2010-2012 unified planning work program
DESCRIPTION
2010 - 2012 UPWPTRANSCRIPT
Unified Planning Work Program
State Fiscal Years
2010-2012
GREATER BUFFALO-NIAGARAGREATER BUFFALO-NIAGARA
GBNRTCGBNRTC
State Fiscal Years 2010-2012
Unified Planning Work Program
GREATER BUFFALO-NIAGARA
REGIONAL TRANSPORTATION COUNCIL
April 1, 2010 – March 31, 2012
This report was prepared in part with the financial assistance of the U.S. Department of
Transportation. However, the contents represent only the view of the authors and do not
necessarily reflect the review or approval of the U.S. Department of Transportation.
TABLE OF CONTENTS
EXECUTIVE SUMMARY ................................................................................................. i
Unified Planning Work Program Purpose .................................................................. i
Funding for Planning Activities .................................................................................... i
Other Federal and State Funds ................................................................................... i
Metropolitan Planning Organization Member Agencies .......................................... i
UPWP Framework for State Fiscal Years 2010-2011 and 2011-2012 ................ ii
UPWP Format ................................................................................................................v
Funding Tables...............................................................................................................v
I. PROGRAM SUPPORT AND ADMINISTRATION (44.21.00) ...............................1
I. A. Program Support Task..........................................................................................1
I. B. Information Systems Services Task ...................................................................1
I. C. Unified Planning Work Program (UPWP) Administration Task .....................2
II. GENERAL DEVELOPMENT AND COMPREHENSIVE PLANNING PROJECT
(44.22.00) ...........................................................................................................................3
II. A. Transportation System Planning Task ..............................................................3
II. A. 1. Highway Systems Subtask .........................................................................3
II. A. 2. Transit Systems Subtask .............................................................................3
II. A. 3. System Performance Measures Baseline Data Subtask .......................4
II. A. 4. Pedestrian/Bicycle Systems Subtask ........................................................4
II. A. 5. Freight Movement and Global Integration Subtask ................................5
II. B. Demographics Database Development and Maintenance ............................6
II. C. Travel Demand Forecasting Task .....................................................................6
II. D. Geographic Information Systems (GIS) Development Task .........................7
II. E. Statewide Initiatives Task ....................................................................................7
III. LONG RANGE TRANSPORTATION PLANNING PROJECT (44.23.00) ......12
III. A. Long Range Transportation Planning- Systems Level Task (44.23.01) ..12
III. A. 1. Long Range Plan Development Subtask ..............................................12
III. A. 2. Clean Air/Energy Planning Subtask .......................................................12
III. B. Long Range Transportation Planning- Project Level Task (44.23.02) .....13
III. B. 1. Transportation Corridor/Sub-Area Studies Subtask ............................13
III. B. 2. BiNational Strategies and Cross Border Planning Subtask ...............15
IV. SHORT RANGE TRANSPORTATION PLANNING PROJECT (44.24.00) ...16
IV. A. System Management Program Task ............................................................16
IV. A. 1. Signal Systems Coordination Project ....................................................16
IV. B. 2. Congestion Management Process .........................................................16
IV. B. 3. Areawide Demand Management ............................................................16
IV.B. Localized Analyses and Planning Task .........................................................17
V. TRANSPORTATION IMPROVEMENT PROGRAM (44.25.00) ........................19
V. A. TIP Administration and Project Monitoring Task .........................................19
VI. PLANNING EMPHASIS AREAS PROJECT (44.26.00) ...................................19
VII. OTHER ACTIVITIES TASK (47.27.00) ...............................................................21
VII. A. Integration of Planning/Environmental Processes ....................................21
i
EXECUTIVE SUMMARY
Unified Planning Work Program Purpose
The SFY 2010-2012 Unified Planning Work Program (UPWP) describes the planning activities of the Greater Buffalo-Niagara Regional Transportation Council (GBNRTC) in Erie and Niagara Counties. GBNRTC is the Metropolitan Planning Organization (MPO) for the Greater Buffalo-Niagara Region. Developed biannually, in cooperation with federal, state and local agencies, the UPWP provides a comprehensive view of short and long-range transportation planning activities. Designated by the Governor of the State of New York, GBNRTC has the responsibility to perform the continuous, comprehensive, and cooperative planning process for the region. The UPWP identifies the transportation planning activities that are to be undertaken in support of the vision, goals, objectives, and policies identified in the Long Range Plan 2030 adopted in January 2007.
Funding for Planning Activities
The most recent authorizing legislation, SAFETEA-LU, enacted on August 10, 2005 by the United States Congress and signed by the President, authorizes the MPO to receive Federal Highway Administration PL program funds in an amount set at one and a quarter percent of the funds authorized for the following programs:
Interstate Maintenance (IM); National Highway System (NHS); Surface Transportation Program (STP); Highway Bridge Replacement and Rehabilitation Program (HBRR); and Congestion Mitigation/Air Quality (CMAQ).
SAFETEA-LU also provides funding for transit planning based on 3 percent of the total amount
of transit funds provided to the region. Transit funding is administered by the Federal Transit
Administration, which allocates the funds to the states on behalf of the MPO.
Other Federal and State Funds
In addition to FHWA and FTA funds, other federal and state funded programs impact the transportation planning and decision-making process. Coordination with these activities is effected through the UPWP, with member agencies of the GBNRTC being either directly in-volved or part of regional and state review mechanisms. The following program is illustrative but not all inclusive of these other activities:
Federal Aviation Administration (FAA) funds are received for Aviation Facilities Planning;
Capital funds from the Congestion Management Air Quality (CMAQ) program for Demand Management and for Areawide Signalization Studies
Metropolitan Planning Organization Member Agencies
GBNRTC member agencies include the:
New York State Department of Transportation (NYSDOT); New York State Thruway Authority (NYSTA); Niagara Frontier Transportation Authority (NFTA); County of Erie; County of Niagara;
ii
City of Buffalo; and City of Niagara Falls.
Regional Strategic Stakeholders in the Planning and Coordinating Committee (PCC) include:
Seneca Nation of Indians Transportation Council of the Buffalo Niagara Partnership Empire State Development Corporation
UPWP Framework for State Fiscal Years 2010-2011 and 2011-2012
SAFETEA-LU and other Federal legislation (such as the 1990 Clean Air Act Amendments, the
Americans With Disabilities Act of 1990 and the 1994 Executive Order on Environmental
Justice), significantly influences the manner in which the cooperative, continuous and
comprehensive transportation planning process is administered. Eight planning factors are listed
in the SAFETEA-LU legislation and these factors provide a framework for transportation
planning and development in the region. These seven factors include:
1. Support the economic vitality of the United States, the States, and metropolitan areas,
especially by enabling global competitiveness, productivity, and efficiency.
2. Increase the safety of the transportation system for motorized and non-motorized users.
3. Increase the security of the transportation system for all users.
4. Increase accessibility and mobility options available to people and for freight.
5. Protect and enhance the environment, promote energy conservation, and improve quality
of life
6. Enhance integration and connectivity of the transportation system, across and between
modes throughout the state, for people and freight.
7. Promote efficient system management and operation
8. Emphasize the preservation of the existing transportation system.
Within the context of the eight planning factors, GBNRTC has identified five planning goals and
related objectives for improving the transportation system. Each goal represents a key issue
addressed within the framework of the Long Range Plan 2030. These goals are the primary
drivers for work activities planned by the GBNRTC.
The goals and associated objectives include:
Goal: The Buffalo-Niagara region will focus on transportation projects that preserve and enhance existing transportation facilities.
Objectives:
To achieve and maintain adequate pavement conditions on roadway facilities based on functional class.
To achieve and maintain adequate bridge conditions based on functional class.
To achieve and maintain adequate transit infrastructure and maintain the system vehicle fleet on a responsible replacement cycle.
iii
Goal: The Buffalo-Niagara region’s transportation system will improve user’s mobility and accessibility.
Objectives:
Create a more balanced transportation system than enhances modal choices.
Enhance mobility for all members of the community including the transportation disadvantaged.
Provide an integrated multi-modal transportation system which offers: the efficient and safe mobility of people, seamless and overlapping networks for goods movement, and a variety of accessible mode choices to regional activity sites.
Provide a regional system that will minimize delay times by implementing effective congestion relief techniques such as: transportation system management (TSM), transportation demand management (TDM), intelligent transportation systems (ITS) and selected linear capacity expansion projects emphasizing areas with existing infrastructure.
Emphasize the development of effective alternatives to single occupant vehicle (SOV) travel.
Enhancement of highway safety techniques, incident management plans, and access management techniques.
Promote increase security of transportation facilities and activities to increase the region’s ability to protect and respond to potential threats and hazards.
Goal: The Buffalo-Niagara region’s transportation system will improve the region’s economic competitiveness.
Objectives:
Improve the mobility of the transit dependent and low-income to employment opportunities.
Maintain the existing system to support existing and future development through the reuse of existing facilities and sites.
Provide transportation services to promote higher density urban redevelopment and infill development projects in, and adjacent to, existing neighborhoods.
Encourage the concentration of employment and activity sites within transit corridors to maximize transportation efficiency.
