HOWARD BRANDSTONDESIGN PROJECT
Asher HarderYuduo Zhao
1
Program Solution
Results
Renovation of historical landmark (old library)
• Redesigned entrance• Addition of contemporary
glass and steel canopy and balcony
Currently owned by the Public Theater
• “Devoted to developing and presenting new theatrical work, innovative productions of the classics, and the showcasing of both established and rising musical talent.”
Project Description
2011 HB
2
http://www.publictheater.org/
http://www.publictheater.org/
Program Solution
Results
Facade• Respect and highlight
neoclassical elements• Complementing contemporary
glass and steel balcony• Evening visibility from the street
• Illuminate flags
Entrance• Circulation visibility
• 5-10fc on horizontal entrance surfaces
Design Requirements and considerations: Exterior
2011 HB
3
http://www.publictheater.org/
http://www.publictheater.org/
Program Solution
Results
Design Requirements and considerations: Interior
2011 HB
Lobby• Highlight neoclassical detailing• Complement contemporary glass
and steel balcony • Visible and exciting from the
exterior• Way finding to ticket office, stairs,
and theater• Illumination requirements: 20 fc
4
http://www.publictheater.org/
http://www.publictheater.org/
Program Solution
Results
Design Requirements and considerations: Interior
2011 HB
Mezzanine• Donor wall visible from front door• Active gathering space• Illumination Requirements: 10fc
Ticket office• Attract patrons attention• Illumination Requirements: 30fc
Corridor• Attract use by patrons• Saturated wall colors• Illumination Requirements: 10fc
5
http://www.publictheater.org/
http://www.publictheater.org/
Program Solution
Results
Inspiration:
2011 HB
http://www.collativelearning.com
http://electroland.net/
• Interactive lighting design
• Simple lighting via planes
6
Program Solution
Results
Overall Concept:
2011 HBLighting using simple geometric
shapes
Planes• Backlit frosted
glass canopy• Illuminated flags
• Graze vertical voids in between three main sections of façade
• Light top most cornice
Lines
7
Program Solution
Results
Equipment Selection:
2011 HBExterior
8
Program Solution
Results
Equipment Selection:
2011 HBInterior
9
Program Solution
Results
Equipment Selection:
2011 HBInterior
10
Program Solution
Results
2011 HBArea Avg. Avg./Min
Lobby 20.71 207.1Ticket Office 31.45 1.58Circulation 11.36 7.1Mezzanine 16.11 161.1
11
Allowable Watts
Design Watts
11060 4092*
*excluding watts from floor “art installation”
Program Solution
Results
2011 HB
FixtureQuantit
y
Watts per
luminaire
Total Watts
ERCO 17W 31 18 558ERCO 26W 19 26 494Mark Arch. 32 32 1024Globe 12 168 2016
12
Fixture Quantity
Watts per
luminaire
Total Watt
sSensacell Panels – Floor 8119 1.08 8768Sensacell Panels – Mezz. Ceiling 1792 1.08 1935
Program Solution
Results
2011 HBEntrance Avg. Illuminance: 4.75fc
Average Illuminance adjacent to rails: 9.0fc
Allowable Watts
Design Watts
5391 3554
13
2011
HOWARD BRANDSTONDESIGN PROJECT
Asher HarderYuduo Zhao
14
Thank You!Questions?