electricity in the region.

These services also reflect the expanding know-ledge transfer initiatives and further underlines LUTHARDT´s commitment to strengthen the onsite infrastructure and man power capacity of a global technology leader whose proven and reliable advanced energy technology has been employed in the Kurdistan Region of Iraq since 2008.

Today, LUTHARDT has developed substantial experience both in engineering and construc-ting fossil power generation plants. LUTHARDT is providing services including development of design criteria as well as generating packages for the engineering, procurement and construc-tion (EPC). Once a contractor has been appoin-ted, Luthardt will provide project management, site construction management and onsite servi-ces as well as commissioning services.

Scope of Work:

LUTHARDT was responsible for the site management, supervision, QA/QC and commissioning services of the following supplies:

b 132 kV transformer bay (switch yard)

b 4X156 MVA main generator transformer

b 4 Unit auxiliary transformers (15/6.6 KV)

b Generator circuit breakers

b Generator, unit auxiliary and service transformers protection

b Isolated phase bus duct system for the units

b 6.6/0.4 kV service transformer

b Low voltage and DC switch gears

b Station rectifiers

b Station inverters

b Station batteries & battery charger

b Plant communication system

b Lightning system & street lighting

Projects 2009 – 2014

Page 38: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Page 38

Luthardt Group

Outlook

In summer 2013, KRG Prime Minister, Nechir-van Barzani, inaugurated the first electricity plant in Iraq to be converted to a combined cycle sys-tem. The Erbil Power Plant upgrade is being made by Kurdistan´s Mass Global together with Turkey´s ENKA, using steam turbines supplied by GE to boost output with additional fuel by 470 MW, enough additional electricity to serve 100,000 Iraqi households. The Prime Minister thanked ABB for helping ENKA to complete the project. He welco-med the contribution of international investors and businessmen in Kurdistan and thanked them for their hard work in utilizing and expanding their part-nership with KRG. The CCGT at AGPS is expected to be commissioned towards the latter part of 2014.

In another project, KAR Group invests in a 1,000 MW simple gas power station which will be converted to a CCGT plant by extending it with a heat recovery steam generator and two steam turbi-nes boosting output by 470 MW in 2015.

Projects 2009 – 2014

Page 39: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Page 39

2009  –2014

Page 40: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Page 40

Luthardt Group Projects 2009 – 2014

Siemens Gas-insulated Switchgear Substations

Order description: Installation supervision /

commissioning 400 kV GIS

Client: Siemens AG

Period: 2013 – 2014

KAI MOHR Certified GIS Supervisor

Background

Based on the close working relationship with Sie-mens within the power generation sector, in 2012 LUTHARDT started to diversify its activities towards power distribution and transmission projects. Siemens’ significant market share for high voltage switchgears in North Africa and the Near Middle East combined with LUTHARDT’s local presence in this region formed a promising basis for this co-operation.

Project description

Referring to the primary equipment of high voltage gas-insulated switchgears, Siemens requests a spe-cial certification process for installation supervisors and commissioning engineers. Therefore Siemens worked out a professional training program for LUTHARDT consisting of a theoretical training at the Berlin factory and practical training on dis- tinctive project sites in Spain, Italy and the United Arab Emirates. Due to successful participation

LUTHARDT is, now, authorized to perform erec-tion and assembly works on SF6 gas-insulated switchgears of the type 8DN8-2/3/4/5, 8DN9-2 and 8DQ1-1/3. In April 2014, LUTHARDT successfully finished its first contract for a 400 kV 8DQ1-1 in Baiji, Iraq. With respect to the secondary systems, LUTHARDT already employs a strong workforce of experienced electrical commissioning engineers. Among other manufacturers they are also qualified in the commissioning of the Siemens SIPROTEC family. Hence, LUTHARDT has been contracted for the commissioning of protection systems for high voltage gas-insulated switchgears in Libya.

Outlook

Based on the obtained know-how for high voltage gas-insulated switchgears, LUTHARDT intends to extend its activities by offering EPC-contracts in the future. Another objective will be the certification of further installation supervisors also for other pro-duct lines.

