  • 8/11/2019 20101209 D56935 Perth Power Partnership - 2010 Performance Audit and Asset Management Review Report

    1/133

    Performance Audit and Asset Management System Review ReportPerth Power Partnership: Kwinana Co-generation PlantSeptember 2010

    Page 1

    Final Report

    2010 Performance Audit and Asset ManagementSystem Review for Perth Power Partnership

    AuditReport

    Authorisation Name Position Date

    Prepared By Nicole DaviesPrincipal

    Consultant(GES Pty Ltd)

    September2010

    Agreed By(licensee) Debasis Baksi

    Perth PowerPartnership

    September2010

    Geographe Environmental Services Pty ltd

    PO Box 572 DUNSBOROUGH WA 6281 Tel: 0438 938 394

    September 2010

    Audit Report No: KPC0910_3

  • 8/11/2019 20101209 D56935 Perth Power Partnership - 2010 Performance Audit and Asset Management Review Report

    2/133

    Performance Audit and Asset Management System Review ReportPerth Power Partnership: Kwinana Co-generation PlantSeptember 2010

    Page 2

    1. EXECUTIVE SUMMARY ........................................................................................................ 5

    1.1 Performance Audit Summary _______________________________________________________ 7

    1.2 Asset Management System Review Summary __________________________________________ 9

    2. PERFORMANCE AUDIT ...................................................................................................... 10

    2.1 Performance Audit Scope _________________________________________________________ 10

    2.2 Performance Audit Objective ______________________________________________________ 11

    2.3 Performance Audit Methodology ___________________________________________________ 12

    2.4 2010 Post Audit Implementation Plan _______________________________________________ 16

    3. Asset Management System Effectiveness Review ........... ........... ........... ........... ........... ....... 18 3.1 AMS Review Scope ______________________________________________________________ 18

    3.2 Objective of the Asset Management System Review ___________________________________ 22

    3.3 Methodology for Asset Management System Review ___________________________________ 22

    3.4 2010 Post Audit Implementation Plan _______________________________________________ 29

    4. FOLLOW UP AUDIT PROCESS ............................................................................................. 29

    LIST OF APPENDICES

    1. Perth Power Partnership: Kwinana Cogeneration Plant Performance AuditReview September 2010

    2. Perth Power Partnership: Kwinana Cogeneration Plant Asset ManagementSystem Review September 2010

  • 8/11/2019 20101209 D56935 Perth Power Partnership - 2010 Performance Audit and Asset Management Review Report

    3/133

    Performance Audit and Asset Management System Review ReportPerth Power Partnership: Kwinana Co-generation PlantSeptember 2010

    Page 3

    GLOSSARY

    BP British Petroleum

    Corriolis Supplier Name Flow monitoring device

    DAS Data Acquisition System

    DCS Distributed Control System

    GES Geographe Environmental Services

    EMPAC Enterprise Maintenance Planning And Control (proprietary asset management software)

    ERA Economic Regulation Authority

    HRSG - Heat Recovery Steam Generators

    KCP Kwinana Cogeneration Plant

    LAN Local Area Net work

    IMO Independent Market Operator

    IPM International Power Mitsui (a limited liability partnership formed between International

    Power Plc of England (70%), and Mitsui & Co Ltd of Japan (30%), Authorised agent for Perth PowerPartnership

    IPR/IPL International Power (International Power plc is a leading independent electricity generatingcompany with 30,807 MW gross (18,935 MW net) in operation and 224 MW gross (149 MW net) underconstruction. International Power has power plants in operation or under construction in Australia, theUnited States of America, the United Kingdom, the Czech Republic, France, Germany, Italy, theNetherlands, Portugal, Spain, Turkey, Bahrain, Oman, Qatar, Saudi Arabia, the UAE, Indonesia,Pakistan, Puerto Rico and Thailand. International Power is listed on the London Stock Exchange withticker symbol IPR. Company website: www.ipplc.com)

    IT - Information Technology

    MARSH (IPRs Insurance Broker and assists IPR in determining insurance and risk control strategy for theiroperations and provides IPR Australia and IPM Kwinana with expert engineering loss control opinion)

    PPP Perth Power Partnership (a partnership between IPM (70%) and Transfield Services InfrastructureFund (30%)), License holder of EGL8

    RFG Refinery Fuel Gas

    SafetyTV - On-line training system supplied by VOCAM

    WPN Western Power Networks

    SurveyMonkey On-line customer satisfac tion survey

    http://www.ipplc.com/http://www.ipplc.com/
  • 8/11/2019 20101209 D56935 Perth Power Partnership - 2010 Performance Audit and Asset Management Review Report

    4/133

    Performance Audit and Asset Management System Review ReportPerth Power Partnership: Kwinana Co-generation PlantSeptember 2010

    Page 4

    This rep or t is p rep a red b y rep resent a t ives of GES Pty Ltd in re la t ion to the a b ove na m ed c lien tsc onforma nc e to the no m ina te d aud it st a nd a rd ( s) . Aud it s a re und er ta ken using a sa m p ling p roc essa nd the rep or t and it s rec om m end a t ions a re re f lec t ive on ly o f a c t iv it ie s and rec ords sigh te d dur ingthis a ud it p roc ess. GES Pty Ltd sha ll no t b e l ia b le fo r loss or da m a g e c a used to o r a c t ions ta ken b y

    third p a rt ies a s a c onseq uen c e o f re l ia nc e o n the inform a t ion c onta ined w ithin th is rep or t or it sa c c o m p a n y in g d o c u m e n t a t io n .

    Quality Control Record

    CLIENT DATE

    REQUESTED BY MARK JAMESON: PERTH POWER PARTNERSHIP JANUARY 2010

    PREPARED BY NICOLE DAVIES SEPTEMBER 2010

    CHECKED BY BRIAN McKENRY SEPTEMBER 2010

    REVISION 3 SEPTEMBER 2010

  • 8/11/2019 20101209 D56935 Perth Power Partnership - 2010 Performance Audit and Asset Management Review Report

    5/133

    Performance Audit and Asset Management System Review ReportPerth Power Partnership: Kwinana Co-generation PlantSeptember 2010

    Page 5

    1. EXECUTIVE SUMMARY

    The Kwinana Cogeneration Plant (KCP), located within the Kwinana Industrial Strip, Kwinana Beach,

    is a gas turbine combined cycle-cogeneration plant capable of producing up to 124MW electricaloutput (capacity declared to the IMO at ISO conditions) and 2,300 tonnes per day of process steamwith the use of duct firing on the heat recovery steam generators (HRSG).

    The plant consists of two gas turbines generators, two heat recovery steam generators, and onecontrolled extraction condensing steam turbine generator. Steam is extracted from the steam turbineand delivered for process use as well as to the deaerator as heating system.

    Electricity generated is provided to Verve Energy and the BP Kwinana oil refinery under Long TermPower Purchase Agreements. The process steam is provided to the refinery, also under Long Term

    Agreement.

    Perth Power Partnership (PPP) has engaged Geographe Environmental Services (GES) to undertake

    the second Performance Audit and Asset Management System Review as required by the Economic

    Regulation Authority (ERA) under generation licence EGL8 under the Electricity Industry Act 2004.

    This combined report contains the audit findings for both the Performance Audit and Asset

    Management System Review.

    Sections 13 & 14 of the Electricity Industry Act 2004 require as a condition of every licence that the

    licensee must, not less than once in every period of 24 months (or any longer period that the

    Authority allows) calculated from the grant of the licence, provide the Authority with a Performance

    Audit and Asset Management System Review conducted by an independent expert acceptable to the

    Authority.

    The Authority approved the appointment of GES Pty Ltd on the 7 th May 2010 and subsequently

    required the development of an audit plan for ERA approval. Notification of the approval of the audit

    plan for the 2010 Performance Audit of Licence EGL8 was provided by the ERA.

    The period for the audit and review is 1 st July 2008 to 30 th June 2010, and the report is submitted tothe Authority before 30 September 2010 as evidence of compliance with the Authoritys requirements.

    The Asset Management System Review and the Performance Audit have been conducted in order to

    assess the effectiveness of the Perth Power Partnership Asset Management Systems and level of

    compliance with the conditions of its Generation Licence EGL8. Through the execution of the AuditPlan, field work, assessment and testing of the control environment, the information system, control

  • 8/11/2019 20101209 D56935 Perth Power Partnership - 2010 Performance Audit and Asset Management Review Report

    6/133

    Performance Audit and Asset Management System Review ReportPerth Power Partnership: Kwinana Co-generation PlantSeptember 2010

    Page 6

    procedures and compliance attitude, the audit team members have gained reasonable assurance that

    Perth Power Partnership: Kwinana Cogeneration Plant has an effective asset management system

    and has complied with its Generating Licence during the audit period 1 st July 2008 to 30 th June 2010,

    with the exception of Licence Condition 4.1 (Compliance Reporting Manual Ref 85). It is noted that

    this non-compliance was in relation to the payment of ERA Licence fees and all root causes have

    been identified and resolved in order to ensure future compliance (Refer to Table 5). This audit report

    is an accurate representation of the audit teams findings and opinions.

    .

  • 8/11/2019 20101209 D56935 Perth Power Partnership - 2010 Performance Audit and Asset Management Review Report

    7/133

    Performance Audit and Asset Management System Review ReportPerth Power Partnership: Kwinana Co-generation PlantSeptember 2010

    Page 7

    1 .1 Per fo rm a nc e Aud i t Sum m a ry

    With the exception of Licence Conditions 4.1, which is in relation to the late payment of fees, all

    licence requirements reviewed were found to be compliant during the audit.

    As required in section 11.4.1 of the Audit Guidelines Electricity, Gas and Water Licences (August

    2010) Table 1 summarises the compliance rating for each licence condition using the 7-point rating

    scale described in Table 3 (Refer Section 2.3 Methodology).

    A comprehensive report of the audit findings is included in Appendix 1.

    There were Generation Licence compliance elements that were not included in the scope of this audit

    because they did not eventuate in this audit period or have not been established within licence EGL8.

    These are defined in Table 1.

