DR RUTH SEGOMOTSI MOMPATIDISTRICT MUNICIPALITY
PROFILE
1
TABLE OF CONTENTS
EXECUTIVE SUMMARY 31. INTRODUCTION 41.1 Overview 41.2 Municipalities within the District 51.3 Political and Administrative Leadership and Seat of District 51.4 Political Representation 62. SERVICE DELIVERY 72.1 Household Infrastructure 72.2 Sanitation 72.3 Water 72.4 Electricity 82.5 Refuse Removal 82.6 Service Provider 83. AUDIT OPINIONS 84. STATE OF LOCAL GOVERNMENT ASSESSMENT 94.1 Overview of findings on assessment in the Municipality 94.1.1 Governance 94.1.2 Financial Management and Viability 94.1.3 Service Delivery 95. INFRASTRUCTURE PRIORITIES IN TERMS OF THE MUNICIPAL
TURN-AROUND STRATEGY10
6. MIG PROJECTS 127. VULNERABILITY CLASSIFICATION 17
2
EXECUTIVE SUMMARY
Dr Ruth Segomotsi Mompati District Municipality has been described as the rural hinterland of North West Province and is relatively arid. Vast rural areas contain scattered small, low-level urban nodes. The agricultural sector, especially in Vryburg, is a significant producer of beef.
There is extreme poverty throughout the district with 82% of households living at or below subsistence level (that is, earning R1 600 or less a month); a large portion (42.61%) of the economically active population is unemployed. When the large numbers of young people are taken into account alongside those not working, it is clear that the dependency ratio is extremely high. A contributory factor to the high level of poverty is the low level of education of the inhabitants of Dr Ruth Segomotsi Mompati.
Sanitation services are less well supplied; the district only supplies just over 26% of households with adequate sanitation services. Access to infrastructure in the municipality increased from 22% in 1996 to a higher level of 31% in 2009. The main contributor to the increase in access is electricity infrastructure.
Audit outcomes of most of the local municipalities in the District are generally poor. In 2005/6 Dr Ruth Mompati district municipality was the only municipality to be granted an audit outcome that is financially unqualified without other matters. However, in 2006/7, 2007/8 and 2008/9 regressed to achieve results that were financially unqualified with other matters.
The State of Local Government Assessment found that there is a lack of access to basic services that may require interim strategies to provide access to people without water and sanitation facilities. The district has a lack of technical personnel and engineers. The District is the Water Services Authority and has WSP agreements with a number of local municipalities, but there are problems on the understanding of the responsibilities of the district and the locals in service provision. There are also tensions between local, district and provincial structures on service delivery that is hampering progress.
In terms of its Municipal Turn-Around Strategy the District identified issues around water and sanitation, as well as electricity and refuse removal, indicating that there need to be more urgent attention in reducing backlogs across all services.
The newly amalgamated municipality of Kagisano/Molopo is partially classified as most vulnerable in terms of functionality, socio-economic profile and backlog status.
This profile confirms that infrastructure prioritisation in Dr Ruth Segomotsi Mompati District should address the identified projects, with special attention to the responsibility between the district and the local municipalities.
3
1. INTRODUCTION
1.1 Overview1
Dr Ruth Segomotsi Mompati District Municipality is approximately 43 699 sq km in extent and borders on Botswana in the north. It comprises six local municipalities: Kagisano, Naledi, Mamusa, Greater Taung, Molopo and Lekwa-Teemane. Dr Ruth Segomotsi Mompati District Municipality has been described as the rural hinterland of North West Province and is relatively arid. The region contains much that is of historical interest because it was the scene of border disputes, rebellions and skirmishes between the British, the Boers of the Transvaal Republic, the Korana Khoikhoi and Tlapin (Tswana) tribes in the late nineteenth century.
The regional centre is Vryburg, which is where the district municipality has offices. Vryburg also has an airport. The only other town of significant size is Schweizer-Reneke. Vast rural areas contain scattered small, low-level urban nodes. Some of the largest Hereford herds in the world are to be found in the Vryburg district and the agricultural sector is a significant producer of beef. The main agricultural crops are maize, groundnuts, sunflower seeds and sorghum.
The dominant employment sectors in Dr Ruth Segomotsi Mompati District are the services sector (providing 36.80% of the total number of employment opportunities) and the agricultural sector (providing 33% of the total number of employment opportunities).The total population numbers approximately 358 166.