Page 41: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Page 41

2009  –2014

Scope of Work:

b Installation supervision primary equipment

b Commissioning primary equipment • High voltage testing • Impulse pressure testing • Resonances testing

b Commissioning secondary equipment (protection system)

Projects 2009 – 2014

Page 42: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Page 42

Luthardt Group Projects 2009 – 2014

Migration of aBB’s Power Plant automation System  Procontrol P14 

Background

More than 35 years ago, ABB launched its complete power plant automation system Procontrol™ P14. Since then, it has proven to be a very reliable and efficient control system on the market with more than 500 installations worldwide. ABB has continued to invest and evolve Procontrol P14 to ensure that existing P14 customers will con-tinue to maximize the life-cycle of both their control

systems and the assets built upon them. Through stepwise system evolution solutions, the risk asso-ciated with system change is mitigated. Regard-less of whether the initial investment by the power plant owner was made many years ago, P14 can be enhanced and extended for years to come in a way that presents the lowest life cycle costs and lowest risk.

Order description: Installation and

commissioning DCS

Client: ABB AG

Period: 2012 – 2014

DIETER HACKER Site Manager

Page 43: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Page 43

2009  –2014

Project description

LUTHARDT was trained on ABB automation pro-ducts and systems and was deployed in several projects referring to the migration of existing Pro-control P14 systems. In particular, this included the installation of the hardware components as well as the commissioning of the control system. In this regard, LUTHARDT has been involved in the fol-lowing migration projects:

1. Gas Turbine Power Plant (120 MW), Aktobe – Kasachstan Installation Supervision

2. Gas Turbine Power Plant (120 MW), Jakarta – Indonesia Installation Supervision

3. Coal-fired Power Plant Tutuka (609 MW), Standerton – South Africa Installation

4. Gas Turbine Power Plant Unit 3 (130 MW), Gandhar – India Commissioning

5. Thermal Power Plant (1,350 MW) Doha West – Kuwait Commissioning

Outlook

Due to the wide spread existing installations of Pro-control P14, LUTHARDT intends to train even more of its own engineers on that automation system. There is certainly a demand in the market since the successive replacement of Procontrol P14 gives the following benefits to the owner:

b Short-term replacements of critical components

b Short outages can be used for the implementation of the cabinets.

b Less investment costs in comparison to a total replacement.

b Stretching of the investment costs over a longer period

b Extended life-time of the control system

Furthermore, a lot of the inherited Alstom gas turbi-nes of the original Brown Boveri and ABB designs are still in operation with a P14 Procontrol system. There is still a substantial demand of upgrading and refurbishing of these gas turbines to be done so that they can continue in operation at higher power and efficiency. During such a service the owners often decide to migrate the control system at the same time in order to benefit from the above men-tioned advantages.

Scope of Work:

Installation:

b Disassembly of old cabinets

b Installation of new cable laying for gas turbine

b Supervision of work perfor- mance

b Progress monitoring

b New cabling of marshalling panel and decontic-rack

b Connection of signal bus-cable

b Revision of existing cabling and connection according to docu- mentation

Commissioning:

b Integration of the new control technology cabinets into the remote bus system by repro- gramming the existing distribu- tion station during system operations

b Updating the existing HMI data

b Installation and loading of the software

b Loop checking

b Restart of the gas turbine

b Customer training

Projects 2009 – 2014

Page 44: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Page 44

Luthardt Group

Operation and Maintenance Supervision of Power Stations

Background

Since its establishment, LUTHARDT has led and managed the commissioning and start-up period of various power stations. In this context, LUTHARDT was responsible for the technical handover of the facilities from the EPC contractor to the respective owners or operators. As a result of that record, vari-ous investors approached LUTHARDT regarding the assumption of operation and maintenance respon-sibility in order to safeguard financial risks during the transition period. Such requests were often sup-ported by the fact that these power plants were the first of its type in a region and, therefore, the access to local qualified operation and maintenance per-sonnel was limited.

