Reference Marker Reference Marker Location Potential Remedies Estimated Costs Impediments to Implementation Comments Begin End 5 11141028 5 11141033 NY 5 (Central Ave.) at Colonie Plaza, CR 153 (New Karner Road), Vly Road, and Old Karner Road Signs, pedestrian accommodations, access management measures. Aggressive driving corridor (May 2006). Resurfacing included high defination pedestrian surfaces and off-set left turn lane pavement marking. $.004M for signage. Estimated cost of the Central Avenue corridor paving project is $6.7M None. HSI #1-1-0413 completed 4/1/03, updated 11/15/07 for PIN 1034.22. Pedestrian accommodations and signage competed 2003. Location included in D260725, construction completed 12/20/08. NY 5 "Roadway Components" committee looking at access issues. 7 11081176 7 11081177 NY 7 (Curry Rd) at NY 911H (Altamont Ave) Maintenance improvements - signs and pavement markings. $1,300 None. HSI #1-6-0022 completed 2/23/07. Work completed 11/28/07. 43 11021226 43 11021226 NY 443 at NY 335 Maintenance improvements - signal timing. $200 None. HSI #1-1-0460 completed 4/2/07. Work completed 1/23/08. 9W11052008 9W11052008 US 9W at NY 912S and Hoffman Ave Maintenance improvements - 1R resurfacing. .024M None Accident history completed 2/20/09 for PIN 1808.17. Letting scheduled for 6/10/10. 7 14091004 7 14091005 NY 7 (Hoosick St) at 8th, 9th, and NY 40 (Oakwood Ave) Signal coordination project - new controllers, new detectors, signals rebuilt under D258327 (2001). Maintenance improvements - overhead signs (2007). Aggressive driving corridor (May 2007). $.330M for signal coordination project. $700 for signs. None. HSI #1-4-0277 completed 8/21/97, updated 2/13/07. Signal coordination project D258327 completed 10/31/01. Sign work completed 3/27/07. REGION 1 -- Five Percent - Highway Segments/Intersections Exhibiting the Most Severe Safety Needs Year 2009 Page 1 of 22

Upload: andy-arthur

Post on 18-Nov-2014

471 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: 2009 5% NYS DOT Report (Most Dangerous Roads in NY)

ReferenceMarker

ReferenceMarker

Location Potential Remedies Estimated CostsImpediments toImplementation

Comments

Begin End

5 11141028 5 11141033NY 5 (Central Ave.) at Colonie Plaza,CR 153 (New Karner Road), VlyRoad, and Old Karner Road

Signs, pedestrian accommodations, accessmanagement measures. Aggressive drivingcorridor (May 2006). Resurfacing included highdefination pedestrian surfaces and off-set leftturn lane pavement marking.

$.004M for signage.Estimated cost of theCentral Avenuecorridor paving projectis $6.7M

None.

HSI #1-1-0413 completed 4/1/03, updated 11/15/07for PIN 1034.22. Pedestrian accommodations andsignage competed 2003. Location included inD260725, construction completed 12/20/08. NY 5"Roadway Components" committee looking at accessissues.

7 11081176 7 11081177NY 7 (Curry Rd) at NY 911H(Altamont Ave)

Maintenance improvements - signs andpavement markings.

$1,300 None.HSI #1-6-0022 completed 2/23/07. Work completed11/28/07.

43 11021226 43 11021226 NY 443 at NY 335 Maintenance improvements - signal timing. $200 None.HSI #1-1-0460 completed 4/2/07. Work completed1/23/08.

9W11052008 9W11052008 US 9W at NY 912S and Hoffman Ave Maintenance improvements - 1R resurfacing. .024M NoneAccident history completed 2/20/09 for PIN1808.17. Letting scheduled for 6/10/10.

7 14091004 7 14091005NY 7 (Hoosick St) at 8th, 9th, and NY40 (Oakwood Ave)

Signal coordination project - new controllers,new detectors, signals rebuilt under D258327(2001). Maintenance improvements -overhead signs (2007). Aggressive drivingcorridor (May 2007).

$.330M for signalcoordination project.$700 for signs.

None.HSI #1-4-0277 completed 8/21/97, updated 2/13/07.Signal coordination project D258327 completed10/31/01. Sign work completed 3/27/07.

REGION 1 -- Five Percent - Highway Segments/Intersections Exhibiting the Most Severe Safety Needs Year 2009

Page 1 of 22

Page 2: 2009 5% NYS DOT Report (Most Dangerous Roads in NY)

ReferenceMarker

ReferenceMarker

Location Potential RemediesEstimated

CostsImpediments to Implementation Comments

Begin End

921B26011011 921B26011011Burrstone Road & FrenchRoad/Champlin Avenue Intersection

Signal timing/phasing adjustments $0.001M None.

A Before-After study of the intersectionreconstruction in 2002 showed a 58%reduction in total intersection crashes. RearEnd crashes were reduced by 70% & Left Turnwith opposing vehicle crashes were reduced31%. All other types = zero. Crashes are beingmonitored & timing adjusted to maximizecapacity & minimize delays.

921C26011012 921C26011012

N. Genesee Street: Deerfield Cornersfour Intersections, each street one-way, with a distance of 300+ feetapart with a gas station & car washwithin the enclosed block.Jurisdiction is with City of Utica.

Striping on roadway segmentsbetween the four intersectionsproposes to reduce from a three laneto a two lane highway to reducedriver confusion.

$0.001M forstriping.

None.

In 2007, an interdisciplinary team studied andrecommended restriping each of the roadwaylegs between the four intersections from threelane to two lane segments.

REGION 2 -- Five Percent - Highway Segments/Intersections Exhibiting the Most Severe Safety Needs Year 2009

Page 2 of 22

Page 3: 2009 5% NYS DOT Report (Most Dangerous Roads in NY)

ReferenceMarker

ReferenceMarker

Location Potential RemediesEstimated

CostsImpediments to Implementation Comments

Begin End

11 33033023 11 33033023 Northern Concourse/ Baily RoadRealign South Bay Road opposite BaileyRoad.

Local (Residential) opposition along BaileyRd.Major Right-of-Way needed to re-alignSouth Bay Street.

Annual Regional and special pavement projects havereplaced faded markings. Weathered,damaged, andmissing signs have been replaced as a result of aSAFETAP (Road Safety Audit) Review.

11 33033048 11 33033048Route 11 at Bear Road & Route 930J at I-481Ramps.

New Signal upgrade installation wascompleted in Spring 2009 an ongoing 2006Signal Requirements Project to improve thesignal at the I-481 interchange. A SignalStudy, using data from both 9/00 and 3/07HSI's determined a need for a closed loopsignal at the Rte I-481 ramps involving signaltiming/phasing coordination with the existingRoute 11 signal in order to address heavypeak hour left turn movements.

$0.5M None.

HSI completed in March 2007. Signal has been installedon Route 930J at I-481 , Spring 2009, with closed loopsystem to include Route 11/Bear Road signal. A SAFETAPreview completed in Spring 2009 identified a need toreplace/upgrade signs. Scheduling Maintenance byContract (MbC) to resurface Route 930J approach toRoute 11 in Summer 2010.

31 33091250 31 33091252 East Crabtree - Pardee/I-81

Capacity related issues associated w/highpeak hour volumes along Route 31 corridor.Four separate Capital projects are beingprogressed along the Route 31 corridor. Thefirst interim project will address the specificcongestion problems associated with theramps during peak AM and PM hours.Restripe back to back left turn lanesunderneath bridge to side by sideconfiguration to provide additional vehiclestorage.

$5.0M

Major Right-of-Way Acquisitions involvingcommercial properties are required to provideadditional needed thru lanes to addresscongestion problems; signal coordination withclosely spaced, at grade intersections.Continued commercial and residentialdevelopment further east add to the heavycongestion.

Addition of an exclusive Route 31 EB right turn lane toaccess the I-81 SB on ramp under the upcoming interimproject PIN 303764. Additionally, the existing exclusiveright turn lane along I-81 NB off ramp will be lengthened toprovide additional storage capacity. Under an adjoiningfuture Capital project, construction of a WB Route 31 loopramp to I-81 SB to eliminate accident patterns associatedwith left turn crossing maneuvers is scheduled. Widenarea under bridge to provide side by side left turn lanes inlieu of back to back lefts. Future PIN's to address theRoute 31 corridor from Route 11 to Thompson Roadintersections are PIN 303765, 303766, 303768.