The larger proportion of the population is in the schoolgoing age group (0–19 years of age). There is extreme poverty throughout the district with 82% of households living at or below subsistence level (that is, earning R1 600 or less a month); a large portion (42.61%) of the economically active population is unemployed. When the large numbers of young people are taken into account alongside those not working, it is clear that the dependency ratio is extremely high.
A contributory factor to the high level of poverty is the low level of education of the inhabitants of Dr Ruth Segomotsi Mompati. A large portion of the population (30.27%) has no education at all and 33.41% have only some primary education. Only 1.38% have a tertiary qualification. More than 88% of households in the district have access to acceptable levels of water services. Sanitation services are less well supplied; the district only supplies just over 26% of households with adequate sanitation services. More than 59% of households have access to electricity. Less than 28% of households have their refuse removed by a local authority at least once a week. Social services are also unevenly distributed. Not all of the district’s local municipalities provide cemeteries, sports facilities or parks, arguing a shortage of funding for such purposes.
1 Source: Gaffney’s, November 2009: Local Government in South Africa 2009 – 2001, Official Yearbook: p 1164 - 1166
4
Most local municipalities also report that health services are undermined by insufficient staff and equipment.
1.2 Municipalities within the Dr Ruth Segomotsi Mompati District
The details of the local municipalities within the District are tabled below. After the 2011 local government elections Kagisano and Molopo were amalgamated.
Table 1: Statistics of the Dr Ruth Segomotsi Mompati District and Local Municipalities
Municipalities within the District
Area (km²) in 2009
Area (km²) after 2011
Local Govt Elections
& %change
PopulationNo. of
Households
Poverty
Rate
Dr Ruth Segomotsi Mompati District Municipality 43,699.9843,699.98 - 358,166 101,09063.39%
Greater Taung Local Municipality 5 635.47 5,635.47 - 146,294 43,38970.46%Kagisano Local Municipality 11,354.0911,354.01 - 76,719 20,09071.98%Lekwa-Teemane Local Municipality 3,681.20 3 661.20 - 33,147 10,05551.82%Mamusa Local Municipality 3,614.84 3,61.1.84 - 36,911 10,53463.07%Molopo Local Municipality 12,473.1912,473 19 - 6,574 3,20569.40%Naledi Local Municipality 6,941.19 6,941.19 - 58,521 13,81453.54%
1.3 Political and Administrative Leadership and Seat of DC2
Political Leadership: Executive Mayor: Mr A TlhadinyaneAdministrative Leadership: Municipal Manager: Mr A Kekesi
The head office of the District is located in Vryburg.
1.4 Political representation3
Table 2: Local Government Election 2006 / Provincial and National Elections 2009 comparison:
Leading Parties in the Elections
Local Government Elections 2006 Provincial Elections 2009 National Elections 2009Party Party Votes and
%Ward Votes and %
Councillor Seats Party Votes and % Party Votes and %Party Seats %
1st ANC 81,263 79.1% 75,546 74.0% ANC 18 72.0% ANC 105,599 75.3% ANC 109,323 75.9%2nd UCDP 10,263 10,0
%9,324 9.1% UCDP 3 12.0
%COPE 11,890 8.5% COPE 12,303 85%
3rd DA 5,251 5.1% 3,984 3.9% DA 2 8.0% UCDP 8,332 5.9% UCDP 7,638 5.3%4th ID 2,887 2.8% 3,535 3.5% ID 1 4.0% DA 7,412 5.3% DA 7,543 5.2%
Other 3,122 3.0% 9,677 9.5% Other 1 4.0% Other 6,915 4.9% Other 7,222 5.0%
2 Source: Dr Ruth Segomotsi Mompati DM; August 20113 UPDATE Aug'09: DC40 seats - ANC(80%) 8 seats, DA(10%) 1 seat UCDP(10%) 1 seat, DA(10%) 1 seat Total 10 DC40 seats
5
Totals 102,786 100% 102,066 100% Totals 25 100% 140,148
100% 144,029
100%
Figure 1: 2011 Local Government Election results and seat allocations:
The ANC is the leading party in terms of proportional DC40 Seats in Dr Ruth Segomotsi Mompati, with10 seats of 12 seats.
6
2. SERVICE DELIVERY
2.1 Dr RuthSegomotsi Mompati District Municipality Household Infrastructure
1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 20090.00
0.10
0.20
0.30
0.40
0.50
0.60
0.70
0.80
Household Infrastructure OverviewNW - DC39 Dr Ruth Segomotsi Mompati
District Municipality
NW - DC39 Bophirim...