Promote the efficiency and the reliability of freight movement (truck and rail) within and through the region and improve multi-modal facilities and system connectivity to capitalize on growing international and trans-border trade opportunities.
iv
Correlate transportation investments to employment growth opportunity.
Focus transportation system improvements to support and promote tourism.
Goal: The Buffalo-Niagara region will plan and develop a transportation system that enhances and protects the region’s natural environmental quality, cultural and historic resources, and communities.
Objectives:
Enhance the attractiveness, convenience, safety and availability of non-motorized transportation systems.
Provide transportation services that not only mitigate adverse environmental impacts but also protect, enhance, and restore the environment.
Promote ways to reduce energy consumption.
Providing transportation services to those areas with existing infrastructure thereby limiting sprawl.
Goal: The Buffalo-Niagara region will achieve better inter-jurisdictional coordination of transportation and land use planning.
Objectives:
Promote consistency between transportation improvements and state and local planned growth and economic development patterns.
Coordinate the regional transportation plan with municipal plans. Ensure that all municipalities in the region have an adopted master plan (update) or set of planning tools for monitoring or directing physical and economic development in a regionally consistent manner.
Encourage mixed-use development with multi-modal transportation connections.
Encourage new development to integrate with existing land use and transportation patterns.
Support legislative efforts for “smart growth” initiatives that promote coordinated planning.
Integrate and strengthen transportation considerations with land use planning by incorporating a land use model within the transportation planning process.
Establish communication and an informational process with municipalities to emphasize the land use-transportation connection.
v
UPWP Format
This document is organized into seven chapters, each describing work tasks with specific concerns. These include:
Program Support and Administration; General Development and Comprehensive Planning; Long Range Transportation Planning;
Short Range Transportation Planning;
Transportation Improvement Program;
Planning Emphasis Areas
Other Activities
Funding Tables
Appendices one through three delineate the total UPWP funding program with respect to the following:
Appendix 1: Agency Participation and New Funding;
Appendix 2: A - Task and Auditable Budget by Participant, FHWA PL Funding Source;
B - Task and Auditable Budget by Participant, FTA Section 5303 Funding Source and Shared Cost Initiative Funding;
Appendix 3: A - Carryover FTA Planning Funds Resources;
B - Description of Other Funds Included in Program
C - National Highway System
1
I. PROGRAM SUPPORT AND ADMINISTRATION (44.21.00)
I. A. Program Support Task
Activities:
Support the function of the GBNRTC and designated subcommittees in
carrying out the multimodal transportation planning process. Includes
clerical, graphic, procurement, accounting and related support services to
maintain the process.
Comply with Title VI of the Civil Rights Act of 1964, the American with
Disabilities Act of 1990, and related statutes and implementing regulations;
to the end that no person shall on the grounds of race, color, national origin,
handicap, age, sex or religion be excluded from participation in, be denied
the benefits of, or be otherwise subjected to discrimination. To meet this
goal, GBNRTC has prepared an Affirmative Action Plan detailing agency
activities, which is revisited and reaffirmed with each recertification.
I. B. Information Systems Services Task
Activities:
Maintain agency information systems availability and upgrade hardware
based on an ongoing replacement schedule.
Acquire and deploy new software needed for daily administrative operations
of the GBNRTC as well as enhanced planning capabilities.
Manage email accounts and Internet DSL access for GBNRTC staff.
Provide hardware and software support for Geographic Information Systems
(GIS) to enhance our digital mapping capabilities and interface with other
agency systems and data. Further development of the GIS program is
described in Task II.
Provide hardware and software support for transportation modeling and
micro-simulation efforts using the TransCAD, TransModeler, Synchro,
CIMS and TranSIMS software packages.
Manage the GBNRTC website contract. Oversee website changes and
additions. Enhance website functionality by adding features and services as
needed for use by the public and member agencies.
Test new versions of hardware and software for compatibility before
deployment.
2
I. C. Unified Planning Work Program (UPWP) Administration Task
Activities:
Preparation of the UPWP and associated budget documentation, as well as
amendments as required.
Preparation of federal-aid applications by NYSDOT as the designated second
party to USDOT for planning funds.
Ensuring compliance with air quality, planning certification, and other
legislation. Contract support for NYSDOT climate change and MOVES
model integration.
Preparation of reimbursement billings and quarterly expense activity to report
in-kind services.
Preparation by the host agency of a Single Audit of GBNRTC Grant
Accounts.
Project management of the UPWP Tasks and preparation of project status
and performance summaries.
Preparing progress reports for all MPO activities, including work
performance of tasks and financial status of federal and non-federal ex-
penditures. These include previous year(s) active FTA planning grants.
Performing all required fiscal and accounting procedures such as quarterly
electronic data processing of expenditures by grant and task, including
consultant billings as required for management control purposes and for
inclusion in reports to the GBNRTC, state and federal agencies.
Provision of staff training and development.
GBNRTC membership and participation in recognized organizations, such as
the New York State MPO Directors Association and the Association of
Metropolitan Planning Organizations (AMPO). All NYS MPO’s FHWA-PL
allocations are adjusted to account for annual AMPO dues.
3
II. GENERAL DEVELOPMENT AND COMPREHENSIVE PLANNING PROJECT
(44.22.00)
II. A. Transportation System Planning Task
II. A. 1. Highway Systems Subtask
Activities:
1.a. Monitoring Program:
Annual monitoring of the highway system by taking automatic traffic recorder
(ATR) traffic counts on approximately 400 sample roadways to represent the
travel demand forecasting model network links. The network is based upon the
eligible federal-aid highway system in the Greater Buffalo-Niagara Region.
Inventory of the physical and operating characteristics and the structural, safety,
and capacity conditions of the metropolitan transportation system, which is
principally all roadway functional classifications down to and including urban
collector roadways. Data collection includes roadway characteristics needed to
calculate a bicycle level-of-service for each facility and local road conditions
where requested.
Manual intersection turning movement counts are conducted annually.
Approximately 100 counts are prepared each year. Additional individual counts
on the Federal-Aid system may be completed as needed. The task includes
verification of roadway characteristics and pedestrian movements. Speed and
delay analysis for the arterial-level roadway network is also conducted.
Vehicle classification is established on federal aid system. Every major system
roadway segment is monitored to provide the quantity of: single-trailer
combination trucks; multiple-trailer combination trucks; two-axle four-tire
vehicles; buses; and vehicles operating on an average day. Major truck route
designations will also be reviewed, and major problem areas identified for further
study.
Quantification of roadway operating and user characteristics to assess the
effectiveness of congestion management and single occupant vehicle (SOV)
reduction measures.
II. A. 2. Transit Systems Subtask
Activities:
2.a. Monitoring Program:
Transit ridership is monitored through NFTA’s Metro ridership count program
4
and is supplemented with additional counts conducted by GBNRTC when
necessary. A listing of route changes for the previous fiscal year is identified.
This information is updated annually and input into a transit ridership file for use
in planning studies and also incorporated into the national database.
2.b. Transit On Board Survey:
Subsequent to implementation of the recommended changes in the Erie County
Restructuring Study, conduct a complete on board survey of the transit system in
Erie and Niagara Counties. Utilize new information for update of the Regional
Travel Model transit component
II. A. 3. System Performance Measures Baseline Data Subtask
Activities:
Several performance measures were developed and approved in the LRP 2030 to
provide general indicators of goals achievement. Baseline data for each measure
was collected and documented, and new data will be updated regularly to gauge
success in achieving the objectives of the Plan.
II. A. 4. Pedestrian/Bicycle Systems Subtask
Activities:
4.a. Regional Bicycle & Pedestrian Plan and Integration:
The Regional Bicycle & Pedestrian Master Plan will be reviewed and
implementation dates revised to reflect achievable goals. The Regional Bicycle &
Pedestrian Master Plan will be incorporated into the project development process
and used to identify projects for inclusion in the funding process.
Continue implementation of the Plan specific to completion of a linear bike/ped
corridor along the Erie/Niagara shoreline from Lake Niagara to the south Erie
County Line. Activities include development of consistent signage and standards,
and promotion of the corridor and linked pathways, especially in regards to the
Greenway Commission’s project funding opportunities.
4.b. Bicycle Route Guide and Related Products:
Changes to format and content of the Bicycle Route Guide will be evaluated with
the objectives of disseminating additional data, improving distribution and
improving ease of use. The revised Bicycle Route Guide will be updated with the
most recent available data and distributed to users. The GBNRTC staff will work
with the Bicycle Pedestrian Subcommittee and interest groups to produce other
maps and informational documents highlighting cycling opportunities in the
region.
5
4.c. Outreach:
Implement outreach efforts from the Regional Bicycle and Pedestrian Master Plan
specific to communities regarding the Plan and opportunities to integrate with
local initiatives. Develop implementation projects with communities.
Provide support services to the Bicycle and Pedestrian Subcommittee including
preparation of agendas, meeting notifications, and meeting summaries.
Alternatives to the existing email tree will be investigated, including the use of the
electronic mailing list software application. In cooperation with the Bicycle-
Pedestrian subcommittee, an alternative will be chosen and implemented by the
GBNRTC staff. The GBNRTC website will be used to document and promote
Bicycle-Pedestrian Subcommittee activities, events, and meetings as well as
provide other appropriate resources to bicyclists as outlined in the master plan.