49 34012153 49 34012153 I-81 interchange

Lane reallocation was completed to narrowshoulders to facilitate placement of a WB leftturn lane across bridge structure. Left turnlane off NB off ramp hinders WB trafficintending to access I-81 SB on ramp.Improper lane storage use for throughmovements in combination with limitedweaving area and short left turn vehiclestorage lengths contribute to congestionduring peak hours. Consideration ofplacement of fully protected signal phasing forEB left turn at the NB on ramp. An additionalWB through lane is needed to addressstorage problems associated with vehiclesqueuing back from the existing signal at the I-81 SB ramps.

$10.0M+Bridge replacement project is needed to provideadditional land for westbound Route 49 trafficentering I-81 SB on ramp.

HSI's 340011 & 12 are being finalized having identifiedboth left turn head-on and right angle crash patterns at theNB ramps. Consider including signal phasingmodifications under future contract to address identifiedaccident patterns at NB ramps.

REGION 3 -- Five Percent - Highway Segments/Intersections Exhibiting the Most Severe Safety Needs Year 2009

Page 3 of 22

Page 4: 2009 5% NYS DOT Report (Most Dangerous Roads in NY)

ReferenceMarker

ReferenceMarker

Location Potential RemediesEstimated

CostsImpediments to Implementation Comments

Begin End

REGION 3 -- Five Percent - Highway Segments/Intersections Exhibiting the Most Severe Safety Needs Year 2009

298 33012025 298 33012029Route 298 at Carrier Circle, OnondagaCounty, Town of Dewitt

Eliminate Circle with at-grade, signalizedintersections and/or grade separation; orreduce skew angles of ramps entering circleto improve sight lines. Recent HSI (3/07)recommended realignment of the remainingtwo slip ramps at an estimated cost of $0.5Min order to steepen the approach angles atboth the SB Thompson Road to Carrier Circleand the Thruway on ramp top Carrier Circle toreduce the overall number of rear-endcollisions associated with the existing rampalignments.

Based on2009 estimate$28M + toeliminatecircle; $1.8Mto Re-alignremaining 2approaches.

To eliminate circle, major right-of-wayacquisition involving commercial propertieswould be likely; signal coordination problemswith closely spaced, at-grade intersections; lowoverall severity of crashes would makereconstruction difficult to justify.

Three of the existing five approaches have been re-aligned. Route 298 EB approach re-aligned & channelizedin 2003 under contract D258905; Service ramp from Route635 NB to Route 298 EB built along with channelization ofRoute 298 WB approach completed in 1993 under contractD254442. Cost of $1.8M to realign Thruway andThompson Road approaches is needed to addresspatterns of rear-end crashes. It is anticipated work to re-align remaining two approaches will be added under afuture Capital Project.

Page 4 of 22

Page 5: 2009 5% NYS DOT Report (Most Dangerous Roads in NY)

ReferenceMarker

ReferenceMarker

Location Potential RemediesEstimated

SafetyCosts

Impediments to Implementation Comments

Begin End

5 41032007 5 21032007Route 5 at the intersection of Route 98, Cityof Batavia, Genesee County

Improve safety by improving signal progressionof adjacent intersections.

$0MContinued maintence of sequencingdependent on local maintenance.

Signal clock drift is being checked. A signal corridor study will beconsidered.

15 43031126 15 43031126Route 15 at Southland Drive, south of I-390interchange, Town of Brighton, MonroeCounty

Improve safety by improving operation ofadjacent intersections. Reconfigureinterchange at I-390 .

$4.0M None.Project has been initiated, PIN 4390.23. Construction isexpected to start in 2012 or 2013.

15 43031127 15 43031128Route 15 at the I-390 interchange, Town ofBrighton, Monroe County

Reconfigure interchange $4.0M None.Project has been initiated, PIN 4390.23. Construction isexpected to start in 2012 or 2013.

15A 43041109 15A 43041113Route 15A - Castle Road to Route 252including I-390 Interchange, Town ofHenrietta, Monroe County

Improve safety and operation of Route15A/252 intersection through raised mediansadded through and turn lanes. Improve CastleRoad intersection.

$4.5M None.Project for 15A and 252 intersection improvements let in March2009, PIN 4046.11. Improvements made to Castle Road and15A as part of a permit.

15A 43041128 15A43041129At Route I-390 Interchange, Town ofBrighton, Monroe County

Reconfigure interchange $2.5M None.Project has been initiated, PIN 4390.17. Construction is expectedto start in 2011.

31 43031178 31 43031180Route 31 between Baier Drive and HowardRoad. Town of Gates, Monroe County

Reduce driveways and manage access to northside businesses. Realign driveway to signal atBaier. Change eastern driveway to right-in right-out.

$0M None.Project completed under Permit completed on 11/9/2007. TheRegion is tracking crash history.

31 43033020 31 43033020Route 31 in the vicinity of bowling alley,Town of Brighton, Monroe County

Construct raised median to prevent left turns $0.2M

Community would not be in favor of thisremedy, difficulty in finding a way fordrivers to make U-turns to accessopposite directions.

This location will be studied again in 2010. Previous studiesindicate that the accident pattern is left turns to/from commercialdriveways, many are "courtesy" accidents where drivers in aqueue for the signal at Route 65 wave turning traffic through gapsin the queue only to have the turners be hit by traffic in anadjacent lane. Route 31 pavement is currently six lanes- threeEB, two WB, TWLTL.

31 43033021 31 43033021Route 31 in the vicinity of bowling alley,Town of Brighton, Monroe County

Construct raised median to prevent left turns $0.2M

Community would not be in favor of thisremedy, difficulty in finding a way fordrivers to make U-turns to accessopposite directions.

This location will be studied again in 2010. Previous studiesindicate that the accident pattern is left turns to/from commercialdriveways, many are "courtesy" accidents where drivers in aqueue for the signal at Route 65 wave turning traffic through gapsin the queue only to have the turners be hit by traffic in anadjacent lane. Route 31 pavement is currently six lanes- threeEB, two WB, TWLTL.

441 43011032 441 43011034Route 441 between Liberty and Five MileLine Road , Town of Penfield, MonroeCounty

Construct raised median to prevent left turnsfrom driveways.

$1.0M

Difficulty in finding a way for drivers tomake U-turns to access oppositedirections. Close proximity of buildings tostreet and general terrain greatly limitsimprovement options.

This location is currently being studied for additional remedies.

REGION 4 -- Five Percent - Highway Segments/Intersections Exhibiting the Most Severe Safety Needs Year 2009

Page 5 of 22

Page 6: 2009 5% NYS DOT Report (Most Dangerous Roads in NY)

ReferenceMarker BEGIN

ReferenceMarker END

Location Potential Remedies Estimated Costs Impediments to implementation Comments

Begin End

33 53011008 33 53011009

NY Route 33, the KensingtonExpressway, where it is West andEast Tupper Street, and Goodell, inthe City of Buffalo, Erie County

This location was recently studied and resulted in Highway SafetyInvestigation 503092, memo dated 1/26/2009. RM Range studied: 33-5301-1008 to 1011. The City of Buffalo plans on altering Tupper Streetfrom one-way to two-way traffic, from Pearl Street to Ellicott Street,beginning in March of 2009. As a result of H.S.I. 503092,recommendations have been made for review of signal timing and all-redclearances, various pavement marking and signing changes. We haveprovided a plan to our Local Projects section (Planning) to work with theCity of Buffalo to accomplish these changes as part of their project.Signal timing changes to be accomplished in house after review byOperations unit. Pavement marking changes that can be completed aspart of the City of Buffalo project should be done as part of the planNYSDOT provided. See 33-5301-1010 to 1010 below.

$.012.M (Estimated) Cooperation from the City of Buffalo.

Project scheduled to begin Spring2009. Continued coordination withLocal Projects unit of Planning.Plans have been provided to theCity of Buffalo.

33 53011010 33 53011010

NY Route 33, the KensingtonExpressway, in the vicinity ofEllicott/MainStreet/Washington/Pearl/Oak, City ofBuffalo, Erie County.