  • 8/11/2019 20101209 D56935 Perth Power Partnership - 2010 Performance Audit and Asset Management Review Report

    8/133

    Performance Audit and Asset Management System Review ReportPerth Power Partnership: Kwinana Co-generation PlantSeptember 2010

    Page 8

    Table 1 : Performance Audit Compliance Summary

    G e n e r a

    t i n g

    L i c e n c e

    R e

    f e r e n c e

    ( C l =

    C l a u s e ,

    S c

    h =

    S c

    h e d u

    l e )

    G e n e r a

    t i o n

    L i c e n c e

    C r i t e r i a

    L i k e l i

    h o o

    d

    C o n s e q u e n c e s

    I n h e r e n t

    R i s k

    A d e q u a c y o

    f e x

    i s t i n g c o n

    t r o

    l s

    C o m p

    l i a n c e

    R a

    t i n g

    NR NA 0 1 2 3 4 5

    Cl 1 Definitions

    Cl 2 Grant of Licence Unlikely Minor Low Strong

    Cl 3 Term Unlikely Minor Low Strong

    Cl 4 Fees Probable Moderate Low Moderate

    Cl 5 Compliance Unlikely Moderate Medium Moderate

    Cl 6 Transfer of Licence Unlikely Major High Strong

    Cl 7 Cancellation of Licence

    Cl 8 Surrender of Licence

    Cl 9 Renewal of Licence

    Cl 10 Amendment of Licence onapplication of the Licensee

    Cl 11 Amendment of Licence by the Authority

    Cl 12 Expansion or Reduction ofGenerating Works, DistributionSystems and TransmissionSystems

    Unlikely Minor Low Strong

    Cl 13 Accounting Records Unlikely Minor Low Strong

    Cl 14 Individual PerformanceStandards Cl 15 Performance Audit Unlikely Major High Strong

    Cl 16 Asset Management System Unlikely Major High Strong

    Cl 17 Reporting Unlikely Major High Strong

    Cl 18 Provision of Information Unlikely Major High Strong

    Cl 19 Publishing Information Unlikely Minor Low Strong

    Cl 20 Notices Unlikely Minor Low Strong

    Cl 21 Review of the AuthoritysDecisions

  • 8/11/2019 20101209 D56935 Perth Power Partnership - 2010 Performance Audit and Asset Management Review Report

    9/133

    Performance Audit and Asset Management System Review ReportPerth Power Partnership: Kwinana Co-generation PlantSeptember 2010

    Page 9

    1 .2 Asse t Ma na g em ent System Rev iew Sum m a ry

    The asset management system was found to be satisfactory with a few issues requiring attention.

    These were Section 4.3 Environmental Analysis, Section 7.5 & 7.6 Asset Management

    Information System, Section 9.1 Contingency Planning and Section 10.2 Financial Planning (refer to

    Table 9 for specific detail).

    As required by section 11.4.2 of the Audit Guidelines (August 2010) Table 2 summarises the auditors

    assessment of both the process and policy definition rating and the performance rating for each key

    process in the licensees asset management system, using the scales described in Table 5 and Table

    6 (refer Section 3.3 Asset Management Review Methodology). The rating was determined by the

    auditors judgement based on the execution of the Audit Plan.

    The process and policy and asset management system adequacy ratings are summarised below;

    Table 2: Asset Management System - Effectiveness Summary

    Asset Management System

    AssetManagement

    Process AndPolicy Definition

    Adequacy Rating

    AssetManagementPerformance

    Rating

    1. Asset planning A 1

    2. Asset creation/ acquisition A 1

    3. Asset disposal A 1

    4. Environmental analysis A 1

    5. Asset operations A 1

    6. Asset maintenance A 1

    7. Asset Management Information System A 2

    8. Risk management A 1

    9. Contingency planning A 2

    10. Financial planning A 1

    11. Capital expenditure planning A 1

    12. Review of AMS A 1

  • 8/11/2019 20101209 D56935 Perth Power Partnership - 2010 Performance Audit and Asset Management Review Report

    10/133

    Performance Audit and Asset Management System Review ReportPerth Power Partnership: Kwinana Co-generation PlantSeptember 2010

    Page 10

    The Audit Guidelines (August 2010 2009) require that auditors who have rated the adequacy of the

    process and policy definition process as C or D or the asset management performance as 3 or 4 also

    make recommendations to address the issue(s).

    2. PERFORMANCE AUDIT

    2 .1 Per fo rm a nc e Aud i t Sc op e

    This is the second audit of Perth Power Partnerships compliance with obligations relating to

    Generation Licence EGL8. As such, the scope of the audit for the period 1 st J uly 2008 to 30 th June

    2010 is to:

    assess the license holders internal compliance systems (i.e. process, outcome and output

    compliance)

    assess the license holders compliance with its license (including integrity of reporting)

    measure performance over time

    The previous Performance Audit covered the period 9 June 2006 to 30 June 2008.

    This Performance Audit was conducted over the following period August to September 2010 and anoverview methodology is outlined below;

    Initial approval to conduct audit obtained by ERA

    Preliminary Audit undertaken to assist with preparation of the Audit Plan

    Audit Plan preparation

    Submission of the Audit Plan to the ERA

    Audit Plan Approval

    Performance Audit conducted on site to execute Audit Plan

    Preparation of Audit Report

    The following people were interviewed during the Performance Audit; Mark Jameson - Operation & Maintenance Supervisor

    Ken Ferguson - HSEQ Compliance Advisor

    Andrew Usher - Plant Engineer

    Lui Dinardo Financial Controller

    John Hatton - Access Billing Manager, Western Power

  • 8/11/2019 20101209 D56935 Perth Power Partnership - 2010 Performance Audit and Asset Management Review Report

    11/133

    Performance Audit and Asset Management System Review ReportPerth Power Partnership: Kwinana Co-generation PlantSeptember 2010

    Page 11

    A list of key documents and other information sources examined by the auditor during the

    Performance Audit is provided below;

    O&M Agreement Power Purchase Agreements Monthly Reports ERA Correspondence Compliance Reports Asset Management Plan Business Plans Lease Agreements Connection Agreement Annual Reports Incident Reports

    Further detail is included in Appendix 1 of the report. In preparation the Performance Audit required30 hours of Nicole Davies time.

    2 .2 Per fo rm a nc e Aud i t Ob jec t ive

    The objective of the performance audit, as defined by the Audit Guidelines, is to assess theeffectiveness of measures taken by the licensee to meet obligations of the performance and quality

    standards referred to in the licence.

    In addition to compliance requirements, a specific focus is to be taken on the systems and

    effectiveness of processes used to ensure compliance with the standards, outputs and outcomes

    required by the licence. The audit outcome is to identify areas of non-compliance and areas of

    compliance where improvement is required and recommend corrective action as necessary.

  • 8/11/2019 20101209 D56935 Perth Power Partnership - 2010 Performance Audit and Asset Management Review Report

    12/133

    Performance Audit and Asset Management System Review ReportPerth Power Partnership: Kwinana Co-generation PlantSeptember 2010

    Page 12

    2 .3 Pe r fo r m a n c e A u d it M e th o d o l o g y

    A risk assessment, assessment of control environment and allocation of audit priority was undertaken

    in accordance with the Audit Guidelines Electricity, Gas and Water Licences (August 2010) on

    each element relating to Generation licensees of the Electricity Compliance Reporting Manual (1 July

    2010) issued by the Authority. However, as the audit period was the 1 st July 2008 to 30 th June 2010,

    the new Electricity Compliance and Reporting Manual (1 July 2010) was not applicable to the audit

    scope. As such, the Performance Audit was conducted against the 2008 Electricity and Compliance

    Reporting Manual (refer ERA website Archived Guidelines). For ease of comparison and future

    reference, the 2010 Electricity and Compliance Reporting criteria are noted in brackets within the

    table in Appendix 1.

    The Performance Audit Methodology as prescribed in the Guidelines was detailed in the Audit Plan.

    Table 3 defines the compliance ratings shown in section 1.1.

    Table 3: Operational/Performance Compliance Rating Scale

    Compliance Status Rating Description of Compliance

    Compliant 5 Compliant with no further action required to maintain compliance

    Compliant 4 Compliant apart from minor or immaterial recommendations to improve thestrength of internal controls top maintain compliance

    Compliant 3 Compliant with major or material recommendations to improve the strength ofinternal controls top maintain compliance

    Non-Compliant 2 Does not meet minimum requirements

    Significantly Non-Compliant 1 Significant weaknesses and/or serious action required

    Not Applicable N/A Determined that the compliance obligation does not apply to the licenseesbusiness operations

    Not Rated N/R No relevant activity took place during the audit period, therefore it is not possible toassess compliance

    In order to focus the audit effort and identify areas for testing and analysis a preliminary assessment

    of the risk and materiality of non-compliance with the Generation Licence was undertaken in

    accordance with the requirements of AS/NZS 31000 Risk Management and Appendix 2 of the Audit

    Guidelines. This assessment rating was reviewed during the audit process subject to the verification

    of control environment.

    Follow-Up from Previous Audit Findings

    A detailed assessment of the previous audit post implementation action plan was undertaken duringthe audit to assess effectiveness. A summary is provided in Table 4.

  • 8/11/2019 20101209 D56935 Perth Power Partnership - 2010 Performance Audit and Asset Management Review Report

    13/133

    Performance Audit and Asset Management System Review ReportPerth Power Partnership: Kwinana Co-generation PlantSeptember 2010

    Page 13

    Table 4 : 2008 Performance Audit Key Findi ngs, Recommendation, Post Audit Plan & Progress

    Ref Licence Condition Issue Recommendation Post-Audit Action Plan Outcome

    82 Generation LicenceCondition 16.1

    1) The ERA Licence details the organisationsGenerating Works as;

    Two gas turbine and one steam turbinegenerators in a combined-cycle, cogenerationarrangement with a nominal 116MW ratedplant capacity whose fuel source is primarilynatural gas or LPG as a secondary fuelsource

    It is noted that the LPG gas system has beendisabled and is no longer available to beused as a secondary source. Once formalapprovals have been obtained it will bedecommissioned and removed.