II. A. 5. Freight Movement and Global Integration Subtask
Activities:
5.a. Logistics Opportunities
Manage completion of the Niagara Frontier Urban Area Freight Transportation
Study. Prepare potential improvement projects for TIP funding consideration.
Incorporate identified policy improvements as appropriate.
Subsequent to completion of the Niagara Frontier Urban Area Freight
Transportation Study, examine the identified logistics and economic development
opportunities in the region consistent with regional and international freight
movements and trade patterns. Develop implementation strategies to implement
recommendations regarding logistics complex.
Administer a Freight Advisory Committee made up of public and private freight
management and logistics experts. Discuss freight study results and future
studies/improvements that enhance freight movement and economic development
in the region.
5.b. Freight Movement and Travel Corridors
Deploy the Commodity Information Management System (CIMS) software to
seamlessly interact with the GBNRTC’s existing travel demand model. Forecast
regional freight movements and summarize those movements in the form of
standard reports and maps. Examine dimensions of projected traffic and describe
impacts for consideration in GBNRTC long range planning efforts.
6
II. B. Demographics Database Development and Maintenance
Activities:
Prepare GBNRTC demographic structures in preparation for data availability from
the 2010 US Census.
Incorporate annual residential building permit data and commercial development
database information into existing GBNRTC databases, for development trends
analysis.
Provide as requested, municipal level data including demographics, traffic count
data, accident data, and other transportation data for use in municipal planning.
Maintain demographic database information in a central GIS system, to allow
access to employment, household, land use and probable development activities.
II. C. Travel Demand Forecasting Task
Activities:
Demonstrate corridor-based operational simulation capabilities linked to regional
travel demand forecasting to improve capital project development, traffic
management, and operational improvements.
1. Complete development of the initial operational simulation capabilities in
each the Buffalo metro area and integrate with the Regional Travel Model.
2. Expand TransModeler capabilities to additional corridors and coverage
areas consistent with study needs in the UPWP.
3. Calibrate and demonstrate usage in corridor planning for both capital
construction and operational improvements.
4. Document process, costs and results with summary recommendations for
transferability to other metro regions in New York State.
Maintain the regional model through continuous review of functionality and
incorporation of minor network changes and data inclusion as necessary. Continue
refinement of the TranSIMS model capabilities in conjunction with regional
partners.
Through the statewide Travel Demand Modeling Users Group, and the national
Travel Model Improvement Group Program and with support from NYSMPO staff,
encourage the sharing of ideas between MPOs related travel demand models. This
will cover the aspects of model inputs regarding demographic data collection and
forecasting, employment data collection and forecasting, roadway network
7
characteristics and future network planning, and other geographic inputs, such as
TAZ structure development. Examine possibility for regional model users support
group in western New York and southern Ontario.
II. D. Geographic Information Systems (GIS) Development Task
Activities:
Maintenance of GBNRTC Dataset on www.gbnrtc.org. Member agencies and the
public are able to download select GBNRTC geospatial files.
Provide links on www.gbnrtc.org to free ESRI GIS data viewers.
Incorporate land use iterative capabilities with travel forecasting for use in
development impact studies in the region. Deploy a specific land use forecasting
model on a demonstration basis.
Provide geospatial data to travel demand model consultants as requested.
Provide mapping for Road Score and other reports.
Research and identify areas in region that can/can not sustain further development
using GIS spatial analysis and in-house or outside infrastructure datasets to advance
the concepts of the Erie-Niagara Regional Framework Plan.
Detail specific GIS databases based on current/future UPWP projects.
Participate in NYSMPO GIS group to collectively improve GIS capabilities
statewide.
Analyze BLAT/CTPP/Dodge Report/Demographics for region.
II. E. Statewide Initiatives Task
A number of transportation planning tasks have been identified that can benefit many or all of the
metropolitan planning organizations in New York State. These typically are research tasks or
those related to data collection. The Metropolitan Planning Organizations in New York State
and New York State Department of Transportation have recognized the efficiency of pooling a
portion of their Federal metropolitan planning funds to undertake these tasks, and NYSDOT has
typically provided a 50% match with SPR funds for most of the tasks. The MPO Directors and
the Director of the NYSDOT MPO Liaison Bureau identify potential tasks, reach consensus on
those that are proposed for the year, and develop a scope of work for each. In general, these
projects are undertaken by a consultant under contract to one of the MPOs or NYSDOT.
No new SCI projects are currently planned for the next two fiscal years.
8
Carryover Projects:
MPO Training – Funding for this work will provide timely training appropriate for
progressing MPO programs through advancement of staff skills and increased awareness
of MPO membership.
NYSMPO Staff Support – Contract activity to provide technical and administrative
support to the NYSMPO organization.
ESRI ArcInfo ArcGIS License - This project will provide for an ESRI ArcInfo ArcGIS
license in each upstate MPO. The ArcInfo license provides an expanded GIS toolset for
visualization, spatial modeling and analysis, and high-end cartography and allows for
spatial data management in more modern data structures.
Relevant Statewide Planning and Research Activities (SPR)
NYSDOT summarizes its consultant planning projects and staff-planning activities in its State
Planning & Research (SPR) Program and each MPO summarizes their planning projects in their
respective Unified Planning Work Plans. Following is a list of SPR programmed activities of
significance to GBNRTC area or specifically supporting GBNRTC initiatives.
Programs for Quality Communities:
Smart Growth Planning
The 2001 Quality Communities Grant Program provides SPR funding for local efforts that
enhanced transportation element of comprehensive plans and support other local quality
community initiatives. Recognizing that more work linking land use and transportation decisions
will be needed; additional funds have been set aside. In addition, SPR funds have been
programmed to hire consultants to assist local governments with access management and land
use issues. Typically these studies delineate proposed access improvements to existing
developments, such as driveway consolidation, parking lot interconnections and new service
roads, and improved pedestrian and transit access.
Quality Communities Program Funding:
C-01-37: Quality Community Initiatives $ 875,000
C-02-56: Access Management and Land Use Studies $ 500,000
Freight & Corridor Studies:
Statewide Focus
A term agreement will be established for Transearch and related freight data on a continual
subscription basis to be able to address regular and ad hoc needs in support of ongoing planning
9
activities and major investment studies. This will develop a foundational and historical trend
data procurement process with Global Insight based upon the Transearch Database and related
supporting products and services.
Inter-Regional Freight & Corridor Studies
A study of the Mohawk-Erie Corridor has also been programmed. This east-west corridor reaches
from the Pennsylvania border to the Massachusetts border encompassing Interstate Route 90, the
Erie Canal, and CSX railroad line. The primary purpose of this study is to identify a consensus of
potential multi and intermodal transportation policies, strategies, and actions needed to
accommodate the expected increases in demand and support the Mohawk-Erie corridor’s
economic vitality over the next twenty-five (25) years. The study will identify ways the Mohawk-
Erie corridor’s economic centers can be better connected with regional, national, and
international trade centers. It will accomplish this by focusing on the needs of freight movers and
shippers, intercity travelers (to and from New York City, Toronto, Boston, Chicago, etc),
commuters, and tourists. GBNRTC will provide the liaison for New York State MPOs.
Freight Studies with a Local Focus
SPR funds were used to fund a just completed study that analyzed barriers to downstate freight
movement, and have more recently been granted to some MPOs to conduct area freight studies.
A series of area studies will be funded to provide an overview of freight issues across the State.
Those studies include:
Binghamton Metropolitan Area Freight Study
Buffalo - Niagara Frontier Metropolitan Region Freight Study
Genesee-Finger Lakes Region Goods Movement Study
Ogdensburg / North Country Freight Study
Freight & Corridor Studies Funding:
C-05-57: Trade Overview Study $ 400,000
C-07-74: Mohawk-Erie Multimodal Transportation Corridor Study $ 3,100,000
C-06-57: Niagara Frontier Freight Demand Study $ 650,000
C-07-63: Integrated Corridor Management $ 175,000
C-09-61: Transearch and related Freight Data Procurement $1,500,000
10
International Border Studies:
New York State SPR funds are being pooled with SPR funds from other states along the northern
U.S. border to update border needs, conduct workshops, advance pilot projects, and conduct
research.
Transit:
General
Considerable funding has been provided for a NYSDOT led project called the State Transit
Service Information Repository [STSIR]. This repository will improve the data collection,
management systems and reporting capabilities of transit properties through a common
framework, which allows comparisons among transit operators. This system will give the transit
authorities an opportunity to learn from one another.
Local Transit Studies
Local transit planning is an eligible use of SPR funds. Recognizing that Federal Transit
Administration (FTA) planning funds for upstate transit authorities is very limited, in 2007 the
upstate transit authorities were invited to submit proposed planning projects for SPR funding.
GBNRTC metro area is conducting:
Buffalo/Niagara Metro (Transit)
A major study has been approved for the Niagara Frontier Transportation Authority to fully
review their operations in light of changing demographics and economy.