This location was recently studied and resulted in Highway SafetyInvestigation 503092, memo dated 1/26/2009. RM Range studied: 33-5301-1008 to 1011. The City of Buffalo plans on altering Tupper Streetfrom one-way to two-way traffic, from Pearl Street to Ellicott Street,beginning in March of 2009. As a result of H.S.I. 503092,recommendations have been made for review of signal timing and all-redclearances, various pavement marking and signing changes. We haveprovided a plan to our Local Projects section (Planning) to work with theCity of Buffalo to accomplish these changes as part of their project.Signal timing changes to be accomplished in house after review byOperations unit. Pavement marking changes that can be completed aspart of the City of Buffalo project should be done as part of the planNYSDOT provided. See 33-5301-1008 to 1009, above.

$.012.M (Estimated) None.

Project scheduled to begin Spring2009. Continued coordination withLocal Projects unit of Planning.Plans have been provided to theCity of Buffalo.

62 53034037 62 53034037US Route 62, Niagara Falls Boulevard,in the Town of Amherst, Erie County.Vicinity of Greenhaven Road

This is a very busy, congested section of Niagara Falls Blvd., highlydeveloped, with many malls, plazas, retail, restaurants and intersections.A Safety Capital Project (PIN 5308.08) scheduled for a March, 2010letting will improve the ramp configuration in this area, as well as someintersections on US Route 62. The Public Hearing Meeting was held inJune 2008. Alternative # 4 was chosen based on its benefit/cost ratioand public input. The most recent study of this location is found inHighway Safety Investigation 503080, dated August 4, 2008.

Project cost iscurrently $3.93M.

None. Project is programmed.

REGION 5 -- Five Percent - Highway Segments/Intersections Exhibiting the Most Severe Safety Needs Year 2009

Page 6 of 22

Page 7: 2009 5% NYS DOT Report (Most Dangerous Roads in NY)

ReferenceMarker BEGIN

ReferenceMarker END

Location Potential Remedies Estimated Costs Impediments to implementation Comments

Begin End

REGION 5 -- Five Percent - Highway Segments/Intersections Exhibiting the Most Severe Safety Needs Year 2009

78 53021214 78 53021216NY 78, Transit Road, from WaldenAvenue to George Urban Boulevard,Vilalge of Depew, Erie County

This is a combined residential and commercial section of WaldenAvenue. A Highway Safety Investigation has been initiated whichincorporates this PIL and two adjacent PIL locations on NY Route 78.This investigation was completed 1/12/2009, H.S.I. 503097.Recommendations are to review signal timing, adjust yellow time, andconsider lengthening the "all-red" clearance time.

N/A, Traffic Controland Maintenanceimprovements.

None.

Copy of investigation was sent tothe Operations Unit with therequest to review the signal timing,yellow time, and all-red clearance

240 53011302 240 53011302NY 240 @ Clinton, Towns ofCheektowaga and West Seneca, ErieCounty

PIN 5268.48 is a Bridge, Safety, and Mobility Project on NY Route 240from Clinton (354) south to Mineral Springs. Project has not yet enteredthe design phase. Project includes sight distance and horizontalcurvature improvements on Rte. 240. Signal improvements will beconsidered at Routes 240 and 354. Project will include right turn lanes atthe intersection of Route 240 and Mineral Springs. Region continues toevaluate need for closed drainage and sidewalks on Route 240. Currentlet date is 6/15/2015.

Total Project Cost is$ 8.80M.

Regional teams need to reach consensusre: sidewalks and closed drainage.

Total Project Cost $8.8M; Projectis programmed for 5/2015 letting.

Page 7 of 22

Page 8: 2009 5% NYS DOT Report (Most Dangerous Roads in NY)

ReferenceMarker

ReferenceMarker

Location Potential Remedies Estimated CostsImpediments toImplementation

Comments

Begin End NO LOCATIONS

REGION 6 -- Five Percent - Highway Segments/Intersections Exhibiting the Most Severe Safety Needs Year 2009

Page 8 of 22

Page 9: 2009 5% NYS DOT Report (Most Dangerous Roads in NY)

ReferenceMarker

ReferenceMarker

Location Potential RemediesEstimated

CostsImpediments toImplementation

Comments

Begin End

11 72071167 11 72071169Route 11, Franklin County, Village of Malone(Covington Street - Pearl Street)

1)The three(3) traffic signals at Main Street & BrewsterStreet, Main Street & Harrison Place, and Main Street/ElmStreet/Pearl Street were interconnected and coordinated inApril 2009.2) As part of PIN 7V0827, the striping at Main Sreet & ElmStreet is being adjusted to make the lanes line up betterthrough the intersection.3)Upon completion of the paving, additional modificationsto the signal program at Main Street/Elm Street/PearlStreet intersection will improve traffic flow by allowingsome pedestrian phases to run with concurrent vehiclephases and No Turn on Red restrictions will be removedon a trial basis.

$0.425 M None

VPP - 7V0827 Mill & Fill Project .All of these changes shouldimprove traffic flow through thedowntown corridor and areanticipated to be complete byJune 2009.

REGION 7 -- Five Percent - Highway Segments/Intersections Exhibiting the Most Severe Safety Needs Year 2009

Page 9 of 22

Page 10: 2009 5% NYS DOT Report (Most Dangerous Roads in NY)

ReferenceMarker

ReferenceMarker

Location Potential RemediesEstimated

CostsImpediments toImplementation

Comments

Begin End

9 82051036 9 82051037Route 9 (Route 52 to Church Street),Village of Fishkill, Dutchess County.

Location was reconstructed in 1998. This workincluded resurfacing, drainage, addition of turn lanes,channelization, and sidewalks. Additional sightdistance improvements are identified.

N/A None.

HSI #824014. Location was studied under the current regional consultant contract forHighway Safety Investigations. A sight line obstruction (tree growth) to a traffic signalwas identified on a permitted access from a commercial property. The property ownerwas directed to remove the obstruction.

9D82033002 9D82033002Route 9D @ I-84, Town of Fishkill,Dutchess County

Route I-84/9D interchange reconstruction to improveoperations and safety; will enhance access toDutchess County intermodal facility on Route 9Dsouth of this interchange. Signal Timing adjustments.

$32.8M

Limited area forreconstruction. Route 9Dat this point is a bridgeover I-84. Current narrowdiamond interchange isinsufficient to handletraffic flow. Not enoughlength for required left turnlanes.

PIN #8062.07, HSI #824019. Location was studied under the current regionalconsultant contract for Highway Safety Investigations. As an interim action, a workorder was drafted for a signal change from a permissive left turn phase to a protectedleft turn phase for both eastbound and westbound access to I-84. Also, removal ofselect vegetation was identified. Future capital project projected letting 2015.

9W83023002 9W83023002Route 9W @ Route 32 (Vicinity of I-84Ramps), Town of Newburgh, OrangeCounty

Changes to signal timing and pavement markings.Remove sight line obstruction.

To be completedby State forcesand/or stripingcontract.

None.HSI #833002 completed April 2005. Work orders were drafted for signal timingmodifications and improved lane delineation pavement markings to be implemented in2009. A right-of-way encroachment was removed.

22 87024046 22 87024046Route 22 @ Route 120 (Southern end ofOverlap), Town of North Castle,Westchester County

Improve advance warning signs on Route 22 andRoute 120 to improve driver negotiation of merge.

To be completedby State forces.

Environmental issues mayimpact the project status.

HSI #874036. Location is being studied under the current regional consultant contractfor Highway Safety Investigations. Work orders will be drafted in 2009 orderinginstallation of additional advance warning signs and improvement of existing signs.

32 83011000 32 83011000Route 32 @ Route 17, Town ofWoodbury, Orange County

Installation of a new loop ramp at interchange, timingimprovements & improve overhead signage.

$61M

Congested area, limitedright-of-way availability,adjacent to majorcommercial center(Woodbury Commons)

PIN #8006.84. Terminus of future I-86. Consultant prepared study in late 2002addressing problems in the corridor adjacent to large commercial shopping centers.Improvements to include: signal timing changes, detection systems, overhead signingimprovements,and pavement striping reconfigurations. Project is currently in design.Letting programmed for 2011.