Project description

In 2008, LUTHARDT supplied the operation and maintenance staff to Mass Global Investment in order to manage the start-up and operation of the first 500 MW simple cycle gas power station in Erbil for an intermediate period of 6 months. During this period, LUTHARDT managed the operation, pro-curement and preventive maintenance as well as supervised and instructed the respective local engi-neers. Since LUTHARDT has been involved during the construction phase as a supervisor for the EPC Contractor ABB, LUTHARDT had in-depth technical knowledge of the facility to be the perfect partner for the plant owner during that transition phase. Based on that experience, LUTHARDT was also

awarded the contract for the operation and main-tenance supervision service for the first combined cycle power plant in Albania in 2011. LUTHARDT started its activities during the commissioning phase in order to assist the plant owner during the handover from the EPC contractor. As soon as the 100 MW power station was under the responsibility of the Albanian client TEC, LUTHARDT established an operation and maintenance system and super-vised all related activities. Furthermore, the local engineers were trained in specific operation and maintenance tasks which they were assigned to.

Outlook

In addition to the objectives to expand its die-sel and gas generator business and to establish maintenance or servicing centers for heavy duty gas turbines, LUTHARDT also intends to become an operation and maintenance partner for decen-tralized power generation solutions. In particular, this approach is focused on oil and gas companies in Iraq and Libya. Due to various new exploration spots in remote areas, independent power supply solutions are required in order to satisfy the additio-nal demand for production and processing facilities. With its service portfolio, LUTHARDT can offer the entire value chain of a project up to operation and maintenance.

Order description: Operation and maintenance

supervision

Client: Mass Global Investment, Termocentrali Vlora sh.a.

Period: 2008, 2011 – 2013

KURT WITTWER Site Manager

Projects 2009 – 2014

Page 45: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Page 45

2009  –2014

Scope of Work:

b Supervision of periodic inspec- tions

b Supervision of routine main- tenance and rapid response

b Supervision of scheduled main- tenance

b Supervision of corrective main- tenance

b Supervision of overhauls at the workshops and site

b Supervision of performance measurements

b Supervision of operation

b Supervision of DCS / C&I main- tenance

b Initiation of procurement of spare parts for all types of maintenance

b Training

b Supervision of and guidance on the spare parts administration

technical details PP Erbil:

b Process: Open Cycle

b Prime Fuel: Natural Gas

b Electric Power: 500 MW (4 x GE Frame SE)

b Control Systems: ABB Procontrol P14 and GE Mark VI

technical details PP Vlora:

b Process: Combined Cycle

b Prime Fuel: Natural Gas

b Electric Power: 97 MW (Ansaldo steam and gas turbine VG 4.3 A)

b Control Systems: Siemens T3000

Projects 2009 – 2014

Page 46: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Page 46

Luthardt Group Current Projects

400 kV Gas-insulated Switchgear (8dQ1-1) / Baiji – Iraq

 Current Projects

Order description:  Installation Supervision /

Commissioning

Client:  Siemens AG

Scope of work: 

Installation Supervision

b Technical clarification with installers and sub- contractors

b Supervising the compliance of the pre-determined documentation in accordance with the state-of- the-art technology in conformity with the techni- cal specifications and directives provided

b Planning and processing of the site-logistics in connection with the installation

b Organization of regular site meetings

b Comprehensive risk management

b Ensuring the on-site quality including problem reports

b Supervision and monitoring of the project within the scope of the projects

b Installation documentation of the electrical components (installation reports/handover documentation) and updating of the documents

b Project completion report and summary of the findings with feedback to the organization

Commissioning

b High voltage testing

b Impulse pressure testing

b Resonances testing

Page 47: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Page 47

2009  –2014

Scope of work: 

b

b Technical Field Assistance (TFA) of commissioning and trial operation including the following task:

• Regular submission of information and reports to the client and site management and/or the owner

• Site management

• System documentation such as quality plans, circuit diagrams, description of the operating manual, product manuals as well as constru- tion and commissioning manuals

b Additional supplies and services which are specified in or may reasonably be inferred from the contract

b Additional best industry practices according to generally accepted industry standards

Gas-Fired Power Plant (600 MW) / Baiji – Iraq

Order description:  Supervision/Commissioning Excitation System Thyripol

Client:  Siemens AG

Supervision and Commissioning of SFC/SEE System:

Current Projects

Page 48: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Page 48

Luthardt Group

400 kV Gas-insulated Switchgear (8dQ1) / tripoli South – Libya

Order description:  Commissioning Secondary Systems

Client:  Siemens AG

Scope of work: 