    2) In addition, a post mortem outage report isundertaken by the organisation to identifyopportunity for improvements for the nextoutage (Ref: Outage GT1B Minutes23/04/08). It is noted that the findings in thereport are not always acted upon andconsiderations could be given to utilising theEMPAC system to track requirements.

    1) Notify the ERA of theintention to remove the LPGFuel System as an alternativefuel source

    2) Utilise the work ordersystem to ensure thatrequirements from outagesare completed.

    ACTION 1: ERA notified of theintention decommission andremove the LPG Fuel system asan alternative fuel source.

    RESPONSIBILITY: J Lee

    DATE: 1 st December 2008

    ACTION 2: Procedure KCP-02-02Maintenance Planning modifiedto state that the work ordersystem is to be used to ensurethat requirements from outagesare actioned for following

    outages.

    Action 1 :Letter sent to ERA on23/12/08 from J. Lee

    Test: The letter has been sightedand discussions with the Secretariatconfirmed adequacy of actionresponse.

    Status: ACTION CLOSED

    Action 2: Review of MaintenancePlanning Procedure KCP-02-02.

    Test: The Procedure was reviewedand confirmation of item noted.Further, a review of Outage Post-Mortem 4 th September 2009 and

    work orders reviewed confirmedthis process has occurred duringthe audit period.

    STATUS: ACTION CLOSED

    83 Generation LicenceCondition 16.2

    103 Generation LicenceCondition 12.2

    109 Generation LicenceCondition 17.1

  • 8/11/2019 20101209 D56935 Perth Power Partnership - 2010 Performance Audit and Asset Management Review Report

    14/133

    Performance Audit and Asset Management System Review ReportPerth Power Partnership: Kwinana Co-generation PlantSeptember 2010

    Page 14

    Ref Licence Condition Issue Recommendation Post-Audit Action Plan Outcome

    86 Generation LicenceCondition 5.1

    The Risk Survey Reports by Marsh reviewthe consequences of fire risks, natural perils,catastrophic failure, terrorism, etc. It does notconsider the loss of natural gas supplyspecifically however the Business Continuity

    Plan (BCP) does consider this event, rankingthe probability of total loss of gas supply asLow. Consideration could be given toreviewing this document in light of theVeranus Island incident as per discussionswith the Asset Manager.

    Review Business ContinuityDocument to reflect updatedstrategy for gas supply.

    ACTION: Review BusinessContinuity Document to reflectupdated strategy for gas supply.

    RESPONSIBILITY: A Usher

    DATE: 31 March 2009

    A review of the Business ContinuityPlan to follow BCP Procedures laiddown by international Power.

    It is noted that there is no simplesolution to obtain alternative supplyof fuel should something happen tothe DBNGP disrupting gas supplies.This will continue to remain on theorganisations agenda until a viablealternative is found.

    Test: Discussion with Management,addressed to within controlparameters.

    Status: ACTION REVIEW STATUS AT NEXT AUDIT

  • 8/11/2019 20101209 D56935 Perth Power Partnership - 2010 Performance Audit and Asset Management Review Report

    15/133

    Performance Audit and Asset Management System Review ReportPerth Power Partnership: Kwinana Co-generation PlantSeptember 2010

    Page 15

    Ref Licence Condition Issue Recommendation Post-Audit Action Plan Outcome

    105 Generation LicenceCondition 13.1

    With respect to the financial reports thefollowing information is noted;

    - The partnerships financial reportdoes not comply with AASB124Related Party Disclosure and

    AASB7 Financial InstrumentsDisclosure -31/12/07.

    - The partnerships financial reportdoes not comply with AASB119Employee Benefits and AASB124Related Party Disclosure 31/12/06

    Convey ERA requirement toFinancial Auditors and ensurecompliance with relevantaccounting standards asrequired by licence EGL8.

    ACTION: Ensure Financial Auditors are aware of ERArequirements to ensurecompliance with EGL8.

    RESPONSIBILITY: FinancialController

    DATE: 31 st December 2008

    KPMG have confirmed that from ameasurement perspective theaccount comply with AASB.Choosing to not meet the disclosurerequirement does not mean PPPdoes not comply with AASB.Compliance with this requirementhas been confirmed.

  • 8/11/2019 20101209 D56935 Perth Power Partnership - 2010 Performance Audit and Asset Management Review Report

    16/133

    Performance Audit and Asset Management System Review ReportPerth Power Partnership: Kwinana Co-generation PlantSeptember 2010

    Page 16

    2.4 2010 Post Au dit Imp lem en tation Plan

    As stipulated in section 11.9 of the Audit Guidelines (August 2010), the Audit Team notes that the Performance Audit Post Implementation Plan(Appendix 3) does not form part of the Audit Opinion. It is the responsibility of the licensee to ensure actions are undertaken as determined byPerth Power Partnership: Kwinana Cogeneration Plant.

    Table 5: Post Audit Implementation Plan

    Ref Aud it Requ irem ent Issue Recommendation Post-Audit Action Plan

    85 Generation Licence Condition 4.1 -Electricity Industry Act section 17(1)

    The licensee must pay theapplicable fees in accordance withthe Regulations.

    A licensee must pay to theAuthority the prescribed licencefee within one month after the dayof grant or renewal of the licenceand within one month after eachanniversary of that day during theterm of the licence.

    Non Compliant [2]

    Licence fees were paid 4 days after the datethey were required to be paid by thelicence.

    The organisation is aware of therequirements for payment of licence feesannually.

    As a result of the last audit an EMPAC workorder was established to pay li cence fees.The last date it was set for was the 1/7/10;however, the Licensee has amended thework order to be raised on 9/5/2011. Thisshould ensure future compliance with thisLicence Condition.

    The ERA invoice was issued and paid withinthe organisations accounts system aspromptly as allowed. The issue arises assystem requires accounts prior to payment.In order to meet the deadline a paymentwould need to be authorised prior toreceipt of the invoice.

    1. Monitoring of the Licence feesin the management meetingcould be considered to ensurethe payment is occurring ontime. Investigation of approvalto pay without the invoicecould be sought.

    ACTION:

    a) Work order scheduled date broughtforward to ensure more time availablefor payment to be actioned.

    b) Purchasing procedure reviewundertaken with regard to makingprovision for regulatory licences to paidon due date regardless of invoice beingreceived.

    DATE:

    a) Completedb) 31 st March 2011

    RESPONSIBILITY: Financial Controller

  • 8/11/2019 20101209 D56935 Perth Power Partnership - 2010 Performance Audit and Asset Management Review Report

    17/133

    Performance Audit and Asset Management System Review ReportPerth Power Partnership: Kwinana Co-generation PlantSeptember 2010

    Page 17

    Ref Aud it Requ irem ent Issue Recommendation Post-Audit Action Plan

    86 Generation Licence Condition 5.1 The Risk Survey Reports by Marsh review theconsequences of fire risks, natural perils,catastrophic failure, terrorism, etc. It does notconsider the loss of natural gas supplyspecifically however the Business Continuity Plan(BCP) does consider this event, ranking theprobability of total loss of gas supply as Low.Consideration could be given to reviewing thisdocument in light of the Veranus Island incidentas per discussions with the Asset Manager

    2. Ensure the post auditimplementation action planfrom the 2008 audit ismonitored for completionand effectiveness.

    ACTION:

    A review has been undertaken and theprobability ranking of a loss of supplyevent has been increased to Mediumas a result of the Varanus IslandIncident however there is no simplesolution to obtaining alternativesupplies of gas fuel should somethinghappen to upstream productionfacilities or the DBNG pipeline to CS10at Kwinana.

    At this time there is no alternativesource of supply available or, perhapsmore importantly, an alternativepipeline route to the plant for thatsupply. This issue will continue toremain on PPP s review agenda untilsuch time as any viable alternativesbecome available and backup suppliescan be arranged.

    RESPONSIBILITY: Asset ManagerDATE: Ongoing

  • 8/11/2019 20101209 D56935 Perth Power Partnership - 2010 Performance Audit and Asset Management Review Report

    18/133

    Performance Audit and Asset Management System Review ReportPerth Power Partnership: Kwinana Co-generation PlantSeptember 2010

    Page 18

    3. ASSET MANAGEMENT SYSTEM EFFECTIVENESS REVIEW

    3.1 AM S Rev iew Sc op e

    The scope of the AMS review includes an assessment of adequacy and effectiveness of Perth Power

    Station: Kwinana Cogeneration Plant asset management system, by evaluating during the audit

    period 1 st July 2008 to 20 th June 2010 the following;

    1. Asset Planning

    2. Asset creation/acquisition

    3. Asset disposal

    4. Environmental analysis5. Asset operations

    6. Asset maintenance

    7. Asset management information system

    8. Risk management

    9. Contingency planning

    10. Financial planning

    11. Capital expenditure planning

    12. Review of asset management system

    The review has been established as a requirement of the current Generating Licence issued by the

    Economic Regulation Authority to Perth Power Partnership: Kwinana Cogeneration Plant.

    The asset management review follows the approved audit plan and uses;

    a risk based approach to auditing using the risk evaluation model set out in ISO31000:2009

    an overall effectiveness rating for an asset management process, based on a combination of

    the process and policy adequacy rating and the performance rating

    the format and content of the reviewers report; and post- implementation plan as described in

    the Guidelines.

    The following people were interviewed during the review;

    Mark Jameson Operations & Maintenance Supervisor

    Ken Ferguson HSEQ Compliance Advisor

    Lui Dinardo Financial Controller

    Andrew Usher Plant Engineer

  • 8/11/2019 20101209 D56935 Perth Power Partnership - 2010 Performance Audit and Asset Management Review Report

    19/133

    Performance Audit and Asset Management System Review ReportPerth Power Partnership: Kwinana Co-generation PlantSeptember 2010

    Page 19

    The key documents and other information sources are detailed below and further in Appendix 2.

