EESSI - Electronic Exchange of Social Security Information
RO perspective
Bianca Culea - CNPAS
EESSI Architecture:
Source: European Commission
MemberState 1
MemberState 2
CI
CI
MemberState 4
CI
CI
CI
CI
CI CICI CICI
CI
CI
Member State 3
CI
CI
CI
MemberState “n”
CI
CI
CI
CoordinationNode CI Competent
InstitutionAccessPoint
NationalNetwork
NationalNetwork
NationalNetwork
NationalNetwork
sTESTA
EESSIInternational Network
NationalNetwork
NationalNetwork
RO – 4 Access Points:
Access Point Covered areas
ApRO04Pension, Legislation Applicable and Work
Accidents and Occupational Diseases
ApRO03 Sickness
ApRO02 Family Benefits
ApRO01Unemployment
MemberState 1
CICI
Access Point
EESSIInternational Network
NationalNetwork
Electronic contact point
Nationaltraffic
Internationaltraffic
CI
Network for Social Security
National part of Access Point
Source: European Commission
CI CompetentInstitution
AccessPoint
International Part of Access Point
National Part ofAccess Point
International part of Access Point
International EESSI Protocol
NationalEESSI Protocol
Internal “Bridging” Protocol
MemberState 2
`
WEBIC
Page 5
5
Routing Architecture:
MS CI 1
AP-RI
NPAPIPAP
CN
EMS EMD
ICD2ICD1
CI1-D1 WEBICAdapter
Original message sent to CI 1 (found in DS)
CI2NA
Adapter
CI1-D2XML
Adapter
D 1 (SP A)
D 2 (SP B)
WEBIC
DB
NA
DB
CI 2
NA
DB Messages in DB and seen by user:
CI2
Messages in DBand seen by user:
CI1 (SP A)
Messages in DBand seen by user:
CI1 (SP B)
CustomRouting
Depending on a parameter in the body of the SED
(SP=SED Parameter)
DB
CI1 (SP A)
CI2
CI1 (SP B)
Messages in DB:
General schedule – Master Directory data upload:
EESSI - April 2010 - RO Status: 4 APs established AP’s Administrators and Managers established CN/Master Directory content for all 4 APs uploaded S - testa connected for all 4 APs Training on PAI and MMI for all 4 APs staff PAI and MMI RO related information checked
(minor modification still needed) PAI translation (RO) done.
RO target: January 2011 - ???Integration of EESSI into national environment, reengineering national application
Mid October 2010
↓31 November
2010
Six Testing Member States to test ALL the components of the EESSI system
End User and national administrator training for all
1 December 2010
↓28 February
2011
Installation, configuration of various EESSI components for all and testing.
1 March 2011
↓1 Mai 2011
A testing campaign of exchanges with the WEBIC will be organises for the non testing Member States will be organised with
Trainings:
September 2010 until the end of November, trainings for national users and administrator will take place.
The purpose of the training is to prepare the Member States for the installation, configuration, administration and the use of the Reference Implementation and the WEBIC.
General schedule: Bid preparation conditionality:
Documentation – final versions:June 2010 - ICD2 and Protocol Design Document middle of August : Coordination Node, Reference Implementation, WEBIC
So,………………….Bid preparation can start……!
RO & EESSI:
• from January 2011, once the local EESSI components are installed, Member States will be in a position to start establishing the connexion of EESSI to their national environment through the ICD2 interface by adapting/configuring national connectors and developing or reengineering national applications.
RO: Bid scope:Required hardware for 4 APs
• NPAPs development• National Applications reengineering and APs
integration• Technical support• Trainings
Ro – “EESSI enabled” scenario:
• June – October 2010 – Bid preparation and launch• November – December 2010 – Bid evaluation• January - February 2011 – IPAPs installations and
tests• May 2011 – NPAPs & National Applications first
release• June 2011-October 2011 – NPAPs & National
Applications and EESSI integration tests
• December 2011 – RO EESSI “enabled”
Thank you!