Commissioning

b Pre-Conditions

b Checking documentation

b Checking parameterization of relays

b CT circuits

b VT circuits

b Power supply check

b Trip circuits

b Checking BI, BO of relays to the same panel

b Checking BI, BO of relays to external panels

b Checking alarms in protection panels

b Checking alarms to SCADA

b Secondary injection test

b Final preparation of devices

b Primary injection, 87 BB, stability test

b Primary injection, transformer stability test

b Primary injection, REF stability test

b Test protocols

b As-built documentation

b Energization

b Final test

Current Projects

Page 49: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Page 49

2009  –2014

Scope of work: 

Site assessment

delivery of Spare Parts:

b Lube oil pump

b Lube oil pump motor

b Emergency Lube oil pump

b D.C. motor for emergency lube oil pump

b Jack oil pump motor

b Jack oil pump

b Vapor extraction fan for lube oil system with motor

b Fuel oil injection motor

b Fuel oil injection pump

b Hydraulic gear pump

b Hydraulic gear pump motor

b Axial piston pump with motor

b Generator cooling pump

b Generator cooling pump motor

b 220 V DC batteries, 54 blocs

b Hydraulic clearance optimization pump motor

b Hydraulic clearance optimization pump

b Pneumatic system

b Turbine exhaust

Gas turbine Power Plant (3x250 MW) / Sarir – Libya 

Order description:  Site Assessment and Delivery of Spare Parts

Client:  Global Electricity Service Company

Current Projects

Page 50: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Page 50

Luthardt Group

Water development Plant / Mina abdullah – Kuwait

Order description:  Supervision DCS Erection

Client:  ABB AG

Scope of work: 

b Responsibility for co-ordination, supervision and inspection of all installation activities in the section I&C and control work

b Overall co-ordination between contractor´s installation management and the other companies working on the power plant project

b Integrated testing during cold commissioning

b Detection and correction of HW mistakes and support hot commissioning tests

b Define and request modifications

b Prepare detailed information for claim management

b Prepare detailed information for NCR

b Draw up quality documentation

b Advise loop checker

b Perform training on the job for customer personal

b Report all abnormal events to the commissioning leader

Current Projects

Page 51: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Page 51

2009  –2014

Scope of work: 

b Supervision and, where necessary, issuing of instructions to contractors to secure the imple- mentation of the building measures in keeping with the public-law requirements and perform- ance specifications;

b Pursuit of technical defects, short-comings in the workman-ship and incomplete perfor- mance until corrected;

b Preparation and implementation of final con- trols, inspection and acceptance of deliveries and performance;

b Securing of the quality codes for the respective properties and plant by self-scheduled and operative quality controls;

b Organization of the guarantee of safe const- ructional and technical installation of the on- site work in the area of responsibility, particu-

larly the safe interaction of the work dischar- ged by the various companies;

b Agreement, co-ordination and securing of the contact points to other trades and firms, as well as supervision and co-ordination of the fulfilment of all contractual agreements bet- ween the contractor and the client;

b Co-ordination and control of the deliveries made by contractors;

b Instigation and integration of the developer performance;

b Co-operation in the preparation of overall schedules, instigation of the preparation of detailed deadlines and deployment plans for the contractors, as well as work on one‘s own progress concept and plans;

Combined Cycle Power Plant Mittelsbüren (445 MW),  Bremen – Germany 

Order description:  Electrical Owner´s Engineer

Client:  Gemeinschaftskraftwerk Bremen GmbH & Co. KG

Current Projects

Page 52: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Page 52

Luthardt Group

a flat hierarchy and short decision making processes Our organisational structure is composed of functional, target-orientated and transparent entities that form the basis of our performance and customer satisfaction. A flat hierarchy and short decision making processes enable economical and individual solutions.