    1. Kwinana Cogeneration Project Business Plan 2009 - 132. Kwinana Cogeneration Project Business Plan 2010 - 143. Kwinana Cogeneration Plant Monthly Report Sept 20084. Kwinana Cogeneration Plant Monthly Report June 20095. Kwinana Cogeneration Plant monthly Report February 20106. Verve Contract Supply of Electricity Part 3 Section 8 in Power purchase

    Agreement7. BP Contract BP Energy and Services Agreement Supply of Electricity and

    Steam Part 3 Section 88. Perth Power Partnership Meeting minutes 10 th March 20109. Perth Power Partnership Meeting minutes 17 th December 200910. Perth Power Partnership Meeting minutes 13 th May 201011. Whole of Plant Risk assessment for Kwinana Cogeneration Plant (spreadsheet)12. Perth Power Partnership Annual Report 200913. Kwinana Cogeneration Plant Annual Report 200914. Kwinana Risk Survey Report Update 03.09 Version 1 (Marsh Report)15. Kwinana Operations and Maintenance Agreement Kwinana Power partnership16. Australian Regional Review Business Plan 2010 - 2014 Asset Overview Perth

    Power Partnership17. Kwinana Maintenance Prediction -201018. Customer Satisfaction Survey SurveyMonkey December 2009 July 2010

    responses19. External complaint Form KCP-07-0420. Identifying Customer Requirements and Measuring Satisfaction Procedure - KCP-

    06-0621. Fuel/Gas Management KCP-03-0222. EMPAC asset management & maintenance software23. Toolbox meeting minutes24. 2010 audit schedule25. Preparation of annual business plan KCP-05-0226. Review by Price Waterhouse Coopers: IPM Operations & Maintenance Kwinana

    Pty Ltd Kwinana DSCR Review27. Syndicated Project Facility Agreement 199528. Minutes of Management Meeting 25 May 2009

    29. Minutes of Management Meeting 10 February 201030. 6 th May 2010 Kwinana bearing No2 failure report update 8 th June 201031. Purchase of Goods & Services Procedure KCP- 06-0232. Plant or Operational Change Approval Procedure KCP-04-0233. Quality Management Procedure KCP-04-0134. Project Checklist Form KCP-04-0935. Table of IPM Kwinana License Renewals / Reports Due / and Fees36. Record of change to Legislative requirements matrix KCP-01-0137. Minutes of Quarterly Compliance Meeting 3/4/09, 8/6/09,38. Plant or Operational Change Approval Procedure KCP-04-0239. Modification Request Form KCP040140. Disposal of Redundant Assets Procedure KCP-05-25

    41. Waste Disposal Procedure KCP 01-0842. Spare Parts Policy Procedure KCP-06-0743. Design process Procedure KCP-04-04

  • 8/11/2019 20101209 D56935 Perth Power Partnership - 2010 Performance Audit and Asset Management Review Report

    20/133

    Performance Audit and Asset Management System Review ReportPerth Power Partnership: Kwinana Co-generation PlantSeptember 2010

    Page 20

    44. IPM Kwinana Cogeneration Plant Business Continuity Plan KCP-08-1445. Table of IPM Kwinana License Renewals / Reports Due / and Fees46. Record of change to Legislative requirements matrix KCP-01-0147. Document register policies and procedures48. Plant Operating Policy KCP 03 & Procedure KCP-03-0449. Plant Operating Logs and Records Procedure KCP-03-2350. Training Procedure KCP-07-1051. Black & Vetch (OEM) Operations & Maintenance Manuals52. GE Operating Manuals53. GE Technician Training manuals54. Training records55. Fuel/Gas Management KCP-03-0256. Weekly Toolbox Meeting minutes57. Training matrix and reports58. Work orders scheduled (PM & unplanned) W/E 19/07/10

    59. Overdue PM work orders YTD 12/07/1060. Non-conformance and Corrective and Preventative Action Procedure KCP-07-0761. Abnormal Occurrence Report KCP-03-40 62. Foxboro DCS63. IT Infrastructure Regular Maintenance Procedure KCP-05-2064. LAN Administration Procedure KCP-05-1565. Server Backup Management KCP-05-2166. Training Procedure KCP-07-1067. Logic modifications KCP-02-0668. Corriolis RGF Calibration procedure KCP-02-1069. Process Steam Flow Transmitter Calibration procedure KCP-02-1170. DCS Backing Up Workstation to Tape Procedures KCP-02-20/21/22

    71. Site Security Procedure KCP-05-1372. 2010 Internal Audit Schedule73. SAI Triennial Audit Report 25/06/0974. Register of Environmental aspects and Impacts 200975. Internal Management System Audits and Reviews procedure KCP-04-0576. Preparation of Annual Business Plan KCP-05-0277. KCP Business Continuity Plan 2010 Draft78. Testing of Stand-by and Emergency Plan KCP-03-1279. Emergency Operation Loss of Station AC Electrical Supplies and Backup Diesel

    Generator Operations KCP-03-1380. Emergency Operation Loss of Water Supply KCP-03-1581. Emergency operation Systems Islanding KCP-03-1682. Emergency Operation Loss of Natural Gas Supply KCP-03-1783. Emergency Operations Protection Operations KCP-03-1884. Emergency Response Plan KCP-08-0285. KIMA Manual KIMA 03986. Review by Price Waterhouse Coopers: IPM Operations & Maintenance Kwinana

    Pty Ltd Kwinana DSCR Review87. Syndicated Project Facility Agreement 199588. Kwinana 5 Year Maintenance Prediction -201089. Kwinana Cogeneration Plant 5 Year Capital Spares Purchases 201090. Delegation of Authority for Assets and Business CEOS FPM/FP0191. GV Instructions 2010 Master.docx (2010 2021)92. Kwinana GV 2010 Base Case (2010 2021)93. SAI Triennial Audit Report 25/06/09

  • 8/11/2019 20101209 D56935 Perth Power Partnership - 2010 Performance Audit and Asset Management Review Report

    21/133

    Performance Audit and Asset Management System Review ReportPerth Power Partnership: Kwinana Co-generation PlantSeptember 2010

    Page 21

    The review was conducted in conjunction with the Performance Audit during August 2010 and

    included one day preliminary site audit, desktop review, one day audit to execute audit plan and

    interview sessions and report writing. In total the audit required 72 hours of Premmck Management

    Services (Neema Premji and Brian McKenry) time. This was the first time Premmck Management

    Services have carried out a compliance audit on this site.

  • 8/11/2019 20101209 D56935 Perth Power Partnership - 2010 Performance Audit and Asset Management Review Report

    22/133

    Performance Audit and Asset Management System Review ReportPerth Power Partnership: Kwinana Co-generation PlantSeptember 2010

    Page 22

    3 .2 Ob jec t ive o f the Asse t Ma na g em ent System Rev iew

    The objective of the review is to examine the effectiveness of the processes used by Perth Power

    Partnership: Kwinana Cogeneration Plant to deliver asset management, the information systems

    supporting asset management activities and the data and knowledge used to make decisions about

    asset management. These elements were examined from a life cycle perspective i.e. planning,

    construction, operation, maintenance, renewal, replacement and disposal using the guidelines

    developed by the Economic Regulation Authority.

    3 .3 Me thod o log y fo r Asse t Ma na g em ent System Rev iew

    The audit methodology detailed in the Audit Guidelines Electricity, Gas and Water Licences (August

    2010) was used in the execution of the Asset Management System Review and is detailed in the

    Audit Plan.

    Asset Management System Effecti veness Rating

    The Audit Guidelines (section 11.4.2) states that the asset management review report must provide a

    table that summarises the auditors assessment of both the process and policy definition rating and

    the performance rating for each key process in the licensees asset management system using the

    scales described in Table 5 and Table 6. It is left to the judgement of the auditor to determine the

    most appropriate rating for each asset management process.

  • 8/11/2019 20101209 D56935 Perth Power Partnership - 2010 Performance Audit and Asset Management Review Report

    23/133

    Performance Audit and Asset Management System Review ReportPerth Power Partnership: Kwinana Co-generation PlantSeptember 2010

    Page 23

    Table 6: Asset management process and policy defini tion adequacy ratings

    Rating Description Criteria

    A Adequately defined Processes and policies are documented.

    Processes and policies adequately document the required performance of the assets.

    Processes and policies are subject to regular reviews, and updated where necessary

    The asset management information system(s) are adequate in relation to the assets that arebeing managed.

    B Requires someimprovement

    Process and policy documentation requires improvement.

    Processes and policies do not adequately document the required performance of the assets.

    Reviews of processes and policies are not conducted regularly enough.

    The asset management information system(s) require minor improvements (taking intoconsideration the assets that are being managed).

    C Requires significantimprovement

    Process and policy documentation is incomplete or requires significant improvement.

    Processes and policies do not document the required performance of the assets.

    Processes and policies are significantly out of date.

    The asset management information system(s) require significant improvements (taking intoconsideration the assets that are being managed).

    D Inadequate Processes and policies are not documented.

    The asset management information system(s) is not fit for purpose (taking into considerationthe assets that are being managed).

  • 8/11/2019 20101209 D56935 Perth Power Partnership - 2010 Performance Audit and Asset Management Review Report

    24/133

    Performance Audit and Asset Management System Review ReportPerth Power Partnership: Kwinana Co-generation PlantSeptember 2010

    Page 24

    Table 7: Asset management performance ratings

    Rating Description Criteria

    1 Performingeffectively

    The performance of the process meets or exceeds the required levels of performance. Process effectiveness is regularly assessed and corrective action taken where necessary.

    2 Opportunity forimprovement

    The performance of the process requires some improvement to meet the required level. Process effectiveness reviews are not performed regularly enough. Process improvement opportunities are not actioned.

    3 Corrective actionrequired

    The performance of the process requires significant improvement to meet the required level. Process effectiveness reviews are performed irregularly, or not at all. Process improvement opportunities are not actioned.

    4 Serious actionrequired

    Process is not performed, or the performance is so poor that the process is considered to beineffective.

    Deviation f rom the Audit Plan

    There were several changes made to the risk assessment ratings conducted for the Audit Plan for thePerformance Audit and the Asset Management System Review. The revisions only involve the

    adequacy of existing controls. All deviations from the Audit Plan are detailed within Appendix 1 and 2

    respectively.

