2009 BOND PROPOSAL

Allen Independent School District

Project Kids Committee

Board appointed citizen’s committee that studied long range facility and technology needs

Project Kids proposed 56 projects and prioritized their need as critical, high or desired

Board identified all critical needs projects to be included in the November 2008 bond proposal

Board held auditorium, stadium and service center for May election

2009 BOND PROPOSAL

Allen High School Auditorium Proposal

Bond Proposal for 2009

Existing Facilities: Auditorium Seating Capacity : 672 or less

Located at Lowery Freshman Center

Original lights and sound

Facility hosts over 100 events year

Requires bussing students for rehearsals

Over 3000 students enrolled in Allen ISD fine arts programs (Grades 6-12)

Bond Proposal for 2009

Construction of New Auditorium 1,500 seat, 75,000 sq. ft. auditorium

Built at northeast corner of AHS

Tie into new career technology wing

Features would include:

Orchestra pit

Ticket booth and concessions

Modern sound and lighting systems

Set construction and storage areas

Estimated Cost- $23.3 million (Open Dec. 2011)

Bond Proposal for 2009

New Auditorium Details 75,000 sq. ft. auditorium

Paved & landscaped entry w/ lighting

1,000 seats at orchestra level and 500 mezzanine level

Gallery exhibition space

Open sound booth

Spotlight room

Ticket booth

Costume / prop & dressing rooms

Offices & conference room

Allen ISD Auditorium

Rendering – PBK Architects

2009 BOND PROPOSAL

Allen ISD

Multipurpose Stadium Proposal

Bond Proposal for 2009

Existing Facilities: Eagle Stadium

Permanent Seating Capacity 7,200

Temporary / Leased Bleachers 7,000

Annual lease cost of $225,000

Reserved seating capacity 4,200 Includes band section of approx. 1000 seats

Bond Proposal for 2009

Eagle Stadium Current Usage

5-6 varsity football games

9 junior varsity football games

11 freshman football games

2 Allen Sports Assn. football playoffs

12 Special Olympics Track & Field

Bond Proposal for 2009

Multipurpose Stadium 18,000 seat stadium

9,000 – home; 4,000 – student; and 5,000 visitor seating

Built at Exchange Parkway & Rivercrest on existing HS property

Includes wrestling rooms & locker room under bleachers

Improved sound, scoreboard, press box, concession and restroom facilities

Estimated Cost- $59.6 million

(Open Aug. 2012)

Bond Proposal for 2009

Multipurpose Stadium Details Entries at each corner of stadium

Concrete structure seating

Covered open air concourse on home side

Ticket booths at each corner of stadium

Concessions at each corner of stadium

18” standard seating, 21” backed reserved seating (5,000 seats)

Open film deck at press box

Dual purpose home-side lockers

Wrestling & playoff game dressing area

Golf practice area with netting

Wrestling room and office area

Bond Proposal for 2009

Multipurpose Stadium Usage

Football games – all levels

UIL Marching Band competitions

Soccer & football playoff host

Practice for football, wrestling, soccer, golf, lacrosse

Community gatherings, concerts

Allen ISD Multipurpose Stadium

Allen ISD Multipurpose Stadium

Rendering – PBK Architects

Bond Proposal for 2009

Allen High School

2009 BOND PROPOSAL

Transportation,

Maintenance &

Student Nutrition

Center

Bond Proposal for 2009

Existing Facilities: Service Center Existing Property on Butler Drive

6.3 acres

Shared fuel facility with City of Allen

Parking for 36 busses on site

Parking for 48 busses off site at Allen HS

Parking for 20 district vehicles

Parking for 150+ employees off-site

34,000 sq. ft. service center

Bond Proposal for 2009

Service Center & Warehouse 131,000 sq. ft. facility

Parking for 120+ school busses

Bus maintenance facility & offices

Allen ISD warehouse and distribution facility

Maintenance shops & offices

Student Nutrition bulk storage

Secure test material storage

Estimated Cost- $36.5 million (Open Dec. 2014)

Bond Proposal for 2009

Service Center Details 55 acre site

Concrete paving for large vehicle traffic

Employee and visitor parking (200)

Fuel station with two 14,000 gallon diesel tanks and one 4,000 unleaded tank

Drive through bus wash

Space allocated for expansion

Allen ISD Service Center

Rendering – PBK Architects

Allen ISD Facility History

School Opened Age

Lowery Auditorium 1982 27

Eagle Stadium 1976* 33

*Addition in 1987

Service Center 1982 27

What Is The Tax Impact

Of This Bond Proposal

If approved – would increase the debt service rate by .02 Impact of two cent increase

$100,000 home = $20 per year or $1.67 per month

$200,000 home = $40 per year or $3.34 per month

Cannot be higher due to state cap of 50 cents on debt service rate

Allen debt service rate is currently .4303. This will increase as bonds of 2008 are sold

Tax Impact Of 2009

Bond Proposal

Year M&O Debt Total

05-06 1.5000 0.4125 1.9125

06-07 1.3700 0.4051 1.7751

07-08 1.0400 0.4303 1.4703

08-09 1.0400 0.4303 1.4703

09-10* 1.0400 0.5000 1.5400

10-11* 1.0400 0.5000 1.5400

* Projections

What If Bond Issue Is

Rejected By Voters?

Would delay or cancel the three proposed projects

Results will not impact 2008 bond projects

Based on growth projections, students and community would continue to use facilities that were not designed for the current usage or attendance

Bond Election Summary

Bond election for $119 million to build an auditorium, maintenance and transportation service center and a stadium

Early voting begins April 27

Election day is Saturday May 9