 Company Structure

Company Structure

Administra- tion: 13

Services and Projects:

38 Affiliates: 42

LUTHARDT Personnel

advisory Board

Juergen Luthardt, Bernd Janker, Daniel Walther

health &  Safety

Peter Zimmerling

Sven Luthardt, Bjoern Luthardt

Quality Manage-ment/Controlling

Kerstin Ludwig

Board of directors

human  resources

Silke Konczalla

Financial  accounting

Katharina Stieber

Gerhard Kessler

Marketing/ Sales

Bjoern Luthardt

Torben Müllers

Projects

Volker Kenschke

affiliates

Sven Luthardt

Services

Bjoern Luthardt

Procurement It

HET Bremen

LUTHARDT Abu Dhabi

NASHED Tripolis

LUTHARDT Belgrade

Page 53: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Page 53

2009  –2014

 team

team

first left: Berlin – Germany

second left: Belgrade – Serbia

third left: Tripoli – Libya

first right: Erbil – Kurdistan Region Iraq

second right: Abu Dhabi – United Arab Emirates

third right: Bremen – Germany

Page 54: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Page 54

Luthardt Group

Emerging markets in the Middle East and Africa are one of the great opportunities for the Ger-man industry. They already account for more than half of the revenue of LUTHARDT´s business. And our strong local presence gives us the best possible basis to further develop our expertise. Therefore, and in consideration of the fact that we wish to share our valuable expertise with com-panies active in the same sector and region at home, LUTHARDT became a member of various committees, business network circles and associations. Since we profit from the excellent world-wide reputation of German engineering, we do feel responsible for marketing ”Made in Germany” beyond our own brand name, too. For us, the following memberships are a very good place to do so.

Afrika-Verein der deutschen Wirtschaft e.V., Berlin www.afrikaverein.de

Deutsch-Arabische Freundschaftsgesellschaft e.V. (DAFG), Berlin www.dafg.eu

Ghorfa - Arab-German Chamber of Commerce and Industry e.V., Berlin www.ghorfa.de

Institution for Railway Signal Engineers (IRSE), London/UK www.irse.org

VGB PowerTech e.V., Essen www.vgb.org

Deutsch-Kurdischer Freundeskreis

Experten Forum Irak (EFI)

Memberships

 Memberships

Page 55: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Page 55

2009  –2014

Luthardt Office tripoli NASHED JOINT STOCK COMPANY for Engineering and Consulting / P.O. Box 608 Tripoli / Libya

[email protected] Phone: +218 (0)92 7313248 Fax: +218 (0)217100050

  

L.O.E. for  Electrical Contracting, Ltd. House No. 240/3/334 Yazdandokht Street Erbil / Ainkawa Kurdistan Region / Irak

bahattin.yanardag@luthardt- group.com Phone: +964 (0)750 796 74 18

 Contacts

Luthardt Office amman S.I. Consortium Adel Al Qasim Building, Flat # 703 Jabal Al Hussein P.O. Box 213669 Amman 11121 / Jordan

Phone: +962 (0)6 5627216 Fax: +962 (0)6 5627228

affiliates:

hEt hanseatische  Energietechnik Gmbh Knechtsand 4 28259 Bremen / Germany

[email protected] Phone: +49 (0)421 484045-0 Fax: +49 (0)421 484045-29

Luthardt & Experts  Electrical Equipment &  Instrumentation LLC. SH. Zaied 1st St. – Shamsi Bldg. M Flr Suite 4 / P.O. Box 32110 Abu Dhabi / U.A.E.

[email protected] Phone: +971 (0)262 80365 Fax: +971 (0)262 80364

Luthardt Belgrade Luthardt Belgrade d.o.o. Sase Filipovica 8/3 11070 Novi Beograd / Serbia

tatjana.mihailovic@luthardt- group.com Phone: +381 (0)11 6565151 +381 (0)11 6565227

Luthardt Office Baghdad AL-HARTHIYA Abdulsattar Fathi / Babil district M 929 / St.18 / Bldg. 94 – Flat 12 Baghdad / Iraq

Phone: +964 (0)79 0515 1074

  

Luthardt Gmbh Reinhardtstr. 58 10117 Berlin / Germany

[email protected] Phone: +49 (0)30 2128001 0

head Office:

Offices:

Contacts

Page 56: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Page 56

Luthardt Group

Within our organisation, the Health, Safety, Environment and Quality (HSEQ) aspects are inextricably inter-linked. A comprehensive HSEQ policy governs our efforts to improve our safety and quality performance. We regularly audit our facilities to ensure that they comply with our own policies and standards and appli-cable regulatory requirements. TÜV Rheinland certified our Health, Safety and Environment System accor-ding to SCC**:2006 and our Quality System according to ISO 9001:2008.