  • 8/11/2019 20101209 D56935 Perth Power Partnership - 2010 Performance Audit and Asset Management Review Report

    25/133

    Performance Audit and Asset Management System Review ReportPerth Power Partnership: Kwinana Co-generation PlantSeptember 2010

    Page 25

    Table 8: Previous Asset Management Review Key Findings, Recommendation, Post Audit Plan & Progr ess

    Ref Audit Requirement Issue Recommendation Post-Audit Action Plan Outcome

    8.4 The probability and

    consequence of asset

    failure are regularly

    assessed

    The probability andconsequences of asset failuresare assessed based onknowledge of the plant,manufacturers data, goodindustry practice and importanceof the asset under consideration.Maintenance plans, policies andprocedures are implemented inEMPAC system to mitigateagainst the consequences offailures. The plant has beencertified compliant withOccupational Health and SafetyManagement Systems AS 4801,Environmental ManagementSystems ISO 14001 and Quality

    Management Systems ISO 9001.While the probability andconsequences of asset failureshas been assessed in the past,there does not appear to beregular assessment reviews.

    The probability andconsequences of asset failureshould be regularly reviewed toconfirm appropriateness andeffectiveness of maintenancesystems.

    ACTION: Developprocedure/process for review ofrisk assessment for assetfailures that is aligned with theplant modification process.

    RESPONSIBILITY: Plant Engineer

    DATE: 30 th Nov 2008

    KCP Procedures KCP-04-01 and

    KCP-04-02 amended to show that

    the Risk Survey Report is

    conducted biennially and that

    any Plant Modifications are

    reviewed against this report at

    that time as well as being

    evaluated on their own as each

    Mod Request is considered for

    approval as per KCP-04-02.

  • 8/11/2019 20101209 D56935 Perth Power Partnership - 2010 Performance Audit and Asset Management Review Report

    26/133

    Performance Audit and Asset Management System Review ReportPerth Power Partnership: Kwinana Co-generation PlantSeptember 2010

    Page 26

    Table 9: Recommendations and Post Audit Action Plans

    Ref Aud it Requ irem ent Issue Recommendation Post-Audit Action Plan

    4.3 Environmental Analysis -Compliance with statutoryand regulatory requirements

    Review Priority 2

    Effectiveness Rating B3

    There has been some disagreement over the

    inclusion of the waste water discharge in theLicensees Environmental Licence or BPsEnvironmental Licence.

    Currently, the intention of the DEC is toinclude it in PPPs Licence. IPL may challengethis decision. The Environmental Licence forthe site is essentially its licence to operatewithin the environmental parametersdefined, if the disagreement is not readilyresolved the cessation of discharge couldhave an impact on the operational ability ofthe plant.

    Recommendation 1: Resolution of

    the issue is required to ensure thefuture discharge of waste water inaccordance with licencerequirements.

    ACTION:PPP are in discussion with DEC andBP refinery to sort out this ongoingissue under the stipulations of thelong term agreements and takemeasures to comply with theregulatory requirements set down byDEC.

    PPP is confident that the issue will beresolved and there would be nodisruption to the operation of theplant.

    RESPONSIBILITY: Asset Manager

    DATE: Ongoing

    7.5 Asset Management

    Information System Databackup procedures appearadequate

    Review Priority - 4

    Effectiveness Rating A2

    The DCS backup tapes could not be located in

    the library as per procedure. Also all doorsbetween DCS server and library were open,including fire doors

    Recommendation 2: The storage of

    DCS back-up tapes requires review;although the library is remote to theDCS servers a review of fire safetyprocesses (i.e. fire doors left open) maybe appropriate .

    ACTION: Procedure to be amended to

    indicate onsite storage as the Fire Proof Safelocated in the Office Amenities room and alsooff site storage through the current serviceprovider.

    RESPONSIBILITY: Plant Engineer

  • 8/11/2019 20101209 D56935 Perth Power Partnership - 2010 Performance Audit and Asset Management Review Report

    27/133

    Performance Audit and Asset Management System Review ReportPerth Power Partnership: Kwinana Co-generation PlantSeptember 2010

    Page 27

    Ref Aud it Requ irem ent Issue Recommendation Post-Audit Action Plan

    DATE: 31 st December 2010

    7.6 Asset ManagementInformation System Keycomputations related tolicensee performancereporting are materiallyaccurate

    Review Priority - 4

    Effectiveness Rating A2

    At the time of the audit concerns were raisedabout where Western Power is monitoringambient temperatures utilised to calculate KCPsmaximum capability

    Recommendation 3: The issue withthe ambient temperature monitoringshould be resolved with Western Powerto ensure KCP capability is notadversely affected.

    ACTION: Select and agree on a suitabletemperature reference site with SystemManagement/IMO for the purpose ofcalculating KCPs maximum capability.

    RESPONSIBILITY: Plant Engineer

    DATE: 31 st December 2010

    9.1 Contingency Planning Contingency plans aredocumented, understood andtested to confirm theiroperating ability and to coverhigher risks

    Review Priority 4

    Effectiveness Rating A2

    Currently KCP is in the process of reviewing itsdraft Business Continuity Plan. It requires befinalising and testing as prescribed within theplan.

    Recommendation 4: KCP BusinessContinuity Plan 2010 Draft to befinalised and implemented accordingly.

    ACTION:

    a) BCP to move from draft to approved andmigrated into Lotus Notes proceduresdatabase.

    b) Testing of BCP is to be conducted byIPR/Marsh and was scheduled for 2010.

    RESPONSIBILITY: Asset Manager

    DATE:

    a) 31st October 2010

    b) 31st December 2010

  • 8/11/2019 20101209 D56935 Perth Power Partnership - 2010 Performance Audit and Asset Management Review Report

    28/133

    Performance Audit and Asset Management System Review ReportPerth Power Partnership: Kwinana Co-generation PlantSeptember 2010

    Page 28

    Ref Aud it Requ irem ent Issue Recommendation Post-Audit Action Plan

    10.2 Financial Planning Thefinancial plan identifies thesource of funds for capitalexpenditure and recurrentcosts

    Review Priority 5

    Effectiveness Rating A2

    The Syndicated Project Facility Agreementprovided for and continues to provide for a secureline of credit, as a viable source of funds until July2011. The use of this source of credit facility wasevident in the purchase of a new rotor andrefurbishment of the failure rotor of Bearing No. 2.

    Recommendation 5: Perth PowerPartnership must investigate financialcredit line instrumentalities andimplement accordingly such that it canbe used as an alternate source of fundsupon the expiration of the currentagreement.

    ACTION: a) Review options for credit facilityand make recommendation for approval priorto existing arrangement expiration.

    RESPONSIBILITY: Financial Controller

    DATE: 31 st May 2011

  • 8/11/2019 20101209 D56935 Perth Power Partnership - 2010 Performance Audit and Asset Management Review Report

    29/133

    Performance Audit and Asset Management System Review ReportPerth Power Partnership: Kwinana Co-generation PlantSeptember 2010

    Page 29

    3.4 2010 Po st Au d i t Im p lem en tat ion Plan

    As stipulated in section 11.9 of the Audit Guidelines (August 2010), the Audit Team notes that the AssetManagement Review Post Implementation Plan does not form part of the Audit Opinion. It is theresponsibility of the licensee to ensure actions are undertaken as determined by Perth Power Partnership:Kwinana Cogeneration Plant.

    4. FOLLOW UP AUDIT PROCESS

    This is the second Performance Audit and Asset Management Review conducted since the issue of

    the licence. Review of actions taken in response to recommendations will form part of subsequentaudit plans.

    The license proposes that Perth Power Partnership reports progress on the Post AuditImplementation Plan to the ERA in the annual Compliance Reports.

  • 8/11/2019 20101209 D56935 Perth Power Partnership - 2010 Performance Audit and Asset Management Review Report

    30/133

    Performance Audit and Asset Management System Review ReportPerth Power Partnership: Kwinana Co-generation PlantSeptember 2010

    Page 30

    APPENDIX 1

    PERTH POWER PARTNERSHIP: KWINANA COGENERATIONPLANT

    PERFORMANCE AUDIT SEPTEMBER 2010

  • 8/11/2019 20101209 D56935 Perth Power Partnership - 2010 Performance Audit and Asset Management Review Report

    31/133

    Performance Audit and Asset Management System Review ReportPerth Power Partnership: Kwinana Co-generation PlantSeptember 2010

    Page 31

    ComplianceReportingManual Ref

    Licence Condition Requirement Compliance Rating Verification/ Tests Effectiveness

    GENERATION LICENCE CONDITION 1 - DEFINITIONS

    - Determined to be not applicable to the auditscope.

    Not Applicable

    [NA]

    NOT APPLICABLE

    GENERATION LICENCE CONDITION 2 - GRANT OF LICENCE

    - Generation Licence condition 2.1- ElectricityIndustry Act 2004

    The licensee is granted a licence for thelicence area to construct and operategenerating works or operate existinggenerating works in accordance with theterms and conditions of this licence.

    Compliant

    [5]

    Perth Power Partnership PtyLtd Generation Licence EGL8 Schedule 1

    Notice Amendment toElectricity Generation Licence8 (29 January 2009)

    Discussions with SiteManagement

    Discussions with SystemManagement

    Application for GenerationLicence (22/12/2005)

    The licensee has operated the generatingworks in accordance with the licenceEGL8.

    The installed capacity of the Unit, asdefined by EGL8, is 116 MW. It is notedthat operationally, under certainconditions, the plant has a capability ofachieving a greater output of up to133MW. This is in response to SystemManagements requirements.

    Risk Assessment Audit Priority Corrective Action/Opportunity for Improvement

    Likelihood

    Consequence

    Inherent Risk

    Unlikely

    Minor

    Low

    5 Nil

  • 8/11/2019 20101209 D56935 Perth Power Partnership - 2010 Performance Audit and Asset Management Review Report

    32/133

    Performance Audit and Asset Management System Review ReportPerth Power Partnership: Kwinana Co-generation PlantSeptember 2010

    Page 32

    ComplianceReportingManual Ref

    Licence Condition Requirement Compliance Rating Verification/ Tests Effectiveness

    Adequacy of Controls Strong

    GENERATION LICENCE CONDITION 3 - TERM

    - Generation Licence Condition 3.1 - Electricity

    Industry Act 2004The licence commences on thecommencement date and continues until theearlier of;

    (a) the cancellation of the licence pursuant toclause 7 of this licence;(b) the surrender of the licence pu rsuant toclause 8 of this licence; or(c) the expiry date.