Inde
x
Source: IHS Global Insight Regional eXplorer version 574
Dr Ruth Segomotsi Mompati has the second lowest access to infrastructure amongst the districts in the province. The graph above indicates that in the period 1996-2009, household access to infrastructure in the municipality was well below the national average. Access to infrastructure in the municipality increased from 22% in 1996 to a higher level of 31% in 2009. The main contributor to the increase in access is electricity infrastructure.
2.2 Sanitation
With regard to access to sanitation, the district municipality’s household access to hygienic toilets has gone up from 23% in 1996 to 58% in 2009. The improvement in access to sanitation in general in the municipality is mainly due to the increase in the use of flush toilets which went up from 20% in 1996 to more than 30% in 2009. About 30% of the households used pit toilets by 2009.
2.3 Water
7
In terms of water infrastructure, there has been an increase in the number of households having access to piped water above RDP level in the municipality from 61% in 1996 to 65% in 2009. While this is the case, households’ access to water below RDP level was at around 25% by 2009.
2.4 Electricity
In 1996, household access to electricity connections was at 31%. Since then, access has increased drastically and in 2009 it was at 72%. The increase in electricity connections is the biggest infrastructure achievement in the municipality.
2.5 Refuse removal
There has been a slight increase in access to formal refuse removal service from 1996 to 2009 in the Municipality. Access has gone up from 22% in 1996 to 31% in 2009. Personal refuse removal which was at around 60% in 1996 remained the same over the years. The high levels of personal refuse removal must be taken in the context of low settlement densities, where on-site disposal or backyard burning of waste is sometimes appropriate.
2.6 Service provider
Dr Ruth Segomotsi Mompati does not have authority and does not perform the electricity reticulation function and the refuse removal, refuse dumps and solid waste disposal function. The municipality has, however, authority and performs potable water function and sanitation function and has some capacity for these functions.
3. AUDIT OPINIONS
Table 3: Audit Opinions of the District and Local Municipalities
Municipality Audit Opinion2005/6
Audit Opinion2006/7
Audit Opinion2007/8
Audit Opinion2008/9
Audit Opinion2009/10
Dr Ruth SegomotsiMompati DM
Financially unqualified with no other matters
Financially unqualified with other matters
Financially unqualified with other matters
Financially unqualified with findings
Audit not finalised at legislated date
Greater Taung LM
Disclaimer Disclaimer Disclaimer Disclaimer Qualified
Kagisano LM Audit outstanding
Audit outstanding
Financially unqualified with other matters
Qualified Audit not finalised at legislated date
Lekwa-Teemane LM
Disclaimer Disclaimer Disclaimer Disclaimer Disclaimer
Mamusa LM Audit outstanding
Audit outstanding
Audit outstanding
Audit not finalised at
Audit not finalised at
8
legislated date
legislated date
Molopo LM Financially unqualified with other matters
Financially unqualified with other matters
Financially unqualified with other matters
Audit not finalised at legislated date
Audit not finalised at legislated date
Naledi LM Disclaimer Disclaimer Disclaimer Adverse Audit not finalised at legislated date
Source: Auditor-General 2009 and 2011, see www.agsa.co.za
In 2005/6 Dr Ruth Segomotsi Mompati district municipality was the only municipality to be granted an audit outcome that is financially unqualified and without other matters. However, in 2006/7, 2007/8 and 2008/9 regressed to achieve results that were financially unqualified with other matters.
4. STATE OF LOCAL GOVERNMENT ASSESSMENTS
4.1 Overview of assessment in municipality
4.1.1 Governance
The State of local government assessment revealed that there is allegedly strong political interference in the appointment of staff. Numerous allegations were made from within municipal structures of corruption and maladministration by councilors and officials.
4.1.2 Financial Management and Viability
There is a need to effectively enforce the MFMA and SCM regulations. The role of the District in supporting the local municipalities with financial viability challenges requires consideration.
4.1.3 Service Delivery
There is an urgent need to develop and apply indigent policy. The IDP cannot be implemented due to poor integrated planning and poor understanding of sustainable human settlements. There is a lack of access to basic services that may require interim strategies to provide access to people without water and sanitation facilities. The district has a lack of technical personnel and engineers. The District is the WSA and has WSP agreements with a number of local municipalities, but there are problems on the understanding of the responsibilities of the district and the locals in service provision. There are also tensions between local, district and provincial structures on service delivery that is hampering progress.