32 83011001 32 83011004Route 32 (Nininger Road to TurnersRoad), Town of Woodbury, OrangeCounty

Reconfiguration of major intersections (signals, addedthrough lanes & turning lanes) and reconfiguration ofmajor access driveways (including WoodburyCommons)

$61M

Congested area, limitedright of way availability,adjacent to majorcommercial center(Woodbury Commons)

PIN #8006.84. Consultant prepared study in late 2002 addressing problems in thecorridor adjacent to large commercial shopping centers. Improvements to include:signal timing changes, detection systems, overhead signing improvements, andpavement striping reconfigurations. Project is currently in design. Lettingprogrammed for 2011.

REGION 8 -- Five Percent - Highway Segments/Intersections Exhibiting the Most Severe Safety Needs Year 2009

Page 10 of 22

Page 11: 2009 5% NYS DOT Report (Most Dangerous Roads in NY)

ReferenceMarker

ReferenceMarker

Location Potential RemediesEstimated

CostsImpediments toImplementation

Comments

Begin End

REGION 8 -- Five Percent - Highway Segments/Intersections Exhibiting the Most Severe Safety Needs Year 2009

35 87012035 35 87012037Route 35 between Pine Grove Court andOld Crompound Road. Town of Yorktown,Westchester County

Continuous center turn lane on Routes 35/202,intersection improvements, signal additions and/orimprovements

$2.6M None.PIN #8561.34, HSI #874101. Location is being studied under the current regionalconsultant contract for Highway Safety Investigations . Intersection improvementproject is currently in development with letting programmed for 2011.

59 85011086 59 85011090Route 59 (NYSTA Ramp to GrandviewAvenue), Town of Clarkstown, RocklandCounty

Capital construction project (PIN 8030.40) resurfacedthis section of roadway in 2005. A Highway SafetyInvestigation was performed at this location. Thisstudy identified possible sight line improvements andother improvements.

Pending None.

HSI #854016. Location was studied under our current regional consultant contract forHighway Safety Investigations. Work orders will direct upgrading of eight inch trafficsignal circulars to twelve inches, signage to aid in identification of a stop line andremoval of vegetation to improve the sight lines to guide signs. Proposed capitalproject to relocate Thruway guide signs.

59 85011072 59 85011078Route 59 (Ternue Avenue to SouthCentral Avenue), Spring Valley, RocklandCounty

Removal of sight-distance obstructions at twointersections under project and other improvementsas determined by Highway Safety Investigation.

Pending None.HSI #854102. Location is being studied under the current regional consultant contractfor Highway Safety Investigations .

59 85011134 59 85011139Route 59 (Chestnut Street to NYSTAramp), Town of Nyack, Rockland County

Update traffic signal heads to 12-inch signal lenseswith back plates and visors at the Route 59intersection with Waldron Avenue/MountainviewAvenue/NYS Thruway. Install curve warning signs inthe eastbound & westbound directions

To be completedby State forcesand/or signalcontract.

Congested Area.

HSI # 854015. Location was studied under the current regional consultant contract forHighway Safety Investigations. Work orders will be drafted in 2009 ordering upgradedtraffic signal heads to 12-inch signal lenses with back plates and visors at the Route59 intersection with Waldron Avenue/Mountainview Avenue/NYS Thruway and theinstallation of curve warning signs in the eastbound and westbound directions

300 83021085 300 83021087Route 300 (Route 17K to Orr Ave), Townof Newburgh, Orange County

This location includes three proposed majorcommercial Highway Work Permits (HWP) foraccess.. One HWP around 1085, north of Route 17Khas been built with a three color traffic signal and aright turn lane on Route 300. The other remainingtwo HWPs (around 1089-1090) are still beingprocessed. The safety improvements for the locationwould include traffic signal upgrade,timing/coordination adjustments, and storage lanesfor turning movements.

N/A Congested Area.

HSI #854028 Location was studied under the current regional consultant contract forHighway Safety Investigations. Under three highway work permit applications (HWP)improvements have begun. One HWP around 1085, north of Route 17K has beenbuilt with a three color traffic signal and a right turn lane on Route 300. The otherremaining two HWPs (around 1089-1090) are still being processed. The safetyimprovements for the location would include traffic signal upgrades,timing/coordination adjustments, and storage lanes for turning movements.

Page 11 of 22

Page 12: 2009 5% NYS DOT Report (Most Dangerous Roads in NY)

ReferenceMarker

ReferenceMarker

Location Potential RemediesEstimated

CostsImpediments toImplementation

Comments

Begin End

REGION 8 -- Five Percent - Highway Segments/Intersections Exhibiting the Most Severe Safety Needs Year 2009

987D87011016 987D87011020Saw Mill River Pkwy @ Cross CountyParkway, City of Yonkers, WestchesterCounty.

Reconstruct interchange ramps to improvegeometrics, reduce weave sections, and the numberof potential conflict points.

Estimated cost$32.1M

Limited area forreconstruction. Route 9Dat this point is a bridgeover I-84. Current narrowdiamond interchange isinsufficient to handletraffic flow. Not enoughlength for required left turnlanes.

PIN #8099.37, HSI #874005. Capital project is in development for constructiontargeted to begin in 2013. Location was studied under our current regional consultantcontract for Highway Safety Investigations. Interim actions to be taken includeinstallation of guiderail and chevrons on S/B lanes of the Parkway and as well asremoval of vegetation. A pavement Friction Test will also be requested.

Page 12 of 22

Page 13: 2009 5% NYS DOT Report (Most Dangerous Roads in NY)

ReferenceMarker

ReferenceMarker

Location Potential RemediesEstimated

CostsImpediments to Implementation Comments

Begin End

17B 96011218 17B 96011218Route 17 Exit 104 to Route 17B; Town ofThompson

Add a WB left turn phase at Jefferson Street. A leadingWB green phase would allow a protected permissiveturn phase. Or, in future, build a dedicated left turn lanewith protected/permissive and/or restricted turningmovements if permissive/protected configuration did notyield sufficient accident reductions.

Unless the left thru lane can be convertedto a left turn lane within the current right-of-way, a dedicated turn lane will requirewidening the roadway.

Study number 968319. Regional SignalEIC is evaluating the recommendedtreatments. WB left turn lane and/orphasing changes will be implemented inan upcoming Signal RequirementsContract.

REGION 9 -- Five Percent - Highway Segments/Intersections Exhibiting the Most Severe Safety Needs Year 2009

Page 13 of 22

Page 14: 2009 5% NYS DOT Report (Most Dangerous Roads in NY)

ReferenceMarker

ReferenceMarker

Location Potential RemediesEstimated

CostsImpediments to Implementation Comments

Begin End

24 03031008 24 03031010NY Route 24 - HollandAvenue toElmont Road

Install countdown timers and improve pedestrian facilities.Install and replace signs.SafeSeniors Pilot Project Location

$.01M NonePIN 080811-Traffic Signal Requirements Let June

19, 2008-August 28, 2008 - Durable PavementMarkings let in February 19, 2009.

24 03031011 24 03031035 Makofske Avenue - Nassau Blvd.Roadway was resurfaced, replaced pavement markings andsigns, Installed countdown timers and improved pedestrianfacilities. Safe Seniors Pilot Project Location.

$3.7M NonePIN 080750 Let April 2005.Construction completedJuly, 2008.

24 03031063 24 03031066NY Route 24-Truro Lane toCourtenay Road.

Total rehabilitation was part of capital improvement contract.Project resurfaced roadway, rebuilt and upgraded existingtraffic signals, extended turning lanes, installed new signs,drainage, center medians, multi-use path and curbing.

$1.3M NonePIN 055320 - Route 24 Rehabilitation Let January,2006. Construction completed October 2007.

24 03031069 24 03031077Hempstead Village Town Line -Cunningham Avenue

Total rehabilitation as part of ongoing capital improvementcontract. Project will resurface roadway, rebuild and upgradeexisting traffic signals, extend turning lanes, install new signs,drainage, center medians, multi-use path, and curbing.

$2.9M NonePIN 055320 - Route 24 Rehabilitation Let January,2006. Construction completed October 2007.

24 03031095 24 03031102NY Route 24 - First Avenue toTaylor Avenue

Will conduct Highway Safety Investigation to determineappropriate remedies.