    Not Rated

    [NR]

    Compliance Reports duringaudit period 1 st July 2008 30 th June 2010

    Interview with Operation &Maintenance Supervisor

    No issues with regards to surrender orcancellation of the licence were raisedduring the audit period. As suchassessment of compliance with clausecannot be undertaken.

    Risk Assessment Audit Priority Corrective Action/Opportunity for Improvement

    Likelihood

    Consequence

    Inherent Risk

    Adequacy of Controls

    Unlikely

    Moderate

    Medium

    Strong

    4 Nil

    GENERATION LICENCE CONDITION 4 - FEES

    85

    [TYPE NR]

    Generation Licence Condition 4.1 - ElectricityIndustry Act section 17 (1)

    The licensee must pay the applicable fees inaccordance with the Regulations.

    A licensee must pay to the Authority the

    Non Compliant

    [2]

    Payment of fees before the9 th July each year

    Discussion with AssetEngineer

    Review of payment/pending

    Licence fees were paid as follows;

    - ERA Invoice ERA182 (date of issue 24June 2010) Approved for payment.(Payment ref #566) Paid 7 th July 2010

    Received by the ERA on the 13 th July 2010

  • 8/11/2019 20101209 D56935 Perth Power Partnership - 2010 Performance Audit and Asset Management Review Report

    33/133

    Performance Audit and Asset Management System Review ReportPerth Power Partnership: Kwinana Co-generation PlantSeptember 2010

    Page 33

    ComplianceReportingManual Ref

    Licence Condition Requirement Compliance Rating Verification/ Tests Effectiveness

    prescribed licence fee within one month afterthe day of grant or renewal of the licence andwithin one month after each anniversary ofthat day during the term of the licence.

    invoice process

    Discussions with TheSecretariat

    EMPAC Work Order (File

    Number 36)

    - ERA Invoice ERA123 (date of issue 16June 2009). Payment ref K013324 (#8094& #530525) Paid 9 th July 2009

    Received by the ERA on the 13 th July 2009

    The organisation is aware of therequirements for payment of licence feesannually.

    As a result of the last aud it an EMPACwork order was established to pay licencefees. The last date it was set f or was the1/7/10, however, the Licensee hasamended the work order to be raised on9/5/2011. This should ensure futurecompliance with this Licence Condition.

    The ERA invoice was issued and paidwithin the organisations accounts systemas promptly as allowed. The is sue arises assystem requires accounts prior topayment. In order to meet the deadline apayment would need to be authorisedprior to receipt of the invoice.

    Risk Assessment Audit Priority Corrective Action/Opportunity for Improvement

    Likelihood

    Consequence

    Inherent Risk

    Unlikely

    Minor

    Low

    Moderate

    5 1. Monitoring of the Licence fees in the management meeting could beconsidered to ensure the payment is occurring on time. Investigationof approval to pay without the invoice could be sought.

    Note: The Adequacy of Controls measure has been revised from Strong toModerate due to audit finding.

  • 8/11/2019 20101209 D56935 Perth Power Partnership - 2010 Performance Audit and Asset Management Review Report

    34/133

    Performance Audit and Asset Management System Review ReportPerth Power Partnership: Kwinana Co-generation PlantSeptember 2010

    Page 34

    ComplianceReportingManual Ref

    Licence Condition Requirement Compliance Rating Verification/ Tests Effectiveness

    Adequacy of Controls

    GENERATION LICENCE CONDITION 5 COMPLIANCE

    - Subject to any modifications or exemptionsgranted pursuant to the Act, the li censeemust comply with any applicable legislation.

    Compliant

    [4]

    Good corporate citizenship

    Regulatory controls

    Legal advisors

    Discussions with PlantEngineer

    Compliance with applicable legislationreferred to the in Generation Licenceforms part of this audit. Exceptions arenoted in the executive summary.

    Risk Assessment Audit Priority Corrective Action/Opportunity for Improvement

    Likelihood

    Consequence

    Inherent Risk

    Adequacy of Controls

    Unlikely

    Moderate

    Medium

    Moderate

    4 Note: Refer to corrective actions detailed in the summary Table 9 AssetManagement Review.

    86

    [TYPE NR]

    A licensee must take reasonable steps to

    minimise the extent or duration of anyinterruption, suspension or restriction of thesupply of electricity due to an accident,emergency, potential danger or otherunavoidable cause.

    Compliant

    [5]

    Discussion with Operation &

    Maintenance Supervisor Operations & Maintenance

    Agreement Section 6.3(i)

    Operational Procedures

    Incident Management

    Emergency Procedures

    O&M availability criteria;

    Operations & Maintenance Agreement

    Section 6.3(i) adequately addressesrequirements to maximise electricitygeneration; high availability targets are setfor IPM/PPP safety and environmentalperformance requirements are specified.

    Compliance with the Agreement ismonitored by Management.

  • 8/11/2019 20101209 D56935 Perth Power Partnership - 2010 Performance Audit and Asset Management Review Report

    35/133

    Performance Audit and Asset Management System Review ReportPerth Power Partnership: Kwinana Co-generation PlantSeptember 2010

    Page 35

    ComplianceReportingManual Ref

    Licence Condition Requirement Compliance Rating Verification/ Tests Effectiveness

    financial penalties

    Secure site

    Effective Health and SafetyManagement Plans

    Safety Compliance AuditsRisk Assessment Audit Priority Corrective Action/Opportunity for Improvement

    Likelihood

    Consequence

    Inherent Risk

    Adequacy of Controls

    Unlikely

    Moderate

    Medium

    Strong

    4 Nil

    87

    [TYPE 2]

    Generation Licence Condition 5.1- ElectricityIndustry Act section 41 (6)

    A licensee must pay the costs of taking aninterest in land or an easement over land .

    Compliant

    [5]

    Site Lease between BPRefinery (Kwinana) Pty Ltdand Kwinana PowerPartnership dated 14 th March1995.

    2.1814 ha Drawing 3315-24-05

    ESA (Energy ServicesAgreement) between Lessorand Lessee dated 7th March1995

    The Kwinana site is leased from BP until2023. This timeframe is aligned with allother relevant contract documentation. Itis noted that the ERA Licence is valid until2036.

    Risk Assessment Audit Priority Corrective Action/Opportunity for Improvement

    Likelihood

    Consequence

    Unlikely

    Minor

    5 Nil

  • 8/11/2019 20101209 D56935 Perth Power Partnership - 2010 Performance Audit and Asset Management Review Report

    36/133

    Performance Audit and Asset Management System Review ReportPerth Power Partnership: Kwinana Co-generation PlantSeptember 2010

    Page 36

    ComplianceReportingManual Ref

    Licence Condition Requirement Compliance Rating Verification/ Tests Effectiveness

    Inherent Risk

    Adequacy of Controls

    Low

    Strong

    Electricity Industry Metering Code

    309

    [TYPE 2]

    (326)

    Generation Licence Condition 5.1 - ElectricityIndustry Metering Code clause 3.5(6)

    A network operator may only impose acharge for providing, installing, operating ormaintaining a metering installation inaccordance with the applicable service levelagreement between it and the user. WesternPower Corporation (WPC) is the NetworkOperator for Kwinana CogenerationPlant/PPP

    Not Applicable

    [NA]

    Not Applicable as Perth Power Partnership is not the Network Operator.Reference to Electricity Industry Metering Code.

    319

    [TYPE 2]

    (336)

    Generation Licence Condition 5.1 - ElectricityIndustry Metering Code clause 3.11(3)

    A Code participant who becomes aware of anoutage or malfunction of a meteringinstallation must advise the network operatoras soon as practicable.

    Compliant

    [5]

    SCADA DATA

    Management Meeting

    Discussion with Plant

    Engineers Discussion with Western

    Power

    Although, The Electricity Metering Code isnot applicable to the scope of the auditthis item is relevant for consideration asthe Licensee still has an obligation to

    report a malfunction of a meteringinstallation. There are systems establishedand adequate monitoring programs toidentify a malfunction should it not beidentified by the Network Operator in thefirst instance.

    Risk Assessment Audit Priority Corrective Action/Opportunity for Improvement

    Likelihood Unlikely 4 Nil

  • 8/11/2019 20101209 D56935 Perth Power Partnership - 2010 Performance Audit and Asset Management Review Report

    37/133

    Performance Audit and Asset Management System Review ReportPerth Power Partnership: Kwinana Co-generation PlantSeptember 2010

    Page 37

    ComplianceReportingManual Ref

    Licence Condition Requirement Compliance Rating Verification/ Tests Effectiveness

    Consequence

    Inherent Risk

    Adequacy of Controls

    Moderate

    Medium

    Strong

    Note: This was rated as Not Applicable in the Audit Plan as the Licensee is notdirectly response for the metering installations. A request from the Secretariatto consider the requirement was made during the audit process.

    331

    [TYPE 2]

    (348)

    Generation Licence Condition 5.1 - ElectricityIndustry Metering Code clause 3.16(5)

    A network operator or a user may require theother to negotiate and enter into a writtenservice level agreement in respect of thematters in the metrology procedure dealtwith under clause 3.16(4) of the Code.

    Not Applicable

    [NA]

    WPN is responsible for metering and this further defined within theConnection Agreement.

    342

    [TYPE 2]

    (359)

    Generation Licence Condition 5.1 - ElectricityIndustry Metering Code clause 3.27

    A person must not install a meteringinstallation on a network unless the person isthe network operator or a registeredmetering installation provider for the networkoperator doing the type of work authorised

    by its registration.

    Not Applicable

    [NA]

    Tariff meters installed at the Kwinana Cogeneration Plant are theresponsibility of Western Power .

    349

    [TYPE NR]

    (366)

    Generation Licence Condition 5.1 - ElectricityIndustry Metering Code clause 4.4(1)

    A network operator and affected Codeparticipants must liaise together to determinethe most appropriate way to resolve adiscrepancy between energy data held in a

    Not Applicable

    [NA]

    Managed via contracts with Verve. WPN and System Management have directcontrol of metering.

