2011 ctm session 3: terminology for life cycle
DESCRIPTION
Terminology in facility management based on industry standards. The use of consistent terms to help reduce conflicts during planning, construction, operation, and documentation in addressing maintenance issues. Ensuring requirements for commissioning, as-builts and other project records, O&M manuals, warranties, staff training, and start up testing are clear. The use of BIM and sustainability in facility management.TRANSCRIPT
![Page 1: 2011 CTM Session 3: Terminology for Life Cycle](https://reader031.vdocument.in/reader031/viewer/2022020207/55981e571a28ab83648b4580/html5/thumbnails/1.jpg)
Terminology Over the Life CycleTerminology Over the Life Cycle
A Facility Manager’s Perspective
Peter J. Geiling, CFM, MRE
![Page 2: 2011 CTM Session 3: Terminology for Life Cycle](https://reader031.vdocument.in/reader031/viewer/2022020207/55981e571a28ab83648b4580/html5/thumbnails/2.jpg)
AIA CreditsAIA Credits
Northern Virginia Chapter CSI is a Registered Provider with The American Institute of Architects Continuing Education Systems. Credit earned on completion of this program will be reported to CES Records for AIA members. Certificates of Completion for non-AIA members available on request.
This program is registered with the AIA/CES for continuing professional education. As such, it does not include content that may be deemed or construed to be an approval or endorsement by the AIA of any material of construction or any method or manner of handling, using, distributing, or dealing in any material or product. Questions related to specific materials, methods, and services will be addressed at the conclusion of this presentation.
![Page 3: 2011 CTM Session 3: Terminology for Life Cycle](https://reader031.vdocument.in/reader031/viewer/2022020207/55981e571a28ab83648b4580/html5/thumbnails/3.jpg)
CSI CreditsCSI Credits
This program is a registered educational program with the Construction Specifications Institute of Alexandria, VA. The content within this program is not created or endorsed by CSI nor should the content be construed as an approval of any product, building method, or service. Information on the specific content can be addressed at the conclusion of this program, by the Registered Provider.
Credit earned for completing this program will automatically be submitted to the CSI CEN. Completion certificates can be obtained by contacting the Provider directly.
This logo and statement identify Provider programs registered with the CSI CEN and are limited to the educational program content.
![Page 4: 2011 CTM Session 3: Terminology for Life Cycle](https://reader031.vdocument.in/reader031/viewer/2022020207/55981e571a28ab83648b4580/html5/thumbnails/4.jpg)
IntroductionIntroduction
The World of the Facility Manager (FM)AKA, the “Owner”
![Page 5: 2011 CTM Session 3: Terminology for Life Cycle](https://reader031.vdocument.in/reader031/viewer/2022020207/55981e571a28ab83648b4580/html5/thumbnails/5.jpg)
1. Facility Management Handbook, Third Edition, Cotts, Roper, Payant, 20102. The Project Resource Manual, CSI Manual of Practice, Fifth Edition, 20053. A Guide to the Project Management Body of Knowledge, Fourth Edition, 2008
Life CycleLife Cycle
![Page 6: 2011 CTM Session 3: Terminology for Life Cycle](https://reader031.vdocument.in/reader031/viewer/2022020207/55981e571a28ab83648b4580/html5/thumbnails/6.jpg)
Life Cycle Costing (LCC) The process of determining the cost of a building over its lifetime, in present value terms, which includes all costs associated with the planning, design, construction, operations, maintenance and capital improvements over time, less any residual value and ultimately the cost of disposing of it. – Source: FMPedia, IFMA Foundation
FMFM’’s Life Cycle Views Life Cycle View
![Page 7: 2011 CTM Session 3: Terminology for Life Cycle](https://reader031.vdocument.in/reader031/viewer/2022020207/55981e571a28ab83648b4580/html5/thumbnails/7.jpg)
Excellent
Good
Fair
Poor
Very Poor
Failed
75% of life40% drop in quality
12% of life
$1.00 for renovation here
Will cost $4.00 to $5.00 here
Goal to extend life cycle curve
FMFM’’s Life Cycle Goals Life Cycle Goal
![Page 8: 2011 CTM Session 3: Terminology for Life Cycle](https://reader031.vdocument.in/reader031/viewer/2022020207/55981e571a28ab83648b4580/html5/thumbnails/8.jpg)
CSI Uniformat/Master format Pmbok (PMI) Means FMPedia (IFMA) BOMI AIA EJCDC AGC LEED ADA ASTM Government acronyms
TerminologyTerminologyConsistent terminology is necessary to reduce conflicts in the Planning, Design, and Construction Phases (First Costs) to protect the FM/Owner for the remaining life of the asset.
![Page 9: 2011 CTM Session 3: Terminology for Life Cycle](https://reader031.vdocument.in/reader031/viewer/2022020207/55981e571a28ab83648b4580/html5/thumbnails/9.jpg)
Use a consistent standard for developing facility performance/program requirements, functional elements (Uniformat)
Integrate the Master Format into Work Breakdown Structures
Specify the most current Master Format as requirement for A/E
Pre-planning using existing formats and terminology help reduce conflicts between owner, designer, and contractor.
Define Risks and Risk Management strategy
Determine maintenance standards
PlanningPlanning
![Page 10: 2011 CTM Session 3: Terminology for Life Cycle](https://reader031.vdocument.in/reader031/viewer/2022020207/55981e571a28ab83648b4580/html5/thumbnails/10.jpg)
Hire an experienced design team and provide design team with important requirements from planning phase
Schedule fixed design reviews Define life-cycle activities –
Commissioning (start-up, adjusting, testing, and training) Facility operations & maintenance procedures (O&M requirements for O&M manuals), attic stock recommendations
Involve FM staff throughout design to ensure requirements and terminology are clear.
Specification of reliable (longevity) building systems and materials.
Proper records and documentation is available to address possible maintenance issues.
DesignDesign
![Page 11: 2011 CTM Session 3: Terminology for Life Cycle](https://reader031.vdocument.in/reader031/viewer/2022020207/55981e571a28ab83648b4580/html5/thumbnails/11.jpg)
FM’s are involved throughout the process. Reviewing submittals and RFIs Reviewing as-built plans and specifications Conducting site visits
ConstructionConstruction
![Page 12: 2011 CTM Session 3: Terminology for Life Cycle](https://reader031.vdocument.in/reader031/viewer/2022020207/55981e571a28ab83648b4580/html5/thumbnails/12.jpg)
CloseClose--outout•Starting and Adjusting•Punch list•O& M Manuals•Warranties•Final as-built acceptance•Lessons learned
![Page 13: 2011 CTM Session 3: Terminology for Life Cycle](https://reader031.vdocument.in/reader031/viewer/2022020207/55981e571a28ab83648b4580/html5/thumbnails/13.jpg)
Operations & MaintenanceOperations & Maintenance Complying with warranty requirements Responding to warranty issues over year one Providing documentation for LEED/sustainability requirements Conducting follow-up surveys with occupants Retro-commissioning (periodic over life-cycle)
![Page 14: 2011 CTM Session 3: Terminology for Life Cycle](https://reader031.vdocument.in/reader031/viewer/2022020207/55981e571a28ab83648b4580/html5/thumbnails/14.jpg)
Other ConsiderationsOther Considerations
Building Information Modeling (BIM)
Sustainability (ongoing measurement and verification)
![Page 15: 2011 CTM Session 3: Terminology for Life Cycle](https://reader031.vdocument.in/reader031/viewer/2022020207/55981e571a28ab83648b4580/html5/thumbnails/15.jpg)
Q & AQ & A