9
5. INFRASTRUCTURE PRIORITIES OF THE MUNICIPAL TURN-AROUND STRATEGY
The Dr Ruth Segomotsi District Municipality identified basic service delivery priorities per municipality in the DM LGTAS Implementation Framework.
Table 4: Infrastructure delivery in terms of the MTAS
CHALLENGES ACTIONSKAGISANO LM
Refuse removal function not provided by municipality
Low MIG expenditure
Engagement and negotiations on transferring refuse removal functions
MIG: Ensure full commitment, 100% registration for 2010/11 and 2011/12
MOLOPO LM
Incomplete indigent register
Sanitation. Contamination of under ground water.
Lack of maintenance of waterborne sewer
Electricity backlog: Bray 700 households without electricity (including informal settlement)
Tosca: 300 houses without electricity
Lack of maintenance of high mast lights
Provide free basic services
Sanitation: eradicate backlog: Bray 1000 households are below RDP standard
Operations and maintenance
Electrification of Tosca and Bray
Functional High mast lights
MAMUSA LM
inadequate supply to Ipelegeng Ext 4 and 5.
No zonal meters to measure water losses and obtain water consumption information.
Access to sanitation
Access to Electricity - unaccounted electricity consumption.
Backlog maintenance of the WTP to be completed (DBSA and DWAE)
Install zonal and flow meters to evaluate the extent of thewater losses, the water management situation and the potential reduction in future water requirement projections
Eradicating 220 buckets in
10
Refuse removal – only two landfill sites Amalia and Schweizer Reneke
Ipelegeng
Replacement of faulty electricity meters. Purchase of the new Cherry Picker truck. Build new electricity sub-station at Groenewoud
To register the site in Amalia and open sites in Migdol, Glaudina and Nooitgedacht
LEKWA TEEMANE LM
Access to electricity - Ageing electricity infrastructure.
ESKOM regions are not operating from same rules
Refuse Removal and Solid Waste Disposal - No provision at Boitumelong and other
Access to electricity at Boitumelong 1230(stands)(Eskom), Coverdale 14 (Municipality) Christiana Ext9: 100 (Municipality)
Provide refuse removal at. Boitumelong Ext.5(1200h/h)Geluksoord Ext.1(300h/h)Utlwanang Ext.5(1500h/h) Application of landfill sites (District).
Employment of labourers for refuse removal and the Waste Control Officers.
GREATER TAUNG LM
Access to water and sanitation: Limited approval of all priority villages
llegal dumping
Funding forwaste management
Priority list to be approved
Provision of Electricity as per 3 yr plan; To have improved turnaround time to registered queries by the service; To have high mast lights and streetlights maintained promptly
Dumping: awareness campaign
Secure funding for waste management
NALEDI LM
Telemetric system not operational
No re-use of 9mgl grey water
Bulk sewer network has reached maximum capacity
Secure funding for refurbishment and expansion of telemetric system (R600 000-00)
Conduct feasibility study
Secure funding for purification
11
Waste water treatment plant under capacity (current capacity 6.5ML) compared to demand of 9ML)
3 825 households not connected to electricity
Faulty water and electrcity meters and inadequate meter readings
Inadeqaute civil and electricity bulk supply
from Department of Water Affairs and Environment
Secure funding from DBSA to Develop a sewer master and maintenance plan
DR RSM Dosing pumps not functioning Pump Station flooded because of negligence
Whole Taung without Water
No trained operators and Supervisors in Place
Licensing of Raw Water Abstraction Previous licence expired and must be renewed
Replace Chlorine Dosing Pumps
Refurbish and install
Install Temporary motor on Duty Pump
Ensure that Plant be Transferred to Sedibeng to Operate and Maintan under SLA
Prepare application and submit to DWA for approval