  • 8/11/2019 20101209 D56935 Perth Power Partnership - 2010 Performance Audit and Asset Management Review Report

    38/133

    Performance Audit and Asset Management System Review ReportPerth Power Partnership: Kwinana Co-generation PlantSeptember 2010

    Page 38

    ComplianceReportingManual Ref

    Licence Condition Requirement Compliance Rating Verification/ Tests Effectiveness

    metering installation and data held in themetering database.

    350

    [TYPE NR]

    (367)

    Generation Licence Condition 5.1 - Electricity

    Industry Metering Code clause 4.5(1)A Code participant must not knowinglypermit the registry to be materiallyinaccurate.

    Not Applicable

    [NA]

    Managed via contracts with Verve. WPN and System Management have direct

    control of metering.

    351

    [TYPE 2]

    (368)

    Generation Licence Condition 5.1 - ElectricityIndustry Metering Code clause 4.5(2)

    If a Code participant (other than a networkoperator) becomes aware of a change to o ran inaccuracy in an item of standing data inthe registry, then it must notify the networkoperator and provide details of the change orinaccuracy within the timeframes prescribed.

    Not Applicable

    [NA]

    Managed via contracts with Verve. WPN and System Management have directcontrol of metering.

    363

    [TYPE NR]

    (380)

    Generation Licence Condition 5.1 - ElectricityIndustry Metering Code clause 5.4(2)

    A user must, when reasonably requested by anetwork operator, use reasonableendeavours to assist the network operator tocomply with the network operatorsobligation under clause 5.4(1).

    Not Applicable

    [NA]

    Managed via contracts with Verve. WPN and System Management have directcontrol of metering.

    365

    [TYPE 2]

    Generation Licence Condition 5.1 - ElectricityIndustry Metering Code clause 5.5(3)

    Not Applicable Managed via contracts with Verve. WPN and System Management have directcontrol of metering.

  • 8/11/2019 20101209 D56935 Perth Power Partnership - 2010 Performance Audit and Asset Management Review Report

    39/133

    Performance Audit and Asset Management System Review ReportPerth Power Partnership: Kwinana Co-generation PlantSeptember 2010

    Page 39

    ComplianceReportingManual Ref

    Licence Condition Requirement Compliance Rating Verification/ Tests Effectiveness

    (382)A user must not impose any charge for theprovision of the data under this Code unless itis permitted to do so under anotherenactment.

    [NA]

    376[TYPE 2]

    (393)

    Generation Licence Condition 5.1 - ElectricityIndustry Metering Code clause 5.16

    A user that collects or receives energy datafrom a metering installation must provide thenetwork operator with the energy data (inaccordance with the communication rules)within the timeframes prescribed.

    Not Applicable[NA]

    Managed via contracts with Verve. WPN and System Management have directcontrol of metering.

    377

    [TYPE 2]

    (394)

    Generation Licence Condition 5.1 -Electricity Industry Metering Code clause5.17(1)

    A user must provide standing data andvalidated (and where necessary substitutedor estimated) energy data to the userscustomer, to which that information relates,where the user is required by an enactmentor an agreement to do so for billing purposesor for the purpose of providing meteringservices to the customer.

    Not Applicable

    [NA]

    Managed via contracts with Verve. WPN and System Management have directcontrol of metering.

    377

    [TYPE 2]

    Generation Licence Condition 5.1 -Electricity Industry Metering Code clause5.18

    A user that collects or receives information

    Not Applicable

    [NA]

    Managed via contracts with Verve. WPN and System Management have directcontrol of metering.

  • 8/11/2019 20101209 D56935 Perth Power Partnership - 2010 Performance Audit and Asset Management Review Report

    40/133

    Performance Audit and Asset Management System Review ReportPerth Power Partnership: Kwinana Co-generation PlantSeptember 2010

    Page 40

    ComplianceReportingManual Ref

    Licence Condition Requirement Compliance Rating Verification/ Tests Effectiveness

    (395)

    regarding a change in the energisation statusof a metering point must provide the networkoperator with the prescribed information,including the stated attributes, within thetimeframes prescribed.

    379

    [TYPE NR]

    (396)

    Generation Licence Condition 5.1 - ElectricityIndustry Metering Code clause 5.19(1)

    A user must, when requested by the networkoperator acting in accordance with goodelectricity industry practice, use reasonableendeavours to collect information fromcustomers, if any, that assists the networkoperator in meeting its obligations describedin the Code and elsewhere.

    Not Applicable

    [NA]

    Managed via contracts with Verve. WPN and System Management have directcontrol of metering.

    380

    [TYPE NR]

    (397)

    Generation Licence Condition 5.1 - ElectricityIndustry Metering Code clause 5.19(2)

    A user must, to the extent that it is able,collect and maintain a record of the address,site and customer attributes, prescribed inrelation to the site of each connection point,with which the user is associated.

    Not Applicable

    [NA]

    Managed via contracts with Verve. WPN and System Management have directcontrol of metering.

    381

    [TYPE 2]

    (398)

    Generation Licence Condition 5.1 - ElectricityIndustry Metering Code clause 5.19(3)

    A user must, after becoming aware of anychange in a sites prescribed attributes, notifythe network operator of the change within

    Not Applicable

    [NA]

    Managed via contracts with Verve. WPN and System Management have directcontrol of metering.

  • 8/11/2019 20101209 D56935 Perth Power Partnership - 2010 Performance Audit and Asset Management Review Report

    41/133

    Performance Audit and Asset Management System Review ReportPerth Power Partnership: Kwinana Co-generation PlantSeptember 2010

    Page 41

    ComplianceReportingManual Ref

    Licence Condition Requirement Compliance Rating Verification/ Tests Effectiveness

    the timeframes prescribed.

    382

    [TYPE 2]

    (399)

    Generation Licence Condition 5.1 - ElectricityIndustry Metering Code clause 5.19(4)

    A user that becomes aware that there is asensitive load at a customers site mustimmediately notify the network operatorsNetwork Operations Control Centre of thefact.

    Not Applicable

    [NA]

    Managed via contracts with Verve. WPN and System Management have directcontrol of metering.

    384

    [TYPE NR]

    (401)

    Generation Licence Condition 5.1 - ElectricityIndustry Metering Code clause 5.19(6)

    A user must use reasonable endeavours toensure that it does notify the networkoperator of a change in an attribute thatresults from the provision of standing data bythe network operator to the user.

    Not Applicable

    [NA]

    Managed via contracts with Verve. WPN and System Management have directcontrol of metering.

    390

    [TYPE 2]

    (407)

    Generation Licence Condition 5.1 - ElectricityIndustry Metering Code clause 5.21(5)

    A Code participant must not request a test oraudit unless the Code participant is a user andthe test or audit relates to a time or times atwhich the user was the current user or theCode participant is the IMO.

    Not Applicable

    [NA]

    Managed via contracts with Verve. WPN and System Management have directcontrol of metering.

    391

    [TYPE 2]

    Generation Licence Condition 5.1 - ElectricityIndustry Metering Code clause 5.21(6)

    Not Applicable

    [NA]

    Managed via contracts with Verve. WPN and System Management have directcontrol of metering.

  • 8/11/2019 20101209 D56935 Perth Power Partnership - 2010 Performance Audit and Asset Management Review Report

    42/133

    Performance Audit and Asset Management System Review ReportPerth Power Partnership: Kwinana Co-generation PlantSeptember 2010

    Page 42

    ComplianceReportingManual Ref

    Licence Condition Requirement Compliance Rating Verification/ Tests Effectiveness

    (408)

    A Code participant must not make a test oraudit request that is inconsistent with anyaccess arrangement or agreement.

    426

    [TYPE 2]

    (409)

    Generation Licence Condition 5.1 - Electricity

    Industry Metering Code clause 5.27Upon request, a current user must providethe network operator with customer attributeinformation that it reasonably believes aremissing or incorrect within the timeframesprescribed.

    Not Applicable

    [NA]

    Managed via contracts with Verve. WPN and System Management have directcontrol of metering.

    433

    [TYPE 2]

    (416)

    Generation Licence Condition 5.1 - ElectricityIndustry Metering Code clause 6.1(2)

    A user must, in relation to a network onwhich it has an access contract, comply withthe rules, procedures, agreements andcriteria prescribed.

    Not Applicable

    [NA]

    Managed via contracts with Verve. WPN and System Management have directcontrol of metering.

    435

    [TYPE NR]

    (418)

    Generation Licence Condition 5.1 - ElectricityIndustry Metering Code clause 7.2(1)

    Code participants must use reasonableendeavours to ensure that they can send andreceive a notice by post, facsimile andelectronic communication and must notifythe network operator of a telephone numberfor voice communication in connection withthe Code.

    Not Applicable

    [NA]

    Managed via contracts with Verve. WPN and System Management have directcontrol of metering.

  • 8/11/2019 20101209 D56935 Perth Power Partnership - 2010 Performance Audit and Asset Management Review Report

    43/133

    Performance Audit and Asset Management System Review ReportPerth Power Partnership: Kwinana Co-generation PlantSeptember 2010

    Page 43

    ComplianceReportingManual Ref

    Licence Condition Requirement Compliance Rating Verification/ Tests Effectiveness

    437

    [TYPE 2]

    (420)

    Generation Licence Condition 5.1 - ElectricityIndustry Metering Code clause 7.2(4)

    A Code participant must notify its contactdetails to a network operator with whom it

    has entered into an access contract within 3business days after the network operatorsrequest.

    Not Applicable

    [NA]

    Managed via contracts with Verve. WPN and System Management have directcontrol of metering.

    438

    [TYPE 2]

    (421)

    Generation Licence Condition 5.1 - ElectricityIndustry Metering Code clause 7.2(5)

    A Code participant must notify any affectednetwork operator of any change to thecontact details it notified to the networkoperator at least 3 business days before thechange takes effect.

    Not Applicable

    [NA]

    Managed via contracts with Verve. WPN and System Management have directcontrol of metering.