 Certificates

Certificates

Page 57: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

12/31/2013 12/31/2012

EUR

1. Sales revenues 16.293.044,54 10.297

2. Increase/decrease (–) in work in process -2.140.461,55 442

3. Other operating income 326.094,54 147

14.478.677,53 10.886

4. Cost of materials

a) Cost of raw materials, supplies and merchandise 4.284.350,01

b) Cost of purchased services 4.696.056,65 8.980.406,66 6.182

5. Gross profit 5.498.270,87 4.704

6. Personnel expenses

a) Wages and salaries 2.352.499,38

b) Social security contributions 367.082,25 2.719.581,63 2.587

7. Depreciation on intangible fixed assets and property, plant and equipment

124.850,45 141

8. Other operating expenses 1.625.616,05 1.444

9. Operational result 1.028.222,74 532

10. Other interest received and similar income 17.560,77 9.245

11. Interest paid and similar expenses –77.563,57 –77.118

12. Financial result -60.002,80 -67.873

13. Result of normal activities 968.219,94 465

14. Income taxes 268.473,95 252

15. Other taxes 47.961,18 23

16. Net profit of the year 651.784,81 189

17. Shares of minor shareholders to net profit of the year 88.570,62 2

18. Consolidated net profit of the year 563.214,19 187 Personnel Amorti- sation and

depreciation

Other operating expenses

MaterialServices

30

20

10

0

Cos

t tu

rnov

er r

atio

s in

%

32.5

18.8

0,9

11.2

29.6

  Profit and Loss Statement (consolidated)

EUR

Page 57

2009  –2014

  Profit and Loss Statement

Profit and Loss Statement

Page 58: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Assets 12/31/2013 12/31/2012

FIXEd aSSEtS UR

I. Intangible assets

1. For remuneration acquired consessions, industrial pro-

perty and similar rights and assets and licenses in such

rights and assets 20.551,78 18 2. Goodwill 82.501,69 110

103.053,47 128

II. Property, plant and equipment

1. Technical equipment and machinery 11.310,20 12 2. Other equipment, factory and office equipment 393.820,27 399

405.130,47 411

III. Financial assets

1. Shares in affiliated companies 3.188,80 3

2. Loans to affiliated companies 170.000,00 170

3. Participating interests 61.345,56 48

234.534,36 221

742.718,30 761

B. CurrENt aSSEtS

I. Inventories

1. Raw materials and supplies 148.175,06

2. Work in process 400.077,43

3. Payments on account less 25.000,00

4. Payments received on account -280.208,75

293.043,74 1.100

II. receivables and other assets

1. Trade receivables 2.469.944,10 2.604

2. Receivables from shareholders 7.907,00 11

3. Other assets 92.114,12 242

2.569.965,22 2.857

III. Cash on hand and bank balances 310.750,76 367

3.173.759,72 4.326

C. PrEPaId aNd dEFErrEd CharGES 45.231,29 85

total 3.961.709,31 5.172

Prepaid and deferred charges

Current assets

Fixed assets

TEUREUR

Page 58

Luthardt Group

  Balance Sheet (consolidated) 

Balance Sheet

Page 59: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Equity and liabilities 12/31/2013

a. StOCKhOLdErS EQuItY T EUR

I. Subscribed capital 250.000,00 250

II. unappropriated profits brought forward    816.976,41 629

III. Consolidated net profit of the year 563.214,19 187

IV. Balancing account for interest of minor shareholders 109.192,92 21

1.739.383,52 1.088

B. rESErVES aNd aCCruaLS

I. tax reserves and accruals 236.885,00 71

II. Other reserves and accruals 454.384,64 384

691.269,64 455

C. LIaBILItIES

I. Bank loans and overdrafts  9.401,57 1.272

II. Payments received on account  269.788,30 213

III. trade payables  665.489,20 1.434

IV. Payables to companies in which the company has  

  a participating interest  124.765,74

172

V. Payables to minor shareholders  43.586,67 42

VI. Other liabilities

of which taxes: EUR 248.769,59 (previous year: TEUR 95)

of which relating to social security: EUR 125,53 (previous year: TEUR 10)