Transit Studies Funding:
C-07-67: State Transit Service Information Repository $ 1,850,000
C-07-75: NFTA Transportation Services Plan $ 1,000,000
Highway Operations:
Studies Focused on the GBNRTC Area
Buffalo/Niagara Metro Area (Highway Operations)
NYSDOT’s Region 5 Office will develop a strategic plan for deployment of resources along
freeways and arterials to coordinate freeway and arterial operations. A Syncro model will be
developed to aid with timing signals and the management of all expressways and arterials in Erie
and Niagara Counties.
The Niagara International Transportation Technology Coalition (NITTEC) has received SPR
funding for a complementary effort to develop concepts of operation. This effort will reach out to
stakeholder groups; establish corridor boundaries and needs; develop performance measures;
11
identify goals and objectives; specify approaches and strategies; resolve various integration
issues; and establish functional requirements for implementation.
A third effort will be funded primarily with SPR funds and some PL funds and will be led by the
GBNRTC. This effort will define major corridors, build operational simulation capabilities in
each corridor and integrate with the Regional Travel Model for corridor planning for capital and
operational improvements. A specific early demonstration in the Scajaquada corridor will be
completed.
Highway Operations Funding:
C-01-41: Comprehensive ITS Strategic Plan $ 1,925,000
C-07-62: Buffalo-Niagara Coord. Operations Strategic Plan $ 106,000
C-07-63: Integrated Corridor Management $ 175,000
C-07-64: Urbanized Area Operational
Simulation Capabilities $ 465,000
Scajaquada Corridor Demonstration $ 150,000
12
III. LONG RANGE TRANSPORTATION PLANNING PROJECT (44.23.00)
III. A. Long Range Transportation Planning- Systems Level Task (44.23.01)
III. A. 1. Long Range Plan Development Subtask
Activities:
1.a. Long Range Plan Preparation
Completion and approval of the Long Range Plan (LRP) 2035 Update. Consistent
with current legislation the approved LRP will be updated to extent the planning
horizon to 2035. This includes revised demographic forecasts, incorporation of
regional studies and initiatives, affirmation of a fiscally constrained project list,
conformity review and final approval. Initiate activities on a complete new
Metropolitan Transportation Plan, incorporating new federal transportation legislation
and evolving transportation projects.
1.b. Long Range Plan Implementation and Strategy Development
Consistent with the project development strategy, identify key elements of the LRP
and devise a pathway to bring each into an active project stage. This includes timing
and funding of studies, preliminary engineering and design, etc needed to assure
implementation of LRP actions.
1.c. Transit Strategy Development
Subsequent to approval of the Erie County Service Restructuring Study, incorporate
revised service plan in regional travel models, including upgrade of model structures,
incorporation of newer data developed through surveys and census, and evaluate
impacts. Detail opportunities to coordinate with related projects, including corridor
management upgrades, land use development, complementary services, etc.
III. A. 2. Clean Air/Energy Planning Subtask
Activities:
Evaluation of project(s) impacting the Transportation Improvement Program (TIP)
or Long Range Plan (LRP) to assure consistency with the approved State
Implementation Plan (SIP) to achieve the National Ambient Air Quality Standards
(NAAQS). Adequate consideration is given to preservation and enhancement of
air quality for both existing and proposed highway and transit system
improvements. The process provides for the identification of air quality impacts
associated with transportation planning and programming decisions. It also
evaluates and identifies ways and means of managing traffic control and
transportation actions to minimize adverse air quality impacts. Perform similar
13
analyses as required for energy consumption consistent with evolving New York
State guidelines and methodologies.
Evaluate proposed CMAQ projects submitted to GBNRTC for inclusion to
planning documents. Proposals and results to be reviewed with NYSDOT.
Assist NYSDOT-ESB in the implementation of energy usage and green house
gases analyses model. This will include the preparation of TDM data for MOVES
model input and comparison of data to previous analyses.
Incorporate MOVES model into existing analytical capabilities.
Participate in Inter-agency Consultation Group (ICG) meetings as well as other
group or agency meetings.
III. B. Long Range Transportation Planning- Project Level Task (44.23.02)
III. B. 1. Transportation Corridor/Sub-Area Studies Subtask
Activities:
1.a. Buffalo Corridor Study
Complete network development and calibration of Mesoscopic and simulation
models for BCS Study area. Upon approval of the supplemental agreement for the
joint NYSDOT/NYSTA corridor study and consultant notice to proceed, provide
model runs to analyze existing conditions, operational constraints and test various
future alternatives as provided by the study team. Participate in team activities and
supply additional information as requested.
1.b. Scajaquada Corridor
Apply completed corridor simulation models in the overall NYSDOT Scajaquada
Corridor project. Test proposed alternatives developed by NYSDOT to
reconfigure the Scajaquada Expressway to bring it more in context with the
surrounding area. Concern has been expressed however that any changes in the
operating characteristics of the facility will result in disrupted travel patterns and
potentially diverted traffic onto local streets in the neighborhoods adjacent to the
park and expressway. Supply network configuration and analyses to study
consultant as needed to complete current contract.
1.c. I-290 Corridor
Prepare an assessment of current and future travel needs over the entire length of
the I-290 from the I-190 to Exit 50 at the I-90. Review proposed demographics
and land use changes in the corridor and in contributory traffic analysis zones. Use
the regional travel model and recently developed mesoscopic and microsimulation
14
models to examine travel patterns and service needs throughout the corridor
including parallel routes such as Sheridan Drive. These analyses will examine
current roadway capacity and traffic operations throughout the corridor and
projected traffic impacts of future scenarios as well as recommend operational and
systems management approaches to resolve identified needs.
1.d. Robert Moses Parkway Reconfiguration
The Office of Parks, Recreation, and Historic Preservation (OPRHP) will study
the reconfiguration of the Robert Moses Parkway from Main Street in Niagara
Falls to Center Street in Lewiston. The study will look at many alternatives,
including combining the function of Whirlpool Street and the Parkway into one
facility. The GBNRTC will assist a Consultant in analyzing the traffic impacts of
such a reconfiguration. A detailed model of the corridor will be developed to
present the current conditions along with analyzing various alternatives.
GBNRTC will assist in developing analysis as requested by study team and the
consultant. Recommendations and project coordination will assist in operational
improvements and infrastructure upgrades.
1.e. Niagara Falls – Communities Accessibility
Recent changes in land uses, completion of comprehensive plans, and significant
transportation improvements indicate a need to examine potential access
improvements to Niagara Falls and surrounding communities. A subarea travel
model will be prepared and used to iterate potential changes suggested by a study
team. A report will document suggested changes and implementation approach.
1.f. Buffalo – Niagara Falls Commuter Rail
Identified as a project in the current Long Range Plan, the commuter rail project
needs further definition and an approach to moving the initiative forward.
GBNRTC will participate on a team and provide technical information to detail
the project potential, develop operational alternatives, and recommend a preferred
approach to service development.
1.g. Additional Corridor Studies
Additional corridor and sub-area studies will be performed during the year as
requested by member agencies. The studies vary in magnitude and a scoping
process will be performed on each request to define the effort and guide results
prior to PCC release to start work.
These major corridor studies will be supported with planning and modeling
consultant assistance, funded primarily with NHS capital funds as well as FHWA PL.
15
III. B. 2. BiNational Strategies and Cross Border Planning Subtask
Activities:
Reinitiate the Cross Border Planning Subcommittee with Canadian partners to
address local cross border planning issues and regional coordination.
Coordination activities include traffic models, infrastructure projects and planning
initiatives.
Review the current BiNational Transportation Strategy in the context of the
greater likelihood of no Shared Border Management agreement. Participate in the
BiNational Working Group and the Niagara – GTA corridor planning group to
implement the overall strategy completed by the cross border working group as
released by NYSDOT and MTO.
16
IV. SHORT RANGE TRANSPORTATION PLANNING PROJECT (44.24.00)
IV. A. System Management Program Task
IV. A. 1. Signal Systems Coordination Project
Activities:
Complete initial phase of the traffic signal retiming program underway in the
previous UPWP. GBNRTC is providing data and coordinating work activities with
the consultant involved in the technical product. This effort includes funds from the
region’s CMAQ allocation as approved in the current TIP.
Based on initial results seek funds and select additional corridors for retiming.
Document improvements and assist in further interagency coordination efforts.
IV. B. 2. Congestion Management Process
Activities:
2.a. Continued Data Collection
Support the recently revised Congestion Management Process document through
continued data collection as specified. Integrate data collection efforts with NITTEC
and establish a data sharing procedure for mutual benefit.
2.b. Mobility and Congestion Indices
Using data collected in this task, nationally available information and available
regional modeling techniques, produce mobility and congestion indices for the
region as specified in the CMP.
2.c. Congestion Management Process (CMP) Project Identification
Based on methodology in the approved CMP for the region, identify and prioritize
candidate projects to address the region’s congestion issues. Use the list as input to
the TIP process and to focus operational strategies at NITTEC.
IV. B. 3. Areawide Demand Management
Activities:
3.a. Areawide Rideshare Program/Demand Management
Continuation of a comprehensive marketing program to increase participation in the
GoodGoingWNY ridesharing programs. Activities may include development of an
17
in-house employer outreach program and other methods deemed useful to establish
objective.