6. MIG Projects
Table 5: MIG projects
Municipality Project name Registered MIG funds
Total actual expenditure in the 2010/11 financial year on MIG funds
Project status (Registered/design/tender/construction)
Project category (e.g. water, sanitation, PMU)
Dr Ruth Mompati DM
Mokassa 2 Bulk Water Supply Project R 1,939,297.00 R 1,356,959.43 Construction WaterUtlwanang Bucket Eradication Programme R 20,520,000.00 R 389,890.25 Construction SanitationBray Water Supply Phase 2 R 4,495,034.48 R 161,496.50 Construction WaterBophirima rural water supply - phase 1 R 10,631,288.88 R 249,425.70 Construction WaterKhibitswane Water Supply R 10,000,000.00 R 8,760,618.65 Construction WaterRural Water Supply Program R 9,816,749.50 R 6,377,100.76 Construction WaterRural Water Supply Greater Taung LM Sekhing Soeding R 6,112,210.53 R 6,112,207.53 Construction WaterRural Water Program R 4,322,025.61 R 4,287,099.12 Construction Water
12
Greater Taung LM PudimoeKagisano Rural Sanitation Program 2009-2014 R 85,158,000.00 R 26,782,425.18 Construction SanitationGreater Taung Rural Sanitation Program 2009-2014 R 61,062,000.00 R 4,421,885.00 Construction SanitationInternal Water Supply Stella R 533,459.12 R 298,824.14 Construction WaterRegional Bulk Water Supply Tseng, De aar and Khudu R 7,061,492.16 R 7,061,492.16 Construction WaterRural Water Supply Greater Taung LM Mogopela R 6,156,057.17 R 5,711,599.64 Construction WaterRural Water Supply Program Greater Taung LM Buxton R 5,544,532.62 R 3,848,495.41 Construction WaterTransfer Station - Vryburg (Waste) R 3,513,154.00 R 138,140.86 completed SanitationIntegrated Broiler Custer R 2,000,000.00 R 35,877.64 completed SanitationPMU R 0.00 R 0.00 Registered PMU
Greater Taung LM Taung Thusong Centres R 17,000,000.00
R 3,303,599.28Construction
community facilities
Taung High Mast Lights R 14,000,000.00R 3,536,000.70
Construction
Street / Community Lighting
Boipelo Stormwater R 4,560,000.00R 2,411,632.60
Construction Roads & s/water
Pudimoe Access Road R 9,600,000.00R 5,318,092.83
Construction Roads & s/water
Myra Road and Stormwater R 5,000,000.00R 4,420,943.34
Construction Roads & s/water
Greater Taung waste management R 8,355,000.00 R 0.00 Design & tender
Solid Waste disposal sites
Mokgareng 2 Stormwater channel R 1,500,000.00
R 0.00Completed
Roads & s/water
Majaneng Roads & Stormwater R 2,000,000.00
R 442,713.94Completed
Roads & s/water
Modimong/Cokonyane Access Roads R 5,834,024.00
R 609,647.13 Design & tenderRoads & s/water
Nhole Food Garden R 245,614.00 R 0.00 construction LEDLED Infrastructure R 11,000,000.00 R 0.00 Registered LEDManokwane Food Garden R 499,500.00 R 0.00 Registered LEDMachonisa Roads & Stormwater R 7,500,000.00
R 556,543.43completed
Roads & s/water
Manthe Sports Complex R 2,500,000.00R 105,769.23
completedsports facilities
Lokgabeng Roads & Stormwater R 3,600,000.00
R 463,239.69completed
Roads & s/water
Refurbishment of Reivilo Hostels R 501,600.00 R 22,800.00 completed LEDConstruction of access road and stormwater in taung extension 4 R 4,000,000.00 R 12,868.90 Completed
Roads & s/water
Gataote-Stormwater Construction R 2,999,600.00 R 491,600.00 Completed
Roads & s/water
PMU Operations R 1,121,400.00 R 732,548.96 registered PMUKagisano LM
Matlhabetlhabe Community Hall R 1,400,000.00 R 73,914.54 Construction
multi purpose community halls
Mmagabue Community Hall R 1,600,000.00 R 178,787.34 Construction
multi purpose community halls
Construction of Ganyesa R 7,089,490.85 R 2,557,699.39 Construction multi
13
Community Hall
purpose community halls
Dipudi Community Hall R 3,935,243.00 R 1,370,947.20 Construction
multi purpose community halls
Morokwaneng Community Hall R 4,010,500.01 R 2,427,555.42 Construction
multi purpose community halls
Kokwana Community Hall R 3,009,052.80 R 1,142,918.29 Construction
multi purpose community halls