1.521.891,15 3.583

d. dEFErrEd INCOME 9.165,00 46

total 3.961.709,31 5.172

Deferred income and

accrued expenses

Equity

Provisions

Liabilities

Page 59

2009  –2014

408.859,67 450

EUR

12/31/2012

  Balance Sheet (consolidated) 

Balance Sheet

Page 60: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Page 60

Luthardt Group

Independent auditor‘s report To LUTHARDT GmbH, Berlin:

We have audited the annual financial statements, compromising the balance sheet, the income statement and the notes to the financial statements, together with the bookkeeping system, and the management report of the company LUTHARDT GmbH, Berlin, for the business year from 1 January 2013 to 31 Decem-ber 2013. The maintenance of the books and records and the preparation of the annual financial state-ments and the management report in accordance with German commercial law are the responsibility of the company’s management. Our responsibility is to express an opinion on the annual financial statements, together with the bookkeeping system, and the management report based on our audit.

We conducted our audit of the annual financial statements in accordance with Art. 317 German Commer-cial Code and German generally accepted standards for the audit of financial statements promulgated by the Institut der Wirtschaftsprüfer [Institute of Public Auditors in Germany] (IDW). Those standards require that we plan and perform the audit such that misstatements materially affecting the presentation of the net assets, financial position and results of operations in the annual financial statements in accordance with German principles of proper accounting and in the management report are detected with reasonable assu-rance. Knowledge of the business activities and the economic and legal environment of the company and expectations as to possible misstatements are taken into account in the determination of audit procedures. The effectiveness of the accounting-related internal control system and the evidence supporting the disclo-sures in the books and records, the annual financial statements and the management report are examined primarily on a test basis within the framework of the audit. The audit includes assessing the accounting principles used and significant estimates made by management, as well as evaluating the overall presen-tation of the annual financial statements and the management report. We believe that our audit provides a reasonable basis for our opinion.

  auditor’s report to Luthardt

auditor’s report

Page 61: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Page 61

2009  –2014

Our audit has not led to any reservations.

In our opinion, based on the findings of our audit, the annual financial statements comply with the legal requirements and give a true and fair view of the net assets, financial position and results of operations of the company in accordance with German principles of proper accounting. The management report is consistent with the annual financial statements and as a whole provides a suitable view of the company’s position and suitably presents the opportunities and risks of future development.

Bremen, May 2014

Hansaberatung GmbH

Audit firm Tax consultants

Martin Beering Rolf Maehlmann Financial auditor Financial auditor

auditor’s report

  auditor’s report to Luthardt

Page 62: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Page 62

Luthardt Group

  Imprint

Imprint

LUTHARDT GmbH

Reinhardtstraße 58

10117 Berlin

Germany

Copies: 1.000

Text: Sven and Bjoern Luthardt / LUTHARDT GmbH

Consulting: Benjamin Diethelm / Diethelm Beratungen GmbH

Layout: Heike Preuß / prussianorange

Print: AZ Druck und Datentechnik GmbH

Paper: Profisilk of IGEPA

Font: Linotype Univers Light and Bold

Photos: If not listed below, from LUTHARDT. p. 1: Fotolia p. 3: © Morris Mac Matzen / Reuters / Corbis p. 8, 9: Ugur Orhanoglu / Heike Preuß p. 12 left, 14, 15: MTU Onsite Energy GmbH p. 16 left: krg.org p. 19 below: Messe Bremen, Jan Rathke p. 23 second right: CWC Group Limited, London p. 40: ABB AG p. 47: Khaled Hagi p. 49: swb, GKB Gemeinschaftskraftwerk Bremen p. 51 first left: Heike Preuß / prussianorange

Graphs: Heike Preuß / prussianorange

Germany 2014

Page 63: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Page 63

2009  –2014

  Imprint

LUTHARDTtie2014

Page 64: 2009-2014 - Startseite - Luthardt GmbHluthardt-group.com/en/uploads/files/luth_jb_2014_small.… ·  · 2017-06-27dC, Battery and uPS Grounding & ... tailors customer-orientated

Page 64

Luthardt Group

LUTHARDT Group 2009–2014 • Reinhardtstr. 58 • 10117 Berlin • Germany • Tel.: +49 (0)30-2128001-0 • www.luthardt-group.com • [email protected]