Continued administration of contractual arrangement to maintain and improve the
GoodGoingWNY website with updated information on alternative travel options.
Participation in local and national events, such as Earth Day, to increase public
awareness of emission reduction programs and energy conservation benefits.
Coordination with regional CarShare and Blue Bike (bike share) programs to
consolidate demand management activities and increase linkage to transit services.
3.b. Carpool/Express Lot Project Development
Build on efforts to advance progress made in the identification of regional park and
ride opportunities. Lead activities to initiate implementation of several additional
lots as determined by sponsors. Coordinate with local governments and funding
agencies to facilitate implementation.
3.c. FHWA Value Pricing Pilot Program
Complete evaluation of the technology for possible nationwide deployment of a
truck VMT based fee system and examine the ability to improve freight delivery
time reliability, reduce peak hour congestion, and offer freight carriers a method to
better control costs. The grant was awarded to GBNRTC by FHWA with Delcan
Corporation defined as a private partner along with Calmar Telematics
(subcontractor to Delcan).
IV.B. Localized Analyses and Planning Task
Activities:
B.1 NFIA Access Analysis
Construction of a complete new terminal at Niagara Falls International Airport has
increased opportunities for additional carriers and flights, as well as attraction of
airport users. GBNRTC will review existing transportation access to the airport
from the surrounding area, prepare appropriate traffic models and analysis, and
report on potential improvements.
B.2. Buffalo CBD Accessibility
The GBNRTC will use the updated Synchro traffic model for the City of Buffalo
CBD as well as mesoscopic model capabilities to assess existing and future
accessibility issues to the Buffalo CBD. The extensive model developed includes
18
all intersections in the CBD and will be used to analyze street modifications and/or
intersections improvements downtown as proposed by the City or NYSDOT. The
models will also be utilized to measure the impacts of various new and proposed
downtown developments. Recommendations and project coordination will assist in
operational improvements and infrastructure upgrades.
B.3. Lockport Area Traffic Improvement
Assemble previous traffic studies prepared in the Lockport area and review in the
context of current development patterns and infrastructure upgrades./Prepare traffic
models as necessary and develop alternative recommendations to improve traffic
operations and serve existing and emerging land uses in the Lockport area.
B.4. Delaware Avenue Bicycle Mobility
Collect existing conditions data and prepare a Synchro traffic assessment of
proposed improvements to Delaware Avenue in the City of Buffalo. Current options
under consideration include reconfiguration of the road to include three travel lanes
and striped bicycle lanes.
B.5 Buffalo Harbor Bridge
Complete traffic forecasts and analytical modeling for the proposed Buffalo Harbor
Bridge project being progressed by Erie Canal Harbor Development Corporation.
Produce traffic data needed for environmental documentation and simulation
graphics for visualization purposes..
B.6. Intergovernmental Land Use-Transportation Coordination
The GBNRTC will continue any ongoing and expanded studies of transportation
and development proposals in the region’s municipalities. Opportunities to create
multijurisdictional land use change review processes will be explored and a report
on potential locations prepared..
B.7. Other Local Initiatives
Provide transportation analysis to members of the GBNRTC as requested and
subsequent to scope definition and concurrence by PCC.
B.9. Site Traffic Impacts
Conduct site traffic analyses as requested by member agencies and also as a
component of the project development process. These analyses will examine trip
generation from proposed land use changes and site projects as well as projected
traffic impacts of future scenarios and recommend operational and systems
management approaches to resolution of identified needs.
19
V. TRANSPORTATION IMPROVEMENT PROGRAM (44.25.00)
V. A. TIP Administration and Project Monitoring Task
Activities:
A. 1. TIP Development and Monitoring
Complete development and approval of the new GBNRTC TIP through FY2015,
including conformity analysis, public review and policy approval. Enter all project
data in EStip for development of the new STIP. Progress development of the
subsequent TIP depending on new federal legislation.
Continued administration of the approved TIP including regular meetings with
local project administrators. Develop electronic project proposal application
process for new project intake. Monitor financial constraint and ARRA process.
A. 2. Project Financial and Performance Monitoring Subtask
Administer the Transportation Projects Subcommittee of the PCC, representing
each member agency and regional strategic stakeholders convened to monitor
project delivery of the approved TIP. Process any proposed TIP amendments
during the fiscal year consistent with approved change control procedures. Enter
approved changes in EStip. Prepare summaries of TIP project progress, funds
utilization, annual obligations summary and issues relevant to the TIP process.
VI. PLANNING EMPHASIS AREAS PROJECT (44.26.00)
Activities:
44.26.12 Coordination of Non-Emergency Human Services Transportation
Using the approved Erie-Niagara Counties Human Services Transportation Plan
as a guide, and in conjunction with the HSTP Review Team and the TPS, review
and select projects that respond to SAFETEA-LU requirements for JARC and
New Freedom and Section 5310 (Elderly and Persons with Disabilities program).
ntegrate approved JARC, New Freedom, and Elderly and Persons with
Disabilities projects into Long Range Plan documentation and transit strategies.
Develop revised HSTP as applicable dependant on future legislation or further
guidance.
Work with community groups and provider agencies to encourage cooperation
and consolidation of services where possible to yield service improvements and
reduced costs.
20
44.26.13 Participation of Transit Operators in Metropolitan and Statewide
Planning
Involve regional transit members and personnel in the ongoing MPO transit
coordination activities, including statewide working groups and NYSDOT
sponsored outreach.
44.26.14 Planning for Transit Systems Management/Operations to Increase
Ridership
Using the evaluations and products developed in the regional transit strategy, Erie
County Services Restructuring portion, and assist implementation of key
initiatives to improve the overall effectiveness of public transportation in the
region. Provide regional travel model simulations of potential systems
management options to gauge ridership and travel impacts.
44.26.15 Support Transit Capital Investment Decisions Through Effective
Systems Planning
Using financial projections, ridership forecasts, system conditions, LRP initiatives
and related materials, develop a framework of capital investment needs to assist
TIP project development and capital budget requests for public transportation
projects in the region.
44.26.16 Incorporate Safety and Security in Transportation Planning
Coordinate with NYSDOT to establish procedures for routine acquisition and
integration of regional crash data records with the local safety analysis system,
and examine potential procedures for review of un-located, non-reportable
collision records.
Initiate activities to produce ramp safety analyses
Review and update regional federal-aid highway characteristics data referenced by
Safety Analysis Application to reflect the necessary network segmentation
changes, functional class changes, facility-type classification changes, and traffic
volume data stored by the GBNTRC
Review and update regional federal-aid highway and intersection geographic data
referenced by Safety Analysis Application to reflect the necessary network
segmentation structure stored by the GBNTRC
Update local safety screening analyses results to track and assess system
performance and correlate with other system performance data
21
Share local safety analysis system results and related crash analysis products with
member agencies and local safety partners to explore local highway safety
improvement strategies
44.26.17 Management and Operations Integration
Develop operational and management strategies to improve the performance of
the existing transportation facilities. These strategies will be developed from the
regional ITS Architecture and in conjunction the Congestion Management
Process. These strategies will serve as input to the TIP project development
process.
GBNRTC will participate in and support the efforts of NITTEC to coordinate
implementation of appropriate projects and strategies. NITTEC is represented on a
PCC System Management and Operations Subcommittee to fully integrate
planning and operational considerations of all modes.
Incorporate NITTEC real time data into the planning process and the signal
systems coordination project. Participate in development of Real Time System
Management Information Program as required of states by new legislation.
VII. OTHER ACTIVITIES TASK (47.27.00)
VII. A. Integration of Planning/Environmental Processes
Activities:
A. 1. Community Outreach and Involvement Subtask
Provide a community involvement process which promotes planning that is open
and responsive to concerns expressed by all segments of the public, provides early
and adequate opportunity for involvement by the public and by private enterprise,
and furnishes subjective values to supplement technical planning work in
evaluation and decision-making. Mechanisms to achieve this goal include:
Maintaining an up-to-date mailing list which includes interested individuals, pub-
lic officials, organizations, the media and interested members of the public for
purposes of notification of various meetings;
Meeting with interested parties and community groups to obtain their goals and
concerns and present pertinent study findings with continued emphasis on small
group outreach meetings in traditionally underserved areas;
22
Consistent with recent Governance initiatives form advisory committees to assist
in development of plans and other related studies.
A. 2. Media and Communications Subtask
Utilization of press releases and media briefings to encourage more frequent
dialogue with members of the media.
Publication of brochures and GBNRTC newsletters for public dissemination.
Maintain and use a media contacts matrix for issues and regular dissemination of
information.
A.3. Environmental Justice Subtask
The 1994 Executive Order 12898 on Environmental Justice directs that
transportation programs, policies, and activities should not have a high and
adverse health and environmental effect on minority and low-income populations.
GBNRTC will review plans and products to assess and ensure compliance with
environmental justice requirements of Title IV.
Special Services Transportation Evaluations Subtask - Review the Federal Transit
Administration (FTA) Section 5310 Program applications from this region
according to NYSDOT guidelines and USDOT schedule requirements.