$0.1M NonePIN 080565 - Highway Safety Investigation StudiesD015485

25 03031099 25 03031103Roxbury Road- Route 495 NService Road

Traffic signal improvements. Install advance guide sign andtree trimming.

$.02MIntersection reconstruction evaluated. However,due to proximity of commercial properties, it wasconsidered to be unfeasible.

PIN 0807.84-Traffic Signal Requirements Let April2007 under D260549.

25 03031155 25 03031157 Village Lane-Woodbury RoadCheck traffic signal clearance time. Traffic signalimprovements. Install advance guide sign and pavementmarkings.

$0.1MIntersection reconstruction evaluated. However,due to proximity of commercial properties, it wasconsidered to be unfeasible.

PIN 080565 Highway Safety Investigation StudiesD015485, PIN 0808.03 - Durable Pavementmarkings let in January 24, 2008. D260721

25 07041201 25 07041214Washington Avenue - ColemanRoad

Total rehabilitation as part of ongoing Capital ImprovementContract. Project will resurface roadway, rebuild and upgradeexisting traffic signals, Install left turn arrows, a two way centerleft turn lane, new signs and drainage.

$3.9M NonePIN 004202- NY Route 25 Rehabilitation let inMarch, 2008.

25 07041216 25 07041220 Smithtown Blvd.-High View Drive

Replace pavement markings, remove offset left turn lanes,narrow lanes, install bike lanes, install new signs and rebuildand upgrade existing traffic signal, install pedestriancountdown timers and improve pedestrian facilities.

$.02M NonePIN 0T2344 Resurfacing to be scheduled. PIN080811 - Traffic Signal Requirements Let June 19,2008

REGION 10 -- Five Percent - Highway Segments/Intersections Exhibiting the Most Severe Safety Needs Year 2009

Page 14 of 22

Page 15: 2009 5% NYS DOT Report (Most Dangerous Roads in NY)

ReferenceMarker

ReferenceMarker

Location Potential RemediesEstimated

CostsImpediments to Implementation Comments

Begin End

REGION 10 -- Five Percent - Highway Segments/Intersections Exhibiting the Most Severe Safety Needs Year 2009

25A07031184 25A07031190NY Route 25A - Elliot Place-Bellemeade Avenue

Install countdown timers, add Leading Pedestrian Intervalsand improved pedestrian facilities. Install Yield to Pedestriansigns and replace worn or missing signs, install guide signsand add Route junction signs. SafeSeniors Pilot ProjectLocation.

$.02M NonePIN 080811 - Traffic Signal Requirements Let June2008 under D080828 - Durable Pavement markingsLet in February 19, 2009.

27 03041026 27 03041031Reyam Road - HempsteadAvenue/Atlantic Avenue

Replaced pavement markings, installed LED signalindications, and re-timed traffic signals. Restricted NB & SBleft turns on Peninsula Blvd. at Route 27 and installedsouthbound Signal Ahead sign.

$0.2M NonePIN 0808.03 - Durable Pavement Markings Let inJanuary 2008. D260721. PIN 080734 - Traffic Signalrebuilt in 2006.

27 03041075 27 03041080NY Route 27 - Bergen Place toNewton Blvd.

Will conduct Highway Safety Investigation to determineappropriate treatment.

$0.05M NonePIN 080565-Highway Safety Investigation StudiesD015485.

27 03041082 27 03041084 Helen Avenue-Liberty AvenueWill conduct Highway Safety Investigation to determineappropriate treatment.

$0.6M NonePIN 080565 - Highway Safety Investigation StudiesD015485

106 03011011 106 03011014NY Route 106 - Jerusalem Roadto Amhurst Street

Improve pavement surface, signs, and pavement markings aspart of a Capital Improvements

$0.30M NonePIN 080565-Highway Safety Investigation StudiesD015485. PIN 080775-Emergency Highway andBridge Repair Contract resurfacing completed.

106 03011049 106 03011058Albany Street-Route 106/Route107 Overlap

Install countdown timers and improve pedestrian facilities.Install and replace signs.

$0.1M NonePIN 080811 - Traffic Signal Requirements Let June2008.

107 03011083 107 03011096 Nevada Street-Route 25

Replaced overhead guide signs, installed pavement markingsfor northbound NY Route 107 to eastbound I-495. Rebuiltsignals at Nevada Street. Added countdown pedestrian timersat Burke Avenue. Improved pavement markings.

$0.5M None

PIN 080811 - Traffic Signal Requirements Let June2008, PIN 080828 - Durable Pavement Markings Letin February 2000. PIN 08052-Guide SignRequirements Let April 2006; ConstructionCompleted May 2008.

110 07011013 110 07011017Washington Avenue - PartheyLane

Improved pavement surface, signs, and pavement markingsas part of a Capital Improvement Project.

$1.5M NonePIN 011254 - Resurfacing project Let in January2007. Construction completed June 2008.

110 07011027 110 07011029Southern State Parkway(SSP) -Main Street/Great Neck

Resurface roadway, replace pavement markings and improvepedestrian facilities.

$0.2M None PIN 0T2344 Resurfacing to be scheduled.

Page 15 of 22

Page 16: 2009 5% NYS DOT Report (Most Dangerous Roads in NY)

ReferenceMarker

ReferenceMarker

Location Potential RemediesEstimated

CostsImpediments to Implementation Comments

Begin End

REGION 10 -- Five Percent - Highway Segments/Intersections Exhibiting the Most Severe Safety Needs Year 2009

110 07011077 110 07011079Route 495 South Service Road -Route 495 North Service Road

Total rehabilitation as part of upcoming Capital ImprovementContract. Project will resurface roadway, rebuild and upgradeexisting traffic signals, extend turning lanes, install new signs,drainage, and curbing.

$29.0M NonePIN 011254 - NYRoute 110 & I-495 InterchangeImprovements Let in March 2009.

111 07011039 111 07011041Brightside Street - GlenmoreAvenue

Total rehabilitation as part of upcoming Capital Improvementcontract. Project will widen and resurface roadway, rebuild andupgrade existing traffic signals, install new signs, drainage,center medians, and curbing.

$1.4M NonePIN 007710 - Route 111 Rehabilitation Let inFebruary 2009.Public hearing held in May 2007.

111 07011054 111 07011056NY Route 111-Central Avenue toI- 495

Install Raised Island, improve signage and intersectionimprovements

$0.3M NonePIN 080811 - Traffic Signal Requirements Let June2008-080828 - Durable Pavement Markings Let inReb 2009.

111 07011072 111 07011074 NY Route111 at NY Route 347

Total rehabilitation as part of an ongoing Capital ImprovementContract. Project will widen and resurface roadway, rebuildand upgrade existing traffic signals, install new signs,drainage, center medians and curbing.

$31.0M NonePIN 005408 - NY454 to NY111 Roadway wideningImprovements to be Let in February 2010.

112 07011042 112 07011044 Route I-495 - Horse Block Road

Total reconstruction as part of upcoming Capital ImprovementContract. Project will widen and resurface roadway, rebuildand upgrade existing traffic signals, install new signs,drainage, center medians, and curbing.

$3.7M NonePIN 001620 - Route 112 Reconstruction to be let infive year Capital Program.

112 07011119 112 07011122 Rose Lane-Wyckoff Avenue

Total rehabilitation as part of upcoming Capital ImprovementContracts. Projects will resurface roadway, rebuild andupgrade existing traffic signals, install new signs, anddrainage.

$4.0M NonePIN 001621 Reconstruct Old Town Road to PineRoad and NY Route 347 to NY Route 25A. LetMarch 2009.

347 07011084 347 07011086NY Route 347-Nicholls Road toPond Path

Total reconstruction as part of programmed CapitalImprovement Contract. Project will construct bridge andinterchange on NY Route 347 at CR 97, resurface road,remove traffic signal, install signs, drainage, center medians,and curbing. Will conduct Safety Investigation to determineappropriate treatment.

$60.9M None

PIN 005412-Construct bridge and interchange at CR97 (Nicholls Road). To be Let in February 2018. PIN080565 - Highway Safety Investigation StudyD015485.