Madinonyane Community Hall R 4,010,500.01 R 470,787.52 Construction
multi purpose community halls
Monnaaphang/ Chief Block Access Road R 4,970,329.41 R 2,110,131.33 Construction
Roads & s/water
Stormwater Drainage on Raburabu Road R 3,200,000.00 R 0.00 Construction
Roads & s/water
Tshetshu/Raburabu Access Road R 8,232,518.28 R 0.00 Construction
Roads & s/water
Ganyesa Dumping Site Fencing R 500,000.00 R 0.00 Registered Fencing
Keipatile Accesss Road R 8,232,518.27 R 3,281,258.79 Construction Roads & s/water
Lekwa-Teemane LM
Paving of internal roads in christiana(Boitumelong & Coverdale) R 30,000,000.00 R 1,667,718.09 Construction
Roads & s/water
Internal Roads Development at Coverdale R 7,150,805.68 R 3,041,572.09 Construction
Roads & s/water
PMU Lekwa Teemane R 324,378.26 R 91,572.73 PMUMolopo LM
Bray Community Hall R 2,755,726.50 R 0.00 Completed
multi purpose community halls
Bray Multi Purpose Center R 3,457,000.00 R 0.00 Design & tender
community facilities
Tosca High Mast Lights R 2,748,000.00 R 911,301.54 Construction
Street / Community Lighting
Tosca Community Hall R 3,500,000.00 R 15,048.00 Design & tender
multi purpose community halls
Tosca Cemetery R 800,000.00 R 11,390.23 Construction Cemeteries Pomfret Cemetery R 1,360,000.00 R 48,334.50 Construction Cemeteries Bray Cemetery R 1,280,000.00 R 8,728.37 Construction Cemeteries Bray Internal Roads and Storm Water R 6,131,602.00 R 0.00 Registered
Roads & s/water
Fencing of Bray Old Cemetery (Site No1) R 70,649.00 R 0.00 Registered CemeteriesFencing of Bray Old Cemetery (Site No2) R 97,205.41 R 0.00 Registered Cemeteries
Bray High Mast Light R 752,500.89 R 0.00 Registered
Street / Community Lighting
14
Naledi LM Paved roads: Colridge & huhudi R 10,500,000.00 R 2,615,956.82 Construction
Roads & s/water
Closure and rehabilitation of Naledi landfil site R 2,258,039.87 R 104,422.31 Completed
Solid Waste disposal sites
Investigate and develop a new general waste landfill site for Naledi R 4,968,278.05 R 660,238.64 Design & tender
Solid Waste disposal sites
Bulk sewer R 1,500,000.00 R 146,547.00 Completed Sanitation
Colridge street lights at royden road R 484,055.00 R 0.00 Completed
Street / Community Lighting
Huhudi street lights at Krish Naidoo street R 331,072.95 R 0.00 Completed
Street / Community Lighting
Stella street lighting (AFA) R 293,081.91 R 0.00 Completed
Street / Community Lighting
Moffat street lighting phase II R 1,252,342.52 R 64,803.37 Completed
Street / Community Lighting
Upgrading Dithakwaneng link road R 9,734,432.26 R 666,306.11 Design & tender
Roads & s/water
Upgrading link road: Devondale R 5,195,206.19 R 444,510.51 Registered
Roads & s/water
Stella cemetery R 2,261,263.55 R 130,134.27 Registered Cemeteries PMU budget R 0.00 PMUItsoseng Bulk Water Supply & Storage R 30,381,000.00 R 14,322,377.17 Construction WaterRatlou roads rehabilitation(EPWP) R 11,140,000.00 R 3,903,084.32
Roads & s/water
Delareyville Sewage Treatment Plant-Upgrade R 10,000,000.00 R 2,407,585.26 SanitationItekeng & Biesiesvlei Bulk Water Supply & Reticulation R 11,301,158.00 R 4,575,967.37 Construction WaterItekeng & Biesiesvlei sanitation and internal sewer reticulation R 17,738,842.00 R 0.00 Design & tender WaterDitsobotla Rural Sanitation Programme R 40,386,000.00 R 2,046,749.61 Design & tender SanitationTlhabologang internal and bulk sanitation R 67,852,652.25 R 0.00 Design & tender SanitationTlhabologo Water Reticulation R 8,947,593.00 R 5,114,545.26 Construction WaterNooitgedacht Bulk Water & Reticulation R 8,643,873.00 R 0.00 Design & tender WaterBapong Bulk Water & Reticulation R 4,435,908.00 R 0.00 Design & tender WaterNaauwpoort Bulk Water & Reticulation R 10,311,027.00 R 0.00 Design & tender WaterKaalpan Bulk Water & Reticulation R 4,457,729.00 R 0.00 Design & tender WaterMajemantsho and Lomanyaneng VIP Toilets R 62,023,456.00 R 0.00 Registered SanitationMafikeng Rural Sanitation R 45,838,640.00 R 656,524.55 Design & tender SanitationBraaklaagte Bulk Water & Reticulation R 10,299,674.00 R 286,743.80 Design & tender WaterDoornglagte and R 8,595,106.56 R 3,727,041.44 Design & tender Water