Evaluation forms are sent to the NYSDOT Albany Passenger Transportation
Division for review of committee considerations.
Accessible Transportation Plan Subtask - Fulfill the requirements of the
Americans with Disabilities Act (ADA) concerning accommodation of disabled
persons on mass transit systems. A mobility plan has been developed which will
establish several transit hubs, restructure existing fixed route service, address
mobility by introducing minibuses, vans, feeder service, route deviation and
increased coordination among existing transit providers in an effort to meet the
travel needs of the population served. The NFTA Advisory Committee on the
Disabled continues to meet and assist the NFTA with planning activities
associated with the mobility plans and in ensuring continued compliance with the
ADA.
A.4. Local Government/MPO Outreach
Approval of the revised governance approach for the MPO and associated
documentation in SFY 2003-2004 clarified roles of all governments and agencies
in the process. Continued outreach to towns, villages, Native American nations
and stakeholders will afford access to the planning process and appropriate
interface. Review governance and propose possible updates for consideration by
GBNRTC members.
23
Major UPWP Planning Activities Schedule
Activity Projected Start Duration
On Board Transit Survey October 2010 16 months
Buffalo Corridor Study Support April 2010 24 months
I – 290 Analyses March 2010 12 months
Robert Moses Parkway Support May 2010 8 months
Niagara Falls-Communities Access December 2010 10 months
Carpool lot Development May 2010 12 months
NFIA Accessibility April 2011 4 months
Buffalo CBD Access December 2010 6 months
Lockport Area Transportation August 2010 8 months
Delaware Avenue Bicycle Focus May 2010 4 months
Ongoing Project Completion Forecasts
Activity Projected Completion
Scajaquada Corridor Study Support December 2010
Long Range Plan 2035 May 2010
Transportation Improvement Program May 2010
Initial Corridor Signal Retiming June 2010
Buffalo Harbor Bridge Support August 2010
APPENDIX 1
GBNRTC 2010-2012 U N I F I E D W O R K P R O G R A M
A G E N C Y P A R T I C I P A T I O N & N E W F U N D I N G
BUFFAL ERIE CO. NIA. CO.
NIAGAR NFTA NYSTA
FALLS
TASKS OTHER TOTAL
(PL) (PL) (PL) (PL) (FTA) (PL) (FTA) (PL) (PL) (FTA)(2) (PL) FUNDS(3)
I-A Project Support and Administration
1. Labor Expenses 0 0 0 0 0 0 0 0 64,111 148,275 0 212,386
2. Support Expenses 0 0 0 0 0 0 0 0 142,704 438,796 6,670 588,170
I-B Information System Services 0 0 0 0 0 0 0 0 60,209 84,600 0 144,809
I-C UPWP Administration (1) 10,000 10,000 7,500 7,500 0 0 0 14,000 90,000 346,156 0 485,156
I. PROGRAM SUPPORT AND ADMINISTRATION (44.21.00) S.T. $10,000 $10,000 $7,500 $7,500 $0 $0 $0 $56,834 $14,000 $357,024 $1,017,827 $6,670 $1,487,355
II-A Transportation Systems Planning
1. Highway Systems
a. Highway Monitoring Program (1) 20,000 20,000 20,000 20,000 0 0 0 5,000 0 651,602 0 736,602
2. Transit Systems
a. Transit Monitoring Program 0 0 0 0 265,140 0 0 0 4,827 0 0 269,967
b. Transit On-Board Survey(1) 236,628 0 236,628
3. System Performance Measures Baseline Data 0 0 0 0 0 0 0 0 0 14,480 0 14,480
4. Bicycle/Pedestrian Planning(1) 0 0 0 0 0 0 0 0 0 180,076 0 180,076
5. Freight Movement and Global Integration 0 0 0 0 0 0 0 0 0 53,002 50,000 103,002
II- B. Demographics Monitoring 0 0 0 0 0 0 0 0 5,000 52,924 0 57,924
II- C. Travel Demand Forecasting (1) 30,000 119,731 40,000 189,731
II- D. Geographic Information Systems (GIS) Development 0 0 0 0 0 0 0 0 0 53,002 0 53,002
II- E. Statewide Initiatives 0 0 0 0 0 0 0 0 0 9,654 0 9,654
II. GENERAL DEVELOPMENT/COMPREHENSIVE PLANNING (44.22.00) S.T. $20,000 $20,000 $20,000 $20,000 $265,140 $0 $0 $213,127 $5,000 $276,455 $1,134,471 $90,000 $2,064,193
III-A Long-Range Transportation Planning (LRTP) - System Level (44.23.01)
1. Long-Range Plan Development (1) 0 0 0 0 0 0 0 5,000 70,000 138,627 0 213,627
2. Transit Strategy Study 0 0 0 0 0 0 0 0 53,002 0 0 53,002
3. Air Quality/Energy Planning(1) 0 0 0 0 0 0 0 0 15,000 38,615 0 53,615
III-B Long-Range Transportation Planning (LRTP) - Project Level (44.23.02) 0 0 0 0
1. Transportation Corridor/Sub-Area Studies 550,000 550,000
a. Buffalo Corridor/NE Erie County Planning 0 0 0 0 0 0 0 0 0 120,674 0 120,674
b. Scajaquada Corridor Study(1) 0 0 0 0 0 0 0 0 0 23,662 30,000 53,662
c. I-290 Corridor 0 0 0 0 0 0 0 0 0 88,684 0 88,684
d. Robert Moses parkway/Study support 0 0 0 0 0 0 0 0 0 23,662 0 23,662
e. Niagara Falls Communities Accessibility 0 0 0 0 0 0 0 0 36,439 0 36,439
f. Buffalo-Niagara Falls Commuter Rail 38,237 0 38,237
g. Additonal Corridor Studies 0 0 0 0 0 0 0 0 0 77,610 0 77,610
2. BiNational Strategies and Cross Border Planning 0 0 0 0 0 0 0 0 0 48,270 0 48,270
III. LONG-RANGE TRANSPORTATION PLANNING (LRTP) - (44.23.00) S.T. $0 $0 $0 $0 $0 $0 $0 $49,729 $5,000 $176,239 $596,243 $580,000 $1,407,211
IV-A System Management Program
1. Traffic Signal Systems Coordination Project (1) 0 0 0 0 0 0 0 0 0 38,615 200,000 238,615
2. Congestion Management Systems (CMS) Plan 0 0 0 0 0 0 0 0 27,323 59,373 0 86,696
3. Areawide Demand Management (1) 0 0
a, Areawide Rideshare Program (CMAQ)(3) 0 0 0 0 0 0 0 0 62,845 0 220,000 282,845
b. Carpool Express Lot Project (PL/FTA) 0 0 0 0 0 0 0 0 23,945 0 0 23,945
c. FHWA Value Pricing Pilot Program 0 0 0 0 0 0 0 0 0 0 235,000 235,000
IV-B Localized Analyses and Planning
1. Buffalo CBD Access 0 0 0 0 0 0 0 0 0 43,727 0 43,727
2. Other localized Analyses and Planning Studies (includes NFIA Access Analysis, 0 0 0 0 0 0 0 0 0 88,873 50,000 138,873
Lockport Area Traffic Improvement, Delaware Avenue Bicycle mobility,Outer
Harbor Bridge, FHWA Value Pricing Pilot Program)
3. Intergovernmental Land Use Transportation Coordination 24,230 0 24,230
4. Other Local Initiatives 0 0 0 0 0 0 0 0 0 87,453 0 87,453
5. Site Traffic Impacts 0 0 0 0 0 0 0 0 0 38,615 0 38,615
IV. SHORT-RANGE TRANSPORTATION PLANNING (SRTP) (44.24.00) S.T. $0 $0 $0 $0 $0 $0 $0 $49,729 $0 $114,113 $380,886 $705,000 $1,249,728
V-A TIP Preparation and Project Monitoring 15,000 15,000 7,500 7,500 0 32,807 0 20,000 91,969 209,952 0 399,728
V-B Project Financial and Performance Monitoring 0 0 0 0 0 0 0 0 0 43,349 0 43,349
V. TRANSPORTATION IMPROVEMENT PROGRAM (44.25.00) S.T. $15,000 $15,000 $7,500 $7,500 $0 $32,807 $0 $248,647 $20,000 $91,969 $253,301 $0 $691,724
1. Coordination of Non-Emergency Human Services Transportation (44.26.12) 0 0 0 0 0 0 0 0 53,002 0 0 53,002
2. Participation of Transit Operators in Metropolitan/Statewide Planning (44.26.13) 0 0 0 0 0 0 0 0 4,827 0 0 4,827
3. Planning for Transit Systems Mgt./Operations to Increase Ridership (44.26.14) 38,995 0 0 38,995
4. Support Transit Systems Management Through Effective Sys. Planning (44.26.15) 0 0 0 0 0 0 0 0 19,308 0 0 19,308
5. Safety and Security Program (44.26.16) 82,154 0 82,154
6. Management and Operations Integration (44.26.17) 0 9,465 0 9,465
VI. PLANNING EMPHASIS AREAS (44.26.00) S.T. $0 $0 $0 $0 $0 $0 $0 $56,834 $0 $116,132 $91,619 $0 $264,585
VII-A Integration of Planning/Environmental Processes Public Involvement
1/2. Community Outreach/Media Communications 0 0 0 0 0 0 0 0 71,558 247,021 0 318,579
3. Environmental Justice 6,068 32,547 0 38,615
4. Local Government/MPO Outreach 0 0 0 0 0 0 0 0 11,000 34,998 0 45,998
VII. OTHER ACTIVITIES (47.27.00) S.T. $0 $0 $0 $0 $0 $0 $0 $35,521 $0 $88,626 $314,566 $0 $438,713
UNIFIED WORK PROGRAM TOTAL $45,000 $45,000 $35,000 $35,000 $265,140 $32,807 $0 $710,421 $44,000 $1,220,558 $3,788,913 $1,381,670 $7,603,509
NOTE:
(1) These tasks may include contractual funding in addition to labor costs to complete the project.