347 07011122 34707011126NY Route 347-Terryville Road toRoute 112

Total rehabilitation as part of an ongoing Capital ImprovementContract. Project will widen NY Route 112 at NY route 347,interconnect signals, and resurface intersection, rebuild andupgrade existing traffic signal, install new signs, curbing andsidewalk, trim trees, install pavement markings and replacesigns.

$0.5M NonePIN 001621 NY Route 112 Old Town Rd to PineRoad and NY 347 to NY25A. Let in March 2009.

Page 16 of 22

Page 17: 2009 5% NYS DOT Report (Most Dangerous Roads in NY)

ReferenceMarker

ReferenceMarker

Location Potential RemediesEstimated

CostsImpediments to Implementation Comments

Begin End

REGION 10 -- Five Percent - Highway Segments/Intersections Exhibiting the Most Severe Safety Needs Year 2009

495 03021103 495 03021108Route 25- Routes 106/107 (Exits40-41)

Segment was resurfaced and pavement markings refurbishedunder completed project.

$1.3M NonePIN 022923 - I-495 Resurfacing Exit 40-43 & 49-52.Let March 2006 and construction completed June2009.

878 03021013 878 03021023NY Route 878 - Penn Blvd.Extension to Central Avenue

Traffic signals rebuilt with lane assignment modificationsproviding left turn lanes and protected/permissive left turnphases at Central Avenue and Broadway.

$0.5M NonePIN 080811 - Traffic Signal Requirements Let June2008.

908E03011062 908E03011072Meadowbrook State Parkway(MSP) at Southern StateParkway (SSP) (Exit M6)

Ramp improvements as part of upcoming CapitalImprovement Project. Project will replace bridge at JerusalemAvenue to provide ramp extensions on Meadowbrook StateParkway. Aggressive Driving Campaign Corridor.

$21.0M

Full Interchange reconstruction evaluated,however, due to environmental concerns andproximity of residential properties, it wasconsidered to be unfeasible.

PIN 052323 - Jerusalem Avenue/MSP Bridge Repair& Ramp Improvements. Let in May 2011. Willcontinue to work with NYS Police to conductTargeted Enforcement for Aggressive Driving.

908E03011087 908E03011092Meadowbrook State Parkway(MSP) at Route 24

Improvements as part of a Capital Construction Project thatinstalled an acceleration lane from MSP to NY Route 24. TheCapital Construction Project cleaned and repaired drainagesystem. Aggressive Driving Campaign Corridor.

$0.7M

Total interchange reconstruction evaluated,however, due to environmental concerns, costand proximity of commercial properties, it wasconsidered to be unfeasible.

PIN 052320 Rehabilitation Let January 2006 andconstruction completed October 2007. PIN 0T1431Resurfacing to be scheduled. Will continue to workwith NYS Police to conduct Targeted Enforcementfor Aggressive Driving.

908E03011111 908E03011120

Meadowbrook State Parkway(MSP) from Zeckendorf Blvd.(Exit M2) - Old Country Road(Exit M1)

Improve pavement surface, signs, and pavement markings aspart of a Capital Improvement Project. Increased Enforcementas part of an Aggressive Driving Campaign Corridor.

$1.5M

Interchange reconstruction evaluated, however,due to environmental concerns and proximity ofresidential properties, it was considered to beunfeasible.

PIN 080757 - Durable Pavement Markingscompleted in June 2007. PIN 052326 - MSP ITS letin September 2005.

908G03011002 908G03011008Northern State Parkway (NSP) atLakeville Road (Exit 25)

Improved pavement surface, signs, and pavement markingsas part of a Capital Improvement Project.

$1.5M

Interchange reconstruction evaluated, however,due to environmental concerns and proximity ofresidential properties, it was considered to beunfeasible.

PIN 053468 - NSP Resurfacing let in December2006 and construction completed October 2007.

908G03011116 908G03011126Northern State Parkway (NSP)from Broadway (Exit 35) -Eastbound ramp from Route 495

Northbound 107 ramp to eastbound NSP increase the lengthof ramp and increase taper. Ramp improvements, improveddrainage and improved Clear Zone.

$5.2M

Total interchange reconstruction evaluated,however, due to environmental concerns andproximity of commercial properties, it wasconsidered to be unfeasible.

PIN 080782 Safety and Pavement Standby ContractResurfacing I-495 to NY Route 908G connectorramp. Pin 051648 Drainage Rehabilitation ContractLet February 2006. Construction completed.

908M03011036 908M03011038Southern State Parkway (SSP)at Hempstead Avenue (Exit 17)

Improve pavement surface, signs, and pavement markings aspart of a Capital Improvement Project. IncreasedEnforcement. Aggressive Driving Campaign Corridor.

$0.5M

Interchange reconstruction evaluated, however,due to environmental concerns and proximity ofresidential properties, it was considered to beunfeasible.

PIN 053469 - SSP Resurfacing let in March 2007and construction completed in September 2008.Will continue to work with NYS Police to conductTargeted Enforcement for Aggressive Driving.

908M03011047 908M03011050Southern State Parkway (SSP)at Eagle Avenue (Exit 18)

Improved pavement surface, signs, and pavement markingsas part of a Capital Improvement Project. IncreasedEnforcement. Aggressive Driving Campaign Corridor.

$0.5M

Interchange reconstruction evaluated, however,due to environmental concerns and proximity ofresidential properties, it was considered to beunfeasible.

PIN 053469 - SSP Resurfacing let in March 2007.Construction Completed In September 2008. Willcontinue to work with NYS Police to conductTargeted Enforcement for Aggressive Driving.

Page 17 of 22

Page 18: 2009 5% NYS DOT Report (Most Dangerous Roads in NY)

ReferenceMarker

ReferenceMarker

Location Potential RemediesEstimated

CostsImpediments to Implementation Comments

Begin End

REGION 10 -- Five Percent - Highway Segments/Intersections Exhibiting the Most Severe Safety Needs Year 2009

908M03011052 908M03011056Southern State Parkway (SSP)at Peninsula Blvd. (Exit19)

Improved pavement surface, signs and pavement markings aspart of a Capital Improvement Project. Increased Enforcement.Aggressive Driving Campaign Corridor.

$0.8M

Interchange reconstruction evaluated, however,due to environmental concerns and proximity ofresidential properties, it was considered to beunfeasible.

PIN 053469 - SSP Resurfacing let in March 2007.Construction completed in September 2008. Willcontinue to work with NYS Police to conductTargeted Enforcement for Aggressive Driving.

908M03011061 908M03011066Southern State Parkway (SSP)at Grand Avenue (Exit 20)

Improved pavement surface, signs, and pavement markingsas part of a Capital Improvement Project. IncreasedEnforcement. Aggressive Driving Campaign Corridor.

$1.0M

Interchange reconstruction evaluated, however,due to environmental concerns and proximity ofresidential properties, it was considered to beunfeasible.

PIN 053469 - SSP Resurfacing let in March 2007.Construction Completed In September 2008. Willcontinue to work with NYS Police to conductTargeted Enforcement for Aggressive Driving.

908M07021079 098M07021081Southern State Parkway (SSP) -Robert Moses Causeway (RMC)(Exit 40)

Improving pavement surface, signs, and pavement markingsas part of Capital Improvement Project currently underconstruction. Increased Enforcement. Aggressive DrivingCampaign Corridor.

$1.5M None

PIN 053470 Resurfacing Southern State Parkwayfrom NY Route 110 to Sagtikos Parkway. Let March2007. Completed August 2008. PIN 080806 SignStructure Repair Let April 2008. Will continue towork with NYS Police to conduct TargetedEnforcement for Aggressive Driving.

908M03011085 908M03011096

Southern State Parkway (SSP)from Meadowbrook StateParkway (MSP) (Exit 22) -Merrick Avenue (Exit 24)

Improving pavement surface, signs, and pavement markingsas part of an ongoing Capital Improvement Project Let in2007. Will extend and widen access ramps as part of anupcoming Capital Improvement Project scheduled for 2009.Increased enforcement. Aggressive Driving CampaignCorridor.

$16.6M

Full Interchange reconstruction evaluated,however, due to environmental concerns andproximity of residential properties, it wasconsidered to be unfeasible.

PIN 053471 - SSP Resurfacing let in December2007. Anticipated completion of construction August2009. PIN 052323 -SSP/MSP InterchangeImprovements to be let in May 2011. Will continueto work with NYS Police to conduct TargetedEnforcement for Aggressive Driving.