15
Pachdraai Bulk Water & ReticulationIkageleng Sewer Network Upgrade R 7,000,000.00 R 2,434,274.51 Construction SanitationZeerust & Welbedatch Sewer Reticulation R 7,400,652.00 R 20,266,330.40 Construction SanitationRamotshere Moiloa Rural Sanitation R 58,716,000.00 R 0.00 Design & tender SanitationMakgori Bulk Water & Reticulation R 4,867,395.00 R 80,437.00 Design & tender WaterMakgobistad Bulk Water & Reticulation R 2,959,329.00 R 798,073.64 Design & tender WaterMoshawane Bulk Water & Reticulation R 6,501,530.00 R 1,489,105.64 Design & tender WaterDelareyville Bulk Water Supply R 62,625,436.00 R 1,140,000.00 Design & tender WaterOttosdal Bulk Water Supply & Reticulation R 13,611,764.00 R 3,051,678.07 Design & tender WaterAgisanang Sewer Upgrade R 15,089,560.00 R 0.00 Registered SanitationDooringlagte VIP toilets R 1,819,999.99 R 641,842.85 Design & tender SanitationRatlou Rural Sanitation Programme (Mareetsane Phase1 and 2) R 42,000,000.00 R 2,080,217.37 Design & tender SanitationMasutlhe 1 Phase 2 Bulk Water Supply & Reticulation - R 2,044,020.00 R 669,008.77 No status WaterSannieshof and Agisanang bulk water supply and reticulation R 22,378,604.00 R 1,531,109.09 No status WaterVerdwaal Bulk Water Supply & Reticulation R 42,440,000.00 R 4,179,793.46 No status WaterDinokana Bulk Water Supply & Reticulation R 18,050,000.00 R 12,618,850.02 No status WaterMosweu Bulk Water Supply & Reticulation R 6,850,000.00 R 912,943.88 No status WaterTop Village Bulk Water Supply & Reticulation R 10,172,544.00 R 870,423.50 No status WaterIkageleng Outfall Sewer Upgrade R 5,271,426.00 R 2,755,207.38 No status SanitationUpgrading of Lichtenburg Sewage Treatment Works - Phase 2 R 8,650,000.00 R 7,254,690.39 No status Sanitation
Mamusa LM Mareesin Farm Primary Roads and Stormwater R 15,150,000.00 R 190,386.97 Construction
Roads & s/water
Construction of streeets in Migdol R 11,009,424.71 R 9,836,668.94 Construction
Roads & s/water
Source: All MIG projects, May 2011
As stated in the monthly non-financial report on MIG, like all municipalities in the North West Dr Ruth Segomotsi Mompati district municipality and its locals did not submit their June 2011 MIG report. In Dr Ruth Mompati district MIG projects are about water and sanitation. Naledi also has more water projects than other project categories. In the case of Greater Taung most MIG projects are about roads and storm water.
16
7. VULNERABILITY CLASSIFICATION
The DCoG Municipal Spatial Classification System was designed to develop municipal profiles according to spatial location, based upon results from indicator sets on functionality, socio-economic profile and backlog status. Its purpose is to inform a differentiated approach to municipalities.
The four municipal classifications developed by DCoG are:Class 1: Most vulnerable (57 local municipalities)Class 2: Second most vulnerable (58 local municipalities)Class 3: Second highest performing (58 local municipalities)Class 4: Highest performing (58 local municipalities)
The five local municipalities in the Dr Ruth Segomotsi Mompati District can be classified as follow:
Table 6: Vulnerability Classification
Local Municipality ClassificationGreater Taung Second most
vulnerableKagisano/Molopo
Most vulnerable/Second most vulnerable
Lekwa-Teemane Second highest performing
Mamusa Second highest performing
Naledi Second highest performing
From this table it is evident that the newly amalgamated municipality of Kagisano/Molopo is partially classified as most vulnerable. `
17