2011 2015 2014 2013 2012 2016 2017 ACTIVITY J A J O J A J O J A J O J A J O J A J O J A J O J A Schedule( 2010-2016 ) UCN Timeline & Major Milestones 2011 2015 2014 2013 2012 2016 2017 Remove M11/13; Cleanup M11/13 front-end,septum,1AQ9 MESON HALL CLEAN-UP: MILESTONES Activities at TRIUMF Activities Elsewhere (KEK, RCNP, CERN, Acsion) * Joint RCNP/TRIUMF/Acsion effort Remove BL1B, Core M13 block Shielding UCN APPARATUS: Spallation Target * UCN Source BEAMLINE: Kicker Septum Dipole Beamline (incl quads, PS, etc…) Design & Review Order/Fabricate/Deliver Install Test Test Install Install Order/Mod Order/Fabricate Design Design Order/Fabricate Install Test Install Design/Prototype/Fabricate Design/Fabricate Install UnInstall Procure shielding blocks Design Install COMMISSION @ TRIUMF Beamline Commissioning HELIUM LIQUEFIER: Upgrade He Liquefier He Liquefier System Procure UCN Source Commissioning Install/Test & Run @ RCNP Procure/Install Install

Upload: marcus-wilkins

Post on 30-Dec-2015

219 views

Category:

Documents


0 download

TRANSCRIPT

2011 2015201420132012 2016 2017ACTIVITY

J A J OJ A J O J A J OJ A J O J A J OJ A J O J A

Schedule( 2010-2016 )UCN Timeline & Major Milestones2011 2015201420132012 2016 2017

Remove M11/13; CleanupM11/13 front-end,septum,1AQ9

MESON HALL CLEAN-UP: MILESTONES

Activities at TRIUMF

Activities Elsewhere(KEK, RCNP, CERN, Acsion)

* Joint RCNP/TRIUMF/Acsion effort

Remove BL1B, Core M13 block

Shielding

UCN APPARATUS:Spallation Target *UCN Source

BEAMLINE:KickerSeptumDipoleBeamline (incl quads, PS, etc…)

Design & Review Order/Fabricate/Deliver Install

Test

Test

Install

Install

Order/Mod

Order/Fabricate

Design

Design Order/Fabricate InstallTest

InstallDesign/Prototype/Fabricate

Design/Fabricate InstallUnInstall

Procure shielding blocksDesign Install

COMMISSION @ TRIUMFBeamline Commissioning

HELIUM LIQUEFIER:

Upgrade He Liquefier

He Liquefier SystemProcure

UCN Source Commissioning

Install/Test & Run @ RCNP

Procure/Install

Install

2011 2015201420132012 2016 2017ACTIVITY

J A J OJ A J O J A J OJ A J O J A J OJ A J O J A

Schedule( 2010-2016 )UCN Timeline & Major Milestones2011 2015201420132012 2016 2017

Remove M11/13; CleanupM11/13 front-end,septum,1AQ9

MESON HALL CLEAN-UP: MILESTONES

Activities at TRIUMF

Activities Elsewhere(KEK, RCNP, CERN, Acsion)

* Joint RCNP/TRIUMF/Acsion effort

Remove BL1B, Core M13 block

Shielding

UCN APPARATUS:Spallation Target *UCN Source

BEAMLINE:Kicker

SeptumDipoleBeamline (incl quads, PS, etc…)

Design & Review Order/Fabricate/Deliver Install

Test

Test

Install

Install

Order/Mod

Order/Fabricate

Design

Design Order/Fabricate InstallTest

InstallDesign/Prototype/Fabricate

Design/Fabricate InstallUnInstall

Procure shielding blocksDesign Install

COMMISSION @ TRIUMFBeamline Commissioning

HELIUM LIQUEFIER:

Upgrade He Liquefier

He Liquefier SystemProcure

UCN Source Commissioning

Install/Test & Run @ RCNP

Procure/Install

Install

Kicker Ceramic Beamtube InstallDesign/Order Fabricate

Install

2011 2015201420132012 2016 2017ACTIVITY

J A J OJ A J O J A J OJ A J O J A J OJ A J O J A

Schedule( 2010-2016 )UCN BL1U KICKER2011 2015201420132012 2016 2017

Remove M11/13; CleanupM11/13 front-end,septum,1AQ9

MESON HALL CLEAN-UP: MILESTONES

Activities at TRIUMF

Activities Elsewhere(KEK, RCNP, CERN, Acsion)

Remove BL1B, Core M13 block

KICKER:Kicker Design & Review Order/Fabricate/Deliver Install

Design & Out for quotes (8)

Bid Time & Place Order (29)

Vendor final design & Fabr. (324)

Acceptance tests & Receive (60)

Unpack & Test (19)

Ceramic Beamtube & Stands

Finalize design & Order (71)

Fabricate/Assemble (136)

Prepare to Install (15)

Design & Review (117)

Design/Order Fabricate Install

Install

2011 2015201420132012 2016 2017ACTIVITY

J A J OJ A J O J A J OJ A J O J A J OJ A J O J A

Schedule( 2010-2016 )UCN BL1U SEPTUM2011 2015201420132012 2016 2017

Remove M11/13; CleanupM11/13 front-end,septum,1AQ9

MESON HALL CLEAN-UP: MILESTONES

Activities at TRIUMF

Activities Elsewhere(KEK, RCNP, CERN, Acsion)

Remove BL1B, Core M13 block

SEPTUM:

Septum Test InstallOrder/ModDesign

Review & Finalize design (129)

Place Order (15)

Fabricate Septum Mods (80)

Receive & Assemble Septum (110)

Map & Test Septum (60)

Vacuum Box & StandReview & Finalize design (45)

Place Order (15)

Fabricate (95)

Assemble (20)

Prepare to Install (10)

Prepare to Install (40)

2011 2015201420132012 2016 2017ACTIVITY

J A J OJ A J O J A J OJ A J O J A J OJ A J O J A

Schedule( 2010-2016 )UCN Timeline & Major Milestones2011 2015201420132012 2016 2017

Remove M11/13; CleanupM11/13 front-end,septum,1AQ9

MESON HALL CLEAN-UP: MILESTONES

Activities at TRIUMF

Activities Elsewhere(KEK, RCNP, CERN, Acsion)

* Joint RCNP/TRIUMF/Acsion effort

Remove BL1B, Core M13 block

Shielding

UCN APPARATUS:Spallation Target *UCN Source

BEAMLINE:Kicker

SeptumDipoleBeamline (incl quads, PS, etc…)

Design & Review Order/Fabricate/Deliver Install

Test

Test

Install

Install

Order/Mod

Order/Fabricate

Design

Design Order/Fabricate InstallTest

InstallDesign/Prototype/Fabricate

Design/Fabricate InstallUnInstall

Procure shielding blocksDesign Install

COMMISSION @ TRIUMFBeamline Commissioning

HELIUM LIQUEFIER:

Upgrade He Liquefier

He Liquefier SystemProcure

UCN Source Commissioning

Install/Test & Run @ RCNP

Procure/Install

Install

Kicker Ceramic Beamtube InstallDesign/Order Fabricate

Install

List of Major Milestones2012 – Dec UCN Source & Spallation Target installation at RCNP.

UCN/nEDM prototyping & commissioning begins.

2014 – Apr Kicker (or Kicker Ceramic Beamtube) Installation completed.

2014 – Aug UCN/nEDM RCNP phase completed.Uninstall & transport to TRIUMF.

2014 – Dec Meson Hall Clean-up completed.

2015 – Apr UCN Source & Spallation Target received at TRIUMF.Installation of Target & Source.

2016 – Mar UCN Beamline (BL1U) Installation completed.

2016 – Mar Commission UCN Facility using low intensity beam.

Kicker

Septum

Dipole