908M03011102 908M03011108

Southern State Parkway (SSP)from Bellmore Avenue toNewbridge Road (Exit 25A & 25)

Improving pavement surface, signs, and pavement markingsas part of a Capital Improvement Project currently underconstruction. Increased Enforcement. Aggressive DrivingCampaign Corridor.

$1.3M

Interchange reconstruction evaluated, however,due to environment concerns and proximity ofresidential properties, it was considered to beunfeasible.

PIN 053471 Resurfacing Let in February 2008.Anticipated completion of construction in August2009. Will continue to work with NYS Police toconduct Targeted Enforcement for AggressiveDriving.

908M03011117 908M03011127

Southern State Parkway (SSP)at Wantagh State Parkway(WSP) and Wantagh Avenue(Exit 27 & 28))

Improving pavement surface, signs, and pavement markingsas part of a Capital Improvement Project currently underconstruction. Increased Enforcement. Aggressive DrivingCampaign Corridor.

$0.7M

Interchange reconstruction evaluated, however,due to environmental concerns, cost andproximity of residential properties, it wasconsidered to be unfeasible.

PIN 053471 -Resurfacing Let in February 2008.Anticipated completion of construction in August2009. Will continue to work with NYS Police toconduct Targeted Enforcement for AggressiveDriving.

925C03011006 925C03011008

Union Turnpike at New HydePark Road

Replaced pavement markings as part of a Pavement MarkingContract.

$0.2M NonePIN 0808.03-Durable Pavement Markings letJanuary 2008. D260721 pavement markingscompleted September 2008.

Page 18 of 22

Page 19: 2009 5% NYS DOT Report (Most Dangerous Roads in NY)

ReferenceMarker

ReferenceMarker

Location Potential Remedies Estimated CostsImpediments toImplementation

Comments

Begin End

87IX1M11058 87IX1M11060Major Deegan Expwy (Northbound) -Ramps to and from W 230th St.

Provide a standard acceleration lane to the on-ramp from W. 230th St. Increase the length of exitramp from Major Deegan Expwy NB to W 230thStreet. Install advisory exit ramp speed sign andcurve warning sign with advisory speed limit sign.

$18.0 M

Providing a standard accelerationlane will necessitate widening of theroadway including reconstruction ofthe retaining wall next to AlbanyCrescent. Providing standarddeceleration lane will necessitatewidening the existing W. 225th St.bridge.

Highway safety investigation was completed in 2009. Regionwill prepare work order for the sign installation.

87IX1M12047 87IX1M12049Major Deegan Expwy (Southbound)- Between on and off ramp to westFordham Road

Install advisory ramp speed sign for Exit 9.Improve signal timing at the end of the exit rampto improve traffic flow. Provide a standarddeceleration lane to Exit 9 "W Fordham Road,University Heights BR". Provide a standardacceleration lane for entrance ramp from W.Fordham Road.

$18.0 M

Providing standard acceleration anddeceleration lane will necessitatereconstructing the existing retainingwall, the W. Fordham bridgeoverpass and will have an adverseeffect on the adjacent local streets.

Region will prepare work order for signs installation. Requestwill be forwarded to NYCDOT for the signal timingimprovement.

95IX1M21000 95IX1M21019Cross Bronx Expwy (Northbound) -Alexander Hamilton Bridge to CrotonaAvenue

Improve lighting & signing. Repair deterioratedpavement. Increase the length of weavingsegment between the entrance ramp fromWashington Bridge and exit ramp to Jerome Ave.Provide a standard acceleration lane for theentrance ramp from Jerome Ave. Provide astandard acceleration lane for the entrance rampfrom Major Deegan Expressway. Providestandard deceleration lane to Webster Ave (Exit2B). Provide a standard acceleration lane for theentrance ramp from Third Ave.

$110.0 MRamps are closely spaced, anyimprovement at one location willadversely affect other locations.

PIN X726.97-1 - Lighting & Signing Project- will improvelighting and signing - Completion Date schrduled - 4/30/2010;PIN X 727.06 - Cross Bronx Expwy Resurfacing- will improvethe riding condition and delineation- Letting (11/16/2012).

95IX1M21071 95IX1M21073Cross Bronx Expwy (Northbound) -Westchester Avenue overpass toPelham Pkwy underpass

Improve capacity and operational constraints.Replace faded pavement markings. Improveguide signs.

$11.0 Mtotal project cost

None

PIN X 726.97-1 - Lighting and Signing Project - Completiondate - 4/20/2010; PIN X731.27 - Bruckner Expressway FourthLane Implementation Project will address the capacity issuesand operational improvements. Letting scheduled 4/19/2016.

278IX2M23063 278IX2M23064Gowanus Expwy (Eastbound) -Off ramp to Hamilton Avenue to 4thPlace.

Improve guide sign at exit 25. Install advanceguide sign on the Gowanus Expwy for theBrooklyn Queens Expwy and Brooklyn BatteryTunnel split. Construct an additional lane tochange the two lane BQE connector to three.Construct an auxiliary lane between the ProspectExpressway entrance ramp and the exit ramp tothe Brooklyn Battery Tunnel.

$151.0 Mtotal project cost

Community opposition to adding alane to change the two lane BQEconnector to three lanes.

PIN X731.10 - Gowanus Emergency Repairs - activeconstruction. An Environmental Impact Statement is currentlybeing prepared to develop long term solutions to the currentdeficiencies on Gowanus Expressway.

REGION 11 -- Five Percent - Highway Segments/Intersections Exhibiting the Most Severe Safety Needs Year: 2009

Page 19 of 22

Page 20: 2009 5% NYS DOT Report (Most Dangerous Roads in NY)

ReferenceMarker

ReferenceMarker

Location Potential Remedies Estimated CostsImpediments toImplementation

Comments

Begin End

REGION 11 -- Five Percent - Highway Segments/Intersections Exhibiting the Most Severe Safety Needs Year: 2009

278IX2M23071 278IX2M23075Brooklyn Queens Expwy(Eastbound) - Kane Street to Rampfrom Atlantic Ave

Replace faded pavement markings. Installwarning and guide signs. Provide a standarddeceleration lane to Atlantic Ave exit ramp.Provide a standard acceleration lane for theentrance ramp from Atlantic Ave. Improve sightdistance before the entrance ramp from AtlanticAve.

$232.0 Mtotal project cost

Entrance ramp from Atlantic Ave toBQE eastbound is an elevatedsection of highway. Implementationof proposed improvements willnecessitate a major reconstruction,that will realign the Expressway.Needs coordination with variousNew York City Departments.

Region will issue work order for the short term improvements,which will include installation of pavement markings, warningand guide signs. Operational and capacity improvements willbe considered under PIN X730.56 - BQE CantileverReconstruction (Letting:7/15/2017)

278IX2M24070 278IX2M24075Brooklyn Queens Expwy(Westbound) - Kane Street to AtlanticAvenue

Install speed limit and curve warning signs.Provide a standard acceleration lane for theentrance ramp from Columbia Street or installmodified ramp metering at the entrance rampfrom Columbia Street. to BQE.

$36.0 M

Entrance ramp from Columbia Streetto BQE westbound is a depressedsection of highway with continuousretaining wall on both sides,constructing a standard accelerationlane will necessitate a majorreconstruction, including relocationof the bridge abutments located atCongress Street and Kane Street.May require displacement ofresidents along Congress Street.

Possibility of installing ramp metering for the entrance rampfrom Atlantic Avenue to BQE W/B is being discussed withNYCDOT. PIN X730.56 - BQE Cantilever Rehab- Atlantic Aveto Sands Street (Letting schedule 7/15/2017)

278IX5M33017 278IX5M33019Brooklyn Queens Expwy(Eastbound) - Off ramp to QueensBlvd/65th Pl to Queens Blvd Overpass

Provide a standard deceleration lane to 65thPlace/Queens Blvd. Provide a standardacceleration lane for entrance ramp from QueensBlvd.

$18.0 M

Possible community opposition,because reconstruction of the areawill adversely affect local roads andcommunities.

PIN X730.53- BQE reconstruction project from 61st Street toBroadway - Under this project, this section of the roadwaywas resurfaced and restriped in 2008.