(2) The GBNRTC FTA column reflects what is available 4/1/10. See Appendix 3A for details of which tasks include carryover from NY-X015, X017 and X018.
(3) A portion of these tasks are listed for information purposes and are funded with other Federal/State/Local funding.
NOTE: $3,335 per UPWP year is included in "other" support expenses for AMPO dues membership which is administered by the BMTS.
FEDERAL SHARE 0 0 0 0 0 0 0 0 0 1,060,558 3,788,913 0 4,849,471$
FEDERAL SHARE (FTA CARRYOVER) 0 0 0 0 0 0 0 0 0 160,000 0 0 160,000$
NON-FEDERAL IN-KIND SHARE 45,000 45,000 35,000 35,000 265,140 32,807 0 710,421 44,000 0 0 0 1,212,368$
STATE CASH 0 0 0 0 0 0 0 0 0 0 0 0 -$
LOCAL CASH 0 0 0 0 0 0 0 0 0 0 0 0 -$
OTHER FUNDS 0 0 0 0 0 0 0 0 0 0 0 1,381,670 1,381,670
4/1/10
NYSDOT GBNRTC STAFF
APPENDIX 2A-1
GBNRTC 2010-2012 UNIFIED WORK PROGRAM
TASK AND AUDITABLE BUDGET BY PARTICIPANT FOR 2010-2011 FHWA-PL FUNDING SOURCE
Grant City of Erie City of Niagara GBNRTC
Auditable Budget Amounts Buffalo County Niagara Falls County NYSDOT NYSTA NFTA Staff
44.20.01 Personnel 949,124 11,770 11,770 8,828 8,828 126,519 11,770 9,125 760,514
44.20.02 Fringe Benefits 668,928 8,230 8,230 6,172 6,172 63,393 8,230 6,381 562,120
44.20.03 Travel 20,000 0 0 0 0 0 0 0 20,000
44.20.04 Equipment 22,000 0 0 0 0 0 0 0 22,000
44.20.05 Supplies/Reproduction 43,466 0 0 0 0 0 0 0 43,466
44.20.06 Contractual - General 100,000 0 0 0 0 0 0 0 100,000
Contractual - Consultant 180,000 0 0 0 0 0 0 0 180,000
44.20.08 Indirect Charges 126,607 0 0 0 0 126,607 0 0 0
TOTAL $2,110,125 $20,000 $20,000 $15,000 $15,000 $316,519 $20,000 $15,506 $1,688,100
Task Budget
44.21.00 Program Administration/ 303,390 5,000 5,000 3,000 3,000 25,322 7,000 0 255,068
Program Support 185,466 0 0 0 0 0 0 0 185,466
44.22.00 General Development and Comprehensive Planning 651,816 10,000 10,000 8,000 8,000 94,956 2,500 518,360
44.23.01 Long-Range Planning - System Level 84,575 0 0 0 0 11,000 0 0 73,575
44.23.02 Long-Range Planning - Project Level 240,675 0 0 0 0 11,156 0 0 229,519
44.24.00 Short-Range Transportation Planning 186,492 0 0 0 0 22,156 0 0 164,336
44.25.00 Transportation Improvement Program 248,450 5,000 5,000 4,000 4,000 110,782 10,500 15,506 93,662
44.26.00 Planning Emphasis Areas 25,322 0 0 0 0 25,322 0 0 see below
44.26.12 Human Services Transportation Plan 0 0 0 0 0 0 0 0
44.26.14 Management & Operations Integration 9,465 0 0 0 0 0 0 9,465
44.26.16 Safety and Security Planning 37,859 0 0 0 0 0 0 37,859
44.27.00 Other Activities 15,825 0 0 0 0 15,825 0 0 see below
Integration of Planning/Environmental Processes/EJ Planning 112,861 0 0 0 0 0 0 0 112,861
Local Government/MPO Outreach 7,929 0 0 0 0 0 0 0 7,929
TOTAL $2,110,125 $20,000 $20,000 $15,000 $15,000 $316,519 $20,000 $15,506 $1,688,100
Federal Share (2010/2011) 1,688,100 0 0 0 0 0 0 0 1,688,100
Federal Share ('10/'11 allocation) 1,901,301 0 0 0 0 0 0 0 1,901,301
Federal Share '10/'11 savings (to backlog) 213,201 0 0 0 0 0 0 0 213,201
State Share (CTPS Match) 316,519 0 0 0 0 316,519 0 0 0
Local Share (CTPS Match) 105,506 20,000 20,000 15,000 15,000 0 20,000 15,506 0
Local Share (Agency Cash Match) 0 0 0 0 0 0 0 0 0
4/1/10
APPENDIX 2A-2
GBNRTC 2010-2011 UNIFIED WORK PROGRAM
TASK AND AUDITABLE BUDGET BY PARTICIPANT FOR 2011-2012 FHWA-PL FUNDING SOURCE
Grant City of Erie City of Niagara GBNRTC
Auditable Budget Amounts Buffalo County Niagara Falls County NYSDOT NYSTA NFTA Staff
44.20.01 Personnel 1,180,790 14,375 14,375 11,770 11,770 157,450 13,800 9,948 947,302
44.20.02 Fringe Benefits 834,336 10,625 10,625 8,230 8,230 78,892 10,200 7,353 700,181
44.20.03 Travel 20,000 0 0 0 0 0 0 0 20,000
44.20.04 Equipment 27,000 0 0 0 0 0 0 0 27,000
44.20.05 Supplies/Reproduction 74,500 0 0 0 0 0 0 0 74,500
44.20.06 Contractual - General 131,830 0 0 0 0 0 0 0 131,830
Contractual - Consultant 200,000 0 0 0 0 0 0 0 200,000
44.20.08 Indirect Charges 157,560 0 0 0 0 157,560 0 0 0
TOTAL $2,626,016 $25,000 $25,000 $20,000 $20,000 $393,902 $24,000 $17,301 $2,100,813
Task Budget
44.21.00 Program Administration/ 381,475 5,000 5,000 4,500 4,500 31,512 7,000 0 323,963
Program Support 253,330 0 0 0 0 0 0 0 253,330
44.22.00 General Development and Comprehensive Planning 780,782 10,000 10,000 12,000 12,000 118,171 2,500 0 616,111
44.23.01 Long-Range Planning - System Level 122,453 0 0 0 0 13,786 5,000 0 103,667
44.23.02 Long-Range Planning - Project Level 203,269 0 0 0 0 13,787 0 0 189,482
44.24.00 Short-Range Transportation Planning 244,123 0 0 0 0 27,573 0 0 216,550
44.25.00 Transportation Improvement Program 351,306 10,000 10,000 3,500 3,500 137,866 9,500 17,301 159,639
44.26.00 Planning Emphasis Areas 31,512 0 0 0 0 31,512 0 0 see below
44.26.12 Human Services Transportation Plan 0 0 0 0 0 0 0 0 0
44.26.14 Management & Operations Integration 0 0 0 0 0 0 0 0 0
44.26.16 Safety and Security Planning 44,295 0 0 0 0 0 0 0 44,295
44.27.00 Other Activities 19,695 0 0 0 0 19,695 0 0 see below
Integration of Planning/Environmental Processes/EJ Planning 166,707 0 0 0 0 0 0 0 166,707
Local Government/MPO Outreach 27,069 0 0 0 0 0 0 0 27,069
TOTAL $2,626,016 $25,000 $25,000 $20,000 $20,000 $393,902 $24,000 $17,301 $2,100,813
Federal Share (2011/2012) 2,100,813 0 0 0 0 0 0 0 2,100,813
Federal Share '11/12 allocation 1,901,301 0 0 0 0 0 0 0 1,901,301
Federal Share '11/'12 backlog used 199,512 0 0 0 0 0 0 0 199,512
State Share (CTPS Match) 393,902 0 0 0 0 393,902 0 0 0
Local Share (CTPS Match) 131,301 25,000 25,000 20,000 20,000 0 24,000 17,301 0
Local Share (Agency Cash Match) 0 0 0 0 0 0 0 0 0
4/1/11
APPENDIX 2B-1
GBNRTC 2010-2012 UNIFIED WORK PROGRAM
TASK AND AUDITABLE BUDGET BY PARTICIPANT FOR FTA 2010-2011 (SECTION 5303) FUNDING SOURCE
Grant City of Erie City of Niagara GBNRTC
Auditable Budget Amounts Buffalo County Niagara Falls County NYSDOT NYSTA NFTA Staff
44.20.01 Personnel 303,226 0 0 0 0 0 0 76,228 226,998
44.20.02 Fringe Benefits 224,123 0 0 0 0 0 0 56,342 167,781
44.20.03 Travel 5,000 0 0 0 0 0 0 0 5,000