    439

    [TYPE 2]

    (422)

    Generation Licence Condition 5.1 - ElectricityIndustry Metering Code clause 7.5

    A Code participant must not disclose, orpermit the disclosure of, confidentialinformation provided to it under or inconnection with the Code and may only useor reproduce confidential information for thepurpose for which it was disclosed or anotherpurpose contemplated by the Code.

    Not Applicable

    [NA]

    Managed via contracts with Verve. WPN and System Management have directcontrol of metering.

    440

    [TYPE 2]

    Generation Licence Condition 5.1 - ElectricityIndustry Metering Code clause 7.6(1)

    Not Applicable

    [NA]

    Managed via contracts with Verve. WPN and System Management have directcontrol of metering.

  • 8/11/2019 20101209 D56935 Perth Power Partnership - 2010 Performance Audit and Asset Management Review Report

    44/133

    Performance Audit and Asset Management System Review ReportPerth Power Partnership: Kwinana Co-generation PlantSeptember 2010

    Page 44

    ComplianceReportingManual Ref

    Licence Condition Requirement Compliance Rating Verification/ Tests Effectiveness

    (423)

    A Code participant must disclose or permitthe disclosure of confidential information thatis required to be disclosed by the Code.

    441

    [TYPE 2]

    (424)

    Generation Licence Condition 5.1 - Electricity

    Industry Metering Code clause 8.1(1)Representatives of disputing parties mustmeet within 5 business days after a noticegiven by a disputing party to the otherdisputing parties and attempt to resolve thedispute under or in connection with theElectricity Industry Metering Code bynegotiations in good faith.

    Not Applicable

    [NA]

    Managed via contracts with Verve. WPN and System Management have directcontrol of metering.

    425

    [TYPE NR]

    (442)

    Generation Licence Condition 5.1 - ElectricityIndustry Metering Code clause 8.1(2)

    If a dispute is not resolved within 10 businessdays after the dispute is referred torepresentative negotiations, the disputingparties must refer the dispute to a seniormanagement officer of each disputing partywho must meet and attempt to resolve thedispute by negotiations in good faith.

    Not Applicable

    [NA]

    Managed via contracts with Verve. WPN and System Management have directcontrol of metering.

    426

    [TYPE NR]

    (443)

    Generation Licence Condition 5.1 - ElectricityIndustry Metering Code clause 8.1(3)

    If the dispute is not resolved within 10business days after the dispute is referred tosenior management negotiations, the

    Not Applicable

    [NA]

    Managed via contracts with Verve. WPN and System Management have directcontrol of metering.

  • 8/11/2019 20101209 D56935 Perth Power Partnership - 2010 Performance Audit and Asset Management Review Report

    45/133

    Performance Audit and Asset Management System Review ReportPerth Power Partnership: Kwinana Co-generation PlantSeptember 2010

    Page 45

    ComplianceReportingManual Ref

    Licence Condition Requirement Compliance Rating Verification/ Tests Effectiveness

    disputing parties must refer the dispute tothe senior executive officer of each disputingparty who must meet and attempt to resolvethe dispute by negotiations in good faith.

    427[TYPE 2]

    (444)

    Generation Licence Condition 5.1 - ElectricityIndustry Metering Code clause 8.1(4)

    If the dispute is resolved by representativenegotiations, senior managementnegotiations or CEO negotiations, thedisputing parties must prepare a written andsigned record of the resolution and adhere tothe resolution.

    Not Applicable[NA]

    Managed via contracts with Verve. WPN and System Management have directcontrol of metering.

    428

    [TYPE NR]

    (445)

    Generation Licence Condition 5.1 - ElectricityIndustry Metering Code clause 8.3(2)

    The disputing parties must at all timesconduct themselves in a manner which isdirected towards achieving the objective ofdispute resolution with as little formality andtechnicality and with as much expedition asthe requirements of Part 8 of the Code and aproper hearing and determination of thedispute, permit

    Not Applicable

    [NA]

    Managed via contracts with Verve. WPN and System Management have directcontrol of metering.

    - Generation Licence Condition 5.1 - Review ofGovernment Gazette Amendments

    GG54 Electricity Industry Act 2004.p1088.03 April 2009

    Compliant

    [5]

    Discussion with PlantManager

    Corporate requirements inrelation to compliance and

    Perth Power Partnership utilise legalcounsel and keep abreast of legal changesthrough this process as well as throughcommunications received from the

  • 8/11/2019 20101209 D56935 Perth Power Partnership - 2010 Performance Audit and Asset Management Review Report

    46/133

    Performance Audit and Asset Management System Review ReportPerth Power Partnership: Kwinana Co-generation PlantSeptember 2010

    Page 46

    ComplianceReportingManual Ref

    Licence Condition Requirement Compliance Rating Verification/ Tests Effectiveness

    GG101 Electricity Industry Act 2004.p2135.16-Jun-2006

    reputation Authority.

    Risk Assessment Audit Priority Corrective Action/Opportunity for Improvement

    Likelihood

    Consequence

    Inherent Risk

    Adequacy of Controls

    Unlikely

    Moderate

    Medium

    Strong

    4 Nil

    - Generation Licence condition 5.2

    Subject to the provisions of any applicablelegislation, the Authority may direct theLicensee in writing to do any measurenecessary to:

    (a) correct the breach of any appli cablelegislation; or

    (b) prevent the breach of any applicablelegislation occurring again,

    and specify a time limit by which such actionmust be taken

    Not Rated

    [NR]

    Discussion with PlantEngineer

    During the audit scope the Authority hasnot required the licensee to correct thebreach of any applicable legislation; orprevent the breach of any applicablelegislation occurring again. As suchassessment of compliance with clausecannot be undertaken.

    Risk Assessment Audit Priority Corrective Action/Opportunity for Improvement

    Likelihood

    Consequence

    Inherent Risk

    Adequacy of Controls

    Unlikely

    Moderate

    Medium

    Strong

    4 Nil

  • 8/11/2019 20101209 D56935 Perth Power Partnership - 2010 Performance Audit and Asset Management Review Report

    47/133

    Performance Audit and Asset Management System Review ReportPerth Power Partnership: Kwinana Co-generation PlantSeptember 2010

    Page 47

    ComplianceReportingManual Ref

    Licence Condition Requirement Compliance Rating Verification/ Tests Effectiveness

    GENERATION LICENCE CONDITION 6 - TRANSFER OF LICENCE

    Generation Licence condition 6.1 - ElectricityIndustry Act section 18 -Transfer of a licence

    This licence may be transferred only inaccordance with the Act.

    Not Applicable

    [NA]

    Discussion with Operation &Maintenance Supervisor

    No transfer of licence undertaken duringthe audit period. As such assessment ofcompliance with clause cannot beundertaken.

    GENERATION LICENCE CONDITION 7 - CANCELLATION OF LICENCE

    Generation Licence condition 7.1 - ElectricityIndustry Act section 35 -Cancellation of alicence

    This licence may be cancelled only inaccordance with the Act .

    Not Applicable

    [NA]

    Determined not to be applicable to audit

    GENERATION LICENCE CONDITION 8 - SURRENDER OF LICENCE

    -Generation Licence condition 8.1 - ElectricityIndustry Act 2004 (Schedule 1 - provision l)

    The licensee may surrender the licence at anytime by written notice to the Authority .

    Not Applicable

    [NA]

    Determined not to be applicable to audit

    - Generation Licence condition 8.2

    The surrender of the licence will take effecton the day that the Authority publishes anotice of the surrender in the Gazette.

    Not Applicable

    [NA]

    Determined not to be applicable to audit

  • 8/11/2019 20101209 D56935 Perth Power Partnership - 2010 Performance Audit and Asset Management Review Report

    48/133

  • 8/11/2019 20101209 D56935 Perth Power Partnership - 2010 Performance Audit and Asset Management Review Report

    49/133

    Performance Audit and Asset Management System Review ReportPerth Power Partnership: Kwinana Co-generation PlantSeptember 2010

    Page 49

    ComplianceReportingManual Ref

    Licence Condition Requirement Compliance Rating Verification/ Tests Effectiveness

    Consequence

    Inherent Risk

    Adequacy of Controls

    Moderate

    Medium

    Strong

    Generation Licence condition 11.2Before amending the licence under clause11.1, the Authority must:

    (a) provide the licensee with written notice ofthe proposed amendments underconsideration by the Authority;

    (b) allow 15 business days for the licensee tomake submissions on the proposedamendments; and

    (c) take into consideration those submissions.

    Compliant[5]

    Discussions with Operation &Maintenance Supervisor

    Decision on Amendment toCustomer Definition -Electricity Licences(29/01/09)

    Adequate review time was provided for inthe amendment of the licence condition.Compliance with Licence Condition 11.2 isnoted.

    Risk Assessment Audit Priority Corrective Action/Opportunity for Improvement

    Likelihood

    Consequence

    Inherent RiskAdequacy of Controls

    Unlikely

    Moderate

    MediumStrong

    4 Nil

    Generation Licence condition 11.3

    This clause also applies to the substitution ofthe existing licence.

    Not Applicable

    [NA]

    Determined not to be applicable to audit

  • 8/11/2019 20101209 D56935 Perth Power Partnership - 2010 Performance Audit and Asset Management Review Report

    50/133

    Performance Audit and Asset Management System Review ReportPerth Power Partnership: Kwinana Co-generation PlantSeptember 2010

    Page 50

    ComplianceReportingManual Ref

    Licence Condition Requirement Compliance Rating Verification/ Tests Effectiveness

    Generation Licence condition 11.4

    For avoidance of doubt, the licensee will nothave to pay an associated application fee orlicence fee for the purpose of clause 11.1.

    Not Applicable

    [NA]

    Determined not to be applicable to audit

    GENERATION LICENCE CONDITION 12 - EXPANSION OF GENERATING WORKS

    Generation Licence condition 12.1

    The licensee may expand or reduce thegenerating works if the relevant expansion orreduction is provided for in the assetmanagement system.

    Compliant

    [5]

    O&M Agreement

    Business Plan

    Asset Management PlanningProcess

    Annual Compliance Reportsto the ERA due 31 st August

    There has been no expansion or reductionin generation works during the au