278IX5M34005 278IX5M34007Brooklyn Queens Expwy(Westbound) - 54th Avenue to Offramp to Long Island Expwy (I-495).

Repair deteriorated pavement. Replace fadedpavement markings. Improve traffic operations byrelocating the lane drop westward of the exit toLong Island Expressway.

$0.10 M None

Region will investigate the feasibility of relocating the lanedrop westward of the exit to LIE and prepare work order toreplace the faded pavement markings. Kosciuszko/NewtonCreek Bridge replacement project will improve trafficoperations on the BQE through the addition of auxiliary lanesconnecting the LIE entrance ramp with Meeker Avenue exitramp.

278IX6M13074 278IX6M13078Staten Island Expwy (Eastbound) -Grasmere Drive to VerrazanoNarrows Bridge (VNB).

Improve capacity and operational constraints atVNB toll plaza. Relocate the exit ramp from LilyPond Ave to Fingerboard Road. Construct newentrance ramp from Steuben Street - Hylan Blvd.Provide an auxiliary lane with standard shoulderbetween Steuben Street - Hylan Blvd and theramp to Verrazano Narrows Bridge lower level.

$26.0 M None

Improvements will be implemented under PIN X731.30 -Staten Island Expwy Access Improvement project. Lettingscheduled October 2009. Half of the section (from Lily pondAve to VNB) is under MTA jurisdiction. MTA has a projectthat will address work within their jurisdiction.

Page 20 of 22

Page 21: 2009 5% NYS DOT Report (Most Dangerous Roads in NY)

ReferenceMarker

ReferenceMarker

Location Potential Remedies Estimated CostsImpediments toImplementation

Comments

Begin End

REGION 11 -- Five Percent - Highway Segments/Intersections Exhibiting the Most Severe Safety Needs Year: 2009

495IX5M14095 495IX5M14097Long Island Expwy (Westbound) -Fresh Meadow Lane to Off ramp toUtopia Blvd.

Install warning and guide signs. Improve sightdistance.

$18.0 M

Reconstruction of the roadway thatincludes improving the vertical curveand realignment of the roadway willadversly impact Utopia Parkway.

Region will prepare work order for the sign installation.

678IX5M11021 678IX5M11032Van Wyck Expwy (Northbound) -Liberty Avenue to On-ramp fromJamaica Avenue/Hillside Avenue

Close the Liberty Avenue entrance ramp toeliminate the merging between the on-ramp trafficfrom Liberty Avenue and off-ramp traffic toAtlantic Avenue. Close the Jamaica Avenue exitramp to increase the acceleration lane for trafficfrom Atlantic Avenue and to eliminate the weavingbetween the entrance and exit ramps.

$0.04 M

Possible community opposition toclosing either of these two ramps.Jamaica Hospital opposed closingthe exit ramp to Jamaica Ave.

JFK Expressway initiative by NYCEDC proposed temporaryclosure of Jamaica Avenue exit.

678IX5M12029 678IX5M12033Van Wyck Expwy (Southbound) -89th Avenue to 86th Avenue

Install warning signs, modify pavement markingsand relocate existing guide sign for AtlanticAvenue further north.

$0.10M None

Region issued work order for installing warning signs andpavement markings. Guide sign will be relocated under PINX735.25 - Kew Gardens interchange reconstruction, contract#2 . Letting schedule 2/3/2011.

907AX5M22100 907AX5M22101Cross Island Pkwy (Southbound) -Exit and entrance ramps to and fromHempstead Turnpike

Provide a standard deceleration lane toeastbound Hempstead Turnpike and a standardacceleration lane from westbound HempsteadTurnpike. Close the Exit Ramp to Belmont RaceTrack.

$12.0 M

This roadway is under NYCDOTjurisdiction. Providing a standarddeceleration lane to EB HempsteadTurnpike will necessitate widening ofHempstead Turnpike Bridge.

Highway safety investigation was completed in 2009. Regionwill forward the investigation findings, including the proposedimprovements to NYCDOT.

907CX2M13053 907CX2M13055Shore Pkwy (Eastbound) -Off-ramp to Bay Parkway to BayParkway underpass

Relocate/Reconfigure the parking area furtherwest to eliminate the unsafe merging at the BayParkway intersection. Reconstruct the roadway toimprove the limited sight distance caused by thevertical and horizontal curves in the roadway.

$18.0 M

This roadway is under NYCDOTjurisdiction. Realigning vertical andhorizontal curve will necessitate amajor reconstruction, includingrealignment of the roadway and theBay Parkway Bridge. This willadversely impact the alignment ofBay Parkway.

Highway safety investigation was completed in 2008. Regionwill forward the investigation findings, including the proposedimprovements to NYCDOT.

907DX5M23051 907DX5M23053Belt Pkwy (Eastbound) -Off ramp to Farmers Blvd to Off rampto Springfield Blvd

Provide a continuous auxiliary lane between theon-ramp from JFK Expressway and off-ramp toFarmers Blvd. by restriping. Provide a standarddeceleration lane to Exit 22, Springfield Blvd.

$18.0 M

This roadway is under NYCDOTjurisdiction. Providing a standarddeceleration lane to Springfield Blvd.will necessitate widening of FarmersBlvd. Bridge.

Highway safety investigation was completed in 2008. Regionwill forward the investigation findings, including the proposedimprovements to NYCDOT.

Page 21 of 22

Page 22: 2009 5% NYS DOT Report (Most Dangerous Roads in NY)

ReferenceMarker

ReferenceMarker

Location Potential Remedies Estimated CostsImpediments toImplementation

Comments

Begin End

REGION 11 -- Five Percent - Highway Segments/Intersections Exhibiting the Most Severe Safety Needs Year: 2009

907HX1M12009 907HX1M12014Bronx River Pkwy (Southbound) -Off-ramp to I-95/George WashingtonBridge to Morris Park Avenue

Provide a standard deceleration lane and improvevertical sight distance at the E 177th Street exit.

$8.0 M

To improve the deceleration laneand sight distance, roadway andbridge has to be widened, includingbridge over Amtrak.

Some operational constraints will be improved under PINX110.19 - Bronx River Parkway Rehabilitation of four bridgesLetting scheduled 6/14/2014.

907MX5M13076 907MX5M13082Grand Central Pkwy (GCP)(Eastbound) - 76th Road to Off-rampto EB Union Turnpike

Improve capacity and operational constraints.Improve sight distance along the horizontal curve.Provide a standard deceleration lane to UnionTurnpike (Exit 14). Construct an additional travellane for southbound VanWyck Expressway.Install warning and guide signs. Replace fadedpavement markings.

$64.0M None

Region implemented short term improvements, whichincludes signing and pavement striping. PIN X735.75 KewGardens interchange reconstruction, Contract #2. LettingScheduled 2/3/2011, PIN X051.60 - Kew GardensInterchange/Jackie Robinson Parkway/GCP InterchangeReconstruction-Contract #3, letting scheduled 6/10/2015, willimprove operational and capacity constraints.

907MX5M14076 907MX5M14086Grand Central Pkwy (GCP)(Westbound) - 76th Drive to MainStreet

Replace faded pavement markings. Installwarning signs. Repair deteriorated pavement.Provide standard acceleration lanes for the UnionTurnpike entrance ramp and the Van Wyckconnector ramp to Grand Central Pkwy. Improvecapacity at Jackie Robinson Parkway (JRP)/GCPsplit. Improve the horizontal alignment.

$45.0 M None

Region implemented short term improvements, whichincludes signing and pavement striping. PIN X051.60 - KewGardens Interchange/JRP/GCP Interchange Reconstruction-Contract #3,letting scheduled 6/10/2015, will implementoperational and capacity improvements.

908BX2M13000 908BX2M13002

Jackie Robinson Pkwy (JRP)(Eastbound) - Jamaica Avenue to On-ramp from Highland Blvd./BuschwickAvenue

Reconfigure intersection at the parkway entranceand Jamaica Avenue. Restripe faded pavementmarkings. Install merge arrow pavement symbols.

$0.50 MThe area where most of theimprovements are proposed is underNYCDOT jurisdiction.

Region will issue work order for pavement markings andcoordinate with NYCDOT.

Page 22 of 22