44.20.04 Equipment 10,000 0 0 0 0 0 0 0 10,000
44.20.05 Supplies/Reproduction 25,000 0 0 0 0 0 0 0 25,000
44.20.06 Contractual - General 50,500 0 0 0 0 0 0 0 50,500
44.20.06 Contractual - Consultant 45,000 0 0 0 0 0 0 0 45,000
TOTAL $662,849 $0 $0 $0 $0 $0 $0 $132,570 $530,279
Task Budget
44.21.00 Program Administration/ 114,320 0 0 0 0 0 0 0 114,320
Support Expenses (Excluding Consultant) 90,500 0 0 0 0 0 0 0 90,500
44.22.00 General Development and Comprehensive Planning 159,668 0 0 0 0 0 0 132,570 27,098
44.23.01 Long-Range Planning - System Level 113,394 0 0 0 0 0 0 0 113,394
44.23.02 Long-Range Planning - Project Level 28,394 0 0 0 0 0 0 0 28,394
44.24.00 Short-Range Transportation Planning 35,717 0 0 0 0 0 0 0 35,717
44.25.00 Transportation Improvement Program 30,000 0 0 0 0 0 0 0 30,000
44.26.00 Planning Emphasis Areas
44.26.12 Coordination of Non-Emergency Human Services Transportation 28,394 0 0 0 0 0 0 0 28,394
44.26.13 Participation of Trans. Operators in Met./State Plng. 2,366 0 0 0 0 0 0 0 2,366
44.26.14 Planning for Transit Systems mgt./Operations to increase ridership 9,465 0 0 0 0 0 0 0 9,465
44.26.15 Support Transit Systems Mgt. Through Effective Sys. Plng. 9,465 0 0 0 0 0 0 0 9,465
44.26.16 Safety and Security Planning 0 0 0 0 0 0 0 0 0
44.27.00 Integration of Planning/Environmental Processes 36,166 0 0 0 0 0 0 0 36,166
44.27.00 Environmental Justice 0 0 0 0 0 0 0 0 0
44.27.00 Local Government/MPO Outreach 5,000 0 0 0 0 0 0 0 5,000
TOTAL $662,849 $0 $0 $0 $0 $0 $0 $132,570 $530,279
Federal Share 530,279 0 0 0 0 0 0 0 530,279
State Share (CTPS Match) 0 0 0 0 0 0 0 0 0
State Share (NYSDOT/Cash Match) 0 0 0 0 0 0 0 0 0
Local Share (CTPS Match) 132,570 0 0 0 0 0 0 132,570 0
Local Share (Agency Match) 0 0 0 0 0 0 0 0 0
4/1/10
APPENDIX 2B-2
GBNRTC 2010-2012 UNIFIED WORK PROGRAM
TASK AND AUDITABLE BUDGET BY PARTICIPANT FOR FTA 2011-2012 (SECTION 5303) FUNDING SOURCE
Grant City of Erie City of Niagara GBNRTC
Auditable Budget Amounts Buffalo County Niagara Falls County NYSDOT NYSTA NFTA Staff
44.20.01 Personnel 243,041 0 0 0 0 0 0 76,228 166,813
44.20.02 Fringe Benefits 179,638 0 0 0 0 0 0 56,342 123,296
44.20.03 Travel 5,000 0 0 0 0 0 0 0 5,000
44.20.04 Equipment 2,000 0 0 0 0 0 0 0 2,000
44.20.05 Supplies/Reproduction 10,000 0 0 0 0 0 0 0 10,000
44.20.06 Contractual - General 23,170 0 0 0 0 0 0 0 23,170
44.20.06 Contractual - Consultant 200,000 0 0 0 0 0 0 0 200,000
TOTAL $662,849 $0 $0 $0 $0 $0 $0 $132,570 $530,279
Task Budget
44.21.00 Program Administration/ 80,000 0 0 0 0 0 0 0 80,000
Support Expenses (Excluding Consultant) 40,170 0 0 0 0 0 0 0 40,170
44.22.00 General Development and Comprehensive Planning 364,561 0 0 0 0 0 0 132,570 231,991
44.23.01 Long-Range Planning - System Level 24,608 0 0 0 0 0 0 0 24,608
44.23.02 Long-Range Planning - Project Level 9,843 0 0 0 0 0 0 0 9,843
44.24.00 Short-Range Transportation Planning 41,833 0 0 0 0 0 0 0 41,833
44.25.00 Transportation Improvement Program 20,000 0 0 0 0 0 0 0 20,000
44.26.00 Planning Emphasis Areas
44.26.12 Human Services Transportation Plan and Process 24,608 0 0 0 0 0 0 0 24,608
44.26.13 Participation of Trans. Operators in Met./State Plng. 2,461 0 0 0 0 0 0 0 2,461
44.26.14 Planning for Transit Systems mgt./Operations to increase ridership29,530 0 0 0 0 0 0 0 29,530
44.26.15 Support Transit Systems Mgt. Through Effective Sys. Plng. 9,843 0 0 0 0 0 0 0 9,843
44.26.16 Safety and Security Planning 0 0 0 0 0 0 0 0 0
44.27.00 Integration of Planning/Environmental Processes 15,392 0 0 0 0 0 0 0 15,392
44.27.00 Environmental Justice 0 0 0 0 0 0 0 0 0
44.27.00 Local Government/MPO Outreach 0 0 0 0 0 0 0 0 0
TOTAL $662,849 $0 $0 $0 $0 $0 $0 $132,570 $530,279
Federal Share 530,279 0 0 0 0 0 0 0 530,279
State Share (CTPS Match) 0 0 0 0 0 0 0 0 0
State Share (NYSDOT/Cash Match) 0 0 0 0 0 0 0 0 0
Local Share (CTPS Match) 132,570 0 0 0 0 0 0 132,570 0
Local Share (Agency Match) 0 0 0 0 0 0 0 0 0
4/1/11
APPENDIX 3A
GBNRTC 2010-2012 UNIFIED WORK PROGRAM
CARRYOVER FTA PLANNING FUND RESOURCES (1)
UPWP TASK 80-X015 80-X017 80-X018 TOTAL
(44.21) I.A. - Project Support/Administration
1. Labor Expenses $10,000 $0 $10,000 $20,000
2. Support Expenses 0 0 12,034 12,034
(44.22) II.A.2. -Transit Monitoring 0 0 17,366 17,366
(44.23) III.A.1 -Long-Range Plan Development 0 0 0 0
(44.24) IV. Short-Range Transportation Planning 0 16,563 20,000 36,563
(44.25) V. Transportation Improvement Program 20,000 0 21,969 41,969
(44.26) VI. - Planning Emphasis Areas 0 0 0
(44.27) VII. - Other Activities 10,716 0 21,352 32,068
GRAND TOTAL $40,716 $16,563 102,721$ $160,000
(1) Federal funds estimated available as of April 1, 2010
4/1/10
UPWP TASK 2010-2011 2011-2012 TOTAL
(44.22) II.A.5. Freight Movement/Global Integtation - State Planning/ 50,000 0 50,000
Research Funds (some carryover from '09-10 UPWP)
(44.22) II.C. Travel Demand Forecasting - State Planning/Research Funds $40,000 0 $40,000
(44.22) II.E. Statewide Initiative - State Planning/Research Funds 0 0 0
(44.23) III.B.1b. Transportation Corridor Studies: Scajaquada Corridor 30,000 0 30,000
State Planning/Research Funds
(44.23) IV.A.1 - Signal Systems - Congestion Mitigation 200,000 0 200,000
Air Quality Grant
(44.23) IV.A.3. - Area Demand Management/Rideshare program - Congestion 100,000 120,000 220,000
Mitigation Air Quality Grant
(44.23) IV.A.3c. - Area Demand Management/FHWA Value Pricing Pilot 235,000 0 235,000
Program
(44.23) IV.A/B. - Long-Range Transportation Planning-Systems&Project Levels 50,000 0 50,000
State Planning/Research Rescission Relief PL Restoration
GRAND TOTAL $705,000 120,000$ $825,000
4/1/10
AUDITABLE BUDGET 2010-2011 2011-2012 TOTAL
44.20.06 Contractual Consultant 250,000 300,000 550,000
TASK BUDGET
(44.23.01/02) LONG-RANGE TRANSPORTATION PLANNING $250,000 300,000 $550,000
SYSTEM/PROJECT LEVEL
4/1/10
APPENDIX 3B
GBNRTC 2010-2012 UNIFIED WORK PROGRAM
DESCRIPTION OF OTHER FUNDS INCLUDED IN PROGRAM
APPENDIX 3C
GBNRTC 2010-2012 UNIFIED WORK PROGRAM
NATIONAL HIGHWAY SYSTEM FUNDS